call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
My Projects
1. Community Memorial Hospital, Ventura, California
Design-Build Contract: $120 Million
New Square Feet: 325,000
Renovated Square Feet: 20,000
Completion Date: Fall, 2015
A new Six-story building that includes:
• 250 Medical-Surgical, 12-bed Critical Care, 12 Bed Intensive Care Units • 6 Cardiac Cath. Laboratories
• Outpatient radio-nuclear imaging unit • MRI and imaging suite • Emergency Department • Chapel and
gift shop • Labor-Delivery Department • Neonatal Intensive Care Unit • Kitchen/Dining • Ten Surgical
Theaters • 30 Bed Recovery Unit • Will meet the seismic standards required by the state by 2013 with soil-
quality posing some challenges on the project.
Goleta Valley Cottage Hospital
Design-Build Contract: $103 Million
New Square Feet: 148,000
Completion Date: Fall, 2013
A new two-story building that includes:
• Pharmacy unit • All-inclusive cardiac unit • Outpatient radio-nuclear imaging unit • MRI and imaging
suite • Emergency Department • Chapel and gift shop • 140 Medical-Surgical rooms • 8 bed ICU Unit •
Kitchen/Dining • 6 Surgical Theaters • Chemical Laboratory • Physical Therapy Suite • Will meet the
seismic standards required by the state by 2013 with soil-quality posing some challenges on the project.
2. Desert Valley Hospital, Victorville, California
Design-Build Contract: $35 Million
New Square Feet: 128,000
Removated Square Feet: 35,000
Completion Date: Fall, 2010
A new one-story Addition that includes:
• 53 Medical-Surgical beds, 12 bed Critical Care Unit • All-inclusive cardiac unit • Outpatient radio-nuclear
imaging unit • Two Cardiac Catheterization Laboratories and state-of-the-art Cardiac Surgery Facilities •
Chapel and gift shop
St. Joseph's Hospital of Buckhannon, Inc.
St. Joseph’s Hospital, Buckhannon, West Virginia
Design-Build Contract: $6,500,000
New Square Feet: 12,150
Removated Square Feet: 20,500
Completion Date: Spring, 2007
A new two-story building that includes:
• Demolition of the existing main entry canopy and access drive to accommodate the new building addition
• Anew entry canopy and vestibule • New Emergency Department with EMS entry canopy and entry, six
exam and six treatment rooms • New Imaging suite – X-ray, CT Scan, Bone Density, Mammography and
Ultrasound
Renovations that include: • Main Lobby/Waiting • Admissions • Chapel • Dining Room • Clinical
Laboratory • Pharmacy • Nuclear Medicine • Five bay Recovery • Five Bay PACU
3. St. Mary's Medical Center
St. Mary’s Medical Center, Huntington, West Virginia
Design-Build Contract: $19,600,000
New Square Feet: 87,000
Renovated Square Feet: 20,000
Completion Date: Spring, 2006
A new three-story building that includes:
• Emergency Unit • Heart and Wellness Center • Shelled space • Roof Helipad • New Parking
Jersey Shore Hospital, Jersey Shore, Pennsylvania
The New Facility: Patient care and ambulatory services in a new, two-story building.
A new two-story building that includes:
• Central Lobby • Emergency Room • Three Surgical Suites and Same Day Surgery • Large Field MRI,
Spiral CT, Digital Ultrasound, Bone-Density, X-ray, Mammography and Nuclear Medicine Suite • Cardiac
Stress and Rehabilitation • Medical-Surgical Patient Unit, Critical Care and Sub-Acute Patient Units with
separate dining area for patients • Diagnostic Laboratory services • Consulting Specialty Clinic (Vascular
and Bariatric
4. Adam’s Mark Hotels, Various Locations
Gift Shop, Mobile, Alabama
Player’s Bar
Typical Ballroom