Corrosion Under Insulation
and
Fire Proofing Materials
V. P. Sastry
TCR Arabia Company Ltd.
www.tcr-arabia.com
sales@tcr-arabia.com
Tel: +966-13-8475784/85
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, , 2015
 External corrosion under insulation (CuI) or Corrosion under
Thermal Insulation (CuTI) of insulated piping, equipment and
structural components is experienced worldwide, mainly due
to the entry of water /oxygen.
 Noticed in both cold and hot insulated systems as well as in
fire proofed systems-Corrosion under Fire Proofing (CuFP).
 Can not be noticed as the process is behind the insulation /
fire proofing.
Introduction
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Moisture into the insulation system may further
• Carry the air borne pollutants/corrosive substances’
• Water leaches out chlorides, other halides or sulphates leading
to corrosion.
• Punctures, slipped cladding, seal deterioration aid the easy
entry of water into the insulation.
• Render the insulation ineffective. For example,1 vol.-% of water
in the insulation material leads to an approximate 4% increase in
the thermal conductivity. A water concentration of 5 vol.-% of the
overall insulation material’s volume, increases the l value by 20%.
Introduction
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
• Design specifications-to define all the measures for good quality
water tight insulated/fire proofed systems.
• Installation craftsmanship, and maintenance-less attention paid by
the owner users in terms of supervision.
• Openings thru. Insulation cladding for many reasons like poor
workmanship, misuse, deterioration of sealing materials.
• Presence of moisture or water, oxygen, chloride ions and other salts,
chemical contamination like acids, acidic gases, alkalis, salts... in a
process plant situation, many such possibilities may arise.
• Warm temperatures. ..this depends up on location.
• Abuse of insulation of insulated system- walking on the insulated
lines, misuse of lifting tools and tackles during maintenance.
Influencing factors
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Specific locations and / or systems…penetrations in the insulation and visually damaged
insulation areas.
• Environmental or surrounding areas include:
• Insulated Carbon steel and low alloy systems, operating temperatures between -
5°C and 150°C, frequent or continuous condensation and re-evaporation of atmospheric
moisture, systems normally operate above 150°C but are in Cyclic thermal/ intermittent
service or subjected to frequent outages.
• Susceptible temperature range for Stainless Steels is 65 to 204 deg.C.
• Carbon Steels /Alloy Steels show pitting/loss of thickness, Stainless Steels show pitting,
SCC in Chloride contamination.
• Areas exposed to mist over spray from cooling towers, steam vents, fire water spray
systems, deluge systems, areas subject to process spills, ingress of moisture, or acid
vapors.
• Protruding dead legs and attachments,
• Vibrating systems may loosen the insulation cladding joints,
• Steam tracing leaks beneath the insulation,
• Systems with deteriorated coating and/or wrappings,
• Cold service operating below the atmospheric dew point.
• Weather Proofing/Mastic Wraps
Some of these are covered in case studies.
Susceptible areas for CUI:
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Some of the insulation components inherently cause problem unless
enough care is taken.
•Cladding- It protects the insulated pipe/equipment. Cladding joints form
the basis for the leaks into the insulation through any openings. The
cladding joint foil many a time creates gap due to wavy stiff end, without
closely touching the mating surfaces.
•Cladding joint sealing materials- some of the sealing materials lose the
sealing property over a period of time due to weathering/deterioration.
Asbestos felt sealing may not be adequate.
•Screws-the screwed points are also a potential source for water ingress
into the insulation. Some of these screws may seen missing in plant visual
audit round.
•Fiber/powder based insulations retain water. Insulation materials such as
mineral wool, glass wool and Ca silicate have some chloride and other salt
contamination. Water leaches out these soluble salts from insulation.
•Vapor retarder, Insulation bonding agents
Cold/hot thermal insulation and components:
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
•Design aspects
specification is the key to cover all the design aspects of Insulation
Materials, cladding, Heat-traced Systems, Protective Coatings and
sealing, Shutdown/Mothballing, Quality Control/Quality Assurance
and follow.
Some examples include:
•Avoid creating inspection ports.
•Select where possible insulation systems like Foam glass which
hold less water.
•Old specifications did not call for protective coatings on the
pipe/equipment/structural, before applying the insulation. Use
coatings to prevent corrosion due to the entry of moisture. CuTI
resistant coatings are required for both cold and hot insulation7.
Coatings for systems without insulation may not work for systems
with insulation
Prevention
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Inspection
One of the important inspection requirements is to get the metal
loss due to CuTI. For this first initial thickness is required.
Baseline surveys are best carried out during the construction
phase, before applying coating and insulation. This helps in taking
corrective actions for components not meeting the specification
can be readily done.
CuTI is difficult to identify and hence where to start is important.
An account of susceptible areas can be used as a guide. Insulated
systems are to be reviewed to identify periodic inspection for
critical areas to take corrective actions. The review is based on the
process and mechanical data. Where possible, remove the
insulation on the critical areas for inspection.
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Inspection
DP, Ultrasonic thickness measurements are commonly used,
where the insulation is removed. In addition, advanced NDT is
also required.
For CuTI inspection, Visual examination (for all cases of
without/local/full removal of insulation) helps in eliminating
misinterpretation with other NDT.
If inspection program is planned for multi plant complex, number
of insulated lines may be at least one lakh in addition to
thousands of equipment.
Removing insulation of all these lines even in small lengths, for
inspection, would be highly laborious, time taking and cost
intensive.
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Inspection
Large lengths of insulation removal mean that there is a
maximum possibility of affecting the process. This restricts the
inspection rate.
Cryogenic insulation removal is not advisable during operation
