Delphi Switch QRQC 11-03-10
Property
of
Faurecia
-
Duplication
prohibited
2
QRQC Delphi Switch – D1 Problem Description
5W/2H IS IS NOT Retained Factors
1) What is the problem:
Missing ECU switch 83457777 from
Delphi
Low runner Delphi switch High runner, other suppliers Inventory discrepancy
2) Why is it a problem:
Caused premium freight and
missing parts on seats at the
customer
Out of material at FAS with nothing
in transit within reach
Lost inventory in house Delphi (unique supplier) inventory
management
3) When did the problem
happen? When was the problem
created?
Happened B shift 5-13
Created in release data
Information in release data created
late delivery
Supplier shipping or transit delay Information in release created late
delivery
4) Who found the problem? Who
Created the problem?
Found by the sequence picker,
creatred in planning
Found in the picking process Detected through visual
management
Not deteced in VM system
5) Where found, Where created?
Found in picking center, created in
planning
Detected at stock out Found at customer
6) How was the problem found?
Stock out at picking
7) How many?
46 pices
Property
of
Faurecia
-
Duplication
prohibited
3
QRQC Delphi Switch – D2 Risk to Similar Processes
Risks on similar processes , machines and plants
Risky process or condition to report
Unanticipated stock outs are possible on parts where release data is bad for any reason and visual
management is not effective.
2nd Problem Redefinition
Scope Reduction
Low runner Delphi switch stock out due to bad release timing and ineffective visual management.
Property
of
Faurecia
-
Duplication
prohibited
4
QRQC Delphi Switch – D3 Containment Actions
Action Pilot Deadline Effectiveness New Risk
Detected
Comments / Conclusions
Notify customer WP 5-13 Y N Customer aware containment
required. Owe timing.
Contact supplier to get material AS 5-13 Y Y Supply critical at supplier and
will require hand carry
Contact carrier for expedite arrangements AS 5-13 Y Y Hand carry required and
there is always risk of delays
with this mode
Create list of lineside only stored parts to
ensure daily audits are done on stock levels
EE 5-14 Y Y 19 part numbers found
Property
of
Faurecia
-
Duplication
prohibited
5
QRQC Delphi Switch – D4 Factor of Non-Detection
Is / Is Not
factor of Non
Detection
Control Point Rule for Risk
Prevention
RS
NOK
RS OK R
vs
St
d
St
d
O
K
Investigat
e Actions
Res
p
DL Result
1 Delphi has
unique steps
in the QAD
inventory
process
The QAD
inventory
loaded in the
BOP daily audit
with customer
demand
Ensure the
ending daily
balance is
consistent with
delivery
expectations
Delphi has
an additional
QAD location
that was
loaded in the
BOP report
Actual in
house
inventory
loaded in
the
report
X O Adjust
inventory
in the
BOP
report for
all Delphi
AS 5-
20
BOP report
shows actual
demand
3 Not detected
through visual
management
Supermarkets
and Escalation
Boards
Parts below
safety are
added to
Escalation
Board
Parts were
not visually
managed.
Stored
Lineside only
BOP
DOH is
visible
and
monitore
d in SM
locations
X O Review
other
parts not
part of
visual
managem
ent
EE 5-
14
19 other
parts at risk
Why Why Why Why Why D4 Root cause
1 Delphi in transit
used as in
house stock in
BOP DOH
report
When pulling
QAD inventory,
Delphi in
transit is
loaded
Delphi is
received
immediately
when shipped
Payment terms
require
exceptional
management
Accounting terms
not supported in
original PO
Process variation injected into QAD
planning due to purchasing issues.
Eliminate variation, do not add.
3 Oversight in set
up of VM and
Escalation
Boards
Did not
validate all
parts, low
runners
omitted
System
developed on
shop floor
without
systematic plan
BOP visual
management
required quick
containment
Part shortages
were prevalent
and unforeseen
In an effort to contain 80% of critical part
shortage issues, 20% were not immediately
addressed in first phase.
Property
of
Faurecia
-
Duplication
prohibited
6
QRQC Delphi Switch – D5 Factor of Occurrence
Is / Is Not
factor of Non
Detection
Control
Point
Rule for Risk
Prevention
RS
NOK
RS OK R vs
Std
Std
OK
Investigate
Actions
Res
p
DL Result
2 Inventory
discrepancy
Inventory
records in
QAD
Inventory
accuracy is to
be at 95% or
greater
Inaccurate
inventory
creates late and
early shipping
information at
suppliers
Inventory
accuracy
provides
proper
planning
baseline
X O Determine
root cause of
inaccurate
inventory
AS 5-
21
Inventory
records
reconciled
from bad prior
adjustment
4 Not detected
in VM
Planning
parameters
determine
the shipping
schedules
Ensure
parameters
provide
expected
information to
suppliers
Parameters set
at 25 days,
shipping Friday
Parameters
, set at 28
days,
shipping
Tuesday
X O Change all
European
suppliers to
28 days
AS 5-
21
Ship day
changed from
Friday to
Tuesday
Why Why Why Why Why D4 Root cause
2 Inventory
records
incorrect
Adjustment in
error
Adjustment
made with
material receipt
not posted
Check sheet
not followed
Adjustment
worksheet not
utilized
Unclear expectations regarding adjustment
process
4 Reduced transit
time in QAD not
see as risk
Impact on QAD
output not
known
Was not
reviewed with
experts or
tested prior to
implementation
Assumption that
QAD would
handle the
change similar
to SAP
SAP is the more
familiar system to
