2. Curriculum vitae
Education
9/2013-4/2016 High School in Poland
8/2017- Bachelor’s degree: Architectural Technology and Construction Management
VIA University College, Horsens
Personal skills
Personal data
Email: 266776@via.dk
Tel.: 52 22 90 73
Date of birth:03/01/1997
Adress: Østerled 7D, 2th
8700 Horsens
Nationality: Polish
Microsoft Office
Revit
SketchUp
Sigma
Driving licence B
Languages
English B2
Polish native
Hobby
Sketching
Dancing
Traveling
Fitness
Photography
Work experience
8/2017-8/2019 Warehouse worker in "Prime Cargo", Kolding
2/2018-6/2019 Warehouse worker in "Freja", Skanderborg
7/2017 Shushi maker in "Kamii" restaurant, Horsens
3. 04
11
28
2 ½ Storey single family house, Sundgårdsvej 95, Horsens
Multi-purpose hall, Lovbyvej 54, Horsens
Multi-storey building Vestergade, 10-14, 8700 Horsens
4. 2 ½ STOREY SINGLE FAMILY HOUSE WITH BASEMENT
2nd Semester Project
5. SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
2 ½ Storey single family house with Basement
House preview
Group 5
03/01/18
K01_TXX_H7_EX_N14
AH 21
Horsens
K01_TXX_H7_EX_N14
House preview
05
6. SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
2 ½ Storey single family house with Basement
Perspective
Group 5
02/15/18
K01_TXX_H7_EX_N54
AH 21
Horsens
K01_TXX_H7_EX_N54
Perspective view
06
7. 11172mm
12632 mm
9532 mm
7172mm
8072 mm
15792mm
4972 mm
11792mm
2500mm
20353,76 mm
28011,14mm
3100 mm
4000mm
38595,7 mm
20283,05mm
31375,96 mm
The house is placed in the plot in accordance to Local
by-law Scheme 141
The distance taken from the building to the
neighbours boundaries = 2.5 meters.
Road Boundaries = 5.0 meters.
The house is placed in a way that makes sure the
inhabitants gets the best of the plot's benifits,
considering view and sunlight. We also made sure
that the client will get the easiest access way to the
house.
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
2 ½ Storey single family house with Basement
Site Plan
Group 5
02/15/18
K01_TXX_H7_EX_N55
AH 21
Horsens
K01_TXX_H7_EX_N55
Site plan
Existing terain
New Terain
Location : Sundgårdsvej 95, Horsens 8700
Plot area: 1292 m2
Habitable area: 174 m2
Plot ratio: 13.5%
The house is placed and leveled at level 17.00
Plot boundries not to cross according to BR15
Hard surface - drive
way
07
1:200
8. EW8EW9EW17EW18EW13EW22
R R R
R
8,589
7,423
4,729
3,517
4,945
2,800
4,729
2,112 2,157 2,145
-0,100
0,345
0,000
2,800
3,918
12060 mm
4,945
EW1EW7 EW14 EW15 EW16 EW21
R
R
11,589
2,900
2,650
2,900 3,000
5,1125,244
3,732
6,505
7,717 7,717 7,717
5,244 5,244
4,118 4,018
5,8005,700
6,918
2,650 2,480
2,700
642 mm
750 mm
13500 mm
Bricks
Roofing slates
Lines indicating everything below soil
Roof slope 25*
EW8 EW9 EW10 EW13EW12EW11
R
2,800 2,700
3,918
4,705
3,493
4,681
0,581
2,249
1,049
8,589
7,423
-0,100
12060 mm
EW1
EW2 EW3 EW4 EW5 EW6
EW7
R
R
-0,100
-0,350
1,018
0,000-0,100
2,249
3,049
4,861 4,861
0,4490,449
7,423
8,589
4,945
4,717
3,505
2,800 2,700
3,918
0,645
2,157
13500 mm
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
2 ½ Storey single family house with Basement
Elevations
Group 5
05/29/18
K01_TXX_H7_EX_N45
AH21
Horsens
K01_TXX_H7_EX_N45
Elevations NorthWest 1:100 NorthEast 1:100
1:100
SouthEast 1:100
SouthWest 1:100
08
9. UP
UP
UP
UPUP
UP
UP
UP
7332mm
6912 mm
4620mm
4560 mm
4890mm
WMDR
6432 mm
4980 mm
7452mm
22,63 m²
Activity room
10,01 m²
Storage
10,49 m²
Utility room
11,13 m²
Hallway
4,75 m²
Sauna
6,09 m²
Shower room
908 mm4488 mm 4348 mm
Airspace
1409,5mm7488mm
4560 mm
4620mm
7008 mm
12108mm
19,79 m²
Bedroom
15,02 m²
Bedroom
9,07 m²
Bathroom
14,69 m²
Bedroom
18,51 m²
Hallway
11568 mm
Materials:
Roof:
1)Roofing slates
2)Wood Timber frame
External walls:
1)Groundloor and 1st floor:
2)Traditional Danish Brick
3)Mineral wool insulation
4)Concrete (loadbearing) internal wall
Basement:
1)Concrete sandwich elements
2)Polyster insulation
Floor structures:
Basement:
1)Clinkers
2)Polyster insulation
3)concrete slab
4)finish
Ground floor:
1)Deck element
2)Wooden floor frame
3)finish
1st Floor:
1)ceiling
2)light floor structure
3)finish
Foundation:
Reinforced In-situ cast Concrete09
10,98 m²
Bathroom
12,13 m²
Office
9,36 m²
Kichen
25,49 m²
Living room
11568 mm
7488mm