due to ice formation.
Hence, techniques to predict the condition of metal beneath
the insulation are required without its removal.
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
It is important to inspect insulated pipe work, equipment and structural to identify
CuTI/CuFP sites. One can detect hot/cold spots with at least 10 deg. C temperature
differential across the thickness of the Component.
It is a remote condition monitoring technique which identifies the presence of
moisture through mapped surface temperatures. For some field applications, consider
influencing factors such as changes in surface Emissivity, the affects of sunlight heat and
other atmospheric effects.
Ideally, Thermography should be done before rainy season and repeat at the end
of the season and correlate.
Thermogram of carbon steel insulated line, showing wet patch
Advance NDT : Thermography
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
This technique is used in the plant inspection. Where the process
plants use nucleonic gauges, the radiography source radiation
interferes with the nucleonic gauge radiation and plants may trip.
This problem becomes acute when the plants are adjacent to each
other. Also it is a slow technique when many lines are to be done.
Taking profile at multiple different angles is useful to catch the area
of Interest.
Profile radiography to check the wall loss
Advance NDT : Profile Radiography
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Lixi profiler, a portable battery operated unit as shown in (figure), uses Gd153
radioisotope source. When detector assembly is placed around pipe, small
amount of focused radiation beam penetrates the diameter of the pipe. The
amount of radiation received by detector (figure) is converted to an equivalent
steel thickness measurement by the instrumentation. Variation in density
(thickness) is plotted on a computer screen in real time image.
1. Computer module 2. Uniconnect module 3. Detector module 4.HUD 5. C-Arm
2. 6. Source holder 7. Battery brick
Advance NDT : Lixi Profile
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Applications of Lixi Profiler include:
Pipe wall thinning, Corrosion under Insulation (CUI, Pipe
Blockages such as Bitumen, Ice, or any another foreign material
Wet Insulation Cluster of Internal and external pitting, Wall
thickness measurement on insulated or bare pipes w/ or w/o
product, Wall thickness measurement on very hot pipes while in-
service, Weld Identification on Insulated Piping Systems.
The profiler can be used on hot permit system.
Advance NDT : Lixi Profile
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Typical plot for a corroded insulated pipe
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
• Guided Wave Inspection
Ultrasonic screening in-service inspection tool to detect general corrosion and wall loss
for 100-150 ft. on either side of the probe.
Ultrasonic wave guide for CuTI inspection.
(a) Instrumentation
(b) Probe mounting on a small length of pipe where insulation is removed.
It is effective for T< 120 deg.C.
Operator skill is needed.
May not detect defects in immediate vicinity of welds.
Reliability decreases with length.
Signal will terminate at a flange or at second elbow.
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
PEC is a noncontact type inspection technique for carbon steel
objects, such as pipes and vessels.
It can measure % variations in steel thickness through any non-
conductive and non-magnetic material between sensor and steel
surface such as air, insulation material, concrete, plastics,
coatings, paint, sea water, marine growth deposits, oil etc.
Electrical current flows through the transmitter coils of probe and
generate a primary magnetic field. This field is unaffected by the
presence of any non-conducting and non-magnetic material and
penetrates undisturbed and magnetizes the top layer of the steel
beneath the transmitter coils.
Advance NDT : Pulsed Eddy Current (PEC)
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
1. Magnetization of the Steel
2. Induced eddy currents Generate secondary magnetic field in the receiver coil
3. Diffusion of eddy currents. Onset of fast decay occurs when far surface is reached.
Advance NDT : Pulsed Eddy Current (PEC)
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
The current in the transmitter coil is switched off, collapsing the primary magnetic field.
The changing magnetic field induces electrical ‘eddy’ currents in the surface of the steel.
These eddy currents generate a secondary magnetic field and induces an electrical voltage,
which in the receiver coils.
The magnitude of this voltage as a function of the time is referred to as the ‘PEC signal’.
The PEC signal contains information about the thickness of the steel, as described below. A
specimen has a near and a far surface. Initially the eddy currents are confined to the near
surface (closest to the PEC probe) but, as time elapses, they travel (or ‘diffuse’) outwards
towards the far surface (figure 9). As long as the eddy currents experience free expansion
in the wall, their strength decreases relatively slowly.
Advance NDT : Pulsed Eddy Current (PEC)
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
However, upon reaching the far surface, their strength decreases rapidly.
The moment in time where the eddy currents first reach the far surface is
indicated by a sharp decrease in PEC signal, known as ‘transition point’
(figure 9). The time of the transition point is therefore a measure of wall
thickness. For example, the earlier the transition point, the sooner the
eddy currents reach the far surface and the thinner the wall must be. In
practice, each time a PEC measurement is done; voltage across the
receiver coils of the PEC probe is amplified, sampled and digitized by the
PEC instrument. This gives a digital record of the PEC signal over 3000
sample moments in time. The digitized signals are stored in a connected
computer. Dedicated software is used to analyze the shape of all PEC
signals and thereby determine wall thickness.
Advance NDT : Pulsed Eddy Current (PEC)
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Circumferential position at 90 degrees
Top side end Vertical Position A B C D
Distance between
two points is
0.1m
21 97.2 98.1 97.3 97
20 99.4 91.8 94.9 94.1
19 95.9 93.7 98.9 99.1
18 97.9 96.7 94.1 98.7
17 94.6 94.9 96.3 96
16 98.1 97.9 91.7 96.9
15 97.6 95.3 93.1 94.8
14 95.8 99.6 95.9 97.4
13 89.4 97.4 96.2 93.9
12 98.8 94.8 100 100.8
Distance between
two points is
0.5m
11 98.1 97.9 93.9 95.8
10 93.1 93.8 97.6 96.5
9 99.2 96.2 90.8 97.1
8 98.1 95.6 92.8 93.3
7 99.6 100.8 101.8 97.3
6 88.5 90.8 92.7 89.4
5 94.0 93.5 91.4 88.3
4 91.5 90.3 93.8 89.1
3 94.8 90.3 93.4 88.9
2 95.6 98.1 92.3 97.9
