Joel Cummings
• Pennsylvania Turnpike Commission, Bridge B-459 (S-26566) Replacement at Milepost 103.47,
Somerset County, Pennsylvania. Responsible for development of roadway plans, cross sections,
erosion sedimentation and pollution control plans, traffic control plans, right-of-way plans,
specifications, and engineer's estimate, and coordination with the client, design manager, agencies,
subconsultants, and team members with respect to other design tasks, permits, and schedule. The
project was let in 2011. [Construction $3.6 million, 2012]
• Pennsylvania Turnpike Commission, Bridge B-409 (S-26466) Replacement at Milepost 104.92,
Somerset County, Pennsylvania. Responsible for the development of roadway plans, cross
sections, erosion sedimentation and pollution control plans, traffic control plans, right-of-way plans,
specifications, and engineer's estimate, and coordination with the client, design manager, agencies,
subconsultants, and team members with respect to other design tasks, permits, and schedule. The
construction cost is $3.2 million.
• Delaware Department of Transportation, Statewide Bridge Design Services 2010 - Bridge 1-
393 Rehabilitation, Various Locations, Delaware. Roadway task leader for rehabilitation of Bridge
1-393 over the Appoquinimink River. Efforts include the preparation of plans, specifications, and
estimates associated with the scour repairs of a bridge over a tidal river in Odessa, Delaware.
• Pennsylvania Department of Transportation, District 4-0, Wayne County Bridge Replacement
Group SR 3015 SEC 670, SR 3024 SEC 671, Pennsylvania. Civil task leader responsible for the
preliminary and final design tasks including preparation of preliminary roadway construction plans,
final roadway construction plans, specifications, engineer's estimate, cross sections, erosion and
sedimentation control plans, and traffic control plans for the replacement of bridges on Finn Swamp
Road and Old Tannery Roads. The winning bid for construction of the 3015 bridge was $527,000,
and the winning bid for the redecking and rehabilitation of the 3024 bridge was $284,000.
• Pennsylvania Department of Transportation, District 8-0, I-83 Overpasses, York County,
Pennsylvania. Responsible for overseeing the development of a feasibility study, preliminary plans,
final plans, specifications, engineer's cost estimate, cross sections, traffic control plans, hydrology
and hydraulics report, and bid documents for the replacement of bridges carrying Sherman Street
and Eberts Lane over I-83 and Mill Creek. The bid documents included design-build plans,
specifications, and estimate for Sherman Street and bid-build plans, specifications, and estimate for
Eberts Lane. The winning bid for construction was $8.9 million.
• Pennsylvania Department of Transportation, District 5-0, SR 422 Section 16B, SR 422 Section
17B, SR 3039 Section 1B, SR 422 Section 1B, Berks County, Pennsylvania. Responsible for the
development of design-build plans, specifications, and engineer's estimate for two bid packages for
the rehabilitation of a total of four bridges. Efforts included the review of contractor design submittals.
The winning bids for construction totaled $2.34 million.
• Pennsylvania Department of Transportation, District 6-0, SR 1058 Section HAT, Franconia and
Hatfield Townships, Pennsylvania. Project engineer responsible for preliminary engineering efforts
including the development of traffic signal permit and traffic signal construction plans for the
proposed connector road between SR 309 and I-476.
• Pennsylvania Department of Transportation, District 6-0, SR 1012 BCG, Franconia Township,
Pennsylvania. Project manager responsible for the oversight of preliminary engineering efforts
including the development of traffic signal plans, line and grade, cross-sections, and pavement
marking and signing plans for the intersection realignment of Godshall and Cowpath Roads.
• Pennsylvania Department of Transportation, District 6-0, SR 611, Section Q66, Warrington
Township, Pennsylvania. Project engineer responsible for the development of preliminary and final
traffic signal construction plans, traffic signal permit plans, traffic signal interconnect plans, operation
and feasibility reports, specifications, and estimates for the interconnection of the traffic signals at 13
intersections on the Easton Road Corridor. The estimated cost of construction is $690,000.
Joel Cummings
• Pennsylvania Department of Transportation, District 6-0, SR 100 Section S35, Upper Uwchlan
Township, Pennsylvania. Widening of 0.5 kilometers of Pennsylvania State Highway from 12.2
meters to 15 meters to accommodate wider lanes, wider shoulders, and left hand turn lanes. Tasks
included pavement design, right-of-way acquisition plans, roadway geometry, and drainage design.
• Pennsylvania Department of Transportation, District 6-0, SR 2001 Section FD-2, Montgomery
County, Pennsylvania. Realignment of the "dog-legged" intersection of North Wales Road with SR
2001 (Morris Road). Tasks included pavement design, right-of-way acquisition plans, roadway
geometry, drainage design, traffic signal design, and pavement marking and signing plans.
• Pennsylvania Department of Transportation, District 6-0, SR 2069, Lower Makefield Township,
Pennsylvania. Widening and realignment of 1 mile of Pennsylvania State Highway to accommodate
wider lanes, wider shoulders, and left turn lanes. Tasks included right-of-way acquisition plans,
roadway geometry, and drainage design.
• Pennsylvania Department of Transportation, District 6-0, SR 3053, Montgomery County,
Pennsylvania. Development of traffic signal permit and construction plans for six intersections.
Tasks included wiring diagrams, emergency preemption, signing, and traffic signal interconnect
timing.
• Pennsylvania Department of Transportation - District 5-0, SR 1018, Section 02B, Replacement
of Viaduct over Martins Creek and Norfolk Southern Railroad, Northampton County,
Pennsylvania. Responsible for development of preliminary roadway plans, cross sections, erosion
sedimentation and pollution control plans, traffic control plans, right-of-way plans, specifications,
and engineer's estimate. [Construction estimate $5.6 million]
.

