ACCURATE TECHNICAL INTERPRETATION OF CLAUSE-11.3 OF
IS-456-2000 FOR STRIPPING OF FORMWORK.
This is a common problem to all the sites that regarding de shuttering of slab ,client or
consultant either refer Table under clause 11.3.1 of IS-456 ,in which guidelines of de
shuttering has been given in terms of age of concrete or consultant / client
consider achievement 70%-100% strength is the criteria for de shuttering of slab.
Both the above criteria are semi - correct and without any technical sense, which badly affect
project schedule, time cycle and underutilization of resources or implementation of very
uneconomic mix to achieve the wrong strength criteria.
The Fact
Quote from IS-456-2000, CL-11.3
“Forms shall not be releaseduntil the concrete has achieved a strength of at least twice
the stress to which the concrete may be subjected at the time of removal of formwork..”
Unquote.
Cl-11.3.1 also says that the above criteria is the only guideline for stripping and the table of
stripping time is established , based on consideration that it will deem the above criteria.
Hence instead of following the table it would be better to follow the exact clause
of stripping, which is very advantageous for the constructor. Most interestingly it depends
upon span length, thk of concrete and imposed load of scaffolding etc., irrespective of grade
of concrete.
Simple Calculation to know the required strength.
A……Load CALCULATION
Load during stripping (considering 1 mtr strip)/mtr =
a) Thk. of slab x 1X Density of conc.= 0.200x 1x 25kn/cum= 5.0 KN
for a slab of 200 mm thk
b) Imposed load( load due to scaffold and forms above = 2.5 KN
W= 7.5 KN/m
B……. Max Bending Moment =( Wl X l)/8= (7.5 x8x8)/8 = 59
KN/m ,
Considering 8 mtr span of slab.
C.. ….. Section Modulus = Z= bd2 /6= ( 1mtr X 0.2x 0.2) /6= 0.0066
m3 for 200 mm d ( thk) and 1m srip.
D….. Stress = B.M. max/Section Modulus= 59/.0066=8.99 n/mm2= 9 n/mm2
E. … . Compressive strength requirement at de shuttering = 2 x9 = 18 N/mm2.
In most of our cases slab span is 3-4 mtr. and as such the strength requirement will not be
more than 4-5 N/mm2.
However the minimum strength requirement should not be considered less than 10 Mpa as
per
BS-8110. The strength requirement is expected to actual strength of structure not cubes
strength, hence apply 30 % safety factor on cubes strength while application.
Hence the min. Cube comp. strength requirement is 13 Mpa.
The above requirement of code is identical both in IS or BS code and widely used for miwan
or tunnel formed concrete. Hence it should be also applied in System or conventional formed
concrete
The write up should be thought upon, understood and let all concern understand the
requirement correctly. It will be highly beneficial for the contractor / developer and
purchaser in terms of reduced time cycle of slab, ultimately the project duration and
cost.
K.K.PATHAK
K.K.PATHAK
Head -QA/QC ,Godrej The Tree project
L&T Construction, B&F IC
Author: K.K. Pathak, a Construction Quality Specialist with 23 years of professional
experience exclusively in QAQC and QMS with the construction and Real Estate sectors.
Author is presently serving with L&T Construction, B&F IC. Prior to joining with L&T,
KKP served in Pratibha- Capacite Group as Head –QA/QC, with M/s Phoenix Mills Ltd,
HCC, Simplex, and Petron. Innovative selection of alternative materials or adaption of
alternative work procedures and specifications which adds values to the organization or
projects is the motto of the author. Product Quality and innovative construction techniques
implemented by Mr. Pathak have been well appreciated by Print Media on several occasions
.Mr. Pathak has been awarded with “50 MOST IMPACTFUL QUALITY PROFESSIONAL”
award by WORLD QUALITY CONGRESS in the year 2016.

