SlideShare a Scribd company logo
1 of 1
Download to read offline
FCI AUTOMOTIVE – NEW PROGRAM LAUNCH
ABS/VSC Connector Module for 2005 FORD Windstar minivan
 Successfully managed a $22M USD FORD/TRW new ABS/VSC program for 2005 FORD Windstar
minivan, from Design to full PPAP launch on-time & within budget.
 Took over a complex FORD program in jeopardy of being lost, gained the trust and credibility of
FORD/TRW Program managers and successfully PPAP launched the program on-time
 Successfully improved a previously strained customer relationship with honesty, integrity trust
 Developed a mandrel prototype concept for insert moulding 52 connector pins, 4 power blades, and
4 bushings for the Automatic Breaking systems ABS & Vehicle System Control VSC CONNECTORS
 Developed & managed all APQP & PPAP documentation including: Design reviews, PFMEA DVP&R,
SPC, Control Plans, SOP, and production tooling design
 Developed automation specifications, RFQ, vendor selection, managed the design, build & installation
of the custom full-automated assembly line Total budget for automation worth over $2.3M USD
Ford ABS & VCS Connectors with module
FORD VSC MODULE

More Related Content

Viewers also liked

Viewers also liked (6)

Presentation1
Presentation1Presentation1
Presentation1
 
Bruce D'Almeida Recomendation
Bruce D'Almeida RecomendationBruce D'Almeida Recomendation
Bruce D'Almeida Recomendation
 
վիտամիններ
վիտամիններվիտամիններ
վիտամիններ
 
Change management
Change managementChange management
Change management
 
Class 7 tdg and you!
Class 7 tdg and you!Class 7 tdg and you!
Class 7 tdg and you!
 
6sigma
6sigma6sigma
6sigma
 

Similar to FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH

Resume Mm Brach Chronological 8.0
Resume   Mm Brach Chronological 8.0Resume   Mm Brach Chronological 8.0
Resume Mm Brach Chronological 8.0mbrach
 
Jay Portfolio - Engineering Manager
Jay Portfolio - Engineering ManagerJay Portfolio - Engineering Manager
Jay Portfolio - Engineering Managerjaymehta2
 
Ace065 rinkevich 2011_o
Ace065 rinkevich 2011_oAce065 rinkevich 2011_o
Ace065 rinkevich 2011_oPardeep Kumar
 
Bruce Hajdyla E Portfolio 2012 Experience Summary
Bruce Hajdyla E Portfolio   2012 Experience SummaryBruce Hajdyla E Portfolio   2012 Experience Summary
Bruce Hajdyla E Portfolio 2012 Experience Summaryfleet1wood
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14briansrobert
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14briansrobert
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14briansrobert
 
Milan Shah Work Portfolio
Milan Shah Work PortfolioMilan Shah Work Portfolio
Milan Shah Work PortfolioMilan Shah
 
Mark Yost Resume For Upload
Mark Yost Resume For UploadMark Yost Resume For Upload
Mark Yost Resume For UploadMark Yost
 
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...Global Business Events
 
Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4Brendan Salmond
 
Curriculum_vitae
Curriculum_vitaeCurriculum_vitae
Curriculum_vitaeKiran Gp
 
Omnex 2019 Newsletter Navigator
Omnex 2019 Newsletter NavigatorOmnex 2019 Newsletter Navigator
Omnex 2019 Newsletter NavigatorOmnex Inc.
 

Similar to FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH (20)

Resume Mm Brach Chronological 8.0
Resume   Mm Brach Chronological 8.0Resume   Mm Brach Chronological 8.0
Resume Mm Brach Chronological 8.0
 
Jay Portfolio - Engineering Manager
Jay Portfolio - Engineering ManagerJay Portfolio - Engineering Manager
Jay Portfolio - Engineering Manager
 
jrs_1_19_17
jrs_1_19_17jrs_1_19_17
jrs_1_19_17
 
Ace065 rinkevich 2011_o
Ace065 rinkevich 2011_oAce065 rinkevich 2011_o
Ace065 rinkevich 2011_o
 
Bruce Hajdyla E Portfolio 2012 Experience Summary
Bruce Hajdyla E Portfolio   2012 Experience SummaryBruce Hajdyla E Portfolio   2012 Experience Summary
Bruce Hajdyla E Portfolio 2012 Experience Summary
 
Sandeep_CV_Updated
Sandeep_CV_UpdatedSandeep_CV_Updated
Sandeep_CV_Updated
 
Sandeep_CV_Updated
Sandeep_CV_UpdatedSandeep_CV_Updated
Sandeep_CV_Updated
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
 
Milan Shah Work Portfolio
Milan Shah Work PortfolioMilan Shah Work Portfolio
Milan Shah Work Portfolio
 
Alex Przebienda Resume
Alex Przebienda ResumeAlex Przebienda Resume
Alex Przebienda Resume
 
Mazda Pres Kuzak
Mazda Pres KuzakMazda Pres Kuzak
Mazda Pres Kuzak
 
Pres Kuzak
Pres KuzakPres Kuzak
Pres Kuzak
 
CV_Prashant
CV_PrashantCV_Prashant
CV_Prashant
 
Mark Yost Resume For Upload
Mark Yost Resume For UploadMark Yost Resume For Upload
Mark Yost Resume For Upload
 
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
 
Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4
 
Curriculum_vitae
Curriculum_vitaeCurriculum_vitae
Curriculum_vitae
 
Omnex 2019 Newsletter Navigator
Omnex 2019 Newsletter NavigatorOmnex 2019 Newsletter Navigator
Omnex 2019 Newsletter Navigator
 

More from Julian Kalac P.Eng

VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.EngJulian Kalac P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowJulian Kalac P.Eng
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSJulian Kalac P.Eng
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Julian Kalac P.Eng
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment Julian Kalac P.Eng
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS Julian Kalac P.Eng
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVERJulian Kalac P.Eng
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureJulian Kalac P.Eng
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018Julian Kalac P.Eng
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutJulian Kalac P.Eng
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverJulian Kalac P.Eng
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over timeJulian Kalac P.Eng
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS Julian Kalac P.Eng
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACJulian Kalac P.Eng
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian KalacJulian Kalac P.Eng
 
The hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACThe hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACJulian Kalac P.Eng
 

More from Julian Kalac P.Eng (20)

VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeover
 
MWV CONTROL VS SPEC
MWV CONTROL VS SPECMWV CONTROL VS SPEC
MWV CONTROL VS SPEC
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over time
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian Kalac
 
The hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACThe hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALAC
 

FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH

  • 1. FCI AUTOMOTIVE – NEW PROGRAM LAUNCH ABS/VSC Connector Module for 2005 FORD Windstar minivan  Successfully managed a $22M USD FORD/TRW new ABS/VSC program for 2005 FORD Windstar minivan, from Design to full PPAP launch on-time & within budget.  Took over a complex FORD program in jeopardy of being lost, gained the trust and credibility of FORD/TRW Program managers and successfully PPAP launched the program on-time  Successfully improved a previously strained customer relationship with honesty, integrity trust  Developed a mandrel prototype concept for insert moulding 52 connector pins, 4 power blades, and 4 bushings for the Automatic Breaking systems ABS & Vehicle System Control VSC CONNECTORS  Developed & managed all APQP & PPAP documentation including: Design reviews, PFMEA DVP&R, SPC, Control Plans, SOP, and production tooling design  Developed automation specifications, RFQ, vendor selection, managed the design, build & installation of the custom full-automated assembly line Total budget for automation worth over $2.3M USD Ford ABS & VCS Connectors with module FORD VSC MODULE