4560 mm
4620mm
6990 mm
7608mm
15,04 m²
Hallway
20,08 m²
covered terrace extention
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
2 ½ Storey single family house with Basement
Floor plans
Group 5
02/15/18
K01_TXX_H7_EX_N57
AH 21
Horsens
K01_TXX_H7_EX_N57
Floor plans
Basement floor plan Groundfloor plan 1st floor plan
1:100
10. Groundfloor
3000 mm
IIIGroundfloor
3000 mm
III
1 Floor
5800 mm
IV1 Floor
5800 mm
IV
Roof
8300 mm
VRoof
8300 mm
V
01 Basement
-100 mm
II01 Basement
-100 mm
II
00 Foundation
-500 mm
I00 Foundation
-500 mm
I
Roof ridge 2
11628,62 mm
VRoof ridge 2
11628,62 mm
V
Roof ridge 1
10423,16 mm
VRoof ridge 1
10423,16 mm
V
Groundfloor
3000 mm
III
1 Floor
5800 mm
IV
Roof
8300 mm
V
01 Basement
-100 mm
II
00 Foundation
-500 mm
I00 Foundation
-500 mm
I
Roof ridge 2
11628,62 mm
V
Roof ridge 1
10423,16 mm
V
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
2 ½ Storey single family house with Basement
U-value analysis/Cross section
Group 5
02/23/18
K01_TXX_H7_EX_N58
AH 21
Horsens
K01_TXX_H7_EX_N58
Externall wall and basement wall
BR15 2020
0,15(0,30) 0,09
Partition walls and suspended upper floors 0,40
Basement floor 0,10(0,20)
Ceiling and roof ctructure 0,10(0,20)
Doors 1,80 0,80
Foundation 0,12
Externall wall - window or door joint 0,03
External door
External door with glazing
1,40
1,50
Insulated sections in glazed external walls 0,60
Suspended floors against cold stores 0,25
Loft and roof insulation : 500 mm
Maximum 22m2 windows per 100m2 habitable floor area
Floor minimum thikness : 400 mm
Energy frame : 20kWh/m2/year
Ventilation with heat recocery
Suplementary solar heating : Solar panels or solar cells
Airtightness : 0,5l/s testing at 50Pa pressure
Optimal insulation materials
Windows facing south
Centrally placed hot-water tank
Roof overhang providing shade in summer
Compact building design
Other requirements:
U-values regulations
U-value Analysis / Crossection
1:100
10
12. UP
UP
DN
DN DN
49.5 m²
Utilityroom
30.9 m²
Lockerroom
28.5 m²
Lockerroom
26.9 m²
Lockerroom
28.8 m²
Lockerroom
50.1 m²
Hallway
1570.8 m²
Gym
20.7 m²
Stair
178.9 m²
Café
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
Comparison old/new
09/07/18
K01_TXX_H1_EX_N11
INDTAST BY
K01_TXX_H1_EX_N11
Changes in the Multi-purpose hall:
- We change general design of wooden part of the Multi-purpose hall, as the client don’t like it.
- We add toilets with easy access from café and meeting rooms.
- We add reception and garden with green wall as well.
- We rearranged toilets and rooms in accordance to Building Regulations 2018
- We add some doors to allow easy access to rooms and in case of fire fast access to exits and rescue openings.
1:500
12
13. SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
Materials
09/07/18
K01_TXX_H1_EX_N14
INDTAST BY
K01_TXX_H1_EX_N14
Two walls which separate
cafe and glass hallway are
cowerd by plans.
garden are coverd by plans.
It will make mirror effect of
nature.
The sports hall is part of the building in which
we use prefabricated concrete elements with an area of 3,6m
Class wall in going throught the hallway.
it gives the impression of an open plan.
Prefabricated wooden elements will use
foradministration part of building where
cafe and meeting room are located.
13
14. 82579
98822
67628
1 - Entrance public parking
2 - Public parking - 84 parking spaces
3 - Bike parking - 60 spaces
4 - Bus parking - 3 spaces
5 - Private entrance
6 - Main entrace
7 - Disabled people parking - 3 spaces
8 - Bus stop
Site plan
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
Site plan
10/31/18
K01_H1_E0_N01
INDTAST BY
K01_H1_E0_N01
All dimensions are in mm
All levels are relative
Adress:Bygholm Hgd, Hatting, plot no. 1ae
Plot area: 58624.645 m2
,
14
1:1000
15. DN
DN DN
450 10108 200 11916 4001951400 14851 4001982400 22208 0450
65716
4501589179015212005419122800100317491216579121832100190891215201003348200278845027311315179218081792854100854179288892017921321
29716273115228
47675
4504419198216018198244284502719403107573533257403
297292719115633610
47620
40323101001200100 7868 1982 5334 1982 3542 1152 2828 4059701622966100 5250 100 3504 4032319 2000 1845100 3030 2030 15101002422022 1725 1994587403 3645