planner
Planning polyvalence open for
improvement; more interaction with master
planner
Property
of
Faurecia
-
Duplication
prohibited
7
QRQC Delphi Switch – D6 Corrective Actions
Actions DL Resp Risk
Asmnt
Effect New Risk
3 The 19 parts that have only line side storage are moved off line with only
limited stock left on line. Transit stock left in supermarket storage.
5-21 EE Y Y N
3 The low runners also have visual indicators line side to improve visual
management and daily review.
5-21 AS Y Y N
3 Low runners follow the same escalation process as all other material 5-21 AS Y Y N
2 QAD settings changed from 25 to 28 days to ensure consistency with carrier
and shipping schedules
5-21 AS Y Y N
2 Shortage report extended to include 4 weeks showing the impact of
customer schedules on delivery and demand
5-28 AS Y Y N
2 Add column to the Delphi BOP review for in transit material to prevent
duplication of inventory
5-28 AS Y Y N
3 All QAD parameter changes are reviewed in the weekly PC&L staff meeting
prior to implementation
6-16 KR Y Y N
1 All adjustments are signed off prior to execution by PC&L manager 6-30 KR Y Y N
Property
of
Faurecia
-
Duplication
prohibited
8
QRQC Delphi Switch – D7 Indicators follow up by date
5-13
5-21
5-28
VM and
Escalation
Process
Shortage
report
expanded
and add
Delphi in
trans
column
QAD
parameter
changes
5-20
6-16
Weekly
parameter
change
audit
Property
of
Faurecia
-
Duplication
prohibited
9
QRQC Delphi Switch – D8 Indicators follow up by date
Actions Resp Date – Deadline Check Y/N
All actions validated and
implemented
Ross 6-30 Y
Operators Informed EE/SH/KR 6-24 Y
Instructions updated at WS EE/SH 6-28 Y
Lessons learned created Ross 7-12 Y
Lessons learned shared Ross 7-13 Y
Follow up by core teams Ross 7-16 Y
FMEA / Risk Assessment
Updated
Ross 7-16 Y
D8- Lessons Learned
Property
of
Faurecia
-
Duplication
prohibited
10
QRQC Delphi Switch – Lessons Learned
Causes of Occurrence:
Lessons Learned:
Causes of Non-Detection:
Lessons Learned:
1. Parameters in QAD were not set correctly
and adversely impacted delivery timing
2. Inventory adjustments made in error
1. Review changes with Master Planner
and test prior to implementation
2. Sign off sheets for all adjustments
1. Parts were not included in the VM set up
2. BOP Review included Delphi in transit
1. FES standards should be in implemented prior to
ramp up
2. Build in safety rules for known variation points
Property
of
Faurecia
-
Duplication
prohibited
11
QRQC Delphi Switch – Cause Analysis
Ship Delivery Pattern
Determines the day that
the shipment is to arrive in
FAS
In order to provide the
supplier the proper
shipping day, the Transport
Days must be a multiple of
7
By decreasing the transit to 25 days, the day of the week for shipping changes
and the freight is not able to make the container shipping schedule
Property
of
Faurecia
-
Duplication
prohibited
12
QRQC Delphi Switch – Cause Analysis
An inventory adjustment inflated the stock records in QAD
The inventory adjustment was made during the stocking process and not
caught because the proper documentation and check list was not utilized
By decreasing the transit to 25 days, the day of the week for shipping changes
and the freight is not able to make the container shipping schedule
QAD Delivery Pattern was changed adjusting the supplier schedules
Property
of
Faurecia
-
Duplication
prohibited
13
QRQC Delphi Switch – Cause Analysis
An improper inventory adjustment inflated the stock records in QAD
A check list ensures all possible causes are
verified prior to adjustments
Property
of
Faurecia
-
Duplication
prohibited
14
QRQC Delphi Switch – Cause Analysis
•The view on top is the standard 28 day transit time with a Tuesday pick
up.
•The bottom view shows the delay created by the 25 day parameter.
•The pick up in the 25 day parameter is moved to Friday by QAD
•This does not allow transit and document processing time
•Freight does not make load time at vessel
•Adds seven days to transit
QAD Settings Analysis
Property
of
Faurecia
-
Duplication
prohibited
15
QRQC Delphi Switch – Detection Analysis
•Above is the view in the BOP Analysis with the in transit Delphi location included
as well as the Panalpina in transit
•The actual view in the BOP Analysis should have looked like this. This view
leaves in the Panalpina in transit and removes the Delphi in transit in QAD.
Property
of
Faurecia
-
Duplication
prohibited
16
QRQC Delphi Switch – Detection Analysis
•Prior to the issue, the Shortage Analysis was done on a two week review
•By expanding the view, the shortage analysis now shows impact of
schedules and delays out 5 weeks
Stock Analysis Report – Reviewed to determine the impact of schedules
Property
of
Faurecia
-
Duplication
prohibited
17
QRQC Delphi Switch – Detection Analysis
The Standard for Supermarket and
Visual Management was not followed
Supermarket with Safety Stock
indicators
Escalation Boards with part and delivery
information
Visual indicator showing safety
stock segmentation
Property
of
Faurecia
-
Duplication
prohibited
18
QRQC Delphi Switch – Shop Floor Improvements
Lineside marked with indicators for low
usage parts
Off line storage for low
runners with common safety
stock indicators
Kan ban used to control volume of
material lineside