More Related Content

What's hot

North Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community MeetingNorth Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community MeetingFairfax County
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectFairfax County
 
Lorton VRE Parking Lot Expansion
Lorton VRE Parking Lot ExpansionLorton VRE Parking Lot Expansion
Lorton VRE Parking Lot ExpansionFairfax County
 
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Fairfax County
 
Soapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental AssessmentSoapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental AssessmentFairfax County
 
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadPedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadFairfax County
 
Reston Network Analysis Boards
Reston Network Analysis BoardsReston Network Analysis Boards
Reston Network Analysis BoardsFairfax County
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Fairfax County
 
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Fairfax County
 
Altamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summaryAltamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summaryAltamont Commuter Express
 
Lukens Lane Intersection Improvements Phase II
Lukens Lane Intersection Improvements Phase IILukens Lane Intersection Improvements Phase II
Lukens Lane Intersection Improvements Phase IIFairfax County
 
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...Fairfax County
 
PROPOSED September Service Change Meetings
PROPOSED September Service Change MeetingsPROPOSED September Service Change Meetings
PROPOSED September Service Change MeetingsCOTA BUS
 
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...Daniel X. O'Neil
 
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding UpdateDulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding UpdateFairfax County
 
Hillside Rd and Greeley Blvd: 2017 VDOT Repaving
Hillside Rd and Greeley Blvd: 2017 VDOT RepavingHillside Rd and Greeley Blvd: 2017 VDOT Repaving
Hillside Rd and Greeley Blvd: 2017 VDOT RepavingFairfax County
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County
 
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...Fairfax County
 
Transform 66: Inside the Beltway
Transform 66: Inside the BeltwayTransform 66: Inside the Beltway
Transform 66: Inside the BeltwayFairfax County
 

What's hot (20)

Flagler street-enhanced-bus-service-presentation-2014-12
Flagler street-enhanced-bus-service-presentation-2014-12Flagler street-enhanced-bus-service-presentation-2014-12
Flagler street-enhanced-bus-service-presentation-2014-12
 
North Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community MeetingNorth Kings Highway (VA 241) Intersection Improvements Study Community Meeting
North Kings Highway (VA 241) Intersection Improvements Study Community Meeting
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road Project
 
Lorton VRE Parking Lot Expansion
Lorton VRE Parking Lot ExpansionLorton VRE Parking Lot Expansion
Lorton VRE Parking Lot Expansion
 
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...
 
Soapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental AssessmentSoapstone Connector Public Information Meeting For Environmental Assessment
Soapstone Connector Public Information Meeting For Environmental Assessment
 
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods RoadPedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
Pedestrian Access Improvements: Burke Lake Road at Coffer Woods Road
 
Reston Network Analysis Boards
Reston Network Analysis BoardsReston Network Analysis Boards
Reston Network Analysis Boards
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
 
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
 
Altamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summaryAltamont corridor rail project preliminary aa executive summary
Altamont corridor rail project preliminary aa executive summary
 
Lukens Lane Intersection Improvements Phase II
Lukens Lane Intersection Improvements Phase IILukens Lane Intersection Improvements Phase II
Lukens Lane Intersection Improvements Phase II
 
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
Hunter Mill Road and Sunset Hills Road Study, Community Meeting #6: Nov. 17, ...
 
