SlideShare a Scribd company logo
1 of 49
Download to read offline
1
Geochemical and Physical Prospecting Report On The:
CARMI BUTCHER BOY PROPERTY
EVENT #5507146
May 02-18 2014
Greenwood Mining Division
British Columbia
BCGS Map 082E045 NTS 082E06E
UTM (NAD 83) 11U 344502, 5484975
Lat: 49.497462 Lon: -119.147505
Owners:
Turnagain Resources Bill McKinney John Bakus
11751 Shell Road #3 โ€“ 1572 Lorne Street East
Richmond, B.C. Kamloops, B.C.
V7A-3W7 V2C-1X6
FMC: 277090 FMC: 223385
Operator:
Turnagain Resources Bill McKinney
11751 Shell Road
Richmond, B.C.
V7A-3W7
FMC: 277090
Research and Report Prepared By:
John Bakus
#3 โ€“ 1572 Lorne Street East
Kamloops, B.C.
V2C-1X6
FMC:223385
2
Carmi Butcher Boy 2014 photos (more included) with additional photos available upon request
Butcher Boy Dump Adit Site: Samples CA-02-13, DP-01-13/DP-10-13 20 ft x15 ft 30Mx10M Dump Area
Carmi Dump Adit Site: Samples CA-26-13, DP2-01-13- DP2-10-13 25 ft x 13 ft 40Mx15M Dump Area
3
Carmi Butcher Boy 2014 Event 5507146 Introduction 1
Carmi Butcher Boy 2014 Photographs 2
Carmi Butcher Boy 2014 Table of Contents 3
Carmi Butcher Boy B.C. Provincial Location Map 1:10,000,000 4
Carmi Butcher Boy Regional Location Map Google Map Eye View 20 KM 5
Carmi Butcher Boy Property Location and Access 6
Carmi Butcher Boy Geology and MinFile Occurrence Map 1:100,000 7
Carmi Butcher Boy Raster Base ARIS Google Map Eye View 20 KM 8
Carmi Butcher Boy Metallic and Industrial Mineral Potential Google Maps Eye View 20 KM 9-10
Carmi Butcher Boy Area Hillside Relief and Aerial Photography Google Maps Eye View 20 KM 11-12
Carmi Butcher Boy Mineralization Geology History 13-15
Carmi Butcher Boy General Claim Google Map Minfile and Tenure List Google Eye View 7 KM 16
Carmi Butcher Boy 2014 Work Program General Google Map and Tenure List Eye View 3 KM 17
Carmi Butcher Boy 2014 Work Program 18
Carmi Butcher Boy 2014 Work Program Spreadsheet 19-20
Carmi Butcher Boy General Work Site Tenure Map Tenure 1027000 1027005 1:10,000 21
Carmi Butcher Boy Geochemical ACME Laboratory Procedure Results Certificate 22-29
Carmi Butcher Boy Geochemical ACME Results Maps 1027000 1027005 1:2,500 1:1:000 30-31
Carmi Butcher Boy Geochemical ACME Laboratory Invoice 32
Event 5507146 Carmi Butcher Boy Geochemical Physical Work Report Form 33-34
Event 5507146 Explorations and Development Work / Expiry Date Change 35
Carmi Butcher Boy Minfile Detail 36-44
Carmi 2014 Work Program Sample Photographs 45-50
4
Carmi Butcher Boy Provincial Location Map
1:10,000,000
Carmi Butcher BoyCarmi Butcher BoyCarmi Butcher BoyCarmi Butcher BoyCarmi Butcher Boy
Abbotsford
Armstrong
Burnaby
Castlegar
Colwood
Coquitlam
Courtenay
Cranbrook
Dawson Creek
Duncan
Enderby
Fort St. John
Grand Forks
Greenwood
Kelowna
KimberleyMerritt
Penticton
Port Alberni
Prince George
Prince Rupert
Quesnel
Revelstoke
Surrey
Terrace
Victoria
Williams Lake
5
Carmi Butcher Boy Regional Location Map
All owners Carmi Butcher Boy area staked mineral claims, Leases, Places and MTO indicated Minfile
Occurrence locations (July 23, 2014)
Turnagain Resources McKinney Bakus Carmi Butcher Boy group within red border
Google Map Eye View 20 KM
6
Carmi Butcher Boy Property Location and Access
Location:
The Carmi Butcher Boy property is located within the Greenwood Mining Division in South Central
British Columbia. The 13 adjoining Carmi Butcher Boy tenures total over 600 hectares in area and are
situated 200 meters due West of Carmi, B.C. which lays directly on B.C. Highway 33. Kelowna B.C. is 75
kilometers North West via Highway 33 North and Beaverdell, B.C. is 8 kilometers South via Highway 33
South. The Carmi property entrance is located West directly off of Highway 33 between 4th and 11th
street in Carmi, B.C. and is a well maintained 2 way gravel road.
The Butcher Boy past producer is situated within tenure 1027005 (Butcher Boy Lot 2353) reverted
surface and underground crown grant. The Butcher Boy lies on the North-West side of the Carmi (Lot
2352) and B. A. Fraction (Lot 2357). The Crown grants lie on the west side of the West Kettle River. The
actual location of the Butcher Boy shown on MTO mapping differs from results shown within this report.
The Carmi past producer is situated within tenure 1027005 (Carmi Lot 2352) and (B. A. Fraction Lot
2357) reverted underground crown grants. The Carmi and B.A. Fraction lay on the South-East side of the
Butcher Boy (Lot 2353). The Crown grants lie on the west side of the West Kettle River. The actual
location of the Butcher Boy shown on MTO mapping differs from results shown within this report.
The May prospect is situated within tenure 102381 and is located at 914 metres elevation immediately
south of Carmi Creek, 2.25 kilometers west-southwest of Carmi, British Columbia. The prospect is 396
metres west of the former Butcher Boy mine (082ESW132) and 640 metres west of the upper adit of the
former Carmi mine (082ESW029).
The Capco prospect is located 1.25 kilometres South West of the May prospect.
Access:
The Carmi property has excellent road access with the property entrance being located West directly off
of Highway 33 between 4th and 11th street in Carmi, B.C.
LAT 49.501126 LON -119.122494 UTM 11U 346327E, 5485331N.
Multiple roads and trails traverse the property from the Carmi entrance's well maintained 2 way gravel
road which allows for fairly easy all year access.
7
Carmi Butcher Boy Geology and MinFile Occurrence Map
Minfile Occurrences Shown
Bedrock Geology by Age and Rock Type with Map Unit Labels
1:100,000
8
Carmi Butcher Boy Raster Base ARIS Map
ARIS Reports for area shown
Google Map Eye View 20 KM
Assessment Reports (ARIS) - Report By Year
9
Carmi Butcher Boy Metallic Mineral Potential
Google Map Eye View 20 KM
10
Carmi Butcher Boy Industrial Mineral Potential
Google Map Eye View 20 KM
11
Carmi Butcher Boy Area Hillside Relief Map
Google Map Eye View 20 KM
12
Carmi Butcher Boy Aerial Photography Map
Google Map Eye View 20 KM
13
Carmi Butcher Boy Mineralization
Two former producers and two additional mineral occurrence prospects underlay the tenures where
work was performed on the Carmi property in 2013:
Former Producers: Butcher Boy 082ESW132 Carmi 082ESW029 Showings: Capco 082ESW104 May
082ESW103
Carmi 082ESW029
Mineralization consists of pyrite with lesser sphalerite and galena carrying gold and silver values. Minor
chalcopyrite and molybdenite are also present. The gangue is quartz and ankerite and in places intensely
sericitized andesitic dike. In 1981, two drillholes (81-6 and 7) intersected vein-hosted mineralization at
deeper levels than previously worked in the Carmi mine area. The more significant intersections were
from drillhole K-81-7. The 1.4-metre interval between 90.5 and 91.9 metres (Sample 2197) intersected
0.07 gram per tonne gold, 1.4 grams per tonne silver and 0.017 per cent zinc (Assessment Report 9174).
Sample 2199, a 1.7-metre interval between 94.7 and 95.1 metres, intersected 1.0 gram per tonne gold,
9.1 grams per tonne silver and 0.19 per cent zinc (Assessment Report 9174).
Butcher Boy 082ESW13
Mineralization consists of pyrite with lesser sphalerite and galena carrying gold and silver values. Minor
chalcopyrite and molybdenite are also present. The gangue is quartz and ankerite and in places intensely
sericitized andesitic dike.
May 082ESW103
Mineralization is confined to shear planes and quartz veins hosted in quartzitic chlorite schists. A 5 to 10
centimetre wide silicified shear is located on a steep face immediately east of the lower adit portal. The
shear contains galena with significant silver values. The mineralization was traced over 1.5 metres along
the shear. A chip sample taken over 1.2 metres of this mineralization yielded 6362 grams per tonne
silver (Assessment Report 3740).
Capco 082ESW104
Mineralization is confined to shear zones exposed by blast trenches. In Trench 1, a strongly fractured
shear zone contains scattered blebs of chalcopyrite in massive pyrrhotite over 30 centimetres width.
The shear zone is 1.2 metres wide, strikes 030 degrees and dips steeply to the south. Mineralization in
Trench 3, 23 metres to the northwest, is less massive. Assay samples from this sheared and fractured
zone yielded 0.32 per cent copper, 9 parts per million molybdenum, 38 parts per million nickel and 460
parts per million cobalt (Assessment Report 3740). Trench 1 samples yielded 0.16 per cent copper
(Assessment Report 3740).
14
Carmi Butcher Boy Geology Minfiles 082ESW029 082ESW13 082ESW103 082ESW104
Carmi 082ESW029: The Carmi is hosted by granodiorite of the Jurassic Westkettle batholith and an
irregular body of Permian Wallace Formation approximately 2.56 square kilometres. The Westkettle
batholith varies in composition from granodiorite to quartz diorite to diorite. The granodiorite phase is
medium grained, grey to pink with chlorite or occasionally biotite-altered mafics. Local epidote and