More Related Content

What's hot

The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraThe 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Spare Parts Inventory Management
Spare Parts Inventory ManagementSpare Parts Inventory Management
Spare Parts Inventory ManagementHaneen Saymeh
 
What is cycle time in the manufacturing process
What is cycle time in the manufacturing processWhat is cycle time in the manufacturing process
What is cycle time in the manufacturing processMRPeasy
 
Effective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesEffective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesLogio_official
 
Mecanismo da Função Produção Perdas
Mecanismo da Função Produção PerdasMecanismo da Função Produção Perdas
Mecanismo da Função Produção PerdasUniversity
 
Shop floor management new flyer 1 day workshop - november 2016
Shop floor management new flyer 1 day workshop - november 2016Shop floor management new flyer 1 day workshop - november 2016
Shop floor management new flyer 1 day workshop - november 2016W3 Group Canada Inc.
 
Inventry Management
Inventry ManagementInventry Management
Inventry ManagementTribi
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulationavijit biswas
 
Phenomenon & Mechanism Analysis
Phenomenon & Mechanism AnalysisPhenomenon & Mechanism Analysis
Phenomenon & Mechanism AnalysisShubham Singh
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1vedzen1234
 
Lean Six Sigma and Procurement
Lean Six Sigma and ProcurementLean Six Sigma and Procurement
Lean Six Sigma and ProcurementMajdi Sleimen
 
Lean Paper Airplane Folding Game
Lean Paper Airplane Folding GameLean Paper Airplane Folding Game
Lean Paper Airplane Folding Gameleansimulations
 

What's hot (20)

Lean ppt
Lean pptLean ppt
Lean ppt
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh AroraThe 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
The 4 Phases to Visual Management - ADDVALUE - Nilesh Arora
 
Spare Parts Inventory Management
Spare Parts Inventory ManagementSpare Parts Inventory Management
Spare Parts Inventory Management
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Lean basics
Lean basicsLean basics
Lean basics
 