25973 2933 13215 19907 3645
62026
28.5 m²
Lockerroom
30.9 m²
Lockerroom
26.9 m²
Lockerroom
28.8 m²
Lockerroom
20.7 m²
Stair
178.9 m²
Café
20.2 m²
Locker room
7.6 m²
Security room
25.8 m²
Storage
25.7 m²
Kitchen
39.4 m²
Technic room 13.2 m²
Toilet 1
13.6 m²
Toilets 2
16.5 m²
Hall
12.3 m²
H-WC
24.9 m²
Storage
6.6 m²
H-WC
66.3 m²
Meeting room
70.7 m²
Meeting room
70.7 m²
Meeting room
49.5 m²
Utilityroom
3.1 m²
WC
3.1 m²
WC
50.1 m²
Hallway
7.9 m²
H-WC
33.3 m²
Hallway
---
--- ---
---
2052
1792
2088
1792
2088
1792
2088
1792
2088
1982
2088
1982
2088
1982
2088
1982
2088
1812
2113
1812
2113
1812
2113
1812
2145
1730
2033
912
2113
1012
2113
712
2113
712
2113
712
2113
712
2113
712
2113
712
2113
712
2113
712
2113
712
2113
712
2113
712
2113
712
2113
912
2113
912
2113
912
2113
912
2113
912
2113
912
2113
912
2113
1730
2113
1830
2113
1730
2032
912
2113
912
2113
912
2113
912
2113
912
2113
912
2113
912
2113
912
2113
912
2113
912
2113
912
2113
1622
2100
400
2100
1622
2100
400
2100
1622
2100
400
2100
1622
2100
400
2100
1622
2100
1982
2100
1982
2100
1982
2100
1982
2100
1982
2100
1982
2100
912
2100
912
2100
912
2100
912
2100
912
2100
1792
612
1792
612
1792
612
1792
612
1570.8 m²
Gym
Garden
4504900200594912131091215159121371912165891214519121485912144210034182001056912790480
29716
4504900200790691250010047009123801001700100165020015682002788170
4501431 3687 2377 100 2513 200
10758
450 10108 200
69.8 m²
Meetingroom
49.5 m²
Technic room
51.3 m²
Office
8.0 m²
H-WC
2.5 m²
WC
68.6 m²
Hall
68.6 m²
Hall
20.8 m²
Stair
912
2100
912
2100
912
2100
912
2100
912
2100
912
2100
912
2100
912
2100
912
2113
912
2113
912
2113
912
2113
912
2113
1792
2145
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
Groundfloor plan and First Floor
10/30/18
K01_H1_EX_N02
INDTAST BY
K01_H1_EX_N02
1:250
15
Groundfloor and 1st floor plan
16. UP
UP
DN
DN DN
1
1
2
R R
Q Q
P P
E E
D D
B B
A A
C C
49.5 m²
Utilityroom
30.9 m²
Lockerroom
28.5 m²
Lockerroom
26.9 m²
Lockerroom
28.8 m²
Lockerroom
1570.8 m²
Gym
3.1 m²
WC
3.1 m²
WC
7.9 m²
H-WC
20.7 m²
Stair
3.1 m²
Lift
8.6 m²
Hall
13.6m²
Toilets2
12.3 m²
H-WC
2.2 m²
Cleaning
24.9 m²
Storage
6.1 m²
Hall
6.6 m²
H-WC
178.9 m²
Café
13.2 m²
Toilet 1
25.8 m²
Storage
66.3 m²
Meeting room
70.7 m²
Meeting room
70.7 m²
Meeting room
20.2 m²
Locker room
16.5 m²
Hall
25.7 m²
Kitchen
39.4 m²
Technic room
33.3 m²
Hallway
O O
N N
M M
L L
K K
J J
I I
H H
G G
F F
4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 37
3 5
5
7 9
9
11 13
13
15 17
17
19 21
21
23 25
25
27 29
29
31 33
33
35
7.6 m²
Security room
24002400240024002400240024002400240024002400240036003600360036003600
3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600 3600
24002400240024002400240024002400240024002400240036003600360036003600
2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400
1
1
2
2
R
Q
P
O
N
M
L
K
J
I
H
G
F
4
4
6
6
8
85
5
240024002400240024002400240024002400240024002400
2400 2400 2400 2400 2400
2400 2400 2400 2400 2400
69.8 m²
Meetingroom
49.5 m²
Technic room
51.3 m²
Office
8.0 m²
H-WC 68.6 m²
Hall
2.5 m²
WC
2.8 m²
WC
20.8 m²
Stair
68.6 m²
Hall
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
Modular Plan
09/07/18
K01_H1_EX_N01
INDTAST BY
K01_H1_EX_N01Modular plan
Multi-purpose hall is build from prefabricated wooden and concrete elements
Wooden elements are 3600mm widh
Concrete elements are 2400mm widh
16
1:250
17. 1 2
Doorheight
2088
V
Wooden roof
5052
VIII
4 6 8 10 12 CJ 14 16 18 20 22 24 26 28 30 32 34 36 373 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35
Terrain
-220
II
Concrete roof
9660
X
2.088 2.088 2.088 2.088 2.088 2.088
0.610 0.6100.6100.6100.6100.610 0.610 0.610 0.610
5.052
6.574
9.660
6.449
240024002400240024002400240024002400240024002400240024002400240024002400240024002400240024002400240024002400
12
Doorheight
2088
V-0.136
7.550
-0.736
4681012CJ14161820222426283032343637 59131721252933
Terrain
-220
II
Concrete roof
9660
X
2.088 2.088
9.666
2400240024002400240024002400 2400 24002400 2400 2400 2400 2400 2400240024002400240024002400240024002400 2400 2400 2400
2.100 2.100
0.000
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
Elevations North South
09/07/18
K01_H2_EX_N01
INDTAST BY
K01_H2_EX_N01
South.