PROPOSED September Service Change Meetings
PROPOSED September Service Change MeetingsPROPOSED September Service Change Meetings
PROPOSED September Service Change Meetings
 
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
Reconstruction of the Congress Parkway Bridge Over the South Branch of the Ch...
 
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding UpdateDulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
 
Hillside Rd and Greeley Blvd: 2017 VDOT Repaving
Hillside Rd and Greeley Blvd: 2017 VDOT RepavingHillside Rd and Greeley Blvd: 2017 VDOT Repaving
Hillside Rd and Greeley Blvd: 2017 VDOT Repaving
 
Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020Fairfax County Little River Turnpike Walkway August 2020
Fairfax County Little River Turnpike Walkway August 2020
 
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
Hunter Mill District 2018 Paving and Restriping: Public Information Meeting M...
 
Transform 66: Inside the Beltway
Transform 66: Inside the BeltwayTransform 66: Inside the Beltway
Transform 66: Inside the Beltway
 

Viewers also liked

2015 Alumni Tribute to Mike Frazier
2015 Alumni Tribute to Mike Frazier2015 Alumni Tribute to Mike Frazier
2015 Alumni Tribute to Mike FrazierMicheal Frazier
 
Article Cuerdas Vocales (5)
Article   Cuerdas Vocales (5)Article   Cuerdas Vocales (5)
Article Cuerdas Vocales (5)yellowwhirlpool2
 
Lijntjes papier
Lijntjes papierLijntjes papier
Lijntjes papierSem Luiten
 
What do we mean by "Digital Theology"
What do we mean by "Digital Theology"What do we mean by "Digital Theology"
What do we mean by "Digital Theology"Peter Phillips
 
4 raisons de maintenir votre page facebook
4 raisons de maintenir votre page facebook4 raisons de maintenir votre page facebook
4 raisons de maintenir votre page facebookFrederic Gonzalo
 
Vanda Murray - Growth and Competitive Advantage: Lessons of the Last 20 years...
Vanda Murray - Growth and Competitive Advantage: Lessons of the Last 20 years...Vanda Murray - Growth and Competitive Advantage: Lessons of the Last 20 years...
Vanda Murray - Growth and Competitive Advantage: Lessons of the Last 20 years...MarkLeeson
 
Vet Practice - June 2015
Vet Practice - June 2015Vet Practice - June 2015
Vet Practice - June 2015Tracey Porter
 
Warner Bros. Box Office 2015 Vs. 2016
Warner Bros. Box Office 2015 Vs. 2016Warner Bros. Box Office 2015 Vs. 2016
Warner Bros. Box Office 2015 Vs. 2016Kyle Dodel
 
Cerebro Adicto
Cerebro AdictoCerebro Adicto
Cerebro Adictoandros13
 

Viewers also liked (13)

2015 Alumni Tribute to Mike Frazier
2015 Alumni Tribute to Mike Frazier2015 Alumni Tribute to Mike Frazier
2015 Alumni Tribute to Mike Frazier
 
Article Cuerdas Vocales (5)
Article   Cuerdas Vocales (5)Article   Cuerdas Vocales (5)
Article Cuerdas Vocales (5)
 
Lijntjes papier
Lijntjes papierLijntjes papier
Lijntjes papier
 
Pompeii and vesuvius
Pompeii and vesuviusPompeii and vesuvius
Pompeii and vesuvius
 
What do we mean by "Digital Theology"
What do we mean by "Digital Theology"What do we mean by "Digital Theology"
What do we mean by "Digital Theology"
 
Hình anh gia đinh
Hình anh gia đinhHình anh gia đinh
Hình anh gia đinh
 
Exposicion
ExposicionExposicion
Exposicion
 
4 raisons de maintenir votre page facebook
4 raisons de maintenir votre page facebook4 raisons de maintenir votre page facebook
4 raisons de maintenir votre page facebook
 
Vanda Murray - Growth and Competitive Advantage: Lessons of the Last 20 years...
Vanda Murray - Growth and Competitive Advantage: Lessons of the Last 20 years...Vanda Murray - Growth and Competitive Advantage: Lessons of the Last 20 years...
Vanda Murray - Growth and Competitive Advantage: Lessons of the Last 20 years...
 
