1/ The rollers are positioned in a pyramid configuration
2/ The top roller is vertically adjustable
3/ Two bottom feed rollers rotate in the same direction
Feed rollers
Top feed roller
Material being rolled
๏ฝ Original concept sketch for pyramid type slip rolls
Four phases of manufacture
1/ Cutting of all materials to specified dimensions
2/ Machining all components to specified dimensions
3/ Fabrication and Welding
4/ Assembly
Testing criteria
1/ Testing of a range of different materials
2/ Testing of a range of different thicknesses of materials
3/ Theoretical testing of machine using the formulae for simple
bending theory
4/ Practical testing of machine using a range different materials in
various thicknesses
5/ Establishing whether the theoretical testing is validated by the
practical testing
6/ Record and tabulate practical testing results
Mild steel
b = 0.5m / d = 0.003m / y = 0.0015m / Yield (ฯƒ) = 210mPa
I =
๐’ƒ๐’™๐’… ๐Ÿ‘
๐Ÿ๐Ÿ
๐’”๐’ ๐‘ฐ =
(๐ŸŽ.๐Ÿ“๐’Ž)๐’™(๐ŸŽ.๐ŸŽ๐ŸŽ๐Ÿ‘) ๐Ÿ‘
๐Ÿ๐Ÿ
๐’”๐’ ๐‘ฐ = ๐Ÿ๐Ÿ๐Ÿ๐Ÿ“ ๐’™ ๐Ÿ๐ŸŽโˆ’๐Ÿ๐Ÿ
๐’Ž ๐Ÿ’
๐ˆ
๐’€
=
๐‘ด
๐‘ฐ
so M =
๐ˆ
๐’€
๐’™ ๐‘ฐ ๐’”๐’ ๐‘ด =
๐Ÿ๐Ÿ๐ŸŽ ๐’™ ๐Ÿ๐ŸŽ ๐Ÿ” ๐‘ต๐’Ž
๐ŸŽ.๐ŸŽ๐ŸŽ๐Ÿ๐Ÿ“ ๐’Ž
๐’™ ๐Ÿ๐Ÿ๐Ÿ๐Ÿ“ ๐’™ ๐Ÿ๐ŸŽโˆ’๐Ÿ๐Ÿ
๐’Ž ๐Ÿ’
Therefore M = 157.5 Nm
M =
๐‘ญ
๐Ÿ
๐’™ ๐ŸŽ. ๐ŸŽ๐Ÿ’๐’Ž so M = 0.02F so F =
๐‘ด
๐ŸŽ.๐ŸŽ๐Ÿ
so F =
๐Ÿ๐Ÿ“๐Ÿ•.๐Ÿ“ ๐‘ต๐’Ž
๐ŸŽ.๐ŸŽ๐Ÿ ๐’Ž
Therefore F = 7875 N
TABLE OF RESULTS FOR THE TESTING OF THE FUNCTIONAL LIMITS OF PYRAMID TYPE SLIP ROLLS
TESTS MATERIAL b (m) d (m) Y (m)
FEED ROLLER CENTRES
(m)
POINT OF MAXIMUM BENDING
(m) S.M.O.A I (m^4) YIELD STRENGTH ฯƒ (Pa)
MAXIMUM BENDING MOMENT
(Nm) FORCE (N) STATUS
TEST 1 STEEL 0.5 0.001 0.0005 0.08 0.04 4.16667E-11 2.10E+08 17.5 875 PASS
TEST 2 STEEL 0.5 0.002 0.001 0.08 0.04 3.33333E-10 2.10E+08 70 3500 PASS
TEST 3 STEEL 0.5 0.003 0.0015 0.08 0.04 1.125E-09 2.10E+08 157.5 7875 PASS
TEST 4 STEEL 0.2 0.004 0.002 0.08 0.04 1.06667E-09 2.10E+08 112 5600 PASS
TEST 5 ALUMINIUM 0.15 0.002 0.001 0.08 0.04 1E-10 1.25E+08 12.5 625 PASS