North
1:200
Elevations North, South
17
18. RQPEDB C
Doorheight
2088
V
Roof wooden
5012
VIII
ONMLKJIHGF
Terrain
-220
II
Concrete roof
9660
X
3600 3600 3600 3600 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400
2.088
5.052
6.574
9.666
2.061 2.088
9.666
Ground slab
-136
III
R Q P E D BC
Doorheight
2088
V
Roof wooden
5012
VIII
O N M L K J I H G F
Concrete roof
9660
X
2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 2400 3600 3600 3600 3600
9.666
7.002 7.002
2.700
0.600
0.000
7.014
5.602
2.145
6.574
5.042
2.088
7.014
2.088
4.102
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
Elevations East West
09/07/18
K01_H2_EX_N02
INDTAST BY
K01_H2_EX_N02
East
West
1:200
Elevations East, West
18
19. 1:25
13.962
17.550
15.052
9.864
3136
-0.136
5.052
2.764
-0.736
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
U-value Analysis
09/06/18
K01_TXX_H1_EX_N4
INDTAST BY
K01_TXX_H1_EX_N4
1 : 200
SNIT AA
ROOF
max: 0.20 W/m2 K
EXTERNAL WAL
max: 0.40 W/m2 K
OUTSIDE DOOR:
with glass panels
max: 1.4 W/m2 K
GROUND SLAB
max: 0.20 W/m2 K
FOUNDATION
max: 0.40 W/m K
(linear)
WINDOW AND WALL JOINT
max:0.06 W/m K
SKYLIGHT
max: 1.40 W/m2 K
1 : 200
Longitunal SectionCURTAIN WALL
max: 1.8 W/m2 K
SKYLIGHT (LIGHT TUNNEL)
max: 1.8 W/m2 K
1:200
19
U-value Analysis
20. UP
UP
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Group no. 7
Multi-Purpose Centre
Green walls
09/06/18
K01_TXX_H1_EX_N5
INDTAST BY
K01_TXX_H1_EX_N5
Public benefits:
- Reducing Air pollution
- Adapting to climate change - Carbon footprint
- Aesthetics and urban design - public health and wellbeing
Private benefits:
- noise reduction
- Protection of building structure
- Increased marked value
Green wall Design principles
- Plant selection
- Growing medium (soil)
- water supply
- irrigation
- shading and light
Garden with Green walls
Section GA-GA'
1:100
Section GB-GB'
1:100
Green walls
20
21. UP
UP
DN
DN DN
UP
UP
49.5 m²
Utilityroom
30.9 m²
Lockerroom
28.5 m²
Lockerroom
26.9 m²
Lockerroom
28.8 m²
Lockerroom
1570.8 m²
Gym
3.1 m²
WC
3.1 m²
WC
7.9 m²
H-WC
20.7 m²
Stair
3.1 m²
Lift
8.6 m²
Hall
13.6m²
Toilets2
39.4m²
Technicroom
12.3 m²
H-WC
2.2 m²
Cleaning
24.9 m²
Storage
6.1 m²
Hall
6.6 m²
H-WC
178.9 m²
Café
13.2 m²
Toilet 1
25.8 m²
Storage
66.3 m²
Meeting room
70.7 m²
Meeting room
70.7 m²
Meeting room
20.2 m²
Locker room
REI 60
REI 60
EI 30
EI 60
EI2 60-C
EI2 30-C
Roof covering class B
Escape route
Escape direction
Rescue opening
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Group no. 7
Multi-Purpose Centre
Fire Analisys
09/06/18
K01_H1_EX_N06
INDTAST BY
K01_H1_EX_N06
1 : 300
Fire analisys ground floor
1 : 300
Escape routes First Floor
1 : 300
SNIT AA
1:300
21
Fire Analisys
22. 300
11
9
8
450
7
6
2
3
4
5
10
9.448
8.990
9.048
1
100
50150150
8.998
15
12
10.468
10.232
Concrete cast In-situ
Concrete reinforced
Concrete adhasive
(mortar, screed)
Timber finish
Timber structural
Timber flooring
Soft insulation
Top Soil
Soil
Clinckers
Hard insulation
Gravel
Concrete prefabricated
Plastic board
Steel
Plastic
Waterprof insulation
Tiles
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
RIDGELIGHT
10/30/18
K01_H5_EX_N01
INDTAST BY
K01_H5_EX_N01
13
1. Double-glazing unit(Laminated inner glass
with PVB foil,Low-E coating
2. Metal flashing
3 Botton bracket for ridgelight 5° with beam
4. Flat steel fixed to timber kerbb with screw
5. Vapour Barrier Connection Strip
6. Bitumen felt 2 layers
7. Cant strip
8. 3 layers of Hard Insulation
9.Timber kerb
10. 0,2 mm Damp Proof Membrane
11. Waffle plate
12. Flashing
13. Spacer
15. Corner bracket fixed with screws
1:5
22
Ridgelight Detail
23. 100100150150150228430
0.000
-0.786
30
10
5
10
3
100 10
5
10
3
Concrete cast In-situ
Concrete reinforced
Concrete adhasive
(mortar, screed)
Timber finish
Timber structural
Timber flooring
Soft insulation
Top Soil
Soil
Clinckers
Hard insulation
Gravel
Concrete prefabricated
Plastic board
Steel
Plastic
Waterprof insulation
Tiles
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
GROUNDFLOOR-WET ROOM,INTERNAL WALL
10/28/18
K01_H5_EX_N02
INDTAST BY
K01_H5_EX_N02
14
13
12
11
9
7
10
8
2
3
4
5
1
6
1.100mm Non-load berring internal concrete wall
2. 0.2 MM Pe-foil
3.13mm Knauf calcium silicate board
4. 5mm Tile adhesive
5.10mm Wall tiles size:150x150mm
6. Flexible seal Knauf
7. 22mm Flour tiles
8. 5mm Tile adhesive
9. 30mm Screed for slope 2,5°
10. Foamglass Plate S3, p=130kg/m3, l=0,046
W/mK,
11.30 Mortar
12. 100 mm Concrete cast In-situ
13. Kooltherm K103 Dash-Kingspan
p=35 kg/m3, l=0,02 W/m
14. 2x150mm Layers of Foamglass Platte S3
p=130kg/m3, l=0,046 W/mK
15. 150mm of Clinker
15
1:5
Wet room,groundfloor Detail
23
24. 3
1
2
3
4
5
8
9
10
11
12
13
6
100
3.802
4.102
3.982
2.962
7
38
25356018080238
10
3
13
3
Concrete cast In-situ