What is cycle time in the manufacturing process
What is cycle time in the manufacturing processWhat is cycle time in the manufacturing process
What is cycle time in the manufacturing process
 
16 lean manufacturing
16 lean manufacturing16 lean manufacturing
16 lean manufacturing
 
Effective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rulesEffective Spare Parts Management - 8 rules
Effective Spare Parts Management - 8 rules
 
Mecanismo da Função Produção Perdas
Mecanismo da Função Produção PerdasMecanismo da Função Produção Perdas
Mecanismo da Função Produção Perdas
 
Shop floor management new flyer 1 day workshop - november 2016
Shop floor management new flyer 1 day workshop - november 2016Shop floor management new flyer 1 day workshop - november 2016
Shop floor management new flyer 1 day workshop - november 2016
 
Inventry Management
Inventry ManagementInventry Management
Inventry Management
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 
Phenomenon & Mechanism Analysis
Phenomenon & Mechanism AnalysisPhenomenon & Mechanism Analysis
Phenomenon & Mechanism Analysis
 
Mistake proofing for web1
Mistake proofing for web1Mistake proofing for web1
Mistake proofing for web1
 
Lean Six Sigma and Procurement
Lean Six Sigma and ProcurementLean Six Sigma and Procurement
Lean Six Sigma and Procurement
 
Lean Paper Airplane Folding Game
Lean Paper Airplane Folding GameLean Paper Airplane Folding Game
Lean Paper Airplane Folding Game
 
8 Wastes
8 Wastes8 Wastes
8 Wastes
 
OEE
OEEOEE
OEE
 

Similar to Qrqc 8 d competition 2011 presentation logistics rev3

2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptx2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptxismailsheriff14
 
ERP System Process and Data Flow in Gane & Sarson Notation
ERP System Process and Data Flow in Gane & Sarson NotationERP System Process and Data Flow in Gane & Sarson Notation
ERP System Process and Data Flow in Gane & Sarson NotationGlen Alleman
 
Absoft sap oil & gas supply chain forum feb 2012
Absoft sap oil & gas supply chain forum feb 2012Absoft sap oil & gas supply chain forum feb 2012
Absoft sap oil & gas supply chain forum feb 2012Absoft Limited
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summaryguest524810
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingLean6Sigma4all
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptxsonutyagi20
 
LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1George Bowman
 
Flawless Project Delivery.ppt
Flawless Project Delivery.pptFlawless Project Delivery.ppt
Flawless Project Delivery.pptSimbuArasan10
 
Using Q-Pulse to Manage Maintenance & Errors
Using Q-Pulse to Manage Maintenance & ErrorsUsing Q-Pulse to Manage Maintenance & Errors
Using Q-Pulse to Manage Maintenance & ErrorsFionaMacGael
 
Rotation #1_Review_Acting Supervisor
Rotation #1_Review_Acting SupervisorRotation #1_Review_Acting Supervisor
Rotation #1_Review_Acting SupervisorSarah Brown
 
Falcon capability summary 2015
Falcon capability summary 2015Falcon capability summary 2015
Falcon capability summary 2015Carolina Esparza
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)Steve Nails
 
Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsTransition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsEmerson Exchange
 
glendimplex manufacturing improvement change
glendimplex manufacturing improvement  changeglendimplex manufacturing improvement  change
glendimplex manufacturing improvement changeNigel Charles
 
Glen &dimplex Process improvements
Glen &dimplex Process improvementsGlen &dimplex Process improvements
Glen &dimplex Process improvementsNigel Charles
 
Production System Analysis & Italian Transport Companies
Production System Analysis & Italian Transport CompaniesProduction System Analysis & Italian Transport Companies
Production System Analysis & Italian Transport CompaniesSajjad Khaksari
 

Similar to Qrqc 8 d competition 2011 presentation logistics rev3 (20)

2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptx2024.02.14 Monthly Operational Review_Jan'24.pptx
2024.02.14 Monthly Operational Review_Jan'24.pptx
 
Mithun Patil Ppt
Mithun Patil PptMithun Patil Ppt
Mithun Patil Ppt
 
ERP System Process and Data Flow in Gane & Sarson Notation
ERP System Process and Data Flow in Gane & Sarson NotationERP System Process and Data Flow in Gane & Sarson Notation
ERP System Process and Data Flow in Gane & Sarson Notation
 