Training_plan
Training_planTraining_plan
Training_plan
 
Vet Practice - June 2015
Vet Practice - June 2015Vet Practice - June 2015
Vet Practice - June 2015
 
Warner Bros. Box Office 2015 Vs. 2016
Warner Bros. Box Office 2015 Vs. 2016Warner Bros. Box Office 2015 Vs. 2016
Warner Bros. Box Office 2015 Vs. 2016
 
Cerebro Adicto
Cerebro AdictoCerebro Adicto
Cerebro Adicto
 

Similar to Additional Work Experience

Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor HarperTaylor Harper
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadFairfax County
 
Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project ResumeEric Girod
 
Marc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire
 
Celestain Jr Alfred_Refernce
Celestain Jr Alfred_RefernceCelestain Jr Alfred_Refernce
Celestain Jr Alfred_RefernceAlfred Celestain
 
Quander Road Outfall and Stream Restoration
Quander Road Outfall and Stream RestorationQuander Road Outfall and Stream Restoration
Quander Road Outfall and Stream RestorationFairfax County
 
David Brotchie
David Brotchie David Brotchie
David Brotchie Brotchie
 
Hussam Abdelkhaleq Resume 2016
Hussam Abdelkhaleq Resume 2016Hussam Abdelkhaleq Resume 2016
Hussam Abdelkhaleq Resume 2016Hussam Abdelkhaleq
 
tlewisresumetopekarev (1)
tlewisresumetopekarev (1)tlewisresumetopekarev (1)
tlewisresumetopekarev (1)Thomas Lewis
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road WalkwayFairfax County
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadFairfax County
 
Allan Eggers-Resume
Allan Eggers-ResumeAllan Eggers-Resume
Allan Eggers-ResumeAllan Eggers
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12Jerry Williams
 

Similar to Additional Work Experience (20)

ORahman-Resume
ORahman-ResumeORahman-Resume
ORahman-Resume
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor Harper
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
 
Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project Resume
 
Marc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire Resume_2015 general
Marc McIntire Resume_2015 general
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
 
Celestain Jr Alfred_Refernce
Celestain Jr Alfred_RefernceCelestain Jr Alfred_Refernce
Celestain Jr Alfred_Refernce
 
Abugattas, Abraham
Abugattas, AbrahamAbugattas, Abraham
Abugattas, Abraham
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
Quander Road Outfall and Stream Restoration
Quander Road Outfall and Stream RestorationQuander Road Outfall and Stream Restoration
Quander Road Outfall and Stream Restoration
 
David Brotchie
David Brotchie David Brotchie
David Brotchie
 
Hussam Abdelkhaleq Resume 2016
Hussam Abdelkhaleq Resume 2016Hussam Abdelkhaleq Resume 2016
Hussam Abdelkhaleq Resume 2016
 
tlewisresumetopekarev (1)
tlewisresumetopekarev (1)tlewisresumetopekarev (1)
tlewisresumetopekarev (1)
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
 
KFW - TAS Resume
KFW - TAS ResumeKFW - TAS Resume
KFW - TAS Resume
 
Antoine's Resume
Antoine's ResumeAntoine's Resume
Antoine's Resume
 
Allan Eggers-Resume
Allan Eggers-ResumeAllan Eggers-Resume
Allan Eggers-Resume
 
Scott resume
Scott resumeScott resume
Scott resume
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12
 