TEST 6 ALUMINIUM 0.1 0.002 0.001 0.08 0.04 6.66667E-11 1.25E+08 8.33E+00 416.667 PASS
TEST 7 COPPER 0.1 0.006 0.003 0.08 0.04 1.8E-09 2.68E+08 160.8 8040
PASS (AT
LIMITS)
MANUFACTURING PLAN FOR PYRAMID TYPE THREE ROLL SLIP ROLLS
COMPONENT MANUFACTURING PROCESSES TIME TAKEN (Hours) WEEK STATUS
RHS BASE FRAME CUTTING, DRILLING, WELDING 2 14 Completed
THREADED INSERTS FOR RHS FRAME CUTTING, DRILLING, TAPPING, WELDING 2 14 Completed
IDLE END PLATE CUTTING, DRILLING, TAPPING, MILLING 12 15 Completed
GEAR END PLATE CUTTING, DRILLING, TAPPING, MILLING 12 16 Completed
TOP ROLLER CUTTING, TURNING, 4 16 Completed
BOTTOM FRONT FEED ROLLER CUTTING, TURNING, MILLING 6 17 Completed
BOTTOM BACK FEED ROLLER CUTTING, TURNING, MILLING 6 17 Completed
GEAR KEYS FOR BOTTOM FEED ROLLERS CUTTING, MILLING, FILING 4 17 Completed
INTERMEDIATE GEAR SHAFT CUTTING, TURNING, MILLING 2 18 Completed
INTERMEDIATE GEAR SHAFT KEY CUTTING, MILLING, FILING 1 18 Completed
BRASS TOP ROLLER GUIDES CUTTING, DRILLING, FILING, MILLING 6 18 Completed
BOTTOM LOCKING BLOCKS CUTTING, DRILLING, COUNTERSINKING 4 18 Completed
TOP LOCKING BLOCKS CUTTING, DRILLING, COUNTERBORING 4 18 Completed
THREADED ROUND SCREWJACK GUIDE CUTTING, DRILLING, TAPPING, WELDING 2 19 Completed
SCREWJACK TURNING HANDLES CUTTING, WELDING 2 19 Completed
SCREWJACK TURNING HANDLE BODIES CUTTING, DRILLING, TAPPING, WELDING 2 19 Completed
RETAINING RING FOR BRASS GUIDES CUTTING, DRILLING, WELDING 2 19 Completed
THREADED ROD CUTTING 1 19 Completed
CRANKING HANDLE CUTTING, DRILLING, WELDING 2 19 Completed
CRANKING HANDLE BOSS CUTTING, DRILLING, FILING,WELDING 2 19 Completed
PRESSING BEARINGS HYDRAULIC PRESSING 1 19 Completed
ASSEMBLY ASSEMBLING OF COMPONENTS AND TORQUEING OF BOLTS 4 20 Completed
TESTING OF FINISHED MACHINE TESTING THE THEORETICAL ABILITIES OF THE MACHINE 6 21 Completed
TESTING OF FINISHED MACHINE TESTING THE THEORETICAL ABILITIES OF THE MACHINE 6 22 Completed
Any questions ???