minor potassic alteration also occur. The quartz diorite phase is commonly foliated and porphyritic.
These phases are intruded by quartz monzonite, quartz-k-feldspar and andesitic dikes. Veins are
composed of quartz, quartz and k-feldspar or quartz-calcite plus or minus pyrite. The veins are
commonly associated with a clay-rich fault gouge. The Carmi and Butcher Boy workings appear to be on
the same faulted vein, following a shear zone in fine-grained granodiorite. The shear zone strikes 090
degrees and dips 45 to 60 degrees southward. It has been traced for over 549 metres strike length,
despite minor fault displacement. The vein varies from 5 to 213 centimetres width. One mineralized ore
shoot near the surface was reported to be 76.2 metres long.
Butcher Boy 082ESW13: The Butcher Boy is hosted by granodiorite of the Jurassic Westkettle batholith
and an irregular body of Permian Wallace Formation approximately 2.56 square kilometres. The
Westkettle batholith varies in composition from granodiorite to quartz diorite to diorite. The
granodiorite phase is medium grained, grey to pink with chlorite or occasionally biotite-altered mafics.
Local epidote and minor potassic alteration also occur. The quartz diorite phase is commonly foliated
and porphyritic. These phases are intruded by quartz monzonite, quartz-k-feldspar and andesitic dikes.
Veins are composed of quartz, quartz and k-feldspar or quartz-calcite plus or minus pyrite. The veins are
commonly associated with a clay-rich fault gouge.
May 082ESW103: The May prospect lies within a small roof pendant of Permian Wallace Formation. The
pendant is composed of metamorphosed pelitic, siliceous and calcareous sediments bordering foliated
granodiorite. Rock types encountered on the south side of Carmi Creek are argillaceous quartzite,
chlorite schist and chlorite-talc schist. Hornblende-biotite foliated granodiorite occur adjacent to schists
and quartzite. Quartz, feldspar dikes and sills intrude chlorite schists along defined fractures. Contacts
with country rocks are poorly defined. Latite and dacite dikes are also present. Their contacts are well
defined with chilled margins.
Capco 082ESW104: The Capco prospect lies within a small roof pendant of Permian Wallace Formation.
The pendant is composed of metamorphosed pelitic, siliceous and calcareous sediments bordering
foliated granodiorite or quartz diorite. Rock types encountered on the south side of Carmi Creek are
argillaceous quartzite, chlorite schist and chlorite-talc schist. Hornblende, biotite foliated granodiorite
occur adjacent to schists and quartzite. Quartz, feldspar dikes and sills intrude chlorite schists along
defined fractures. Contacts with country rocks are poorly defined. Fine-grained rhyodacite, latite and
dacite dikes are common. Their contacts are well defined with chilled margins.
15
Carmi Butcher Boy History Minfiles 082ESW029 082ESW13 082ESW103 082ESW104
The Carmi and Butcher claims were first staked in 1896 by J.C. Dale. Development work initially
consisted of opencuts and a shallow shaft. The claim was sold in 1900 to London, England interests, who
conducted further work under Carmi Mining Co. The B.A. Fraction claim was located in the same year.
The Carmi and B.A. Fraction claims were Crown granted to E.H. Thurston and associates in 1901, the
same year as the first production. In 1904, a 5-stamp mill was erected and had a capacity of 20 short
tons per day. In 1913, the claims were leased to A. Robinson from F. J. Finnucane. Further work was
done and ore shipments made between 1913 and 1915. The mine closed briefly in 1916 and 1917.
Further work was resumed by new owners and lessees in 1918 and 1919. Construction of a new oil
flotation concentrator was started. In 1922, optioning interests formed Carmi Gold Mining Co. Work
ceased in 1928. Canadian-American Mines Ltd. acquired the Carmi, Butcher Boy (082ESW132) and 18
other claims in 1932. The underground workings were extended between 1932 and 1933, with several
ore shipments made. Canadian-American Mines Ltd. assets were taken over by Carmi Gold Mines Ltd. in
1934 and further underground development work was completed. Between 1935 and 1937, lessees J.
Kerr and R. Legiest made additional ore shipments. Highland-Bell Ltd. leased the property in 1939. A
small amount of development work was done and the lease given up. The former lessees resumed work
and made a final ore shipment in 1940. Since this time, the Carmi and B.A. Fraction claims have been
acquired by J.V. Hinks and J.A. Olinger. Options have been held by International Minerals and Chemical
Corp. (Canada) Ltd in 1970 and by Husky Oil and G.V. Lloyd Exploration Ltd. in 1970 and 1971. Vestor
Explorations Ltd. optioned the property in 1974. In 1981, Kelvin Energy Ltd. was owner of the Carmi
claims, surrounding the Carmi occurrence. An 8-hole diamond drill program was conducted, three of
which tested for the Carmi veins below the old workings.
Carmi 082ESW029: The Carmi has produced 4780 tonnes of ore intermittently between 1901 and 1915,
then annually between 1932 and 1940. Recovery included 279,585 grams of silver, 87,929 grams of gold,
3179 kilograms of lead and 7303 kilograms of zinc.
Butcher Boy 082ESW13: The Butcher Boy has produced 2000 tonnes of ore intermittently between 1904
and 1940. Recovery included 21,337 grams of silver, 5195 grams of gold, 361 kilograms of lead and 634
kilograms of zinc.
Capco 082ESW104: Diamond-drill hole #11, drilled in 1970 by International Minerals Corp., yielded
massive pyrite and pyrrhotite between 21.6 and 41.4 metres. Assay samples yielded 0.17 gram per
tonne gold and 6.86 gram per tonne silver between 27.1 and 33.5 metres (Assessment Report 3740).
May 082ESW103: Mineralization is confined to shear planes and quartz veins hosted in quartzitic
chlorite schists. A 5 to 10 centimetre wide silicified shear is located on a steep face immediately east of
the lower adit portal. The shear contains galena with significant silver values. The mineralization was
traced over 1.5 metres along the shear. A chip sample taken over 1.2 metres of this mineralization
yielded 6362 grams per tonne silver (Assessment Report 3740).
16
Carmi Butcher Boy General Claim Google Map Minfile and Tenure List
Tenures:
1011078, 1011089, 1011091, 1011095, 1023812, 1023813, 1023815, 1026999, 1027000, 1027001,
1027002, 1027005 and 1027006
Minfile occurrences underlying the Carmi Claims:
Former Producers: Butcher Boy 082ESW132 Carmi 082ESW029 Prospects: Capco 082ESW104 May
082ESW103
Google Map Eye View 7 KM
17
Carmi Butcher Boy 2014 Work Program General Google Map and Tenure List
Tenure which were investigated during the 2014 Carmi Butcher Boy work program include:
1023815, 1027000, 1027005 and 1027006
Google Relief Base Map Eye View 3 KM
18
Carmi Butcher Boy 2014 Work Program
The 2014 Carmi work program was performed by Bill McKinney of Turnagain Resources FMC 277090
from Richmond, B.C., and assisted by Bill Lessard FMC 115596 of Richmond, B.C. Investigation of the
Carmi mineral group was accomplished by way of two separate visits to the property and commenced
by travelling from Richmond B.C to Carmi B.C. to the Carmi mineral property on May 02 and May 16
2104 and returning to Richmond, B.C. May 06 and 18 2014. John Bakus and Bill McKinney prepped on
May 01, 2014, and Bill McKinney sorted and compiled the sample information after his return from the
field on May 19, 2014. Additional technical, mapping and report preparation was performed by John
Bakus from May 09 to July 25 2014.
This report constitutes a preliminary survey of the Carmi property and area with the work performed
within the property. The focus of the 2014 work program was to confirm previous Minfile reports on
the properties by sample collection of in situ, float and dump mineralized samples and of determining
and mapping the accessibility and workings within the property. UTMโ€™s, photos and samples were
taken from various locations throughout the area and sample types include in situ hard rock, float
boulder, dump or stockpile and additional points of interest. Assays were performed on 4 selected
samples and 5 of the Butcher Boy dump samples that were collected.
Prospecting of the Carmi Butcher Boy property area entailed the orange flagging and marking of the
sample sites and points of interest with multiple photos taken of the samples and areas of collection.
GPS coordinates were taken and all samples and locations were recorded and mapped in multiple
forums some of which are included within this report.
Roads and trails are mapped by GPS with notes on conditions and hazards. Any other development
work is noted and mapped with rock samples taken if appropriate. Notes were taken on terrain,
watercourses, overburden etc with future prospecting, geological mapping, additional geochemical and