More Related Content

What's hot

Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresShahrukh Niaz
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
Non destructive test on concrete
Non destructive test on concreteNon destructive test on concrete
Non destructive test on concreteAglaia Connect
 
Etabs BY Subash Pathak
Etabs BY Subash PathakEtabs BY Subash Pathak
Etabs BY Subash PathakSubash Pathak
 
PILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHULPILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHULAnshul Shakya
 
Pullout test as nondestructive test method in structural engineering
Pullout test as nondestructive test method in structural engineeringPullout test as nondestructive test method in structural engineering
Pullout test as nondestructive test method in structural engineeringMohammed Layth
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing MethodMd Tanvir Alam
 
Design and Detailing of RC Deep beams as per IS 456-2000
Design and Detailing of RC Deep beams as per IS 456-2000Design and Detailing of RC Deep beams as per IS 456-2000
Design and Detailing of RC Deep beams as per IS 456-2000VVIETCIVIL
 
Site engineer duties
Site engineer dutiesSite engineer duties
Site engineer dutiesgetmar2
 
Pile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsPile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsAkash Tilokani
 

What's hot (20)

Lecture 8 raft foundation
Lecture 8 raft foundationLecture 8 raft foundation
Lecture 8 raft foundation
 
Rehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structuresRehabilitation and strengthening of existing structures
Rehabilitation and strengthening of existing structures
 
Deep foundation - pile foundation
Deep foundation - pile foundationDeep foundation - pile foundation
Deep foundation - pile foundation
 
Pile foundation
Pile  foundation Pile  foundation
Pile foundation
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Design of steel beams
Design of steel beamsDesign of steel beams
Design of steel beams
 
Non destructive test on concrete
Non destructive test on concreteNon destructive test on concrete
Non destructive test on concrete
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 
Etabs BY Subash Pathak
Etabs BY Subash PathakEtabs BY Subash Pathak
Etabs BY Subash Pathak
 
Shs (square hollow section) size range
Shs (square hollow section) size rangeShs (square hollow section) size range
Shs (square hollow section) size range
 
PILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHULPILE FOUNDATION PROJECT TRAINING ANSHUL
PILE FOUNDATION PROJECT TRAINING ANSHUL
 
Table formwork
Table formwork Table formwork
Table formwork
 
One way slab load calculation
One way slab load calculation One way slab load calculation
One way slab load calculation
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Pullout test as nondestructive test method in structural engineering
Pullout test as nondestructive test method in structural engineeringPullout test as nondestructive test method in structural engineering
Pullout test as nondestructive test method in structural engineering
 
Concrete works
Concrete worksConcrete works
Concrete works
 
Cable Layout, Continuous Beam & Load Balancing Method
 Cable Layout, Continuous Beam & Load Balancing Method Cable Layout, Continuous Beam & Load Balancing Method
Cable Layout, Continuous Beam & Load Balancing Method
 
Design and Detailing of RC Deep beams as per IS 456-2000
Design and Detailing of RC Deep beams as per IS 456-2000Design and Detailing of RC Deep beams as per IS 456-2000
Design and Detailing of RC Deep beams as per IS 456-2000
 
Site engineer duties
Site engineer dutiesSite engineer duties
Site engineer duties
 
Pile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm WallsPile Foundations and Diaphragm Walls
Pile Foundations and Diaphragm Walls
 

Viewers also liked

Viewers also liked (6)

Minima -Panel Formwork System
Minima -Panel Formwork SystemMinima -Panel Formwork System
Minima -Panel Formwork System
 
Megashor
MegashorMegashor
Megashor
 
Concrete
ConcreteConcrete
Concrete
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
 
Cost effective construction techniques
Cost effective construction techniquesCost effective construction techniques
Cost effective construction techniques
 

Similar to STRIPPING OF FORMWORK

IRJET - Experimental and Analytical Study on Partial Replacement of Coarse Ag...
IRJET - Experimental and Analytical Study on Partial Replacement of Coarse Ag...IRJET - Experimental and Analytical Study on Partial Replacement of Coarse Ag...
IRJET - Experimental and Analytical Study on Partial Replacement of Coarse Ag...IRJET Journal
 
