Net Transfer Capacity (NTC) Between
Armenia and Georgia
2020
• Winter Max
• Summer Max
Presentation Overview
• Tie lines between Armenia & Georgia 2020
• Future links between Armenia & Georgia 2025
• NTC calculation procedure
• NTC calculation results
Tie Lines Between Armenia-Georgia
SS Gardabani SS Marneuli
AM-GE
Border
220 kV
220 kV
SS Alaverdi-2 Hrazdan TPP
400 kV
400 kV
Future links between Armenia & Georgia
2025
SS Marneuli
AM - GE
Border
500 kV220 kV
SS Alaverdi-2
Hrazdan TPP
400 kV
400 kV
Back-to-back HVDC
NTC Calculation Step by Step
Implement LF
calculation to identify
base case interchange
(BCE)
Implement
contingency analysis
Check
violations
Yes
No
Change interchange
value
TTC = BCE + ΔEmax
NTC = TTC - TRM
TTC - Total transfer Capacity
ΔEmax - Max exchange program
between to areas
TRM – Transmission reliability margin
Net Transfer Capacity
Winter Maximum Regime
Source TSO - Georgia
Sink TSO - Armenia
Source TSO - Armenia
Sink TSO - Georgia
Direction BCE
(MW)
NTF
(MW)
ΔEmax
(MW)
TTC
(MW)
TRM
(MW)
GEAM -300 -272.9 750 450 100
NTC
(MW)
350
Outage
of the NE
Overload
of the NE
I/Imax %
400 kV Line 220 kV Line 102.2
Direction BCE
(MW)
NTF
(MW)
ΔEmax
(MW)
TTC
(MW)
TRM
(MW)
AMGE 300 272.9 100 300 100
NTC
(MW)
300
Outage
of the NE
Overload
of the NE
I/Imax %
400 kV Line 220 kV Line 109.6
Net Transfer Capacity
Summer Maximum Regime
Source TSO - Georgia
Sink TSO - Armenia
Source TSO - Armenia
Sink TSO - Georgia
Direction BCE
(MW)
NTF
(MW)
ΔEmax
(MW)
TTC
(MW)
TRM
(MW)
GEAM -250 -244 550 300 100
NTC
(MW)
200
Outage
of the NE
Overload
of the NE
I/Imax %
400 kV Line 220 kV Line 102.5
Direction BCE
(MW)
NTF
(MW)
ΔEmax
(MW)
TTC
(MW)
TRM
(MW)
AMGE 250 244 0 250 100
NTC
(MW)
150
Outage
of the NE
Overload
of the NE
I/Imax %
400 kV Line 220 kV Line 101.8
Note: NTC calculation is implemented taking into account that line transfer capacity varies depending
from air temperature.
Presentation Overview
• New updated Load Flow models should take
into account seasonal thermal limitations in terms
of elements rates.
• New planned Back-to-back HVDC system will be
taken into account in further analyses.
• Taking into account previously mentioned, new
Base Case Power Exchanges between areas should
be adjusted and reviewed.
Thank you!

More Related Content

Viewers also liked

Pedagogia en lengua castellana
Pedagogia en lengua castellanaPedagogia en lengua castellana
Pedagogia en lengua castellana
santileguizamo
 
MIS CREACIONES POETICAS
MIS CREACIONES POETICASMIS CREACIONES POETICAS
MIS CREACIONES POETICAS
santileguizamo
 
Articulo exponer
Articulo exponerArticulo exponer
Articulo exponer
Yudy Luque
 
Circulo linguistico de praga
Circulo linguistico de pragaCirculo linguistico de praga
Circulo linguistico de praga
santileguizamo
 

Viewers also liked (19)

Curso tronadura enaex
Curso tronadura enaexCurso tronadura enaex
Curso tronadura enaex
 
Gerencia de Proyectos Nelson Mancipe
Gerencia de Proyectos Nelson MancipeGerencia de Proyectos Nelson Mancipe
Gerencia de Proyectos Nelson Mancipe
 
Comfites eliza
Comfites elizaComfites eliza
Comfites eliza
 
Pedagogia en lengua castellana
Pedagogia en lengua castellanaPedagogia en lengua castellana
Pedagogia en lengua castellana
 