1 95.4 97.6 94.2 98.0
Ground side end
Remaining wall thickness of one leg of Horton sphere
Colour code: 85-90%; 90-110%
Examples of reasons for CuTI experienced, measures
taken.
Inadequate design aspects
Normally Stiffening rings, platform support rings and
Insulated support rings are not provided with drain holes
for possible collection of rain water on to the rings.
Hence corrosion is often vulnerable.
Connected to the process columns operating temperature
between 60 to 100 deg.C due to accumulation of Water
in the mineral wool insulation support ring.
As a corrective action, holes are drilled; apply suitable
paint to resist under insulation corrosion applied.
Update the specification.
Column ring without holes
causing corrosion due to
accumulation of water in
rainy season.
Case Studies
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Fire proof insulation:
In the process column, bottom piping leaked exactly where the pipes crossing the fire
proofed skirt, due to long contact with water beneath the fire proofing. Specification is
updated to do CuTI paint before fire proofing.
Leakage of column bottom pipes in contact with column skirt fire proofing
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
12 O’clock clad joints
To protect water entry, the clad joints shall be at 6 O’clock
position
The clad joints shown with Arrow in 1 O’clock/12 O’clock poisons.
These should have been at 6 O’clock position to avoid direct water entry through
the joint gaps.
Update the specification.
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Deviation from design conditions
Different Normally No Flow (NNF) hydrocarbon carbon steel lines or dead legs of varied
diameters are hot mineral wool insulated expecting above ambient temperatures. But these
lines did not have any flow, experienced only ambient temperatures.
Pipe wall thinning as much as 50% in 15 years of time under insulation.
All such affected lines are replaced with new lines and CuTI resistant paint was applied
before insulation.
But these lines did not have any flow, experienced only ambient temperatures.
One such PSV upstream line was mineral wool insulated as per Line Designation Table (LDT),
but remained at ambient temperature.
Corroded insulated PSV upstream
line due to ambient temperature
Mineral wool insulated lines as per LDT but remained at
ambient T-used intermittently during plant shutdowns, for
commissioning/ decommissioning.
CuTI on intermittent
service line
Heat traced lines to maintain the liquid temperature and hence insulation was used.
Electrical heat traced lines, found corroded in-service.
These lines were audited/reassessed and found that the tracing is not required.
So the electrical tracing was disabled. So this 2”, Sch. 40 Carbon steel line carrying
fuel gas experienced ambient temperatures leading to corrosion under mineral
wool insulation .
Remedial action done included replacing the corroded length, removal of heat
tracing and application Paint to resist Corrosion under Insulation.
Insulation removed for inspection.
Electrical heat tracing is disabled.
Corrosion noticed under insulation.
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Similarly Steam tracing line leaked and corroded the pipe under mineral wool
insulation as steam tracing is not activated on 6” Sch. 40 carbon steel lines for
benzene service.
CuTI on steam tracing inactivated line
Abuse of insulated lines as some personnel walk on them
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Corroded cladding
Direct water entry is possible through the cladding damages.
Corroded insulation cladding. GI sheet performs poorly as a cladding material.
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Cladding joints sealing material life.
Sealing material works for some time. After that, due to dry up cracks or fall off,
the joints are exposed. Well before monsoon, these joints are to be inspected
and rectified in the problem areas. Another problem noticed is that the cladding
ends should not have wavy pattern to have proper sealing. If found, they have to
be smoothened / straightened.
Clad joint sealant with proper sealing
Clad sealing. Mark 1 is the asbestos sealant and
Mark 2 shows the absence of sealing on top allowing
the possibility of any contamination / ingression.
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Exposed insulation
Exposed insulation at the ends of the lines, supports etc. due to improper or
incomplete or no cladding
Incomplete installation of insulation. Incomplete provision of insulation.
Cladding cover is missing.
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Influence of neighboring plants.
Insulated Stainless steel type 304 lines are vulnerable for cracking.
Make up water to De-aerator T 60 deg.C .
These lines are prone to failures as exposed to neighboring continuous plume from
cooling tower fan exhaust and steam leakages and contamination.
Corroded lines were replaced and provided with SS foil before insulation.
SCC on stainless steel line
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Leakage of steam tracing leaks
External corrosion of a pipe and
flange joint / fasteners at the
break of mineral insulation due
to leaky steam tracing.
Maintenance
Insulation and cladding improperly done / not redone during maintenance
Improperly done cladding.
No sealing also for clad joints
Inadequacy in Insulation of Piping supports
CuTI Deposits in the Support Lugs
Corrosion of piping supports
Piping support corrosion is a frequently noticed problem under insulation.
They have to be inspected closely and take corrective actions. In case of new
plants, adequate focus has to be given in specification preparation to minimize the
problem.
In the field, they have to be maintained with a close watch.
Another example of corrosion under insulation of a 2"
carbon steel pipe near bottom welded support.
The support pipe covered under the piping insulation is also
found corroded and perforated.
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
a) Open inspection pocket b) Improperly fitted Inspection pocket
RECOMMENDATIONS:
• Insulation system is designed and done as per international
norms, codes and standards.
• Learn from others’ problems, conduct necessary audits and
take precautions by the owner users for the assets.
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
Insulation system is designed and done as per
international norms, codes and standards.
• Learn from others’ problems, conduct necessary
audits and take precautions by the owner users for the
assets.
Recommendations
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
The author thanks the organizers for accepting the paper for
presentation.
Acknowledgments
Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015