Optimization of prestressed concrete girder
Optimization of prestressed concrete girderOptimization of prestressed concrete girder
Optimization of prestressed concrete girdereSAT Journals
 
Evaluation of Design Provisions for One-Way Solid Slabs in SBC-304
Evaluation of Design Provisions for One-Way Solid Slabs in SBC-304Evaluation of Design Provisions for One-Way Solid Slabs in SBC-304
Evaluation of Design Provisions for One-Way Solid Slabs in SBC-304IRJET Journal
 
COST EFFECTIVENESS OF HIGH PERFORMANCE CONCRETE
COST EFFECTIVENESS OF HIGH PERFORMANCE CONCRETECOST EFFECTIVENESS OF HIGH PERFORMANCE CONCRETE
COST EFFECTIVENESS OF HIGH PERFORMANCE CONCRETEIRJET Journal
 
Optimization of Precast Post-tensioned Concrete I-Girder Bridge
Optimization of Precast Post-tensioned Concrete I-Girder BridgeOptimization of Precast Post-tensioned Concrete I-Girder Bridge
Optimization of Precast Post-tensioned Concrete I-Girder BridgeIRJET Journal
 
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...IRJET Journal
 
IRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for BridgesIRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for BridgesIRJET Journal
 
CEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_ProjectCEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_ProjectBharath Gummaraj
 
Static Structural, Fatigue and Buckling Analysis of Jet Pipe Liner by Inducin...
Static Structural, Fatigue and Buckling Analysis of Jet Pipe Liner by Inducin...Static Structural, Fatigue and Buckling Analysis of Jet Pipe Liner by Inducin...
Static Structural, Fatigue and Buckling Analysis of Jet Pipe Liner by Inducin...IRJET Journal
 
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic Loading
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic LoadingIRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic Loading
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic LoadingIRJET Journal
 
Analysis of Prestressed Concrete Girder for Bridges
Analysis of Prestressed Concrete Girder for BridgesAnalysis of Prestressed Concrete Girder for Bridges
Analysis of Prestressed Concrete Girder for Bridgesijtsrd
 
IRJET- Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...
IRJET-  	  Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...IRJET-  	  Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...
IRJET- Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...IRJET Journal
 
Cost Optimization of Roof Top Swimming Pool
Cost Optimization of Roof Top Swimming PoolCost Optimization of Roof Top Swimming Pool
Cost Optimization of Roof Top Swimming PoolIRJET Journal
 
A RESEARCH ON ANALYSIS OF PROGRESSIVE COLLPSE OF RCC BUILDING WITH BLAST LOAD...
A RESEARCH ON ANALYSIS OF PROGRESSIVE COLLPSE OF RCC BUILDING WITH BLAST LOAD...A RESEARCH ON ANALYSIS OF PROGRESSIVE COLLPSE OF RCC BUILDING WITH BLAST LOAD...
A RESEARCH ON ANALYSIS OF PROGRESSIVE COLLPSE OF RCC BUILDING WITH BLAST LOAD...IRJET Journal
 
IRJET- Strengthening of New Building
IRJET- Strengthening of New BuildingIRJET- Strengthening of New Building
IRJET- Strengthening of New BuildingIRJET Journal
 
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...IRJET Journal
 
Ijsred v2 i3p86
Ijsred v2 i3p86Ijsred v2 i3p86
Ijsred v2 i3p86IJSRED
 
IRJET- Structural Analysis and Design of Pump House
IRJET- Structural Analysis and Design of Pump HouseIRJET- Structural Analysis and Design of Pump House
IRJET- Structural Analysis and Design of Pump HouseIRJET Journal
 

Similar to STRIPPING OF FORMWORK (20)

IRJET - Experimental and Analytical Study on Partial Replacement of Coarse Ag...
IRJET - Experimental and Analytical Study on Partial Replacement of Coarse Ag...IRJET - Experimental and Analytical Study on Partial Replacement of Coarse Ag...
IRJET - Experimental and Analytical Study on Partial Replacement of Coarse Ag...
 