More Related Content

What's hot

Tanques sapphire
Tanques sapphireTanques sapphire
Tanques sapphireEDUARDOMOURIZ
ย 
Contract manufacturing
Contract manufacturingContract manufacturing
Contract manufacturingkahlenberg
ย 
Valvula check swing fe bridada x 125 lbs rex
Valvula check swing fe bridada x 125 lbs rexValvula check swing fe bridada x 125 lbs rex
Valvula check swing fe bridada x 125 lbs rexGRUPO BACRUFLEX PERU
ย 
viscometer
viscometerviscometer
viscometerfurqanridha
ย 
Eagle Millยฎ Discharge Hose -Single Jacket Mill Hose/Double Jacket Mill Hose -...
Eagle Millยฎ Discharge Hose -Single Jacket Mill Hose/Double Jacket Mill Hose -...Eagle Millยฎ Discharge Hose -Single Jacket Mill Hose/Double Jacket Mill Hose -...
Eagle Millยฎ Discharge Hose -Single Jacket Mill Hose/Double Jacket Mill Hose -...JGB Enterprises, Inc.
ย 
Eagle Arcticยฎ Oilfield 150 PSI Hose - Oilfield Hose
Eagle Arcticยฎ Oilfield 150 PSI Hose - Oilfield HoseEagle Arcticยฎ Oilfield 150 PSI Hose - Oilfield Hose
Eagle Arcticยฎ Oilfield 150 PSI Hose - Oilfield HoseJGB Enterprises, Inc.
ย 
Douglas chero main catalogue
Douglas chero main catalogueDouglas chero main catalogue
Douglas chero main catalogueStefano Pedrini
ย 
Gokwe Water Tank Structure Design (New Members) - Design Sheets
Gokwe Water Tank Structure Design (New Members) - Design SheetsGokwe Water Tank Structure Design (New Members) - Design Sheets
Gokwe Water Tank Structure Design (New Members) - Design SheetsMagdel Kotze
ย 
Kluberlub be-41-542 Mr Tรนng - 0987 988 407 | www.khodaumo.com
Kluberlub be-41-542 Mr Tรนng - 0987 988 407 | www.khodaumo.comKluberlub be-41-542 Mr Tรนng - 0987 988 407 | www.khodaumo.com
Kluberlub be-41-542 Mr Tรนng - 0987 988 407 | www.khodaumo.comฤแป— Bรก Tรนng
ย 
Mcb bh p-dienhathe.org
Mcb bh p-dienhathe.orgMcb bh p-dienhathe.org
Mcb bh p-dienhathe.orgDien Ha The
ย 
Mcb bh dienhathe.org
Mcb bh dienhathe.orgMcb bh dienhathe.org
Mcb bh dienhathe.orgDien Ha The
ย 
New Microsoft PowerPoint Presentation
New Microsoft PowerPoint PresentationNew Microsoft PowerPoint Presentation
New Microsoft PowerPoint Presentationebbin daniel
ย 
Valvula compuerta fe bridada v-f 125 lb rex
Valvula compuerta fe bridada v-f 125 lb rexValvula compuerta fe bridada v-f 125 lb rex
Valvula compuerta fe bridada v-f 125 lb rexGRUPO BACRUFLEX PERU
ย 

What's hot (20)