Concrete reinforced
Concrete adhasive
(mortar, screed)
Timber finish
Timber structural
Timber flooring
Soft insulation
Top Soil
Soil
Clinckers
Hard insulation
Gravel
Concrete prefabricated
Plastic board
Steel
Plastic
Waterprof insulation
Tiles
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
WET ROOM-HEAVY FLOOR PARTITION AND
INTERNAL WALL
10/24/18
K01_H5_EX_N03
INDTAST BY
K01_H5_EX_N03
1. Flexible joint
2. 22mm Flour tiles
3. 3mm tile adhesive
4. 35mm Screed for slope 2.5°
5. 60mm Cast in-situ concret
6. 180mm hollocow core slab
7. Suspended ceiling with ventilation pipes
8. 10mm Wall tiles
9. 3mm Wall adhesive
10. 13mm Knauf Calcium silicone board
11. 0.2mm Pe-foil
12. Non-load berring wall Concrete
material A2-s1,d0
13. 30mm Mortar
1:5
Wet room,heavy floor partition Detail
24
25. 80200230150
150
200
100150
-0.152
7066100
0.000
450
25
450
-0.486
-0.233
450
0.037
17
Concrete cast In-situ
Concrete reinforced
Concrete adhasive
(mortar, screed)
Timber finish
Timber structural
Timber flooring
Soft insulation
Top Soil
Soil
Clinckers
Hard insulation
Gravel
Concrete prefabricated
Plastic board
Steel
Plastic
Waterprof insulation
Tiles
2.061
13
70
450
13
230150
2.088
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
EXTERNAL DOOR
10/23/18
K01_H5_EX_N04
INDTAST BY
K01_H5_EX_N04
8
9
10
11
12
15
16
6
5
4
3
1
2
7
13
14
1. Polished concrete, floor covering class Dfl-
s1, class G floor covering
2. Foamglass Plate S3, p=130kg/m3, l=0,046
W/mK,
3. Concrete cast insitu
p=2400kg/m3, l=2 W/mK
4. DPM 0.2 mm
5. Insulation Kooltherm K103 Dash-Kingspan
p=35 kg/m3, l=0,02 W/mK
6. 2x150mm Layers of Foamglass Platte S3
p=130kg/m3, l=0,046 W/mK
7. Glass door 1982x2088
8. Dorstep
9. Cauking witch insulation material and
polyestylene pipes
10. Water-proof silicone sealant
11. Support for grating adjusted to height of
doorstep
12. Grid grate
13. Concrete , material A2-s1,d0
14.Rock wool facade insulation, p=100kg/m3,
l=0,04 W/mK
15. Moat
16. Concrete plate
17. Protective board
1:5
25
External door Detail
24
25
26
27
28
29
18
19
20
21
22
23
18. Concrete, material A2-s1,d0
19. Insulation material
20. Polyetyene buckstop
21. Door frame
22. Glass door 1982x2088
23.Damp proof membrane
24. Rock wool facade insulation,
q=100 kg/m3, l=0,04 W/mK
25. Lightweight concrete, q=
1800kg/m3, l=1.3 W/mK
26. Screw
27. Rain thight sealant
28. 13mm Function glue
29. 13mm Fiber cement board
26. 403
220830
12
1320
1
2
10
3
4
5
6
7
8
9
11
12
13
Concrete cast In-situ
Concrete reinforced
Concrete adhasive
(mortar, screed)
Timber finish
Timber structural
Timber flooring
Soft insulation
Top Soil
Soil
Clinckers
Hard insulation
Gravel
Concrete prefabricated
Plastic board
Steel
Plastic
Waterprof insulation
Tiles
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
WOODEN ELEMENTS-CORNER CONNECTION
11/08/18
K01_H5_EX_N27
INDTAST BY
K01_H5_EX_N27
Prefabricated wooden wall:
Required U=
Actual U=0,10 W/mK
1. Cover board - 22mm
2. Batten 45x45mm
3.Wooden cladding - 20 mm
4.Ventilation gap - 30 mm
5.Wind membrane - 8mm
6.Rockwool facade insulation - 220mm
7.PE foil
8.Rockwool facade insulation - 100mm
9. Batten - 45x70mm
10. Mineral wool stop
11. Polyethyrene buckstop
12.OSB - 12mm
13.Gypsum board - 13mm
1:5
26
Prefabrcated wooden elements, corner connection Detail
27. 3
250
150100150150100
150
223084
30
200
0.000
-0.236
-0.636
-0.486
-0.336
-0.136
-0.052
160
7066100100150150
-1.136
-0.636
-0.936
200
Concrete cast In-situ
Concrete reinforced
Concrete adhasive
(mortar, screed)
Timber finish
Timber structural
Timber flooring
Soft insulation
Top Soil
Soil
Clinckers
Hard insulation
Gravel
Concrete prefabricated
Plastic board
Steel
Plastic
Waterprof insulation
Tiles
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
AH 31Karolina Sylwia Woźnicka
Multi-Purpose Centre
FOUNDATION- ELEVATOR
10/31/18
K01_H5_EX_N06
INDTAST BY
K01_H5_EX_N06
13
12
11
10
8
5
4
1
1. 22mm Flour tiles
2. 5mm Tile adhesive
3. 30mm Screed for slope
4.2x12.5mm gypsum board
Knauf Gipsmaschinenputz MP 75 L, p= 950kg/m3, l=0.34 W/mK
5. Foamglass Plate S3, p=130kg/m3, l=0,046 W/mK
6. Concrete material A2-s1,d0
Wall EI60 A2-s1,d0
7 30mm. Mortar
8. Concrete cast insitu
p=2400kg/m3, l=2 W/mK
9. DPM 0.2 mm
10. Kooltherm K103 Dash-Kingspan
p=35 kg/m3, l=0,02 W/mK
11. 2x 150mm Foamglass Platte S3, p=130kg/m3, l=0,046 W/mK
12.Concrete cast insitu
p=2400kg/m3, l=2 W/mK
13. Clinker
14. Polished concrete, floor covering class Dfl-s1, class G floor
covering
15. Foamglass Plate S3, p=130kg/m3, l=0,046 W/mK
9
7
2
3
6
6
7
14
15
12
13
11
10
9
8
27
Elevator foundation Detail
1:5
29. Overview
Architecture
The building facade will consist of red masonry with black
windows,
while the staircase and elevator shaft will have a finish of black
eternity.