Absoft sap oil & gas supply chain forum feb 2012
Absoft sap oil & gas supply chain forum feb 2012Absoft sap oil & gas supply chain forum feb 2012
Absoft sap oil & gas supply chain forum feb 2012
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
Zero Defect Competition @ July 22.pptx
Zero Defect Competition  @ July 22.pptxZero Defect Competition  @ July 22.pptx
Zero Defect Competition @ July 22.pptx
 
LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1LEAN TRANSFORMATION Final 1
LEAN TRANSFORMATION Final 1
 
Flawless Project Delivery.ppt
Flawless Project Delivery.pptFlawless Project Delivery.ppt
Flawless Project Delivery.ppt
 
Tollgate Presentation
Tollgate PresentationTollgate Presentation
Tollgate Presentation
 
LeanSixSigmaProjectPresentation
LeanSixSigmaProjectPresentationLeanSixSigmaProjectPresentation
LeanSixSigmaProjectPresentation
 
Using Q-Pulse to Manage Maintenance & Errors
Using Q-Pulse to Manage Maintenance & ErrorsUsing Q-Pulse to Manage Maintenance & Errors
Using Q-Pulse to Manage Maintenance & Errors
 
Rotation #1_Review_Acting Supervisor
Rotation #1_Review_Acting SupervisorRotation #1_Review_Acting Supervisor
Rotation #1_Review_Acting Supervisor
 
Falcon capability summary 2015
Falcon capability summary 2015Falcon capability summary 2015
Falcon capability summary 2015
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)
 
Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsTransition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operations
 
glendimplex manufacturing improvement change
glendimplex manufacturing improvement  changeglendimplex manufacturing improvement  change
glendimplex manufacturing improvement change
 
Glen &dimplex Process improvements
Glen &dimplex Process improvementsGlen &dimplex Process improvements
Glen &dimplex Process improvements
 
Production System Analysis & Italian Transport Companies
Production System Analysis & Italian Transport CompaniesProduction System Analysis & Italian Transport Companies
Production System Analysis & Italian Transport Companies
 
Planning for Substation Maintenance and Reliability
Planning for Substation Maintenance and ReliabilityPlanning for Substation Maintenance and Reliability
Planning for Substation Maintenance and Reliability
 

Recently uploaded

SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Neo4j
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 

Recently uploaded (20)

SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024Build your next Gen AI Breakthrough - April 2024
Build your next Gen AI Breakthrough - April 2024
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 