Seamless steel pipe for lpg gas cylinder
Seamless steel pipe for lpg gas cylinderSeamless steel pipe for lpg gas cylinder
Seamless steel pipe for lpg gas cylinder
ย 
Tanques sapphire
Tanques sapphireTanques sapphire
Tanques sapphire
ย 
Contract manufacturing
Contract manufacturingContract manufacturing
Contract manufacturing
ย 
Valvula check swing fe bridada x 125 lbs rex
Valvula check swing fe bridada x 125 lbs rexValvula check swing fe bridada x 125 lbs rex
Valvula check swing fe bridada x 125 lbs rex
ย 
viscometer
viscometerviscometer
viscometer
ย 
Eagle Millยฎ Discharge Hose -Single Jacket Mill Hose/Double Jacket Mill Hose -...
Eagle Millยฎ Discharge Hose -Single Jacket Mill Hose/Double Jacket Mill Hose -...Eagle Millยฎ Discharge Hose -Single Jacket Mill Hose/Double Jacket Mill Hose -...
Eagle Millยฎ Discharge Hose -Single Jacket Mill Hose/Double Jacket Mill Hose -...
ย 
Eagle Arcticยฎ Oilfield 150 PSI Hose - Oilfield Hose
Eagle Arcticยฎ Oilfield 150 PSI Hose - Oilfield HoseEagle Arcticยฎ Oilfield 150 PSI Hose - Oilfield Hose
Eagle Arcticยฎ Oilfield 150 PSI Hose - Oilfield Hose
ย 
TOKO ALAT UJI LAB TANAH,BETON DAN ASPAL,081222169921
TOKO ALAT UJI LAB TANAH,BETON DAN ASPAL,081222169921TOKO ALAT UJI LAB TANAH,BETON DAN ASPAL,081222169921
TOKO ALAT UJI LAB TANAH,BETON DAN ASPAL,081222169921
ย 
Douglas chero main catalogue
Douglas chero main catalogueDouglas chero main catalogue
Douglas chero main catalogue
ย 
ฤแป“ng hแป“ ฤ‘o lฦฐu lฦฐแปฃng khรญ hรณa lแปng
ฤแป“ng hแป“ ฤ‘o lฦฐu lฦฐแปฃng khรญ hรณa lแปngฤแป“ng hแป“ ฤ‘o lฦฐu lฦฐแปฃng khรญ hรณa lแปng
ฤแป“ng hแป“ ฤ‘o lฦฐu lฦฐแปฃng khรญ hรณa lแปng
ย 
Gokwe Water Tank Structure Design (New Members) - Design Sheets
Gokwe Water Tank Structure Design (New Members) - Design SheetsGokwe Water Tank Structure Design (New Members) - Design Sheets
Gokwe Water Tank Structure Design (New Members) - Design Sheets
ย 
Hydra clean
Hydra cleanHydra clean
Hydra clean
ย 
Kluberlub be-41-542 Mr Tรนng - 0987 988 407 | www.khodaumo.com
Kluberlub be-41-542 Mr Tรนng - 0987 988 407 | www.khodaumo.comKluberlub be-41-542 Mr Tรนng - 0987 988 407 | www.khodaumo.com
Kluberlub be-41-542 Mr Tรนng - 0987 988 407 | www.khodaumo.com
ย 
Mcb bh p-dienhathe.org
Mcb bh p-dienhathe.orgMcb bh p-dienhathe.org
Mcb bh p-dienhathe.org
ย 
Mcb bh dienhathe.org
Mcb bh dienhathe.orgMcb bh dienhathe.org
Mcb bh dienhathe.org
ย 
Technical capacity
Technical capacityTechnical capacity
Technical capacity
ย 
New Microsoft PowerPoint Presentation
New Microsoft PowerPoint PresentationNew Microsoft PowerPoint Presentation
New Microsoft PowerPoint Presentation
ย 
Thomafluid i english
Thomafluid i englishThomafluid i english
Thomafluid i english
ย 
TC_FLS_SIHI_ISOchem_EN
TC_FLS_SIHI_ISOchem_ENTC_FLS_SIHI_ISOchem_EN
TC_FLS_SIHI_ISOchem_EN
ย 
Valvula compuerta fe bridada v-f 125 lb rex
Valvula compuerta fe bridada v-f 125 lb rexValvula compuerta fe bridada v-f 125 lb rex
Valvula compuerta fe bridada v-f 125 lb rex
ย 

Viewers also liked

Screw Jack Design
Screw Jack DesignScrew Jack Design
Screw Jack DesignKunind Sharma
ย 
Bending machine project
Bending machine projectBending machine project
Bending machine projectMohammad Karim
ย 
Design and fabrication of bending machine
Design and fabrication of bending machineDesign and fabrication of bending machine
Design and fabrication of bending machineparamesr2020
ย 
MECHANICAL PROJECT
MECHANICAL PROJECTMECHANICAL PROJECT
MECHANICAL PROJECTShivam Prajapati
ย 
Final Year Project Presentation
Final Year Project PresentationFinal Year Project Presentation
Final Year Project PresentationLauraConroy
ย 
Final Year Project
Final Year ProjectFinal Year Project
Final Year ProjectMuhammad Khan
ย 
Presentation on project report
Presentation on project reportPresentation on project report
Presentation on project reportramesh_x
ย 

Viewers also liked (10)

Screw Jack Design
Screw Jack DesignScrew Jack Design
Screw Jack Design
ย 
Bending machine project
Bending machine projectBending machine project
Bending machine project
ย 
01 screw Jack
01 screw Jack01 screw Jack
01 screw Jack
ย 
Screw jack
Screw jackScrew jack
Screw jack
ย 
Assembly of screw jack
Assembly of screw jackAssembly of screw jack
Assembly of screw jack
ย 
Design and fabrication of bending machine
Design and fabrication of bending machineDesign and fabrication of bending machine
Design and fabrication of bending machine
ย 
MECHANICAL PROJECT
MECHANICAL PROJECTMECHANICAL PROJECT
MECHANICAL PROJECT
ย 
Final Year Project Presentation
Final Year Project PresentationFinal Year Project Presentation
Final Year Project Presentation
ย 
Final Year Project
Final Year ProjectFinal Year Project
Final Year Project
ย 
Presentation on project report
Presentation on project reportPresentation on project report
Presentation on project report
ย 