Additional Work Experience

  • 1. Joel Cummings • Pennsylvania Turnpike Commission, Bridge B-459 (S-26566) Replacement at Milepost 103.47, Somerset County, Pennsylvania. Responsible for development of roadway plans, cross sections, erosion sedimentation and pollution control plans, traffic control plans, right-of-way plans, specifications, and engineer's estimate, and coordination with the client, design manager, agencies, subconsultants, and team members with respect to other design tasks, permits, and schedule. The project was let in 2011. [Construction $3.6 million, 2012] • Pennsylvania Turnpike Commission, Bridge B-409 (S-26466) Replacement at Milepost 104.92, Somerset County, Pennsylvania. Responsible for the development of roadway plans, cross sections, erosion sedimentation and pollution control plans, traffic control plans, right-of-way plans, specifications, and engineer's estimate, and coordination with the client, design manager, agencies, subconsultants, and team members with respect to other design tasks, permits, and schedule. The construction cost is $3.2 million. • Delaware Department of Transportation, Statewide Bridge Design Services 2010 - Bridge 1- 393 Rehabilitation, Various Locations, Delaware. Roadway task leader for rehabilitation of Bridge 1-393 over the Appoquinimink River. Efforts include the preparation of plans, specifications, and estimates associated with the scour repairs of a bridge over a tidal river in Odessa, Delaware. • Pennsylvania Department of Transportation, District 4-0, Wayne County Bridge Replacement Group SR 3015 SEC 670, SR 3024 SEC 671, Pennsylvania. Civil task leader responsible for the preliminary and final design tasks including preparation of preliminary roadway construction plans, final roadway construction plans, specifications, engineer's estimate, cross sections, erosion and sedimentation control plans, and traffic control plans for the replacement of bridges on Finn Swamp Road and Old Tannery Roads. The winning bid for construction of the 3015 bridge was $527,000, and the winning bid for the redecking and rehabilitation of the 3024 bridge was $284,000. • Pennsylvania Department of Transportation, District 8-0, I-83 Overpasses, York County, Pennsylvania. Responsible for overseeing the development of a feasibility study, preliminary plans, final plans, specifications, engineer's cost estimate, cross sections, traffic control plans, hydrology and hydraulics report, and bid documents for the replacement of bridges carrying Sherman Street and Eberts Lane over I-83 and Mill Creek. The bid documents included design-build plans, specifications, and estimate for Sherman Street and bid-build plans, specifications, and estimate for Eberts Lane. The winning bid for construction was $8.9 million. • Pennsylvania Department of Transportation, District 5-0, SR 422 Section 16B, SR 422 Section 17B, SR 3039 Section 1B, SR 422 Section 1B, Berks County, Pennsylvania. Responsible for the development of design-build plans, specifications, and engineer's estimate for two bid packages for the rehabilitation of a total of four bridges. Efforts included the review of contractor design submittals. The winning bids for construction totaled $2.34 million. • Pennsylvania Department of Transportation, District 6-0, SR 1058 Section HAT, Franconia and Hatfield Townships, Pennsylvania. Project engineer responsible for preliminary engineering efforts including the development of traffic signal permit and traffic signal construction plans for the proposed connector road between SR 309 and I-476. • Pennsylvania Department of Transportation, District 6-0, SR 1012 BCG, Franconia Township, Pennsylvania. Project manager responsible for the oversight of preliminary engineering efforts including the development of traffic signal plans, line and grade, cross-sections, and pavement marking and signing plans for the intersection realignment of Godshall and Cowpath Roads. • Pennsylvania Department of Transportation, District 6-0, SR 611, Section Q66, Warrington Township, Pennsylvania. Project engineer responsible for the development of preliminary and final traffic signal construction plans, traffic signal permit plans, traffic signal interconnect plans, operation and feasibility reports, specifications, and estimates for the interconnection of the traffic signals at 13 intersections on the Easton Road Corridor. The estimated cost of construction is $690,000.
  • 2. Joel Cummings • Pennsylvania Department of Transportation, District 6-0, SR 100 Section S35, Upper Uwchlan Township, Pennsylvania. Widening of 0.5 kilometers of Pennsylvania State Highway from 12.2 meters to 15 meters to accommodate wider lanes, wider shoulders, and left hand turn lanes. Tasks included pavement design, right-of-way acquisition plans, roadway geometry, and drainage design. • Pennsylvania Department of Transportation, District 6-0, SR 2001 Section FD-2, Montgomery County, Pennsylvania. Realignment of the "dog-legged" intersection of North Wales Road with SR 2001 (Morris Road). Tasks included pavement design, right-of-way acquisition plans, roadway geometry, drainage design, traffic signal design, and pavement marking and signing plans. • Pennsylvania Department of Transportation, District 6-0, SR 2069, Lower Makefield Township, Pennsylvania. Widening and realignment of 1 mile of Pennsylvania State Highway to accommodate wider lanes, wider shoulders, and left turn lanes. Tasks included right-of-way acquisition plans, roadway geometry, and drainage design. • Pennsylvania Department of Transportation, District 6-0, SR 3053, Montgomery County, Pennsylvania. Development of traffic signal permit and construction plans for six intersections. Tasks included wiring diagrams, emergency preemption, signing, and traffic signal interconnect timing. • Pennsylvania Department of Transportation - District 5-0, SR 1018, Section 02B, Replacement of Viaduct over Martins Creek and Norfolk Southern Railroad, Northampton County, Pennsylvania. Responsible for development of preliminary roadway plans, cross sections, erosion sedimentation and pollution control plans, traffic control plans, right-of-way plans, specifications, and engineer's estimate. [Construction estimate $5.6 million] .