It will have shed roof on top of two apartments which are
situated on the left and right side of the building.
Between them, there will be a common balcony with glazed
roof.
Each apartment has a private balcony facing the main street,
for optimal light to shine into the living room.
The purpose of the common balcony is to enjoy time outside
with an extended view.
The entrance is placed in the back of the building in order to
make the facade more complete.
We designed an access balcony for functional aspect in order
to entrance easily every apartment.
Sustainability
The building will be constructed according to BR-2018 regulations.
The green area in the backyard will contain playground for the
children
and benches for the adults to meet and socialize. There will also be
trees and open bicycle stand.
29
30. 3122.72
1733.83
3124.89
Street and house number:
Vestergade 10-14
City: Horsens
Plot size: 1735 m2
Building area: 390 m2
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Site plan
Group 3
06/14/19
K01_TXX_H7_EX_N34
AH 41
TYPE CITY
K01_TXX_H7_EX_N34
Location
The building is located at Vestergade 10-14 in
Horsens.
The driveway to the parking will be connected with
the main road
on the left side of the building. There are 14 parking
spaces, 2 of them
for disabled people. Along with parking spaces in the
backyard, there will be barbeque area and playground
area.
30
1:200
31. UP
UP
UP
1
1 3
3
4
4
5
5
A A
C C
BB
2
2
7.77 m²
Bathroom
13.97 m²
Bedroom
6.53 m²
Bathroom
38.49 m²
Living room
13.99 m²
Bedroom
7.19 m²
Bathroom
14.24 m²
Bedroom
35.36 m²
Living room
9.67 m²
Kitchen
20.04 m²
Meeting room
46.71 m²
Office
WM S WMS
WMS
14.19 m²
Stair 1.61 m²
Elevator
Redundant Room
Tech. space
1.17 m²
Tech. space
0.58 m²
Tech. space
1.55 m²
Tech. space
38.41 m²
Living room
SWM
8100 8100 8400
7.7 m²
Kitchen
4.75 m²
Bathroom
35028
1500
9600
3247
ø 1500
6.41 m²
Room
6.44 m²
Room
11148
8700
1600
14.43 m²
Bedroom
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Groundfloor plan
Karolina Sylwia Woźnicka
06/10/19
K01_TXX_H1_EX_N017
AH 41
TYPE CITY
K01_TXX_H1_EX_N017
Groundfloor plan
31
1:100
32. UP
1
1 3
3
4
4
5
5
A A
C C
BB
14.08 m²
Bedroom
38.41 m²
Living room
6.59 m²
Bathroom
6.53 m²
Bathroom
38.41 m²
Living room
14.08 m²
Bedroom
35.94 m²
Living room
14.43 m²
Bedroom
7.19 m²
Bathroom
14.24 m²
Bedroom
0.64 m²
Tech. space1.13 m²
Tech. space
5.95 m²
Bathroom
0.54 m²
Tech. space
37.92 m²
Living room
11.44 m²
Bedroom
1.61 m²
Elevator
1.17 m²
Tech. space
12.73 m²
Bedroom
WMS
7.62 m²
Kitchen
8.85 m²
Kitchen
WMSWM S
38.41 m²
Living room
WM
S
5.22 m²
Balcony
1.62 m²
Tech. space
5.2 m²
Balcony
5.22 m²
Balcony
5.22 m²
Balcony
2
2
14.19 m²
Stair
9600 8100 8100 8400
4401
6.49 m²
Kitchen
6.49 m²
Kitchen
9174
35028
1600
96483676.17
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
1st,2nd floor plan
Karolina Sylwia Woźnicka
06/10/19
K01_TXX_H1_EX_N018
TYPE CITY
K01_TXX_H1_EX_N018
1st,2nd floor plan
32
1:100
AH 41
33. UP
UP
UP
1
1 3
3
4
4
5
5
A A
C C
BB
2
2
11.61 m²
Bedroom
6.23 m²
Bathroom
30.16 m²
Living room
35.49 m²
Living room
1.61 m²
Elevator
14.22 m²
Stair
11.46 m²
Bedroom
WM
S S WM
9.9 m²
Bedroom
0.62 m²
Tech. space
6.06 m²
Kitchen
5.99 m²
Bathroom
1.55 m²
Tech. space
9.24 m²
Kitchen
18.35 m²
Balcony
20.66 m²
Balcony
16008700
9600 8100 8100 8400
35025.8
10943.2
Roof terrace
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
3rd floor plan
Karolina Sylwia Woźnicka
06/10/19
K01_TXX_H1_EX_N005
TYPE CITY
K01_TXX_H1_EX_N005
1:100
33
3rd floor plan
AH 41
34. 7.01 m²
Caretaker office
3.39 m²
Toilet
13.82 m²
Laundry room
12.51 m²
Service room
2.51 m²
Storrage room
2.51 m²
Storrage room
2.51 m²
Storrage room
2.51 m²
Storrage room
2.52 m²
Storrage room
2.5 m²
Storrage room
2.49 m²
Storrage room
1500
2.51 m²
Storrage room
1.93 m²
Storrage room
1.72 m²
Elevator
2.04 m²
Storrage room
2.07 m²
Storrage room
2.04 m²
Storrage room