Similar to FINAL PROJECT PRESENTATION (3rd YEAR) - Copy

SURFACE ROUGHNESS OPTIMIZATION IN BALL NOSE MILLING PROCESS OF C45 STEEL USIN...
SURFACE ROUGHNESS OPTIMIZATION IN BALL NOSE MILLING PROCESS OF C45 STEEL USIN...SURFACE ROUGHNESS OPTIMIZATION IN BALL NOSE MILLING PROCESS OF C45 STEEL USIN...
SURFACE ROUGHNESS OPTIMIZATION IN BALL NOSE MILLING PROCESS OF C45 STEEL USIN...IAEME Publication
ย 
Rolling Diaphragm Air Cyclinders for Linear Motion
Rolling Diaphragm Air Cyclinders for Linear MotionRolling Diaphragm Air Cyclinders for Linear Motion
Rolling Diaphragm Air Cyclinders for Linear MotionHile Controls of Alabama, Inc.
ย 
Industrial Valves 2018
Industrial Valves 2018Industrial Valves 2018
Industrial Valves 2018Murat Cengiz
ย 
Caterpillar 3208 Diesel Engine Service Manual Copy One [PDF, ENG, 154 MB].pdf
Caterpillar 3208 Diesel Engine Service Manual Copy One [PDF, ENG, 154 MB].pdfCaterpillar 3208 Diesel Engine Service Manual Copy One [PDF, ENG, 154 MB].pdf
Caterpillar 3208 Diesel Engine Service Manual Copy One [PDF, ENG, 154 MB].pdfEguima Guima
ย 
Crankshaft Manufacturing Project report
Crankshaft Manufacturing Project report Crankshaft Manufacturing Project report
Crankshaft Manufacturing Project report Omar Amen
ย 
Catalogo Atlas en espaรฑol
Catalogo Atlas en espaรฑolCatalogo Atlas en espaรฑol
Catalogo Atlas en espaรฑolJean Pierre Gutierrez
ย 
Final Bachelor thesis Presentation
Final Bachelor thesis PresentationFinal Bachelor thesis Presentation
Final Bachelor thesis PresentationMohammed Omer
ย 
Etm551 lecture04
Etm551 lecture04Etm551 lecture04
Etm551 lecture04Alex Chuรช
ย 
ETANCHEITE PSS SHAFT SEAL
ETANCHEITE PSS SHAFT SEALETANCHEITE PSS SHAFT SEAL
ETANCHEITE PSS SHAFT SEALemmanuelle bezzi
ย 
GWC Valve International Triple Offset Butterfly Valves
GWC Valve International Triple Offset Butterfly ValvesGWC Valve International Triple Offset Butterfly Valves
GWC Valve International Triple Offset Butterfly ValvesGWC Valve International
ย 
MULTI CAVITY DIE PREPARATION, ANALYSIS AND MANUFACTURING PROCESS OF DIESEL EN...
MULTI CAVITY DIE PREPARATION, ANALYSIS AND MANUFACTURING PROCESS OF DIESEL EN...MULTI CAVITY DIE PREPARATION, ANALYSIS AND MANUFACTURING PROCESS OF DIESEL EN...
MULTI CAVITY DIE PREPARATION, ANALYSIS AND MANUFACTURING PROCESS OF DIESEL EN...Ijripublishers Ijri
ย 
IRJET- Experimental Study on the Effect of Axial Loading on Light Gauge Steel...
IRJET- Experimental Study on the Effect of Axial Loading on Light Gauge Steel...IRJET- Experimental Study on the Effect of Axial Loading on Light Gauge Steel...
IRJET- Experimental Study on the Effect of Axial Loading on Light Gauge Steel...IRJET Journal
ย 
Pneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place RobotPneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place RobotAbhijeet Pawar
ย 
Crankshaft Manufacturing
Crankshaft Manufacturing Crankshaft Manufacturing
Crankshaft Manufacturing Habashy Shaaban
ย 
Crankshaft Manufacturing Process sequence
Crankshaft Manufacturing Process sequence  Crankshaft Manufacturing Process sequence
Crankshaft Manufacturing Process sequence Omar Amen
ย 
T series pneumatic actuator catalogue
T series pneumatic actuator catalogueT series pneumatic actuator catalogue
T series pneumatic actuator catalogueRespon Flow Control
ย 
Rock Drilling Tools
Rock Drilling ToolsRock Drilling Tools
Rock Drilling ToolsJeb Williams
ย 
Amtek persentation aman (11 me-06)
Amtek persentation aman (11 me-06)Amtek persentation aman (11 me-06)
Amtek persentation aman (11 me-06)Aman5252
ย 