More Related Content

Similar to MENDT2015_44.pdf

LNG Industry Magazine (Risk Mitigation Standards) July 2016
LNG Industry Magazine (Risk Mitigation Standards) July 2016LNG Industry Magazine (Risk Mitigation Standards) July 2016
LNG Industry Magazine (Risk Mitigation Standards) July 2016Dyplast Products
 
corrosion under thermal insulation
corrosion under thermal insulationcorrosion under thermal insulation
corrosion under thermal insulationhasan abrahem
 
Customer Bulletin 0610 Polyisocyanurate vs. Cellular Glass Insulation
Customer Bulletin 0610 Polyisocyanurate vs. Cellular Glass InsulationCustomer Bulletin 0610 Polyisocyanurate vs. Cellular Glass Insulation
Customer Bulletin 0610 Polyisocyanurate vs. Cellular Glass InsulationJoe Hughes
 
A life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrityA life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrityOkeme Esegine PMP
 
1957FullText150Corrosion Under Insulation - Facts and Prevents ( corcon 2016...
1957FullText150Corrosion Under Insulation - Facts and Prevents  ( corcon 2016...1957FullText150Corrosion Under Insulation - Facts and Prevents  ( corcon 2016...
1957FullText150Corrosion Under Insulation - Facts and Prevents ( corcon 2016...Kumar Kolur Vadivelu
 
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Joe Hughes
 
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Dyplast Products
 
Stopaq® belægnings- og forseglingsløsning!
Stopaq® belægnings- og forseglingsløsning!Stopaq® belægnings- og forseglingsløsning!
Stopaq® belægnings- og forseglingsløsning!Daniel Pedersen
 
The Role of the Insulation System in Optimizing value in LNG Facilities
The Role of the Insulation System in Optimizing value in LNG FacilitiesThe Role of the Insulation System in Optimizing value in LNG Facilities
The Role of the Insulation System in Optimizing value in LNG FacilitiesDyplast Products
 
The Role of the Insulation System in Optimizing value in LNG Facilities
The Role of the Insulation System in Optimizing value in LNG FacilitiesThe Role of the Insulation System in Optimizing value in LNG Facilities
The Role of the Insulation System in Optimizing value in LNG FacilitiesJoe Hughes
 
ACT Clamps 03-2015 English
ACT Clamps 03-2015 EnglishACT Clamps 03-2015 English
ACT Clamps 03-2015 EnglishWaldo Sanchez
 
Asset corrosion management cui - masterclass 2018
Asset corrosion management   cui - masterclass 2018Asset corrosion management   cui - masterclass 2018
Asset corrosion management cui - masterclass 2018Marcep Inc.
 
Iso c1 chilled-water-installation-guide_0619
Iso c1 chilled-water-installation-guide_0619Iso c1 chilled-water-installation-guide_0619
Iso c1 chilled-water-installation-guide_0619gasanden
 
Goel Scientific General information and introduction
Goel Scientific General information and introductionGoel Scientific General information and introduction
Goel Scientific General information and introductionGoel Scientific
 
Tough performers - Industrial-grade Sensors for Extreme Conditions
Tough performers - Industrial-grade Sensors for Extreme ConditionsTough performers - Industrial-grade Sensors for Extreme Conditions
Tough performers - Industrial-grade Sensors for Extreme ConditionsManfred Muenzl
 
Technical Bulletin 1128A Mechanical Insulation In Typical Refrigeration Appli...
Technical Bulletin 1128A Mechanical Insulation In Typical Refrigeration Appli...Technical Bulletin 1128A Mechanical Insulation In Typical Refrigeration Appli...
Technical Bulletin 1128A Mechanical Insulation In Typical Refrigeration Appli...Joe Hughes
 