BES - Solving condenstion problems
BES - Solving condenstion problemsBES - Solving condenstion problems
BES - Solving condenstion problems
 
somhelpdoc
somhelpdocsomhelpdoc
somhelpdoc
 
INFORMATICA
INFORMATICAINFORMATICA
INFORMATICA
 
Técnicas de estudio
Técnicas de estudioTécnicas de estudio
Técnicas de estudio
 
ESCUELA NUEVA
ESCUELA NUEVAESCUELA NUEVA
ESCUELA NUEVA
 
CONFITES
CONFITESCONFITES
CONFITES
 
Mechnikov hospital 29 monts of war
Mechnikov hospital 29 monts of warMechnikov hospital 29 monts of war
Mechnikov hospital 29 monts of war
 
Community event edu 620 final_assignment
Community event edu 620 final_assignmentCommunity event edu 620 final_assignment
Community event edu 620 final_assignment
 
MIS CREACIONES POETICAS
MIS CREACIONES POETICASMIS CREACIONES POETICAS
MIS CREACIONES POETICAS
 
derecho laboral
derecho laboralderecho laboral
derecho laboral
 
Michael Hausenblas- Scalable time series and stream processing for IoT applic...
Michael Hausenblas- Scalable time series and stream processing for IoT applic...Michael Hausenblas- Scalable time series and stream processing for IoT applic...
Michael Hausenblas- Scalable time series and stream processing for IoT applic...
 
Articulo exponer
Articulo exponerArticulo exponer
Articulo exponer
 
Human-Centered Design for Immersive Interaction - Jason Jerald
Human-Centered Design for Immersive Interaction - Jason JeraldHuman-Centered Design for Immersive Interaction - Jason Jerald
Human-Centered Design for Immersive Interaction - Jason Jerald
 
Changez votre Monde pour réussir votre stratégie
Changez votre Monde pour réussir votre stratégieChangez votre Monde pour réussir votre stratégie
Changez votre Monde pour réussir votre stratégie
 
Circulo linguistico de praga
Circulo linguistico de pragaCirculo linguistico de praga
Circulo linguistico de praga
 

Similar to NTC AM-GE expended

00b7d526edbdcf1507000000
00b7d526edbdcf150700000000b7d526edbdcf1507000000
00b7d526edbdcf1507000000
Steve Sugden
 
GCC Interconnection Grid Operational Studies
GCC Interconnection Grid Operational StudiesGCC Interconnection Grid Operational Studies
GCC Interconnection Grid Operational Studies
Power System Operation
 

Similar to NTC AM-GE expended (20)

Srldc 28 May2013_congestionEnergy & Power Meet
Srldc 28 May2013_congestionEnergy & Power MeetSrldc 28 May2013_congestionEnergy & Power Meet
Srldc 28 May2013_congestionEnergy & Power Meet
 
HVDC vs HVAC ppt
HVDC vs HVAC pptHVDC vs HVAC ppt
HVDC vs HVAC ppt
 
ELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptxELECTRICAL POWER TRANSMISSION-3.pptx
ELECTRICAL POWER TRANSMISSION-3.pptx
 
Millimetre Wave Channel Measurements in a Railway Depot
Millimetre Wave Channel Measurements in a Railway DepotMillimetre Wave Channel Measurements in a Railway Depot
Millimetre Wave Channel Measurements in a Railway Depot
 
Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
 Determining Crossing Conductor Clearance Using Line-Mounted LiDAR  Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
 
00b7d526edbdcf1507000000
00b7d526edbdcf150700000000b7d526edbdcf1507000000
00b7d526edbdcf1507000000
 
GCC Interconnection Grid Operational Studies
GCC Interconnection Grid Operational StudiesGCC Interconnection Grid Operational Studies
GCC Interconnection Grid Operational Studies
 
transmission line
transmission line transmission line
transmission line
 
The pan arab interconnection project latest update
The pan arab interconnection project latest updateThe pan arab interconnection project latest update
The pan arab interconnection project latest update
 
Analysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokharaAnalysis for underground cable system, lakeside pokhara
Analysis for underground cable system, lakeside pokhara
 
Transmission Line presentation______.ppt
Transmission Line presentation______.pptTransmission Line presentation______.ppt
Transmission Line presentation______.ppt
 
123
123123
123
 
RVNL_Report_ppt
RVNL_Report_pptRVNL_Report_ppt
RVNL_Report_ppt
 
10.1109@powercon.2014.6993724
10.1109@powercon.2014.699372410.1109@powercon.2014.6993724
10.1109@powercon.2014.6993724
 
10.1109@powercon.2014.6993724
10.1109@powercon.2014.699372410.1109@powercon.2014.6993724
10.1109@powercon.2014.6993724
 
Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...
Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...
Voltage Profile Improvement using Switched Capacitors: Case of Single Wire Ea...
 
Design aspects of high voltage transmission line
Design aspects of high voltage transmission lineDesign aspects of high voltage transmission line
Design aspects of high voltage transmission line
 
Construction EHV Transmission Line
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission Line
 
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdfSwitching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
 
CASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & Pakistan
CASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & PakistanCASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & Pakistan
CASA-1000 Kyrgyzstan & Tajikistan to Afghanistan & Pakistan
 

NTC AM-GE expended

  • 1. Net Transfer Capacity (NTC) Between Armenia and Georgia 2020 • Winter Max • Summer Max
  • 2. Presentation Overview • Tie lines between Armenia & Georgia 2020 • Future links between Armenia & Georgia 2025 • NTC calculation procedure • NTC calculation results
  • 3. Tie Lines Between Armenia-Georgia SS Gardabani SS Marneuli AM-GE Border 220 kV 220 kV SS Alaverdi-2 Hrazdan TPP 400 kV 400 kV
  • 4. Future links between Armenia & Georgia 2025 SS Marneuli AM - GE Border 500 kV220 kV SS Alaverdi-2 Hrazdan TPP 400 kV 400 kV Back-to-back HVDC
  • 5. NTC Calculation Step by Step Implement LF calculation to identify base case interchange (BCE) Implement contingency analysis Check violations Yes No Change interchange value TTC = BCE + ΔEmax NTC = TTC - TRM TTC - Total transfer Capacity ΔEmax - Max exchange program between to areas TRM – Transmission reliability margin
  • 6. Net Transfer Capacity Winter Maximum Regime Source TSO - Georgia Sink TSO - Armenia Source TSO - Armenia Sink TSO - Georgia Direction BCE (MW) NTF (MW) ΔEmax (MW) TTC (MW) TRM (MW) GEAM -300 -272.9 750 450 100 NTC (MW) 350 Outage of the NE Overload of the NE I/Imax % 400 kV Line 220 kV Line 102.2 Direction BCE (MW) NTF (MW) ΔEmax (MW) TTC (MW) TRM (MW) AMGE 300 272.9 100 300 100 NTC (MW) 300 Outage of the NE Overload of the NE I/Imax % 400 kV Line 220 kV Line 109.6
  • 7. Net Transfer Capacity Summer Maximum Regime Source TSO - Georgia Sink TSO - Armenia Source TSO - Armenia Sink TSO - Georgia Direction BCE (MW) NTF (MW) ΔEmax (MW) TTC (MW) TRM (MW) GEAM -250 -244 550 300 100 NTC (MW) 200 Outage of the NE Overload of the NE I/Imax % 400 kV Line 220 kV Line 102.5 Direction BCE (MW) NTF (MW) ΔEmax (MW) TTC (MW) TRM (MW) AMGE 250 244 0 250 100 NTC (MW) 150 Outage of the NE Overload of the NE I/Imax % 400 kV Line 220 kV Line 101.8 Note: NTC calculation is implemented taking into account that line transfer capacity varies depending from air temperature.
  • 8. Presentation Overview • New updated Load Flow models should take into account seasonal thermal limitations in terms of elements rates. • New planned Back-to-back HVDC system will be taken into account in further analyses. • Taking into account previously mentioned, new Base Case Power Exchanges between areas should be adjusted and reviewed.