or geophysical work in mind. A vehicle was used access as far as possible, and then hiking on foot with
equipment carried as required.
Location sites and assay results from the laboratory tests of the specimens that were selectively tested
from the 2014 Carmi Butcher Boy field program by Acme Laboratories are mapped and labeled and are
included within this report .
Equipment List:
Chainsaw saw, Garmin GPS, 2 Tom Tom GPS's, Sony camera, pentex camera, laptop, compasses, VHF
radios, Spot GPS emergency locator, bear spray, air horn, bags, tags, assorted markers, assorted
hammers, shovels, vehicle.
19
Carmi Butcher Boy Work Program Spreadsheet
Carmi 2014 Yellow designates assayed samples
Sample
X
11U
Y
11U Lat Lon Notes
C2-03-13 345413 5483959 49.488567
-
119.134533 IS Outcrop 4 ft x 3 ft oxidized exposure brecc
C2-07-13 344951 5484134 49.490017
-
119.140983 IS Milky white oxidized and vuggy 2ftx3ft brecc
C2-08-13 345046 5484161 49.490283
-
119.139683 FB Massive brecciated quartz vein
C2-09-13 345146 5484223 49.490867
-
119.138317 FB Massive brecciated quartz vein
C2-11-13 345352 5484431 49.49279 -119.13555 FB grandiorite with 2mm pyrite veinlet
C2-28-13 345346 5484504 49.49345 -119.13566 FB brecciated 4" qtz vein no sulphides
C2-29-13 345272 5484557 49.49391 -119.13671 FB medium grained granodiorite, no sulphides
CA-02-13 345897 5484195 49.49081 -119.12795 FB Bboy Dump Adit Site Assayed
CA-03-13 345897 5484195 49.49081 -119.12795 FB Bboy Dump Adit Site Assayed
CA-06-13 345541 5484287 49.49154
-
119.132901 FB grey schist no veining highly fractured throughout
CA-07-13 345518 5484319 49.49183 -119.13323 FB Greenstone,shatter hairline qtz vein throughout
CA-08-13 345446 5484309 49.49172 -119.13421 FB grandiorite, med grainedqtz veining irregular
CA-09-13 345480 5484273 49.49141 -119.13373 FB sheared grandiorite with quartz stringers
CA-10-13 344929 5484336 49.49182 -119.14136 FB grandiorite with qtz veinlets oxidized
CA-11-13 344926 5484317 49.49165 -119.14139 Outcrop Oxidized 1ft by 1 ft exposed
CA-12-13 344987 5484328 49.49177 -119.14055 FB Highly oxidized fractured Vuggy Quartz
CA-13-13 345553 5484335 49.49198 -119.13275 FB siliceius rock, silicified volcnic, qtz and carbonate veinlets
CA-14-13 345558 5484335 49.49197 -119.13268 FB grey schist, possiblle mudstone,no sulphides, no veins
CA-15-13 345603 5484325 49.49195 -119.13205 FB massive grey granular rock, arenite?no texture
CA-18-13 345218 5484358 49.49209 -119.13738 FB granite with chlorite shears, qtz veinlet,no sulphides
CA-19-13 345158 5484377 49.49225 -119.13821 SS sediment sample fines
CA-20-13 344816 5484254 49.49106 -119.14288 FB silicous quartzite massive
CA-21-13 345786 5484063 49.48959 -119.12942 FB granodiorite, massive, elongate pyroxene crystals
CA-22-13 345803 5484049 49.48947 -119.12918 FB medium grained granodiorite, no sulphides
CA-24-13 345571 5484391 49.49248 -119.13252 FB med grey figr intrusive, siliceous injections
CA-25-13 345554 5484433 49.49285 -119.13277 FB qtz vein brecciated, no sulphidescourse grained
CA-26-13 346057 5484135 49.49034 -119.12571 IS Carmi Shaft
CP-01-13 346323 5485326 49.50109 119.122498 HGY 33 Rd W
CP-02-13 345362 5484379 49.492334 119.135393 Rd N
CP-03-13 345244 5484362 49.492147 119.137017 Rd S and W
CP-04-13 345588 5484044 49.489372 119.132146 May Sh ?
CP-05-13 345261 5483784 49.486953 119.136561 Rd E
CP-17-13 344735 5483858 49.487483 119.143851 Overgrown Rd w fence East
CP-19-13 345602 5485553 49.49395 -119.13215 Trail NE
CP-20-13 345254 548453 49.492067 119.136882 Carmi Creek rd splits to N and S areas
CP-21-13 345523 5484499 49.493449 119.133234 Rd bearing North
CP-22-13 346008 5485033 49.498367 119.126749 Cattleguard old raiway bed
20
Carmi Butcher Boy Work Program Spreadsheet
Dump Samples Description DP 01-10,DP2 01-10
The rock material in the samples collected from the
stockpile dumps, all had the same composition.
The dump material was almost entirely variably sized
up to a foot across and the samples were randomly
collected across the dumps from finer sand sized pieces of
this rock which were small enough to be assayed.
DP-01-13 345897 5484195 49.49081 -119.12795 Butcher Boy Dump
DP-02-13 345897 5484195 49.49081 -119.12795 Butcher Boy Dump
DP-03-13 345888 5484214 49.49097 -119.12808 Butcher Boy Dump
DP-04-13 345888 5484214 49.49097 -119.12808 Butcher Boy Dump
DP-05-13 345841 5484203 49.49086 -119.12872 Butcher Boy Dump
DP-06-13 345841 5484203 49.49086 -119.12872 Butcher Boy Dump
DP-07-13 345862 5484212 49.49095 -119.12843 Butcher Boy Dump
DP-08-13 345862 5484212 49.49095 -119.12843 Butcher Boy Dump
DP-09-13 345917 5484188 49.49074 -119.12767 Butcher Boy Dump
DP-10-13 345917 5484188 49.49074 -119.12767 Butcher Boy Dump
DP2-01-
13 346057 5484135 49.49034 -119.12571 Carmi Dump
DP2-02-
13 346057 5484135 49.49034 -119.12571 Carmi Dump
DP2-03-
13 346043 5484222 49.49108 -119.12594 Carmi Dump
DP2-04-
13 346043 5484222 49.49108 -119.12594 Carmi Dump
DP2-05-
13 346078 5484211 49.49099 -119.12545 Carmi Dump
DP2-06-
13 346078 5484211 49.49099 -119.12545 Carmi Dump
DP2-07-
13 346023 5484219 49.49105 -119.12621 Carmi Dump
DP2-08-
13 346023 5484219 49.49105 -119.12621 Carmi Dump
DP2-09-
13 346064 5484215 49.49102 -119.12565 Carmi Dump
DP2-10-
13 346064 5484215 49.49102 -119.12565 Carmi Dump
Characteristics of the dump samples include
quartz veining with massive pyrites, metased, sulphids,
sulphide stringers, massive crystalline quartz veining
shattered, med graining granodiorite pyritic cubing
21
Carmi Butcher Boy General Work Site Tenure Map Tenure 1027000 1027005 1:10,000
22
Carmi Butcher Boy Geochemical ACME Laboratory Procedure
Sample Preparation:
9 samples crushed and pulverized Crush 1 kg to โ‰ฅ70% passing 2mm ... Pulv 250 g โ‰ฅ85% 75ฮผm
Crush 70% 10 mesh and pulverize 250 g
Exploration Geochemistry:
9 samples tested by way of Aqua Regia AQ202-ICP/ICP-MS
Sample splits of 30.0 g were leached in hot modified Aqua Regia.
23
2 samples additionally tested by way of Ultra Trace ICP-MS
MA250 Ultratrace ICP-MS
Multi-acid digestion packages combine a strong multiacid digestion that dissolves most minerals Ultra
Trace ICP-MS (MA250) analysis to give near total values for all elements. A 0.25 g split is heated in
HNO3-HClO4-HF to fuming and taken to dryness. The residue is dissolved in HCl.
24
Carmi Butcher Boy Geochemical ACME Laboratory Results Certificate
25
26
27
28
29
30
Carmi Butcher Boy Geochemical ACME Laboratory Results Location Map Tenure 1027000
31
Carmi Butcher Boy Geochemical ACME Laboratory Results Location Map Tenure 1027005
32
Carmi Butcher Boy Geochemical ACME Laboratory Invoice
33
Event 5507146 Carmi Butcher Boy Geochemical Physical Work Report Form
34
35
Event 5507146 Explorations and Development Work / Expiry Date Change
5507146 Carmi 2014 Event Download
Event Number: 5507146
Work Type: Technical Work
Technical Items:
Geochemical, PAC Withdrawal (up to 30% of technical work performed), Preparatory
Surveys, Prospecting
Work Start Date: 2014/MAY/02
Work Stop Date: 2014/MAY/18
Total Value of Work: $ 7548.00
Tenure Number
Claim
Name/Property
Issue
Date
Good
To
Date
New
Good
To
Date
# of
Days
For-
ward
Area
in
Ha
Applied
Work
Value
Sub-
mission
Fee
1011078 2012/jul/12 2014/jun/03 2015/jul/15 407 83.91 $ 471.28 $ 0.00
1011089 2012/jul/12 2014/jun/03 2015/jul/15 407 20.98 $ 117.83 $ 0.00
1011091 BELOW CARMI 2012/jul/12 2014/jun/02 2015/jul/15 408 104.91 $ 590.62 $ 0.00
1011095 SIDEBAR 2012/jul/12 2014/jun/03 2015/jul/15 407 62.94 $ 353.47 $ 0.00
1023812
Carmi Butcher
Capco A
2013/jan/23 2016/jan/01 2018/jun/20 901 20.99 $ 553.69 $ 0.00
1023813
Carmi Butcher
Capco B
2013/jan/23 2016/jan/01 2018/jun/20 901 20.99 $ 553.74 $ 0.00
1023815
Carmi May 6362
GT AG
2013/jan/23 2016/jan/01 2018/jun/20 901 41.97 $ 1107.38 $ 0.00
1026999
Carmi Butcher
Boy N 2
2013/jul/13 2014/jul/13 2018/jun/22 1440 41.96 $ 1234.79 $ 0.00
1027000
Carmi Butcher
Boy North
2013/jul/13 2014/jul/13 2018/jun/22 1440 41.97 $ 1234.91 $ 0.00
1027001
Carmi Butcher
Capco A
2013/jul/13 2014/jul/13 2018/jun/22 1440 20.98 $ 617.40 $ 0.00
1027002
Carmi Moly
South
2013/jul/13 2014/jul/13 2018/jun/22 1440 20.98 $ 617.45 $ 0.00
1027005
Carmi Mine 13
GT AU
2013/jan/23 2016/jan/01 2018/jun/20 901 104.94 $ 2768.59 $ 0.00
1027006
Carmi Bchrby
Mn 17GT AU
2013/jan/23 2016/jan/01 2018/jun/20 901 20.98 $ 553.64 $ 0.00
Financial Summary:
Total applied work value:$ 10774.79
PAC name: Bakus
Debited PAC amount: $ 3226.79
36
Carmi Minfile Detail
37
Carmi Production Detail
38
Carmi Inventory Report
39
Butcher Boy Minfile Detail
40
Butcher Boy Production Detail
41
Butcher Boy Inventory Report
42
Capco Minfile Detail
43
Capco Inventory Report
44
May Minfile Detail
45
Carmi 2014 Sample Photographs ( Additional Photographs Available Upon Request)
46
48
50
Butcher Boy Dump Site
Carmi Dump Site
51
Millsite 1 Butcher Boy
Millsite 2 Carmi