Qrqc 8 d competition 2011 presentation logistics rev3

  • 2. Property of Faurecia - Duplication prohibited 2 QRQC Delphi Switch – D1 Problem Description 5W/2H IS IS NOT Retained Factors 1) What is the problem: Missing ECU switch 83457777 from Delphi Low runner Delphi switch High runner, other suppliers Inventory discrepancy 2) Why is it a problem: Caused premium freight and missing parts on seats at the customer Out of material at FAS with nothing in transit within reach Lost inventory in house Delphi (unique supplier) inventory management 3) When did the problem happen? When was the problem created? Happened B shift 5-13 Created in release data Information in release data created late delivery Supplier shipping or transit delay Information in release created late delivery 4) Who found the problem? Who Created the problem? Found by the sequence picker, creatred in planning Found in the picking process Detected through visual management Not deteced in VM system 5) Where found, Where created? Found in picking center, created in planning Detected at stock out Found at customer 6) How was the problem found? Stock out at picking 7) How many? 46 pices
  • 3. Property of Faurecia - Duplication prohibited 3 QRQC Delphi Switch – D2 Risk to Similar Processes Risks on similar processes , machines and plants Risky process or condition to report Unanticipated stock outs are possible on parts where release data is bad for any reason and visual management is not effective. 2nd Problem Redefinition Scope Reduction Low runner Delphi switch stock out due to bad release timing and ineffective visual management.
  • 4. Property of Faurecia - Duplication prohibited 4 QRQC Delphi Switch – D3 Containment Actions Action Pilot Deadline Effectiveness New Risk Detected Comments / Conclusions Notify customer WP 5-13 Y N Customer aware containment required. Owe timing. Contact supplier to get material AS 5-13 Y Y Supply critical at supplier and will require hand carry Contact carrier for expedite arrangements AS 5-13 Y Y Hand carry required and there is always risk of delays with this mode Create list of lineside only stored parts to ensure daily audits are done on stock levels EE 5-14 Y Y 19 part numbers found
  • 5. Property of Faurecia - Duplication prohibited 5 QRQC Delphi Switch – D4 Factor of Non-Detection Is / Is Not factor of Non Detection Control Point Rule for Risk Prevention RS NOK RS OK R vs St d St d O K Investigat e Actions Res p DL Result 1 Delphi has unique steps in the QAD inventory process The QAD inventory loaded in the BOP daily audit with customer demand Ensure the ending daily balance is consistent with delivery expectations Delphi has an additional QAD location that was loaded in the BOP report Actual in house inventory loaded in the report X O Adjust inventory in the BOP report for all Delphi AS 5- 20 BOP report shows actual demand 3 Not detected through visual management Supermarkets and Escalation Boards Parts below safety are added to Escalation Board Parts were not visually managed. Stored Lineside only BOP DOH is visible and monitore d in SM locations X O Review other parts not part of visual managem ent EE 5- 14 19 other parts at risk Why Why Why Why Why D4 Root cause 1 Delphi in transit used as in house stock in BOP DOH report When pulling QAD inventory, Delphi in transit is loaded Delphi is received immediately when shipped Payment terms require exceptional management Accounting terms not supported in original PO Process variation injected into QAD planning due to purchasing issues. Eliminate variation, do not add. 3 Oversight in set up of VM and Escalation Boards Did not validate all parts, low runners omitted System developed on shop floor without systematic plan BOP visual management required quick containment Part shortages were prevalent and unforeseen In an effort to contain 80% of critical part shortage issues, 20% were not immediately addressed in first phase.
  • 6. Property of Faurecia - Duplication prohibited 6 QRQC Delphi Switch – D5 Factor of Occurrence Is / Is Not factor of Non Detection Control Point Rule for Risk Prevention RS NOK RS OK R vs Std Std OK Investigate Actions Res p DL Result 2 Inventory discrepancy Inventory records in QAD Inventory accuracy is to be at 95% or greater Inaccurate inventory creates late and early shipping information at suppliers Inventory accuracy provides proper planning baseline X O Determine root cause of inaccurate inventory AS 5- 21 Inventory records reconciled from bad prior adjustment 4 Not detected in VM Planning parameters determine the shipping schedules Ensure parameters provide expected information to suppliers Parameters set at 25 days, shipping Friday Parameters , set at 28 days, shipping Tuesday X O Change all European suppliers to 28 days AS 5- 21 Ship day changed from Friday to Tuesday Why Why Why Why Why D4 Root cause 2 Inventory records incorrect Adjustment in error Adjustment made with material receipt not posted Check sheet not followed Adjustment worksheet not utilized Unclear expectations regarding adjustment process 4 Reduced transit time in QAD not see as risk Impact on QAD output not known Was not reviewed with experts or tested prior to implementation Assumption that QAD would handle the change similar to SAP SAP is the more familiar system to planner Planning polyvalence open for improvement; more interaction with master planner