2.04 m²
Storrage room
2.04 m²
Storrage room
1.95 m²
Storrage room
13718.1
9411.6
8980.7
3794.37
4812.4
13226.45
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Basement Plan
Karolina Sylwia Woźnicka
06/07/19
K01_TXX_H1_EX_N021
TYPE CITY
K01_TXX_H1_EX_N021
1:100
Basement plan
34 AH 41
35. UP
UP
UP
1
1 3
3
4
4
5
5
A A
C C
BB
7.77 m²
Bathroom
13.97 m²
Bedroom
6.53 m²
Bathroom
38.49 m²
Living room
13.99 m²
Bedroom
7.19 m²
Bathroom
14.24 m²
Bedroom
35.36 m²
Living room
9.67 m²
Kitchen
20.04 m²
Meeting room
46.71 m²
Office
14.19 m²
Stair 1.61 m²
Elevator
Redundant Room
Tech. space
1.17 m²
Tech. space
0.58 m²
Tech. space
1.55 m²
Tech. space
38.41 m²
Living room
8100 8100 8400
7.7 m²
Kitchen
4.75 m²
Bathroom
5370
795
35028
19081212190812129481212528132012121188912912 11882448912246091221001212192891244812124689125268
1500
912468120
16008700
9648
558094812121908
220812121908912154812122148
1908121215481212228151214281218166215121908121211881212154815123780 3828121246818121944
2
2
9600
1740
3087
4526
3092
1375
3625
8630
6585
5360
1050
3247
2624
6058.5
3228
1996
39844526
7935 7950
1996
3984
1908
4890
3709
216038403890
2493
3238
3238ø 1500
3228
6.41 m²
Room
3600
1450
1450
3600 3600
1450
9600
16008700
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Modular plan
Karolina Sylwia Woźnicka
03/27/19
K01_TXX_H1_EX_N007
AH 41
TYPE CITY
K01_TXX_H1_EX_N007
Groundfloor plan
Modular plan
35
1:100
36. 02 Groundfloor
1250
III
Level access, terrain
0
II
03 First floor
3750
IV
04 Second floor
6250
V
05 3rd floor
8942
VI
06 Roof
11250
VII
1345 2
3.262
5.762
8.262
10.954
13.616
11.898
11.087 10.954
8.395
5.895
10.042
7.350
4.850
2.350
7.995
5.495
2.995
3.262
13.633
12.250
2.995
12.093
3.395
R R
R R R
R R R
R R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
11.250
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Elevation North
Karolina Sylwia Woźnicka
06/14/19
K01_TXX_H1_EX_N023
AH 41
TYPE CITY
K01_TXX_H1_EX_N023
Elevation North
36
1:100
37. 02 Groundfloor
1250
III
Level access, terrain
0
II
03 First floor
3750
IV
04 Second floor
6250
V
05 3rd floor
8942
VI
06 Roof
11250
VII
1 3 4 52
3.350
10.954
3.262
5.762
8.262
10.954
11.380
13.194
13.633
5.762
11.380
13.616
13.178
3.3953.262
5.895
8.395
12.075
11.087
3.395
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Elevation South
Karolina Sylwia Woźnicka
06/14/19
K01_TXX_H1_EX_N037
AH 41
TYPE CITY
K01_TXX_H1_EX_N037
1:100
37
Elevation South
38. 02 Groundfloor
1250
III
Level access, terrain
0
II
03 First floor
3750
IV
04 Second floor
6250
V
05 3rd floor
8942
VI
06 Roof
11250
VII
A CB
10.042
3.262
5.762
8.262
2.995
5.495
7.995
10.954
10.687
10.954
13.633
12.250
13.178
11.617
12.154
R R R
R R R
R R R
R R R
02 Groundfloor
1250
III
Level access, terrain
0
II
03 First floor
3750
IV
04 Second floor
6250
V
05 3rd floor
8942
VI
06 Roof
11250
VII
AC B
3.750
3.257
5.762
5.495
7.995
8.262
10.042
10.95410.954
10.687
12.250
13.63313.442
11.932
0.770 0.730 0.770 0.770
8.025
11.688
4.025
0.050
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Elevation East West
Group 7
06/14/19
K01_TXX_H1_EX_N024
AH 41
TYPE CITY
K01_TXX_H1_EX_N024
1:100
38
Elevations East,West
East West
39. 530
2120
50 5050
Drain
pipe
Heat
pipes
Ventilation pipes
Ventilation unit
56.5
56.5
50
30
30
200
50 50
5050
400
30
30
30
30
Water
pipes
150mm load-berring
concrete prefabricated wall
Metal stud wall with
70mm soft insulation
and gypsum boards
555
Ventilation pipes from
apartmens under, running all
through the technical space and
going out through the roof
Concrete prefabricated
Concrete cast In-situ
Bricks
Concrete adhasive
(mortar, screed)
Steel
Timber finish
Structural timber
Timber flooring
Soft insulation
Hard insulation
Plastic
Soil
Sand
Clincker
Gravel
Floor tiles
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Service shaft analysis
Karolina Sylwia Woźnicka
05/30/19
K01_TXX_H7_EX_N14
AH 41