More Related Content

Similar to 2014 carmi butcher boy gold Beaverdell British Columbia MLS Mining geochem 2014

Kombat copper feb 2014 corporate
Kombat copper feb 2014 corporateKombat copper feb 2014 corporate
Kombat copper feb 2014 corporate
kombatcopper
ย 
RC Drilling near Island Copper
RC Drilling near Island CopperRC Drilling near Island Copper
RC Drilling near Island Copper
Gary Sutton
ย 
Mth ages conference illogwa iocg presentation (for asx lodging)
Mth ages conference illogwa iocg presentation (for asx lodging)Mth ages conference illogwa iocg presentation (for asx lodging)
Mth ages conference illogwa iocg presentation (for asx lodging)
richardsproull
ย 
Golden dawn presentation_2010_4
Golden dawn presentation_2010_4Golden dawn presentation_2010_4
Golden dawn presentation_2010_4
Golden Dawn Minerals
ย 
Xama property fact sheet 20150301
Xama property fact sheet 20150301Xama property fact sheet 20150301
Xama property fact sheet 20150301
John Chapman
ย 
Calibre Corporate Presentation
Calibre Corporate PresentationCalibre Corporate Presentation
Calibre Corporate Presentation
Adnet Communications
ย 
Keg 2010 carlson chapman 201004012
Keg 2010 carlson chapman 201004012Keg 2010 carlson chapman 201004012
Keg 2010 carlson chapman 201004012
John Chapman
ย 
MONTORO FINDS RENEWED INTEREST IN ITS MALACHITE COBALT/COPPER PROPERTY โ€“ BATH...
MONTORO FINDS RENEWED INTEREST IN ITS MALACHITE COBALT/COPPER PROPERTY โ€“ BATH...MONTORO FINDS RENEWED INTEREST IN ITS MALACHITE COBALT/COPPER PROPERTY โ€“ BATH...
MONTORO FINDS RENEWED INTEREST IN ITS MALACHITE COBALT/COPPER PROPERTY โ€“ BATH...
Follow me on Twitter @Stockshaman
ย 

Similar to 2014 carmi butcher boy gold Beaverdell British Columbia MLS Mining geochem 2014 (20)

REIS 2013 Broken Hill - Adelaide Resources ASX:ADN
REIS 2013 Broken Hill - Adelaide Resources ASX:ADNREIS 2013 Broken Hill - Adelaide Resources ASX:ADN
REIS 2013 Broken Hill - Adelaide Resources ASX:ADN
ย 
Conquest Resources Limited - Corporate Presentation
Conquest Resources Limited - Corporate PresentationConquest Resources Limited - Corporate Presentation
Conquest Resources Limited - Corporate Presentation
ย 
Kombat copper feb 2014 corporate
Kombat copper feb 2014 corporateKombat copper feb 2014 corporate
Kombat copper feb 2014 corporate
ย 
Drumlummon Gold Mine, Montanna
Drumlummon Gold Mine, MontannaDrumlummon Gold Mine, Montanna
Drumlummon Gold Mine, Montanna
ย 
RC Drilling near Island Copper
RC Drilling near Island CopperRC Drilling near Island Copper
RC Drilling near Island Copper
ย 
Investor Presentation | Silver City Minerals (ASX:SCI) | Gold Investment Symp...
Investor Presentation | Silver City Minerals (ASX:SCI) | Gold Investment Symp...Investor Presentation | Silver City Minerals (ASX:SCI) | Gold Investment Symp...
Investor Presentation | Silver City Minerals (ASX:SCI) | Gold Investment Symp...
ย 
Mth ages conference illogwa iocg presentation (for asx lodging)
Mth ages conference illogwa iocg presentation (for asx lodging)Mth ages conference illogwa iocg presentation (for asx lodging)
Mth ages conference illogwa iocg presentation (for asx lodging)
ย 
Heraldry Gold's Whiteburn Gold Project (PDAC, March 2023)
Heraldry Gold's Whiteburn Gold Project (PDAC, March 2023)Heraldry Gold's Whiteburn Gold Project (PDAC, March 2023)
Heraldry Gold's Whiteburn Gold Project (PDAC, March 2023)
ย 
C 75 Report
C 75 ReportC 75 Report
C 75 Report
ย 
Golden dawn presentation_2010_4
Golden dawn presentation_2010_4Golden dawn presentation_2010_4
Golden dawn presentation_2010_4
ย 
Application of the microdiamond technique in assisting diamond mining juniors...
Application of the microdiamond technique in assisting diamond mining juniors...Application of the microdiamond technique in assisting diamond mining juniors...
Application of the microdiamond technique in assisting diamond mining juniors...
ย 
Heraldry Gold, Whiteburn Presentation, March 2020
Heraldry Gold, Whiteburn Presentation, March 2020Heraldry Gold, Whiteburn Presentation, March 2020
Heraldry Gold, Whiteburn Presentation, March 2020
ย 
Marsfontein case history 2005
Marsfontein case history 2005Marsfontein case history 2005
Marsfontein case history 2005
ย 
Xama property fact sheet 20150301
Xama property fact sheet 20150301Xama property fact sheet 20150301
Xama property fact sheet 20150301
ย 
Calibre Corporate Presentation
Calibre Corporate PresentationCalibre Corporate Presentation
Calibre Corporate Presentation
ย 
Keg 2010 carlson chapman 201004012
Keg 2010 carlson chapman 201004012Keg 2010 carlson chapman 201004012
Keg 2010 carlson chapman 201004012
ย 
A Study Of Traffic Assignment Algorithms
A Study Of Traffic Assignment AlgorithmsA Study Of Traffic Assignment Algorithms
A Study Of Traffic Assignment Algorithms
ย 
Sokoman Minerals Corporate Presentation - October 2022
Sokoman Minerals Corporate Presentation - October 2022Sokoman Minerals Corporate Presentation - October 2022
Sokoman Minerals Corporate Presentation - October 2022
ย 
East Arunta Copper Drilling Results
East Arunta Copper Drilling ResultsEast Arunta Copper Drilling Results
East Arunta Copper Drilling Results
ย 
MONTORO FINDS RENEWED INTEREST IN ITS MALACHITE COBALT/COPPER PROPERTY โ€“ BATH...
MONTORO FINDS RENEWED INTEREST IN ITS MALACHITE COBALT/COPPER PROPERTY โ€“ BATH...MONTORO FINDS RENEWED INTEREST IN ITS MALACHITE COBALT/COPPER PROPERTY โ€“ BATH...
MONTORO FINDS RENEWED INTEREST IN ITS MALACHITE COBALT/COPPER PROPERTY โ€“ BATH...
ย 