Similar to MENDT2015_44.pdf (20)

LNG Industry Magazine (Risk Mitigation Standards) July 2016
LNG Industry Magazine (Risk Mitigation Standards) July 2016LNG Industry Magazine (Risk Mitigation Standards) July 2016
LNG Industry Magazine (Risk Mitigation Standards) July 2016
 
corrosion under thermal insulation
corrosion under thermal insulationcorrosion under thermal insulation
corrosion under thermal insulation
 
Customer Bulletin 0610 Polyisocyanurate vs. Cellular Glass Insulation
Customer Bulletin 0610 Polyisocyanurate vs. Cellular Glass InsulationCustomer Bulletin 0610 Polyisocyanurate vs. Cellular Glass Insulation
Customer Bulletin 0610 Polyisocyanurate vs. Cellular Glass Insulation
 
A life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrityA life cycle approach to corrosion management and asset integrity
A life cycle approach to corrosion management and asset integrity
 
Vci paper
Vci paperVci paper
Vci paper
 
1957FullText150Corrosion Under Insulation - Facts and Prevents ( corcon 2016...
1957FullText150Corrosion Under Insulation - Facts and Prevents  ( corcon 2016...1957FullText150Corrosion Under Insulation - Facts and Prevents  ( corcon 2016...
1957FullText150Corrosion Under Insulation - Facts and Prevents ( corcon 2016...
 
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
 
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
Technical Bulletin 0714 Elastomeric insulation versus polyisocyanurate in low...
 
Stopaq® belægnings- og forseglingsløsning!
Stopaq® belægnings- og forseglingsløsning!Stopaq® belægnings- og forseglingsløsning!
Stopaq® belægnings- og forseglingsløsning!
 
The Role of the Insulation System in Optimizing value in LNG Facilities
The Role of the Insulation System in Optimizing value in LNG FacilitiesThe Role of the Insulation System in Optimizing value in LNG Facilities
The Role of the Insulation System in Optimizing value in LNG Facilities
 
The Role of the Insulation System in Optimizing value in LNG Facilities
The Role of the Insulation System in Optimizing value in LNG FacilitiesThe Role of the Insulation System in Optimizing value in LNG Facilities
The Role of the Insulation System in Optimizing value in LNG Facilities
 
ACT Clamps 03-2015 English
ACT Clamps 03-2015 EnglishACT Clamps 03-2015 English
ACT Clamps 03-2015 English
 
Asset corrosion management cui - masterclass 2018
Asset corrosion management   cui - masterclass 2018Asset corrosion management   cui - masterclass 2018
Asset corrosion management cui - masterclass 2018
 
Iso c1 chilled-water-installation-guide_0619
Iso c1 chilled-water-installation-guide_0619Iso c1 chilled-water-installation-guide_0619
Iso c1 chilled-water-installation-guide_0619
 
Goel Scientific General information and introduction
Goel Scientific General information and introductionGoel Scientific General information and introduction
Goel Scientific General information and introduction
 
Tough performers - Industrial-grade Sensors for Extreme Conditions
Tough performers - Industrial-grade Sensors for Extreme ConditionsTough performers - Industrial-grade Sensors for Extreme Conditions
Tough performers - Industrial-grade Sensors for Extreme Conditions
 
VDVDVD
VDVDVDVDVDVD
VDVDVD
 
Technical Bulletin 1128A Mechanical Insulation In Typical Refrigeration Appli...
Technical Bulletin 1128A Mechanical Insulation In Typical Refrigeration Appli...Technical Bulletin 1128A Mechanical Insulation In Typical Refrigeration Appli...
Technical Bulletin 1128A Mechanical Insulation In Typical Refrigeration Appli...
 
1.Product Range_companyprofile
1.Product Range_companyprofile1.Product Range_companyprofile
1.Product Range_companyprofile
 
Summer Trg
Summer TrgSummer Trg
Summer Trg
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 

