Problem Statement
After last weeks meeting, it was determined that to further improve in the elimination of waste and attain our
cost per unit goal building the 304 Family of Cameras, batch building would be the greatest potential. In order
to do so, we would create a work station in the Production area. Both to build and to test large quantities of
family cameras due to this particular family requiring the fewest quantity of components to build, therefore
demanding the least amount of footprint. This family of cameras being of the top 3 products by volume, will
offer the greatest cost savings by batch building to meet demand.
Batch building this family would eliminate the costs associated with our traditional pull-pick method which
creates the highest cost association because of multiple handling, pre staging and movement into production
by our warehouse associates across 3 shifts.
By implementing a Batch build method we can possibly produce a weekly requirement by building with one
person on an as needed basis after further utilizing trend data to determine quantity.
Receive
Material
following
process
Quality
Inspection
Put Away
Material /
Note
location
Upload
Location
Fill Rack /
Pallet in
Batch area
per schedule
Batch Build
specified
weekly / Daily
Requirements
Move to
Finished
Goods
Storage
Finished Goods
Error Proof and Quality
Inspection In Station
Shipping
Batch Build Value Stream
Ideal Workstation for Batch Build M304 Product Family
M304 Product Family M304 Product Family
Small Lot
Parts Rack

More Related Content

Similar to My Company Batch Build M304 [Autosaved]

Internship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptxInternship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptxPedroFerreira876615
 
Product content management_process_samples
Product content management_process_samplesProduct content management_process_samples
Product content management_process_samplesIndra kumar
 
HBM Operations CMD
HBM  Operations  CMDHBM  Operations  CMD
HBM Operations CMDknoxbusiness
 
Corner Post Project
Corner Post ProjectCorner Post Project
Corner Post Projecttabyrnes
 
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journeyInvest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journeyInvest Northern Ireland
 
Hewlett packard
Hewlett packard Hewlett packard
Hewlett packard Rita Li
 
Session 8
Session 8Session 8
Session 8thangv
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OMthangv
 
Columbus - Warehouse and Inventory Management System
Columbus - Warehouse and Inventory Management SystemColumbus - Warehouse and Inventory Management System
Columbus - Warehouse and Inventory Management SystemSchool Time
 
Cost Reduction Strategies
Cost Reduction StrategiesCost Reduction Strategies
Cost Reduction StrategiesAbhishek Raj
 
PTS Consolidation Action Plan
PTS Consolidation Action PlanPTS Consolidation Action Plan
PTS Consolidation Action PlanMia Montilla
 
Types of manufacturing processes sumit verma MBA 2nd sem
Types of manufacturing processes sumit verma MBA 2nd semTypes of manufacturing processes sumit verma MBA 2nd sem
Types of manufacturing processes sumit verma MBA 2nd semSumit Verma
 
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docxsusanschei
 
om chapter 3.ppt
om chapter 3.pptom chapter 3.ppt
om chapter 3.pptDejeneDay
 

Similar to My Company Batch Build M304 [Autosaved] (20)

Internship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptxInternship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptx
 
Product content management_process_samples
Product content management_process_samplesProduct content management_process_samples
Product content management_process_samples
 
HBM Operations CMD
HBM  Operations  CMDHBM  Operations  CMD
HBM Operations CMD
 
Corner Post Project
Corner Post ProjectCorner Post Project
Corner Post Project
 
CD June 2016 - TotalMobile
CD June 2016 -  TotalMobileCD June 2016 -  TotalMobile
CD June 2016 - TotalMobile
 
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journeyInvest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journey
 
Hewlett packard
Hewlett packard Hewlett packard
Hewlett packard
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Session 8
Session 8Session 8
Session 8
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Methods Of Production
Methods Of ProductionMethods Of Production
Methods Of Production
 
Accomplishments - Reynosa
Accomplishments - ReynosaAccomplishments - Reynosa
Accomplishments - Reynosa
 
Session 4
Session 4Session 4
Session 4
 
Columbus - Warehouse and Inventory Management System
Columbus - Warehouse and Inventory Management SystemColumbus - Warehouse and Inventory Management System
Columbus - Warehouse and Inventory Management System
 
Cost Reduction Strategies
Cost Reduction StrategiesCost Reduction Strategies
Cost Reduction Strategies
 
PTS Consolidation Action Plan
PTS Consolidation Action PlanPTS Consolidation Action Plan
PTS Consolidation Action Plan
 
Types of manufacturing processes sumit verma MBA 2nd sem
Types of manufacturing processes sumit verma MBA 2nd semTypes of manufacturing processes sumit verma MBA 2nd sem
Types of manufacturing processes sumit verma MBA 2nd sem
 
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx
©2003-2006 Factory Physics, Inc.Value Stream Mapping P.docx
 
An approach for implementing key performance indicators of a discrete manufa...
An approach for implementing key performance  indicators of a discrete manufa...An approach for implementing key performance  indicators of a discrete manufa...
An approach for implementing key performance indicators of a discrete manufa...
 
om chapter 3.ppt
om chapter 3.pptom chapter 3.ppt
om chapter 3.ppt
 

My Company Batch Build M304 [Autosaved]

  • 1. My Company Productivity Improvement Batch Build 8/3/2016 Juan Burnett
  • 2. Problem Statement After last weeks meeting, it was determined that to further improve in the elimination of waste and attain our cost per unit goal building the 304 Family of Cameras, batch building would be the greatest potential. In order to do so, we would create a work station in the Production area. Both to build and to test large quantities of family cameras due to this particular family requiring the fewest quantity of components to build, therefore demanding the least amount of footprint. This family of cameras being of the top 3 products by volume, will offer the greatest cost savings by batch building to meet demand. Batch building this family would eliminate the costs associated with our traditional pull-pick method which creates the highest cost association because of multiple handling, pre staging and movement into production by our warehouse associates across 3 shifts. By implementing a Batch build method we can possibly produce a weekly requirement by building with one person on an as needed basis after further utilizing trend data to determine quantity.
  • 3. Receive Material following process Quality Inspection Put Away Material / Note location Upload Location Fill Rack / Pallet in Batch area per schedule Batch Build specified weekly / Daily Requirements Move to Finished Goods Storage Finished Goods
  • 4. Error Proof and Quality Inspection In Station Shipping Batch Build Value Stream
  • 5. Ideal Workstation for Batch Build M304 Product Family M304 Product Family M304 Product Family Small Lot Parts Rack