More from John Bakus MLS Mining

2015 Slocan Dayton gold MLS Mining
2015 Slocan Dayton gold MLS Mining2015 Slocan Dayton gold MLS Mining
2015 Slocan Dayton gold MLS Mining
John Bakus MLS Mining
ย 
2015 Slocan White Eagle gold silver slocan british columbia MLS Mining
2015  Slocan White Eagle gold silver slocan british columbia MLS Mining2015  Slocan White Eagle gold silver slocan british columbia MLS Mining
2015 Slocan White Eagle gold silver slocan british columbia MLS Mining
John Bakus MLS Mining
ย 
2015 lucky thorne gold terrace British Columbia MLS Mining tech
2015 lucky thorne gold terrace British Columbia MLS Mining tech2015 lucky thorne gold terrace British Columbia MLS Mining tech
2015 lucky thorne gold terrace British Columbia MLS Mining tech
John Bakus MLS Mining
ย 

More from John Bakus MLS Mining (10)

2014 Patmore eclipse gold au vancouver island MLS Mining
2014 Patmore eclipse gold au vancouver island MLS Mining2014 Patmore eclipse gold au vancouver island MLS Mining
2014 Patmore eclipse gold au vancouver island MLS Mining
ย 
2015 Brandywine property synopsis MLS Mining
2015 Brandywine property synopsis MLS Mining2015 Brandywine property synopsis MLS Mining
2015 Brandywine property synopsis MLS Mining
ย 
2012 Windpass Gold 43 101 MLS Mining Turnagain Resources Little Fort British ...
2012 Windpass Gold 43 101 MLS Mining Turnagain Resources Little Fort British ...2012 Windpass Gold 43 101 MLS Mining Turnagain Resources Little Fort British ...
2012 Windpass Gold 43 101 MLS Mining Turnagain Resources Little Fort British ...
ย 
2008 Vault Gold exploration proposal Okanagan Falls British Columbia tech MLS...
2008 Vault Gold exploration proposal Okanagan Falls British Columbia tech MLS...2008 Vault Gold exploration proposal Okanagan Falls British Columbia tech MLS...
2008 Vault Gold exploration proposal Okanagan Falls British Columbia tech MLS...
ย 
2015 Slocan Dayton gold MLS Mining
2015 Slocan Dayton gold MLS Mining2015 Slocan Dayton gold MLS Mining
2015 Slocan Dayton gold MLS Mining
ย 
2015 Slocan White Eagle gold silver slocan british columbia MLS Mining
2015  Slocan White Eagle gold silver slocan british columbia MLS Mining2015  Slocan White Eagle gold silver slocan british columbia MLS Mining
2015 Slocan White Eagle gold silver slocan british columbia MLS Mining
ย 
2015 Snow Gold Vancouver Island tech MLS Mining
2015 Snow Gold Vancouver Island tech MLS Mining2015 Snow Gold Vancouver Island tech MLS Mining
2015 Snow Gold Vancouver Island tech MLS Mining
ย 
2015 Vault Gold Okanagan Falls British Columbia tech MLS Mining
2015 Vault Gold Okanagan Falls British Columbia tech MLS Mining2015 Vault Gold Okanagan Falls British Columbia tech MLS Mining
2015 Vault Gold Okanagan Falls British Columbia tech MLS Mining
ย 
2015 lucky thorne gold terrace British Columbia MLS Mining tech
2015 lucky thorne gold terrace British Columbia MLS Mining tech2015 lucky thorne gold terrace British Columbia MLS Mining tech
2015 lucky thorne gold terrace British Columbia MLS Mining tech
ย 
2015 alexandria gold deposit Thurlow British Columbia MLS Mining technical
2015 alexandria gold deposit Thurlow British Columbia MLS Mining technical2015 alexandria gold deposit Thurlow British Columbia MLS Mining technical
2015 alexandria gold deposit Thurlow British Columbia MLS Mining technical
ย 

Recently uploaded

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
KreezheaRecto
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 

Recently uploaded (20)

data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
ย 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 