MENDT2015_44.pdf

  • 1. Corrosion Under Insulation and Fire Proofing Materials V. P. Sastry TCR Arabia Company Ltd. www.tcr-arabia.com sales@tcr-arabia.com Tel: +966-13-8475784/85 Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, , 2015
  • 2.  External corrosion under insulation (CuI) or Corrosion under Thermal Insulation (CuTI) of insulated piping, equipment and structural components is experienced worldwide, mainly due to the entry of water /oxygen.  Noticed in both cold and hot insulated systems as well as in fire proofed systems-Corrosion under Fire Proofing (CuFP).  Can not be noticed as the process is behind the insulation / fire proofing. Introduction Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 3. Moisture into the insulation system may further • Carry the air borne pollutants/corrosive substances’ • Water leaches out chlorides, other halides or sulphates leading to corrosion. • Punctures, slipped cladding, seal deterioration aid the easy entry of water into the insulation. • Render the insulation ineffective. For example,1 vol.-% of water in the insulation material leads to an approximate 4% increase in the thermal conductivity. A water concentration of 5 vol.-% of the overall insulation material’s volume, increases the l value by 20%. Introduction Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 4. • Design specifications-to define all the measures for good quality water tight insulated/fire proofed systems. • Installation craftsmanship, and maintenance-less attention paid by the owner users in terms of supervision. • Openings thru. Insulation cladding for many reasons like poor workmanship, misuse, deterioration of sealing materials. • Presence of moisture or water, oxygen, chloride ions and other salts, chemical contamination like acids, acidic gases, alkalis, salts... in a process plant situation, many such possibilities may arise. • Warm temperatures. ..this depends up on location. • Abuse of insulation of insulated system- walking on the insulated lines, misuse of lifting tools and tackles during maintenance. Influencing factors Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 5. Specific locations and / or systems…penetrations in the insulation and visually damaged insulation areas. • Environmental or surrounding areas include: • Insulated Carbon steel and low alloy systems, operating temperatures between - 5°C and 150°C, frequent or continuous condensation and re-evaporation of atmospheric moisture, systems normally operate above 150°C but are in Cyclic thermal/ intermittent service or subjected to frequent outages. • Susceptible temperature range for Stainless Steels is 65 to 204 deg.C. • Carbon Steels /Alloy Steels show pitting/loss of thickness, Stainless Steels show pitting, SCC in Chloride contamination. • Areas exposed to mist over spray from cooling towers, steam vents, fire water spray systems, deluge systems, areas subject to process spills, ingress of moisture, or acid vapors. • Protruding dead legs and attachments, • Vibrating systems may loosen the insulation cladding joints, • Steam tracing leaks beneath the insulation, • Systems with deteriorated coating and/or wrappings, • Cold service operating below the atmospheric dew point. • Weather Proofing/Mastic Wraps Some of these are covered in case studies. Susceptible areas for CUI: Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 6. Some of the insulation components inherently cause problem unless enough care is taken. •Cladding- It protects the insulated pipe/equipment. Cladding joints form the basis for the leaks into the insulation through any openings. The cladding joint foil many a time creates gap due to wavy stiff end, without closely touching the mating surfaces. •Cladding joint sealing materials- some of the sealing materials lose the sealing property over a period of time due to weathering/deterioration. Asbestos felt sealing may not be adequate. •Screws-the screwed points are also a potential source for water ingress into the insulation. Some of these screws may seen missing in plant visual audit round. •Fiber/powder based insulations retain water. Insulation materials such as mineral wool, glass wool and Ca silicate have some chloride and other salt contamination. Water leaches out these soluble salts from insulation. •Vapor retarder, Insulation bonding agents Cold/hot thermal insulation and components: Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 7. •Design aspects specification is the key to cover all the design aspects of Insulation Materials, cladding, Heat-traced Systems, Protective Coatings and sealing, Shutdown/Mothballing, Quality Control/Quality Assurance and follow. Some examples include: •Avoid creating inspection ports. •Select where possible insulation systems like Foam glass which hold less water. •Old specifications did not call for protective coatings on the pipe/equipment/structural, before applying the insulation. Use coatings to prevent corrosion due to the entry of moisture. CuTI resistant coatings are required for both cold and hot insulation7. Coatings for systems without insulation may not work for systems with insulation Prevention Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 8. Inspection One of the important inspection requirements is to get the metal loss due to CuTI. For this first initial thickness is required. Baseline surveys are best carried out during the construction phase, before applying coating and insulation. This helps in taking corrective actions for components not meeting the specification can be readily done. CuTI is difficult to identify and hence where to start is important. An account of susceptible areas can be used as a guide. Insulated systems are to be reviewed to identify periodic inspection for critical areas to take corrective actions. The review is based on the process and mechanical data. Where possible, remove the insulation on the critical areas for inspection. Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 9. Inspection DP, Ultrasonic thickness measurements are commonly used, where the insulation is removed. In addition, advanced NDT is also required. For CuTI inspection, Visual examination (for all cases of without/local/full removal of insulation) helps in eliminating misinterpretation with other NDT. If inspection program is planned for multi plant complex, number of insulated lines may be at least one lakh in addition to thousands of equipment. Removing insulation of all these lines even in small lengths, for inspection, would be highly laborious, time taking and cost intensive. Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 10. Inspection Large lengths of insulation removal mean that there is a maximum possibility of affecting the process. This restricts the inspection rate. Cryogenic insulation removal is not advisable during operation due to ice formation. Hence, techniques to predict the condition of metal beneath the insulation are required without its removal. Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 11. It is important to inspect insulated pipe work, equipment and structural to identify CuTI/CuFP sites. One can detect hot/cold spots with at least 10 deg. C temperature differential across the thickness of the Component. It is a remote condition monitoring technique which identifies the presence of moisture through mapped surface temperatures. For some field applications, consider influencing factors such as changes in surface Emissivity, the affects of sunlight heat and other atmospheric effects. Ideally, Thermography should be done before rainy season and repeat at the end of the season and correlate. Thermogram of carbon steel insulated line, showing wet patch Advance NDT : Thermography Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 12. This technique is used in the plant inspection. Where the process plants use nucleonic gauges, the radiography source radiation interferes with the nucleonic gauge radiation and plants may trip. This problem becomes acute when the plants are adjacent to each other. Also it is a slow technique when many lines are to be done. Taking profile at multiple different angles is useful to catch the area of Interest. Profile radiography to check the wall loss Advance NDT : Profile Radiography Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 13. Lixi profiler, a portable battery operated unit as shown in (figure), uses Gd153 radioisotope source. When detector assembly is placed around pipe, small amount of focused radiation beam penetrates the diameter of the pipe. The amount of radiation received by detector (figure) is converted to an equivalent steel thickness measurement by the instrumentation. Variation in density (thickness) is plotted on a computer screen in real time image. 1. Computer module 2. Uniconnect module 3. Detector module 4.HUD 5. C-Arm 2. 6. Source holder 7. Battery brick Advance NDT : Lixi Profile Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 14. Applications of Lixi Profiler include: Pipe wall thinning, Corrosion under Insulation (CUI, Pipe Blockages such as Bitumen, Ice, or any another foreign material Wet Insulation Cluster of Internal and external pitting, Wall thickness measurement on insulated or bare pipes w/ or w/o product, Wall thickness measurement on very hot pipes while in- service, Weld Identification on Insulated Piping Systems. The profiler can be used on hot permit system. Advance NDT : Lixi Profile Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 15. Typical plot for a corroded insulated pipe Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 16. • Guided Wave Inspection Ultrasonic screening in-service inspection tool to detect general corrosion and wall loss for 100-150 ft. on either side of the probe. Ultrasonic wave guide for CuTI inspection. (a) Instrumentation (b) Probe mounting on a small length of pipe where insulation is removed. It is effective for T< 120 deg.C. Operator skill is needed. May not detect defects in immediate vicinity of welds. Reliability decreases with length. Signal will terminate at a flange or at second elbow. Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 17. PEC is a noncontact type inspection technique for carbon steel objects, such as pipes and vessels. It can measure % variations in steel thickness through any non- conductive and non-magnetic material between sensor and steel surface such as air, insulation material, concrete, plastics, coatings, paint, sea water, marine growth deposits, oil etc. Electrical current flows through the transmitter coils of probe and generate a primary magnetic field. This field is unaffected by the presence of any non-conducting and non-magnetic material and penetrates undisturbed and magnetizes the top layer of the steel beneath the transmitter coils. Advance NDT : Pulsed Eddy Current (PEC) Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 18. 1. Magnetization of the Steel 2. Induced eddy currents Generate secondary magnetic field in the receiver coil 3. Diffusion of eddy currents. Onset of fast decay occurs when far surface is reached. Advance NDT : Pulsed Eddy Current (PEC) Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 19. The current in the transmitter coil is switched off, collapsing the primary magnetic field. The changing magnetic field induces electrical ‘eddy’ currents in the surface of the steel. These eddy currents generate a secondary magnetic field and induces an electrical voltage, which in the receiver coils. The magnitude of this voltage as a function of the time is referred to as the ‘PEC signal’. The PEC signal contains information about the thickness of the steel, as described below. A specimen has a near and a far surface. Initially the eddy currents are confined to the near surface (closest to the PEC probe) but, as time elapses, they travel (or ‘diffuse’) outwards towards the far surface (figure 9). As long as the eddy currents experience free expansion in the wall, their strength decreases relatively slowly. Advance NDT : Pulsed Eddy Current (PEC) Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 20. However, upon reaching the far surface, their strength decreases rapidly. The moment in time where the eddy currents first reach the far surface is indicated by a sharp decrease in PEC signal, known as ‘transition point’ (figure 9). The time of the transition point is therefore a measure of wall thickness. For example, the earlier the transition point, the sooner the eddy currents reach the far surface and the thinner the wall must be. In practice, each time a PEC measurement is done; voltage across the receiver coils of the PEC probe is amplified, sampled and digitized by the PEC instrument. This gives a digital record of the PEC signal over 3000 sample moments in time. The digitized signals are stored in a connected computer. Dedicated software is used to analyze the shape of all PEC signals and thereby determine wall thickness. Advance NDT : Pulsed Eddy Current (PEC) Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 21. Circumferential position at 90 degrees Top side end Vertical Position A B C D Distance between two points is 0.1m 21 97.2 98.1 97.3 97 20 99.4 91.8 94.9 94.1 19 95.9 93.7 98.9 99.1 18 97.9 96.7 94.1 98.7 17 94.6 94.9 96.3 96 16 98.1 97.9 91.7 96.9 15 97.6 95.3 93.1 94.8 14 95.8 99.6 95.9 97.4 13 89.4 97.4 96.2 93.9 12 98.8 94.8 100 100.8 Distance between two points is 0.5m 11 98.1 97.9 93.9 95.8 10 93.1 93.8 97.6 96.5 9 99.2 96.2 90.8 97.1 8 98.1 95.6 92.8 93.3 7 99.6 100.8 101.8 97.3 6 88.5 90.8 92.7 89.4 5 94.0 93.5 91.4 88.3 4 91.5 90.3 93.8 89.1 3 94.8 90.3 93.4 88.9 2 95.6 98.1 92.3 97.9 1 95.4 97.6 94.2 98.0 Ground side end Remaining wall thickness of one leg of Horton sphere Colour code: 85-90%; 90-110%