TYPE CITY
K01_TXX_H7_EX_N14
2nd floor
Service shaft analysis
39
1:5
40. Level access, terrain
0
II
1
150
349.8
-0.586
0.152
320121901219012
120120
95
10010 240
150
-0.386
200
5.31
509
12
Concrete prefabricated
Concrete cast In-situ
Bricks
Concrete adhasive
(mortar, screed)
Steel
Timber finish
Structural timber
Timber flooring
Soft insulation
Hard insulation
Plastic
Soil
Sand
Clincker
Gravel
Floor tiles
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Basement wall
Karolina Sylwia Woźnicka
06/01/19
K01_TXX_H1_EX_N002
AH 41
TYPE CITY
K01_TXX_H1_EX_N002
Danish standart brick
108mmx54mmx228mm
Mineral wool insulation 240mm
Bitumen Felt
Load bearing internal concrete wall 150mm
Plaster 10mm
Load bearing Basement wall with Corbel 150mm
Bitumen felt
Leca block 190x100mm
Leca Block 320x100
Ventilation gap 11mm
2x120mm Pressure resistant insulation
Polystyrene insulation 240mm
Mortar 12mm
10mm Plaster
40
Basement wall Detail
1:5
41. 01 Basement
-1250
I
100 100
350
350
300
300
-1.741
-1.691
-2.041
127
140 120 150 6
105
15
50
50
160
467.8
Foundation basement
-2040.8
0
-1.931
Concrete prefabricated
Concrete cast In-situ
Bricks
Concrete adhasive
(mortar, screed)
Steel
Timber finish
Structural timber
Timber flooring
Soft insulation
Hard insulation
Plastic
Soil
Sand
Clincker
Gravel
Floor tiles
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Foundation
Karolina Sylwia Woźnicka
05/26/19
K01_TXX_H1_EX_N004
AH 41
TYPE CITY
K01_TXX_H1_EX_N004
Drain 300x300mm
Drain pipe in center 80mm
Reinforced Cast In-Situ concrete
Foundation 350X350mm
2x layers of polystyrene
insulation 150mm
Polished concrete
100mm
Presure resistant
insulation 2x240mm
Reinforced load-berring concrete wall 150mm
15mm polystyrene insulation
Bitumen felt
50mm Concrete
blinding
Soil
41
Foundation Detail
1:5
42. 45
55018018
8 9
5
18
5018018018
451
Metal drip edge
13.163
12.730
12.712
12.712
25 251845245
100
180
375.5
7
37.1
1
Concrete prefabricated
Concrete cast In-situ
Bricks
Concrete adhasive
(mortar, screed)
Steel
Timber finish
Structural timber
Timber flooring
Soft insulation
Hard insulation
Insulation polyester
Soil
Sand
Clincker
GravelPlastic
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Roof with wooden wall connection
Karolina Sylwia Woźnicka
06/02/19
K01_TXX_H1_EX_N003
AH 41
TYPE CITY
K01_TXX_H1_EX_N003
2x2.5mm Bitumen felt
18mm OSB3
50mm Ventilation gap
Damp proof membrane
18mm OSB3
Fiber cement 8mm
22mm Ventilation gap
Windstopper
Extreme 9 mm
Soft insulation between load
bearing stud frame 240mm
Soft insulation between non-
load bearing frame 45mm
Oriented Strand Board 18mm
Damp proof membrane overlapping 180mm
2x12.5mm Gypsum board
Screw 240mm
Angle bracket 65x65x55x2.5mm
Batten 45x45mm
Load-berring frame 245x45mm
Batten 25x45mm
42
Roof and wooden wall Detail
1:5
43. Level access, terrain
0
II
150
150
200
50
25
50
20
50
180
104
60
365.5
9 180
Concrete prefabricated
Concrete cast In-situ
Bricks
Concrete adhasive
(mortar, screed)
Steel
Timber finish
Structural timber
Timber flooring
Soft insulation
Hard insulation
Plastic
Soil
Sand
Clincker
Gravel
Floor tiles
SCHOOL OF TECHNOLOGI AND BUSINESS
PROJECT:
SUBJECT:
DRAWN BY:
SCALE:
CLASS:
DATE:
Bring ideas to life
VIA University College
Multi-storey building
Door detail
Karolina Sylwia Woźnicka
06/11/19
K01_TXX_H1_EX_N001
AH 41
TYPE CITY
K01_TXX_H1_EX_N001
300mm landing with steel tube
inside
for invisible connection with the
wall
The steel tube is wrapped with
neoprene
Weather-proof silicone sealant
Caulking with insulation material
and polyetylene pipes
20mm high Timber doorstep
150mm Insulation
150mm prefabricated concrete wall
25mm Grid grate
Moat
50mm Concrete
plate
25mm Concrete tiles
180mm Load-berring
prefabricated concrete wall
Caulking with insulation material
and polyetylene pipes
Weather-proof silicone sealant
9mm Fiber cement
External door and landing connection
43
1:5