2014 carmi butcher boy gold Beaverdell British Columbia MLS Mining geochem 2014

  • 1. 1 Geochemical and Physical Prospecting Report On The: CARMI BUTCHER BOY PROPERTY EVENT #5507146 May 02-18 2014 Greenwood Mining Division British Columbia BCGS Map 082E045 NTS 082E06E UTM (NAD 83) 11U 344502, 5484975 Lat: 49.497462 Lon: -119.147505 Owners: Turnagain Resources Bill McKinney John Bakus 11751 Shell Road #3 โ€“ 1572 Lorne Street East Richmond, B.C. Kamloops, B.C. V7A-3W7 V2C-1X6 FMC: 277090 FMC: 223385 Operator: Turnagain Resources Bill McKinney 11751 Shell Road Richmond, B.C. V7A-3W7 FMC: 277090 Research and Report Prepared By: John Bakus #3 โ€“ 1572 Lorne Street East Kamloops, B.C. V2C-1X6 FMC:223385
  • 2. 2 Carmi Butcher Boy 2014 photos (more included) with additional photos available upon request Butcher Boy Dump Adit Site: Samples CA-02-13, DP-01-13/DP-10-13 20 ft x15 ft 30Mx10M Dump Area Carmi Dump Adit Site: Samples CA-26-13, DP2-01-13- DP2-10-13 25 ft x 13 ft 40Mx15M Dump Area
  • 3. 3 Carmi Butcher Boy 2014 Event 5507146 Introduction 1 Carmi Butcher Boy 2014 Photographs 2 Carmi Butcher Boy 2014 Table of Contents 3 Carmi Butcher Boy B.C. Provincial Location Map 1:10,000,000 4 Carmi Butcher Boy Regional Location Map Google Map Eye View 20 KM 5 Carmi Butcher Boy Property Location and Access 6 Carmi Butcher Boy Geology and MinFile Occurrence Map 1:100,000 7 Carmi Butcher Boy Raster Base ARIS Google Map Eye View 20 KM 8 Carmi Butcher Boy Metallic and Industrial Mineral Potential Google Maps Eye View 20 KM 9-10 Carmi Butcher Boy Area Hillside Relief and Aerial Photography Google Maps Eye View 20 KM 11-12 Carmi Butcher Boy Mineralization Geology History 13-15 Carmi Butcher Boy General Claim Google Map Minfile and Tenure List Google Eye View 7 KM 16 Carmi Butcher Boy 2014 Work Program General Google Map and Tenure List Eye View 3 KM 17 Carmi Butcher Boy 2014 Work Program 18 Carmi Butcher Boy 2014 Work Program Spreadsheet 19-20 Carmi Butcher Boy General Work Site Tenure Map Tenure 1027000 1027005 1:10,000 21 Carmi Butcher Boy Geochemical ACME Laboratory Procedure Results Certificate 22-29 Carmi Butcher Boy Geochemical ACME Results Maps 1027000 1027005 1:2,500 1:1:000 30-31 Carmi Butcher Boy Geochemical ACME Laboratory Invoice 32 Event 5507146 Carmi Butcher Boy Geochemical Physical Work Report Form 33-34 Event 5507146 Explorations and Development Work / Expiry Date Change 35 Carmi Butcher Boy Minfile Detail 36-44 Carmi 2014 Work Program Sample Photographs 45-50
  • 4. 4 Carmi Butcher Boy Provincial Location Map 1:10,000,000 Carmi Butcher BoyCarmi Butcher BoyCarmi Butcher BoyCarmi Butcher BoyCarmi Butcher Boy Abbotsford Armstrong Burnaby Castlegar Colwood Coquitlam Courtenay Cranbrook Dawson Creek Duncan Enderby Fort St. John Grand Forks Greenwood Kelowna KimberleyMerritt Penticton Port Alberni Prince George Prince Rupert Quesnel Revelstoke Surrey Terrace Victoria Williams Lake
  • 5. 5 Carmi Butcher Boy Regional Location Map All owners Carmi Butcher Boy area staked mineral claims, Leases, Places and MTO indicated Minfile Occurrence locations (July 23, 2014) Turnagain Resources McKinney Bakus Carmi Butcher Boy group within red border Google Map Eye View 20 KM
  • 6. 6 Carmi Butcher Boy Property Location and Access Location: The Carmi Butcher Boy property is located within the Greenwood Mining Division in South Central British Columbia. The 13 adjoining Carmi Butcher Boy tenures total over 600 hectares in area and are situated 200 meters due West of Carmi, B.C. which lays directly on B.C. Highway 33. Kelowna B.C. is 75 kilometers North West via Highway 33 North and Beaverdell, B.C. is 8 kilometers South via Highway 33 South. The Carmi property entrance is located West directly off of Highway 33 between 4th and 11th street in Carmi, B.C. and is a well maintained 2 way gravel road. The Butcher Boy past producer is situated within tenure 1027005 (Butcher Boy Lot 2353) reverted surface and underground crown grant. The Butcher Boy lies on the North-West side of the Carmi (Lot 2352) and B. A. Fraction (Lot 2357). The Crown grants lie on the west side of the West Kettle River. The actual location of the Butcher Boy shown on MTO mapping differs from results shown within this report. The Carmi past producer is situated within tenure 1027005 (Carmi Lot 2352) and (B. A. Fraction Lot 2357) reverted underground crown grants. The Carmi and B.A. Fraction lay on the South-East side of the Butcher Boy (Lot 2353). The Crown grants lie on the west side of the West Kettle River. The actual location of the Butcher Boy shown on MTO mapping differs from results shown within this report. The May prospect is situated within tenure 102381 and is located at 914 metres elevation immediately south of Carmi Creek, 2.25 kilometers west-southwest of Carmi, British Columbia. The prospect is 396 metres west of the former Butcher Boy mine (082ESW132) and 640 metres west of the upper adit of the former Carmi mine (082ESW029). The Capco prospect is located 1.25 kilometres South West of the May prospect. Access: The Carmi property has excellent road access with the property entrance being located West directly off of Highway 33 between 4th and 11th street in Carmi, B.C. LAT 49.501126 LON -119.122494 UTM 11U 346327E, 5485331N. Multiple roads and trails traverse the property from the Carmi entrance's well maintained 2 way gravel road which allows for fairly easy all year access.
  • 7. 7 Carmi Butcher Boy Geology and MinFile Occurrence Map Minfile Occurrences Shown Bedrock Geology by Age and Rock Type with Map Unit Labels 1:100,000
  • 8. 8 Carmi Butcher Boy Raster Base ARIS Map ARIS Reports for area shown Google Map Eye View 20 KM Assessment Reports (ARIS) - Report By Year
  • 9. 9 Carmi Butcher Boy Metallic Mineral Potential Google Map Eye View 20 KM
  • 10. 10 Carmi Butcher Boy Industrial Mineral Potential Google Map Eye View 20 KM
  • 11. 11 Carmi Butcher Boy Area Hillside Relief Map Google Map Eye View 20 KM
  • 12. 12 Carmi Butcher Boy Aerial Photography Map Google Map Eye View 20 KM
  • 13. 13 Carmi Butcher Boy Mineralization Two former producers and two additional mineral occurrence prospects underlay the tenures where work was performed on the Carmi property in 2013: Former Producers: Butcher Boy 082ESW132 Carmi 082ESW029 Showings: Capco 082ESW104 May 082ESW103 Carmi 082ESW029 Mineralization consists of pyrite with lesser sphalerite and galena carrying gold and silver values. Minor chalcopyrite and molybdenite are also present. The gangue is quartz and ankerite and in places intensely sericitized andesitic dike. In 1981, two drillholes (81-6 and 7) intersected vein-hosted mineralization at deeper levels than previously worked in the Carmi mine area. The more significant intersections were from drillhole K-81-7. The 1.4-metre interval between 90.5 and 91.9 metres (Sample 2197) intersected 0.07 gram per tonne gold, 1.4 grams per tonne silver and 0.017 per cent zinc (Assessment Report 9174). Sample 2199, a 1.7-metre interval between 94.7 and 95.1 metres, intersected 1.0 gram per tonne gold, 9.1 grams per tonne silver and 0.19 per cent zinc (Assessment Report 9174). Butcher Boy 082ESW13 Mineralization consists of pyrite with lesser sphalerite and galena carrying gold and silver values. Minor chalcopyrite and molybdenite are also present. The gangue is quartz and ankerite and in places intensely sericitized andesitic dike. May 082ESW103 Mineralization is confined to shear planes and quartz veins hosted in quartzitic chlorite schists. A 5 to 10 centimetre wide silicified shear is located on a steep face immediately east of the lower adit portal. The shear contains galena with significant silver values. The mineralization was traced over 1.5 metres along the shear. A chip sample taken over 1.2 metres of this mineralization yielded 6362 grams per tonne silver (Assessment Report 3740). Capco 082ESW104 Mineralization is confined to shear zones exposed by blast trenches. In Trench 1, a strongly fractured shear zone contains scattered blebs of chalcopyrite in massive pyrrhotite over 30 centimetres width. The shear zone is 1.2 metres wide, strikes 030 degrees and dips steeply to the south. Mineralization in Trench 3, 23 metres to the northwest, is less massive. Assay samples from this sheared and fractured zone yielded 0.32 per cent copper, 9 parts per million molybdenum, 38 parts per million nickel and 460 parts per million cobalt (Assessment Report 3740). Trench 1 samples yielded 0.16 per cent copper (Assessment Report 3740).