  • 22. Examples of reasons for CuTI experienced, measures taken. Inadequate design aspects Normally Stiffening rings, platform support rings and Insulated support rings are not provided with drain holes for possible collection of rain water on to the rings. Hence corrosion is often vulnerable. Connected to the process columns operating temperature between 60 to 100 deg.C due to accumulation of Water in the mineral wool insulation support ring. As a corrective action, holes are drilled; apply suitable paint to resist under insulation corrosion applied. Update the specification. Column ring without holes causing corrosion due to accumulation of water in rainy season. Case Studies Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 23. Fire proof insulation: In the process column, bottom piping leaked exactly where the pipes crossing the fire proofed skirt, due to long contact with water beneath the fire proofing. Specification is updated to do CuTI paint before fire proofing. Leakage of column bottom pipes in contact with column skirt fire proofing Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 24. 12 O’clock clad joints To protect water entry, the clad joints shall be at 6 O’clock position The clad joints shown with Arrow in 1 O’clock/12 O’clock poisons. These should have been at 6 O’clock position to avoid direct water entry through the joint gaps. Update the specification. Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 25. Deviation from design conditions Different Normally No Flow (NNF) hydrocarbon carbon steel lines or dead legs of varied diameters are hot mineral wool insulated expecting above ambient temperatures. But these lines did not have any flow, experienced only ambient temperatures. Pipe wall thinning as much as 50% in 15 years of time under insulation. All such affected lines are replaced with new lines and CuTI resistant paint was applied before insulation. But these lines did not have any flow, experienced only ambient temperatures. One such PSV upstream line was mineral wool insulated as per Line Designation Table (LDT), but remained at ambient temperature. Corroded insulated PSV upstream line due to ambient temperature Mineral wool insulated lines as per LDT but remained at ambient T-used intermittently during plant shutdowns, for commissioning/ decommissioning. CuTI on intermittent service line
  • 26. Heat traced lines to maintain the liquid temperature and hence insulation was used. Electrical heat traced lines, found corroded in-service. These lines were audited/reassessed and found that the tracing is not required. So the electrical tracing was disabled. So this 2”, Sch. 40 Carbon steel line carrying fuel gas experienced ambient temperatures leading to corrosion under mineral wool insulation . Remedial action done included replacing the corroded length, removal of heat tracing and application Paint to resist Corrosion under Insulation. Insulation removed for inspection. Electrical heat tracing is disabled. Corrosion noticed under insulation. Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 27. Similarly Steam tracing line leaked and corroded the pipe under mineral wool insulation as steam tracing is not activated on 6” Sch. 40 carbon steel lines for benzene service. CuTI on steam tracing inactivated line Abuse of insulated lines as some personnel walk on them Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 28. Corroded cladding Direct water entry is possible through the cladding damages. Corroded insulation cladding. GI sheet performs poorly as a cladding material. Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 29. Cladding joints sealing material life. Sealing material works for some time. After that, due to dry up cracks or fall off, the joints are exposed. Well before monsoon, these joints are to be inspected and rectified in the problem areas. Another problem noticed is that the cladding ends should not have wavy pattern to have proper sealing. If found, they have to be smoothened / straightened. Clad joint sealant with proper sealing Clad sealing. Mark 1 is the asbestos sealant and Mark 2 shows the absence of sealing on top allowing the possibility of any contamination / ingression. Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 30. Exposed insulation Exposed insulation at the ends of the lines, supports etc. due to improper or incomplete or no cladding Incomplete installation of insulation. Incomplete provision of insulation. Cladding cover is missing. Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 31. Influence of neighboring plants. Insulated Stainless steel type 304 lines are vulnerable for cracking. Make up water to De-aerator T 60 deg.C . These lines are prone to failures as exposed to neighboring continuous plume from cooling tower fan exhaust and steam leakages and contamination. Corroded lines were replaced and provided with SS foil before insulation. SCC on stainless steel line Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 32. Leakage of steam tracing leaks External corrosion of a pipe and flange joint / fasteners at the break of mineral insulation due to leaky steam tracing. Maintenance Insulation and cladding improperly done / not redone during maintenance Improperly done cladding. No sealing also for clad joints Inadequacy in Insulation of Piping supports CuTI Deposits in the Support Lugs
  • 33. Corrosion of piping supports Piping support corrosion is a frequently noticed problem under insulation. They have to be inspected closely and take corrective actions. In case of new plants, adequate focus has to be given in specification preparation to minimize the problem. In the field, they have to be maintained with a close watch. Another example of corrosion under insulation of a 2" carbon steel pipe near bottom welded support. The support pipe covered under the piping insulation is also found corroded and perforated. Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 34. a) Open inspection pocket b) Improperly fitted Inspection pocket RECOMMENDATIONS: • Insulation system is designed and done as per international norms, codes and standards. • Learn from others’ problems, conduct necessary audits and take precautions by the owner users for the assets. Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 35. Insulation system is designed and done as per international norms, codes and standards. • Learn from others’ problems, conduct necessary audits and take precautions by the owner users for the assets. Recommendations Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015
  • 36. The author thanks the organizers for accepting the paper for presentation. Acknowledgments Seventh Middle East NDT Conference & Exhibition 2015, Bahrain 13-16 Sept, 2015