  • 7. Property of Faurecia - Duplication prohibited 7 QRQC Delphi Switch – D6 Corrective Actions Actions DL Resp Risk Asmnt Effect New Risk 3 The 19 parts that have only line side storage are moved off line with only limited stock left on line. Transit stock left in supermarket storage. 5-21 EE Y Y N 3 The low runners also have visual indicators line side to improve visual management and daily review. 5-21 AS Y Y N 3 Low runners follow the same escalation process as all other material 5-21 AS Y Y N 2 QAD settings changed from 25 to 28 days to ensure consistency with carrier and shipping schedules 5-21 AS Y Y N 2 Shortage report extended to include 4 weeks showing the impact of customer schedules on delivery and demand 5-28 AS Y Y N 2 Add column to the Delphi BOP review for in transit material to prevent duplication of inventory 5-28 AS Y Y N 3 All QAD parameter changes are reviewed in the weekly PC&L staff meeting prior to implementation 6-16 KR Y Y N 1 All adjustments are signed off prior to execution by PC&L manager 6-30 KR Y Y N
  • 8. Property of Faurecia - Duplication prohibited 8 QRQC Delphi Switch – D7 Indicators follow up by date 5-13 5-21 5-28 VM and Escalation Process Shortage report expanded and add Delphi in trans column QAD parameter changes 5-20 6-16 Weekly parameter change audit
  • 9. Property of Faurecia - Duplication prohibited 9 QRQC Delphi Switch – D8 Indicators follow up by date Actions Resp Date – Deadline Check Y/N All actions validated and implemented Ross 6-30 Y Operators Informed EE/SH/KR 6-24 Y Instructions updated at WS EE/SH 6-28 Y Lessons learned created Ross 7-12 Y Lessons learned shared Ross 7-13 Y Follow up by core teams Ross 7-16 Y FMEA / Risk Assessment Updated Ross 7-16 Y D8- Lessons Learned
  • 10. Property of Faurecia - Duplication prohibited 10 QRQC Delphi Switch – Lessons Learned Causes of Occurrence: Lessons Learned: Causes of Non-Detection: Lessons Learned: 1. Parameters in QAD were not set correctly and adversely impacted delivery timing 2. Inventory adjustments made in error 1. Review changes with Master Planner and test prior to implementation 2. Sign off sheets for all adjustments 1. Parts were not included in the VM set up 2. BOP Review included Delphi in transit 1. FES standards should be in implemented prior to ramp up 2. Build in safety rules for known variation points
  • 11. Property of Faurecia - Duplication prohibited 11 QRQC Delphi Switch – Cause Analysis Ship Delivery Pattern Determines the day that the shipment is to arrive in FAS In order to provide the supplier the proper shipping day, the Transport Days must be a multiple of 7 By decreasing the transit to 25 days, the day of the week for shipping changes and the freight is not able to make the container shipping schedule
  • 12. Property of Faurecia - Duplication prohibited 12 QRQC Delphi Switch – Cause Analysis An inventory adjustment inflated the stock records in QAD The inventory adjustment was made during the stocking process and not caught because the proper documentation and check list was not utilized By decreasing the transit to 25 days, the day of the week for shipping changes and the freight is not able to make the container shipping schedule QAD Delivery Pattern was changed adjusting the supplier schedules
  • 13. Property of Faurecia - Duplication prohibited 13 QRQC Delphi Switch – Cause Analysis An improper inventory adjustment inflated the stock records in QAD A check list ensures all possible causes are verified prior to adjustments
  • 14. Property of Faurecia - Duplication prohibited 14 QRQC Delphi Switch – Cause Analysis •The view on top is the standard 28 day transit time with a Tuesday pick up. •The bottom view shows the delay created by the 25 day parameter. •The pick up in the 25 day parameter is moved to Friday by QAD •This does not allow transit and document processing time •Freight does not make load time at vessel •Adds seven days to transit QAD Settings Analysis
  • 15. Property of Faurecia - Duplication prohibited 15 QRQC Delphi Switch – Detection Analysis •Above is the view in the BOP Analysis with the in transit Delphi location included as well as the Panalpina in transit •The actual view in the BOP Analysis should have looked like this. This view leaves in the Panalpina in transit and removes the Delphi in transit in QAD.
  • 16. Property of Faurecia - Duplication prohibited 16 QRQC Delphi Switch – Detection Analysis •Prior to the issue, the Shortage Analysis was done on a two week review •By expanding the view, the shortage analysis now shows impact of schedules and delays out 5 weeks Stock Analysis Report – Reviewed to determine the impact of schedules
  • 17. Property of Faurecia - Duplication prohibited 17 QRQC Delphi Switch – Detection Analysis The Standard for Supermarket and Visual Management was not followed Supermarket with Safety Stock indicators Escalation Boards with part and delivery information Visual indicator showing safety stock segmentation
  • 18. Property of Faurecia - Duplication prohibited 18 QRQC Delphi Switch – Shop Floor Improvements Lineside marked with indicators for low usage parts Off line storage for low runners with common safety stock indicators Kan ban used to control volume of material lineside

Editor's Notes

  1. <number>
  2. <number>
  3. <number>
  4. <number>
  5. <number>
  6. <number>
  7. <number>
  8. <number>
  9. <number>
  10. <number>
  11. <number>
  12. <number>
  13. <number>
  14. <number>
  15. <number>
  16. <number>
  17. <number>