  • 14. 14 Carmi Butcher Boy Geology Minfiles 082ESW029 082ESW13 082ESW103 082ESW104 Carmi 082ESW029: The Carmi is hosted by granodiorite of the Jurassic Westkettle batholith and an irregular body of Permian Wallace Formation approximately 2.56 square kilometres. The Westkettle batholith varies in composition from granodiorite to quartz diorite to diorite. The granodiorite phase is medium grained, grey to pink with chlorite or occasionally biotite-altered mafics. Local epidote and minor potassic alteration also occur. The quartz diorite phase is commonly foliated and porphyritic. These phases are intruded by quartz monzonite, quartz-k-feldspar and andesitic dikes. Veins are composed of quartz, quartz and k-feldspar or quartz-calcite plus or minus pyrite. The veins are commonly associated with a clay-rich fault gouge. The Carmi and Butcher Boy workings appear to be on the same faulted vein, following a shear zone in fine-grained granodiorite. The shear zone strikes 090 degrees and dips 45 to 60 degrees southward. It has been traced for over 549 metres strike length, despite minor fault displacement. The vein varies from 5 to 213 centimetres width. One mineralized ore shoot near the surface was reported to be 76.2 metres long. Butcher Boy 082ESW13: The Butcher Boy is hosted by granodiorite of the Jurassic Westkettle batholith and an irregular body of Permian Wallace Formation approximately 2.56 square kilometres. The Westkettle batholith varies in composition from granodiorite to quartz diorite to diorite. The granodiorite phase is medium grained, grey to pink with chlorite or occasionally biotite-altered mafics. Local epidote and minor potassic alteration also occur. The quartz diorite phase is commonly foliated and porphyritic. These phases are intruded by quartz monzonite, quartz-k-feldspar and andesitic dikes. Veins are composed of quartz, quartz and k-feldspar or quartz-calcite plus or minus pyrite. The veins are commonly associated with a clay-rich fault gouge. May 082ESW103: The May prospect lies within a small roof pendant of Permian Wallace Formation. The pendant is composed of metamorphosed pelitic, siliceous and calcareous sediments bordering foliated granodiorite. Rock types encountered on the south side of Carmi Creek are argillaceous quartzite, chlorite schist and chlorite-talc schist. Hornblende-biotite foliated granodiorite occur adjacent to schists and quartzite. Quartz, feldspar dikes and sills intrude chlorite schists along defined fractures. Contacts with country rocks are poorly defined. Latite and dacite dikes are also present. Their contacts are well defined with chilled margins. Capco 082ESW104: The Capco prospect lies within a small roof pendant of Permian Wallace Formation. The pendant is composed of metamorphosed pelitic, siliceous and calcareous sediments bordering foliated granodiorite or quartz diorite. Rock types encountered on the south side of Carmi Creek are argillaceous quartzite, chlorite schist and chlorite-talc schist. Hornblende, biotite foliated granodiorite occur adjacent to schists and quartzite. Quartz, feldspar dikes and sills intrude chlorite schists along defined fractures. Contacts with country rocks are poorly defined. Fine-grained rhyodacite, latite and dacite dikes are common. Their contacts are well defined with chilled margins.
  • 15. 15 Carmi Butcher Boy History Minfiles 082ESW029 082ESW13 082ESW103 082ESW104 The Carmi and Butcher claims were first staked in 1896 by J.C. Dale. Development work initially consisted of opencuts and a shallow shaft. The claim was sold in 1900 to London, England interests, who conducted further work under Carmi Mining Co. The B.A. Fraction claim was located in the same year. The Carmi and B.A. Fraction claims were Crown granted to E.H. Thurston and associates in 1901, the same year as the first production. In 1904, a 5-stamp mill was erected and had a capacity of 20 short tons per day. In 1913, the claims were leased to A. Robinson from F. J. Finnucane. Further work was done and ore shipments made between 1913 and 1915. The mine closed briefly in 1916 and 1917. Further work was resumed by new owners and lessees in 1918 and 1919. Construction of a new oil flotation concentrator was started. In 1922, optioning interests formed Carmi Gold Mining Co. Work ceased in 1928. Canadian-American Mines Ltd. acquired the Carmi, Butcher Boy (082ESW132) and 18 other claims in 1932. The underground workings were extended between 1932 and 1933, with several ore shipments made. Canadian-American Mines Ltd. assets were taken over by Carmi Gold Mines Ltd. in 1934 and further underground development work was completed. Between 1935 and 1937, lessees J. Kerr and R. Legiest made additional ore shipments. Highland-Bell Ltd. leased the property in 1939. A small amount of development work was done and the lease given up. The former lessees resumed work and made a final ore shipment in 1940. Since this time, the Carmi and B.A. Fraction claims have been acquired by J.V. Hinks and J.A. Olinger. Options have been held by International Minerals and Chemical Corp. (Canada) Ltd in 1970 and by Husky Oil and G.V. Lloyd Exploration Ltd. in 1970 and 1971. Vestor Explorations Ltd. optioned the property in 1974. In 1981, Kelvin Energy Ltd. was owner of the Carmi claims, surrounding the Carmi occurrence. An 8-hole diamond drill program was conducted, three of which tested for the Carmi veins below the old workings. Carmi 082ESW029: The Carmi has produced 4780 tonnes of ore intermittently between 1901 and 1915, then annually between 1932 and 1940. Recovery included 279,585 grams of silver, 87,929 grams of gold, 3179 kilograms of lead and 7303 kilograms of zinc. Butcher Boy 082ESW13: The Butcher Boy has produced 2000 tonnes of ore intermittently between 1904 and 1940. Recovery included 21,337 grams of silver, 5195 grams of gold, 361 kilograms of lead and 634 kilograms of zinc. Capco 082ESW104: Diamond-drill hole #11, drilled in 1970 by International Minerals Corp., yielded massive pyrite and pyrrhotite between 21.6 and 41.4 metres. Assay samples yielded 0.17 gram per tonne gold and 6.86 gram per tonne silver between 27.1 and 33.5 metres (Assessment Report 3740). May 082ESW103: Mineralization is confined to shear planes and quartz veins hosted in quartzitic chlorite schists. A 5 to 10 centimetre wide silicified shear is located on a steep face immediately east of the lower adit portal. The shear contains galena with significant silver values. The mineralization was traced over 1.5 metres along the shear. A chip sample taken over 1.2 metres of this mineralization yielded 6362 grams per tonne silver (Assessment Report 3740).
  • 16. 16 Carmi Butcher Boy General Claim Google Map Minfile and Tenure List Tenures: 1011078, 1011089, 1011091, 1011095, 1023812, 1023813, 1023815, 1026999, 1027000, 1027001, 1027002, 1027005 and 1027006 Minfile occurrences underlying the Carmi Claims: Former Producers: Butcher Boy 082ESW132 Carmi 082ESW029 Prospects: Capco 082ESW104 May 082ESW103 Google Map Eye View 7 KM
  • 17. 17 Carmi Butcher Boy 2014 Work Program General Google Map and Tenure List Tenure which were investigated during the 2014 Carmi Butcher Boy work program include: 1023815, 1027000, 1027005 and 1027006 Google Relief Base Map Eye View 3 KM
  • 18. 18 Carmi Butcher Boy 2014 Work Program The 2014 Carmi work program was performed by Bill McKinney of Turnagain Resources FMC 277090 from Richmond, B.C., and assisted by Bill Lessard FMC 115596 of Richmond, B.C. Investigation of the Carmi mineral group was accomplished by way of two separate visits to the property and commenced by travelling from Richmond B.C to Carmi B.C. to the Carmi mineral property on May 02 and May 16 2104 and returning to Richmond, B.C. May 06 and 18 2014. John Bakus and Bill McKinney prepped on May 01, 2014, and Bill McKinney sorted and compiled the sample information after his return from the field on May 19, 2014. Additional technical, mapping and report preparation was performed by John Bakus from May 09 to July 25 2014. This report constitutes a preliminary survey of the Carmi property and area with the work performed within the property. The focus of the 2014 work program was to confirm previous Minfile reports on the properties by sample collection of in situ, float and dump mineralized samples and of determining and mapping the accessibility and workings within the property. UTMโ€™s, photos and samples were taken from various locations throughout the area and sample types include in situ hard rock, float boulder, dump or stockpile and additional points of interest. Assays were performed on 4 selected samples and 5 of the Butcher Boy dump samples that were collected. Prospecting of the Carmi Butcher Boy property area entailed the orange flagging and marking of the sample sites and points of interest with multiple photos taken of the samples and areas of collection. GPS coordinates were taken and all samples and locations were recorded and mapped in multiple forums some of which are included within this report. Roads and trails are mapped by GPS with notes on conditions and hazards. Any other development work is noted and mapped with rock samples taken if appropriate. Notes were taken on terrain, watercourses, overburden etc with future prospecting, geological mapping, additional geochemical and or geophysical work in mind. A vehicle was used access as far as possible, and then hiking on foot with equipment carried as required. Location sites and assay results from the laboratory tests of the specimens that were selectively tested from the 2014 Carmi Butcher Boy field program by Acme Laboratories are mapped and labeled and are included within this report . Equipment List: Chainsaw saw, Garmin GPS, 2 Tom Tom GPS's, Sony camera, pentex camera, laptop, compasses, VHF radios, Spot GPS emergency locator, bear spray, air horn, bags, tags, assorted markers, assorted hammers, shovels, vehicle.