Optimization of prestressed concrete girder
Optimization of prestressed concrete girderOptimization of prestressed concrete girder
Optimization of prestressed concrete girder
 
Evaluation of Design Provisions for One-Way Solid Slabs in SBC-304
Evaluation of Design Provisions for One-Way Solid Slabs in SBC-304Evaluation of Design Provisions for One-Way Solid Slabs in SBC-304
Evaluation of Design Provisions for One-Way Solid Slabs in SBC-304
 
COST EFFECTIVENESS OF HIGH PERFORMANCE CONCRETE
COST EFFECTIVENESS OF HIGH PERFORMANCE CONCRETECOST EFFECTIVENESS OF HIGH PERFORMANCE CONCRETE
COST EFFECTIVENESS OF HIGH PERFORMANCE CONCRETE
 
Optimization of Precast Post-tensioned Concrete I-Girder Bridge
Optimization of Precast Post-tensioned Concrete I-Girder BridgeOptimization of Precast Post-tensioned Concrete I-Girder Bridge
Optimization of Precast Post-tensioned Concrete I-Girder Bridge
 
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
IRJET- Study & Improvement of Design and Construction Methodology of Precast ...
 
IRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for BridgesIRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for Bridges
 
CEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_ProjectCEE598_Gummaraj_Bharath_Final_Project
CEE598_Gummaraj_Bharath_Final_Project
 
Static Structural, Fatigue and Buckling Analysis of Jet Pipe Liner by Inducin...
Static Structural, Fatigue and Buckling Analysis of Jet Pipe Liner by Inducin...Static Structural, Fatigue and Buckling Analysis of Jet Pipe Liner by Inducin...
Static Structural, Fatigue and Buckling Analysis of Jet Pipe Liner by Inducin...
 
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic Loading
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic LoadingIRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic Loading
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic Loading
 
Analysis of Prestressed Concrete Girder for Bridges
Analysis of Prestressed Concrete Girder for BridgesAnalysis of Prestressed Concrete Girder for Bridges
Analysis of Prestressed Concrete Girder for Bridges
 
Tb 1500b
Tb 1500bTb 1500b
Tb 1500b
 
IRJET- Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...
IRJET-  	  Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...IRJET-  	  Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...
IRJET- Flexural Behaviour of RCC Beam with Partially Replaced Concrete be...
 
Cost Optimization of Roof Top Swimming Pool
Cost Optimization of Roof Top Swimming PoolCost Optimization of Roof Top Swimming Pool
Cost Optimization of Roof Top Swimming Pool
 
STUDY THE WORKING STRESS METHOD AND LIMIT STATE METHOD AND IN RCC CHIMNEY DESIGN
STUDY THE WORKING STRESS METHOD AND LIMIT STATE METHOD AND IN RCC CHIMNEY DESIGNSTUDY THE WORKING STRESS METHOD AND LIMIT STATE METHOD AND IN RCC CHIMNEY DESIGN
STUDY THE WORKING STRESS METHOD AND LIMIT STATE METHOD AND IN RCC CHIMNEY DESIGN
 
A RESEARCH ON ANALYSIS OF PROGRESSIVE COLLPSE OF RCC BUILDING WITH BLAST LOAD...
A RESEARCH ON ANALYSIS OF PROGRESSIVE COLLPSE OF RCC BUILDING WITH BLAST LOAD...A RESEARCH ON ANALYSIS OF PROGRESSIVE COLLPSE OF RCC BUILDING WITH BLAST LOAD...
A RESEARCH ON ANALYSIS OF PROGRESSIVE COLLPSE OF RCC BUILDING WITH BLAST LOAD...
 
IRJET- Strengthening of New Building
IRJET- Strengthening of New BuildingIRJET- Strengthening of New Building
IRJET- Strengthening of New Building
 
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
IRJET- Design and Finite Element Analysis of Fabricated Panama Chock with 225...
 