Similar to FINAL PROJECT PRESENTATION (3rd YEAR) - Copy (20)

SURFACE ROUGHNESS OPTIMIZATION IN BALL NOSE MILLING PROCESS OF C45 STEEL USIN...
SURFACE ROUGHNESS OPTIMIZATION IN BALL NOSE MILLING PROCESS OF C45 STEEL USIN...SURFACE ROUGHNESS OPTIMIZATION IN BALL NOSE MILLING PROCESS OF C45 STEEL USIN...
SURFACE ROUGHNESS OPTIMIZATION IN BALL NOSE MILLING PROCESS OF C45 STEEL USIN...
ย 
Rolling Diaphragm Air Cyclinders for Linear Motion
Rolling Diaphragm Air Cyclinders for Linear MotionRolling Diaphragm Air Cyclinders for Linear Motion
Rolling Diaphragm Air Cyclinders for Linear Motion
ย 
Sintering plant
Sintering plantSintering plant
Sintering plant
ย 
Industrial Valves 2018
Industrial Valves 2018Industrial Valves 2018
Industrial Valves 2018
ย 
Caterpillar 3208 Diesel Engine Service Manual Copy One [PDF, ENG, 154 MB].pdf
Caterpillar 3208 Diesel Engine Service Manual Copy One [PDF, ENG, 154 MB].pdfCaterpillar 3208 Diesel Engine Service Manual Copy One [PDF, ENG, 154 MB].pdf
Caterpillar 3208 Diesel Engine Service Manual Copy One [PDF, ENG, 154 MB].pdf
ย 
Crankshaft Manufacturing Project report
Crankshaft Manufacturing Project report Crankshaft Manufacturing Project report
Crankshaft Manufacturing Project report
ย 
Catalogo Atlas en espaรฑol
Catalogo Atlas en espaรฑolCatalogo Atlas en espaรฑol
Catalogo Atlas en espaรฑol
ย 
Final Bachelor thesis Presentation
Final Bachelor thesis PresentationFinal Bachelor thesis Presentation
Final Bachelor thesis Presentation
ย 
Etm551 lecture04
Etm551 lecture04Etm551 lecture04
Etm551 lecture04
ย 
ETANCHEITE PSS SHAFT SEAL
ETANCHEITE PSS SHAFT SEALETANCHEITE PSS SHAFT SEAL
ETANCHEITE PSS SHAFT SEAL
ย 
GWC Valve International Triple Offset Butterfly Valves
GWC Valve International Triple Offset Butterfly ValvesGWC Valve International Triple Offset Butterfly Valves
GWC Valve International Triple Offset Butterfly Valves
ย 
MULTI CAVITY DIE PREPARATION, ANALYSIS AND MANUFACTURING PROCESS OF DIESEL EN...
MULTI CAVITY DIE PREPARATION, ANALYSIS AND MANUFACTURING PROCESS OF DIESEL EN...MULTI CAVITY DIE PREPARATION, ANALYSIS AND MANUFACTURING PROCESS OF DIESEL EN...
MULTI CAVITY DIE PREPARATION, ANALYSIS AND MANUFACTURING PROCESS OF DIESEL EN...
ย 
IRJET- Experimental Study on the Effect of Axial Loading on Light Gauge Steel...
IRJET- Experimental Study on the Effect of Axial Loading on Light Gauge Steel...IRJET- Experimental Study on the Effect of Axial Loading on Light Gauge Steel...
IRJET- Experimental Study on the Effect of Axial Loading on Light Gauge Steel...
ย 
Pneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place RobotPneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place Robot
ย 
Mr77 12
Mr77 12Mr77 12
Mr77 12
ย 
Crankshaft Manufacturing
Crankshaft Manufacturing Crankshaft Manufacturing
Crankshaft Manufacturing
ย 
Crankshaft Manufacturing Process sequence
Crankshaft Manufacturing Process sequence  Crankshaft Manufacturing Process sequence
Crankshaft Manufacturing Process sequence
ย 
T series pneumatic actuator catalogue
T series pneumatic actuator catalogueT series pneumatic actuator catalogue
T series pneumatic actuator catalogue
ย 
Rock Drilling Tools
Rock Drilling ToolsRock Drilling Tools
Rock Drilling Tools
ย 
Amtek persentation aman (11 me-06)
Amtek persentation aman (11 me-06)Amtek persentation aman (11 me-06)
Amtek persentation aman (11 me-06)
ย 