  • 19. 19 Carmi Butcher Boy Work Program Spreadsheet Carmi 2014 Yellow designates assayed samples Sample X 11U Y 11U Lat Lon Notes C2-03-13 345413 5483959 49.488567 - 119.134533 IS Outcrop 4 ft x 3 ft oxidized exposure brecc C2-07-13 344951 5484134 49.490017 - 119.140983 IS Milky white oxidized and vuggy 2ftx3ft brecc C2-08-13 345046 5484161 49.490283 - 119.139683 FB Massive brecciated quartz vein C2-09-13 345146 5484223 49.490867 - 119.138317 FB Massive brecciated quartz vein C2-11-13 345352 5484431 49.49279 -119.13555 FB grandiorite with 2mm pyrite veinlet C2-28-13 345346 5484504 49.49345 -119.13566 FB brecciated 4" qtz vein no sulphides C2-29-13 345272 5484557 49.49391 -119.13671 FB medium grained granodiorite, no sulphides CA-02-13 345897 5484195 49.49081 -119.12795 FB Bboy Dump Adit Site Assayed CA-03-13 345897 5484195 49.49081 -119.12795 FB Bboy Dump Adit Site Assayed CA-06-13 345541 5484287 49.49154 - 119.132901 FB grey schist no veining highly fractured throughout CA-07-13 345518 5484319 49.49183 -119.13323 FB Greenstone,shatter hairline qtz vein throughout CA-08-13 345446 5484309 49.49172 -119.13421 FB grandiorite, med grainedqtz veining irregular CA-09-13 345480 5484273 49.49141 -119.13373 FB sheared grandiorite with quartz stringers CA-10-13 344929 5484336 49.49182 -119.14136 FB grandiorite with qtz veinlets oxidized CA-11-13 344926 5484317 49.49165 -119.14139 Outcrop Oxidized 1ft by 1 ft exposed CA-12-13 344987 5484328 49.49177 -119.14055 FB Highly oxidized fractured Vuggy Quartz CA-13-13 345553 5484335 49.49198 -119.13275 FB siliceius rock, silicified volcnic, qtz and carbonate veinlets CA-14-13 345558 5484335 49.49197 -119.13268 FB grey schist, possiblle mudstone,no sulphides, no veins CA-15-13 345603 5484325 49.49195 -119.13205 FB massive grey granular rock, arenite?no texture CA-18-13 345218 5484358 49.49209 -119.13738 FB granite with chlorite shears, qtz veinlet,no sulphides CA-19-13 345158 5484377 49.49225 -119.13821 SS sediment sample fines CA-20-13 344816 5484254 49.49106 -119.14288 FB silicous quartzite massive CA-21-13 345786 5484063 49.48959 -119.12942 FB granodiorite, massive, elongate pyroxene crystals CA-22-13 345803 5484049 49.48947 -119.12918 FB medium grained granodiorite, no sulphides CA-24-13 345571 5484391 49.49248 -119.13252 FB med grey figr intrusive, siliceous injections CA-25-13 345554 5484433 49.49285 -119.13277 FB qtz vein brecciated, no sulphidescourse grained CA-26-13 346057 5484135 49.49034 -119.12571 IS Carmi Shaft CP-01-13 346323 5485326 49.50109 119.122498 HGY 33 Rd W CP-02-13 345362 5484379 49.492334 119.135393 Rd N CP-03-13 345244 5484362 49.492147 119.137017 Rd S and W CP-04-13 345588 5484044 49.489372 119.132146 May Sh ? CP-05-13 345261 5483784 49.486953 119.136561 Rd E CP-17-13 344735 5483858 49.487483 119.143851 Overgrown Rd w fence East CP-19-13 345602 5485553 49.49395 -119.13215 Trail NE CP-20-13 345254 548453 49.492067 119.136882 Carmi Creek rd splits to N and S areas CP-21-13 345523 5484499 49.493449 119.133234 Rd bearing North CP-22-13 346008 5485033 49.498367 119.126749 Cattleguard old raiway bed
  • 20. 20 Carmi Butcher Boy Work Program Spreadsheet Dump Samples Description DP 01-10,DP2 01-10 The rock material in the samples collected from the stockpile dumps, all had the same composition. The dump material was almost entirely variably sized up to a foot across and the samples were randomly collected across the dumps from finer sand sized pieces of this rock which were small enough to be assayed. DP-01-13 345897 5484195 49.49081 -119.12795 Butcher Boy Dump DP-02-13 345897 5484195 49.49081 -119.12795 Butcher Boy Dump DP-03-13 345888 5484214 49.49097 -119.12808 Butcher Boy Dump DP-04-13 345888 5484214 49.49097 -119.12808 Butcher Boy Dump DP-05-13 345841 5484203 49.49086 -119.12872 Butcher Boy Dump DP-06-13 345841 5484203 49.49086 -119.12872 Butcher Boy Dump DP-07-13 345862 5484212 49.49095 -119.12843 Butcher Boy Dump DP-08-13 345862 5484212 49.49095 -119.12843 Butcher Boy Dump DP-09-13 345917 5484188 49.49074 -119.12767 Butcher Boy Dump DP-10-13 345917 5484188 49.49074 -119.12767 Butcher Boy Dump DP2-01- 13 346057 5484135 49.49034 -119.12571 Carmi Dump DP2-02- 13 346057 5484135 49.49034 -119.12571 Carmi Dump DP2-03- 13 346043 5484222 49.49108 -119.12594 Carmi Dump DP2-04- 13 346043 5484222 49.49108 -119.12594 Carmi Dump DP2-05- 13 346078 5484211 49.49099 -119.12545 Carmi Dump DP2-06- 13 346078 5484211 49.49099 -119.12545 Carmi Dump DP2-07- 13 346023 5484219 49.49105 -119.12621 Carmi Dump DP2-08- 13 346023 5484219 49.49105 -119.12621 Carmi Dump DP2-09- 13 346064 5484215 49.49102 -119.12565 Carmi Dump DP2-10- 13 346064 5484215 49.49102 -119.12565 Carmi Dump Characteristics of the dump samples include quartz veining with massive pyrites, metased, sulphids, sulphide stringers, massive crystalline quartz veining shattered, med graining granodiorite pyritic cubing
  • 21. 21 Carmi Butcher Boy General Work Site Tenure Map Tenure 1027000 1027005 1:10,000
  • 22. 22 Carmi Butcher Boy Geochemical ACME Laboratory Procedure Sample Preparation: 9 samples crushed and pulverized Crush 1 kg to โ‰ฅ70% passing 2mm ... Pulv 250 g โ‰ฅ85% 75ฮผm Crush 70% 10 mesh and pulverize 250 g Exploration Geochemistry: 9 samples tested by way of Aqua Regia AQ202-ICP/ICP-MS Sample splits of 30.0 g were leached in hot modified Aqua Regia.
  • 23. 23 2 samples additionally tested by way of Ultra Trace ICP-MS MA250 Ultratrace ICP-MS Multi-acid digestion packages combine a strong multiacid digestion that dissolves most minerals Ultra Trace ICP-MS (MA250) analysis to give near total values for all elements. A 0.25 g split is heated in HNO3-HClO4-HF to fuming and taken to dryness. The residue is dissolved in HCl.
  • 24. 24 Carmi Butcher Boy Geochemical ACME Laboratory Results Certificate
  • 25. 25
  • 26. 26
  • 27. 27
  • 28. 28
  • 29. 29
  • 30. 30 Carmi Butcher Boy Geochemical ACME Laboratory Results Location Map Tenure 1027000
  • 31. 31 Carmi Butcher Boy Geochemical ACME Laboratory Results Location Map Tenure 1027005
  • 32. 32 Carmi Butcher Boy Geochemical ACME Laboratory Invoice
  • 33. 33 Event 5507146 Carmi Butcher Boy Geochemical Physical Work Report Form
  • 34. 34
  • 35. 35 Event 5507146 Explorations and Development Work / Expiry Date Change 5507146 Carmi 2014 Event Download Event Number: 5507146 Work Type: Technical Work Technical Items: Geochemical, PAC Withdrawal (up to 30% of technical work performed), Preparatory Surveys, Prospecting Work Start Date: 2014/MAY/02 Work Stop Date: 2014/MAY/18 Total Value of Work: $ 7548.00 Tenure Number Claim Name/Property Issue Date Good To Date New Good To Date # of Days For- ward Area in Ha Applied Work Value Sub- mission Fee 1011078 2012/jul/12 2014/jun/03 2015/jul/15 407 83.91 $ 471.28 $ 0.00 1011089 2012/jul/12 2014/jun/03 2015/jul/15 407 20.98 $ 117.83 $ 0.00 1011091 BELOW CARMI 2012/jul/12 2014/jun/02 2015/jul/15 408 104.91 $ 590.62 $ 0.00 1011095 SIDEBAR 2012/jul/12 2014/jun/03 2015/jul/15 407 62.94 $ 353.47 $ 0.00 1023812 Carmi Butcher Capco A 2013/jan/23 2016/jan/01 2018/jun/20 901 20.99 $ 553.69 $ 0.00 1023813 Carmi Butcher Capco B 2013/jan/23 2016/jan/01 2018/jun/20 901 20.99 $ 553.74 $ 0.00 1023815 Carmi May 6362 GT AG 2013/jan/23 2016/jan/01 2018/jun/20 901 41.97 $ 1107.38 $ 0.00 1026999 Carmi Butcher Boy N 2 2013/jul/13 2014/jul/13 2018/jun/22 1440 41.96 $ 1234.79 $ 0.00 1027000 Carmi Butcher Boy North 2013/jul/13 2014/jul/13 2018/jun/22 1440 41.97 $ 1234.91 $ 0.00 1027001 Carmi Butcher Capco A 2013/jul/13 2014/jul/13 2018/jun/22 1440 20.98 $ 617.40 $ 0.00 1027002 Carmi Moly South 2013/jul/13 2014/jul/13 2018/jun/22 1440 20.98 $ 617.45 $ 0.00 1027005 Carmi Mine 13 GT AU 2013/jan/23 2016/jan/01 2018/jun/20 901 104.94 $ 2768.59 $ 0.00 1027006 Carmi Bchrby Mn 17GT AU 2013/jan/23 2016/jan/01 2018/jun/20 901 20.98 $ 553.64 $ 0.00 Financial Summary: Total applied work value:$ 10774.79 PAC name: Bakus Debited PAC amount: $ 3226.79
  • 45. 45 Carmi 2014 Sample Photographs ( Additional Photographs Available Upon Request)
  • 46. 46
  • 47. 48
  • 48. 50 Butcher Boy Dump Site Carmi Dump Site
  • 49. 51 Millsite 1 Butcher Boy Millsite 2 Carmi