Ijsred v2 i3p86
Ijsred v2 i3p86Ijsred v2 i3p86
Ijsred v2 i3p86
 
IRJET- Structural Analysis and Design of Pump House
IRJET- Structural Analysis and Design of Pump HouseIRJET- Structural Analysis and Design of Pump House
IRJET- Structural Analysis and Design of Pump House
 

STRIPPING OF FORMWORK

  • 1. ACCURATE TECHNICAL INTERPRETATION OF CLAUSE-11.3 OF IS-456-2000 FOR STRIPPING OF FORMWORK. This is a common problem to all the sites that regarding de shuttering of slab ,client or consultant either refer Table under clause 11.3.1 of IS-456 ,in which guidelines of de shuttering has been given in terms of age of concrete or consultant / client consider achievement 70%-100% strength is the criteria for de shuttering of slab. Both the above criteria are semi - correct and without any technical sense, which badly affect project schedule, time cycle and underutilization of resources or implementation of very uneconomic mix to achieve the wrong strength criteria. The Fact Quote from IS-456-2000, CL-11.3 “Forms shall not be releaseduntil the concrete has achieved a strength of at least twice the stress to which the concrete may be subjected at the time of removal of formwork..” Unquote. Cl-11.3.1 also says that the above criteria is the only guideline for stripping and the table of stripping time is established , based on consideration that it will deem the above criteria. Hence instead of following the table it would be better to follow the exact clause of stripping, which is very advantageous for the constructor. Most interestingly it depends upon span length, thk of concrete and imposed load of scaffolding etc., irrespective of grade of concrete. Simple Calculation to know the required strength. A……Load CALCULATION Load during stripping (considering 1 mtr strip)/mtr = a) Thk. of slab x 1X Density of conc.= 0.200x 1x 25kn/cum= 5.0 KN for a slab of 200 mm thk b) Imposed load( load due to scaffold and forms above = 2.5 KN W= 7.5 KN/m B……. Max Bending Moment =( Wl X l)/8= (7.5 x8x8)/8 = 59 KN/m , Considering 8 mtr span of slab. C.. ….. Section Modulus = Z= bd2 /6= ( 1mtr X 0.2x 0.2) /6= 0.0066 m3 for 200 mm d ( thk) and 1m srip. D….. Stress = B.M. max/Section Modulus= 59/.0066=8.99 n/mm2= 9 n/mm2 E. … . Compressive strength requirement at de shuttering = 2 x9 = 18 N/mm2.
  • 2. In most of our cases slab span is 3-4 mtr. and as such the strength requirement will not be more than 4-5 N/mm2. However the minimum strength requirement should not be considered less than 10 Mpa as per BS-8110. The strength requirement is expected to actual strength of structure not cubes strength, hence apply 30 % safety factor on cubes strength while application. Hence the min. Cube comp. strength requirement is 13 Mpa. The above requirement of code is identical both in IS or BS code and widely used for miwan or tunnel formed concrete. Hence it should be also applied in System or conventional formed concrete The write up should be thought upon, understood and let all concern understand the requirement correctly. It will be highly beneficial for the contractor / developer and purchaser in terms of reduced time cycle of slab, ultimately the project duration and cost. K.K.PATHAK K.K.PATHAK Head -QA/QC ,Godrej The Tree project L&T Construction, B&F IC Author: K.K. Pathak, a Construction Quality Specialist with 23 years of professional experience exclusively in QAQC and QMS with the construction and Real Estate sectors. Author is presently serving with L&T Construction, B&F IC. Prior to joining with L&T, KKP served in Pratibha- Capacite Group as Head –QA/QC, with M/s Phoenix Mills Ltd, HCC, Simplex, and Petron. Innovative selection of alternative materials or adaption of alternative work procedures and specifications which adds values to the organization or projects is the motto of the author. Product Quality and innovative construction techniques implemented by Mr. Pathak have been well appreciated by Print Media on several occasions .Mr. Pathak has been awarded with “50 MOST IMPACTFUL QUALITY PROFESSIONAL” award by WORLD QUALITY CONGRESS in the year 2016.