FINAL PROJECT PRESENTATION (3rd YEAR) - Copy

  • 2. 1/ The rollers are positioned in a pyramid configuration 2/ The top roller is vertically adjustable 3/ Two bottom feed rollers rotate in the same direction Feed rollers Top feed roller Material being rolled
  • 3. ๏ฝ Original concept sketch for pyramid type slip rolls
  • 4.
  • 5. Four phases of manufacture 1/ Cutting of all materials to specified dimensions 2/ Machining all components to specified dimensions 3/ Fabrication and Welding 4/ Assembly
  • 6.
  • 7.
  • 8.
  • 9. Testing criteria 1/ Testing of a range of different materials 2/ Testing of a range of different thicknesses of materials 3/ Theoretical testing of machine using the formulae for simple bending theory 4/ Practical testing of machine using a range different materials in various thicknesses 5/ Establishing whether the theoretical testing is validated by the practical testing 6/ Record and tabulate practical testing results
  • 10. Mild steel b = 0.5m / d = 0.003m / y = 0.0015m / Yield (ฯƒ) = 210mPa I = ๐’ƒ๐’™๐’… ๐Ÿ‘ ๐Ÿ๐Ÿ ๐’”๐’ ๐‘ฐ = (๐ŸŽ.๐Ÿ“๐’Ž)๐’™(๐ŸŽ.๐ŸŽ๐ŸŽ๐Ÿ‘) ๐Ÿ‘ ๐Ÿ๐Ÿ ๐’”๐’ ๐‘ฐ = ๐Ÿ๐Ÿ๐Ÿ๐Ÿ“ ๐’™ ๐Ÿ๐ŸŽโˆ’๐Ÿ๐Ÿ ๐’Ž ๐Ÿ’ ๐ˆ ๐’€ = ๐‘ด ๐‘ฐ so M = ๐ˆ ๐’€ ๐’™ ๐‘ฐ ๐’”๐’ ๐‘ด = ๐Ÿ๐Ÿ๐ŸŽ ๐’™ ๐Ÿ๐ŸŽ ๐Ÿ” ๐‘ต๐’Ž ๐ŸŽ.๐ŸŽ๐ŸŽ๐Ÿ๐Ÿ“ ๐’Ž ๐’™ ๐Ÿ๐Ÿ๐Ÿ๐Ÿ“ ๐’™ ๐Ÿ๐ŸŽโˆ’๐Ÿ๐Ÿ ๐’Ž ๐Ÿ’ Therefore M = 157.5 Nm M = ๐‘ญ ๐Ÿ ๐’™ ๐ŸŽ. ๐ŸŽ๐Ÿ’๐’Ž so M = 0.02F so F = ๐‘ด ๐ŸŽ.๐ŸŽ๐Ÿ so F = ๐Ÿ๐Ÿ“๐Ÿ•.๐Ÿ“ ๐‘ต๐’Ž ๐ŸŽ.๐ŸŽ๐Ÿ ๐’Ž Therefore F = 7875 N
  • 11. TABLE OF RESULTS FOR THE TESTING OF THE FUNCTIONAL LIMITS OF PYRAMID TYPE SLIP ROLLS TESTS MATERIAL b (m) d (m) Y (m) FEED ROLLER CENTRES (m) POINT OF MAXIMUM BENDING (m) S.M.O.A I (m^4) YIELD STRENGTH ฯƒ (Pa) MAXIMUM BENDING MOMENT (Nm) FORCE (N) STATUS TEST 1 STEEL 0.5 0.001 0.0005 0.08 0.04 4.16667E-11 2.10E+08 17.5 875 PASS TEST 2 STEEL 0.5 0.002 0.001 0.08 0.04 3.33333E-10 2.10E+08 70 3500 PASS TEST 3 STEEL 0.5 0.003 0.0015 0.08 0.04 1.125E-09 2.10E+08 157.5 7875 PASS TEST 4 STEEL 0.2 0.004 0.002 0.08 0.04 1.06667E-09 2.10E+08 112 5600 PASS TEST 5 ALUMINIUM 0.15 0.002 0.001 0.08 0.04 1E-10 1.25E+08 12.5 625 PASS TEST 6 ALUMINIUM 0.1 0.002 0.001 0.08 0.04 6.66667E-11 1.25E+08 8.33E+00 416.667 PASS TEST 7 COPPER 0.1 0.006 0.003 0.08 0.04 1.8E-09 2.68E+08 160.8 8040 PASS (AT LIMITS)
  • 12.
  • 13. MANUFACTURING PLAN FOR PYRAMID TYPE THREE ROLL SLIP ROLLS COMPONENT MANUFACTURING PROCESSES TIME TAKEN (Hours) WEEK STATUS RHS BASE FRAME CUTTING, DRILLING, WELDING 2 14 Completed THREADED INSERTS FOR RHS FRAME CUTTING, DRILLING, TAPPING, WELDING 2 14 Completed IDLE END PLATE CUTTING, DRILLING, TAPPING, MILLING 12 15 Completed GEAR END PLATE CUTTING, DRILLING, TAPPING, MILLING 12 16 Completed TOP ROLLER CUTTING, TURNING, 4 16 Completed BOTTOM FRONT FEED ROLLER CUTTING, TURNING, MILLING 6 17 Completed BOTTOM BACK FEED ROLLER CUTTING, TURNING, MILLING 6 17 Completed GEAR KEYS FOR BOTTOM FEED ROLLERS CUTTING, MILLING, FILING 4 17 Completed INTERMEDIATE GEAR SHAFT CUTTING, TURNING, MILLING 2 18 Completed INTERMEDIATE GEAR SHAFT KEY CUTTING, MILLING, FILING 1 18 Completed BRASS TOP ROLLER GUIDES CUTTING, DRILLING, FILING, MILLING 6 18 Completed BOTTOM LOCKING BLOCKS CUTTING, DRILLING, COUNTERSINKING 4 18 Completed TOP LOCKING BLOCKS CUTTING, DRILLING, COUNTERBORING 4 18 Completed THREADED ROUND SCREWJACK GUIDE CUTTING, DRILLING, TAPPING, WELDING 2 19 Completed SCREWJACK TURNING HANDLES CUTTING, WELDING 2 19 Completed SCREWJACK TURNING HANDLE BODIES CUTTING, DRILLING, TAPPING, WELDING 2 19 Completed RETAINING RING FOR BRASS GUIDES CUTTING, DRILLING, WELDING 2 19 Completed THREADED ROD CUTTING 1 19 Completed CRANKING HANDLE CUTTING, DRILLING, WELDING 2 19 Completed CRANKING HANDLE BOSS CUTTING, DRILLING, FILING,WELDING 2 19 Completed PRESSING BEARINGS HYDRAULIC PRESSING 1 19 Completed ASSEMBLY ASSEMBLING OF COMPONENTS AND TORQUEING OF BOLTS 4 20 Completed TESTING OF FINISHED MACHINE TESTING THE THEORETICAL ABILITIES OF THE MACHINE 6 21 Completed TESTING OF FINISHED MACHINE TESTING THE THEORETICAL ABILITIES OF THE MACHINE 6 22 Completed