This document contains Jeffrey Dalin Vierneza's resume. It includes his contact information, work experience as an Asset and Material Controller and in various electrical and instrumentation roles, education and skills including welding, appliance repair, and house installation. It also lists character references and describes his background as hard working with good communication skills.
1. Jeffrey Dalin Vierneza
Email add: jeffrey_vierneza15@yahoo.com
Brgy.Pob.2 block-6, lot-3
GMA, Cavite
Cell #: +639424079353 and +639275833075
Material Controller
Objectives:
TO WORK IN COMPANY WHERE I UTILIZE MY SKILL, LEARN NEW THINGS AND FINDING
OPPORTUNITIES FOR INCREASED RESPONSIBILITY AND ADVANCEMENT
Employment Record:
Asset and Material Controller (Asset Manager)
Kentech Qatar Technical Services
Qatar Shell Gas To Liquid
January 18, 2014 to March 17,2016
Coordinate with international and local shipping contractor.
Maintain a log of all material movement for local transportation and for international imported material.
Ensure parts are secured properly compliant with safety requirements.
Keep trucks and associated equipment orderly and in good working order.
Maintains records of all issues and locations of inventory items.
Stocks parts into appropriate inventory locations.
Receives parts. Inspects all material received for proper quantity, condition and documentation accord.
Verifies MSDS and company approval on all hazardous materials received.
Assists internal and external customers with their stock parts requirements. Locates parts and issues them to
the requester physically and in the computer system.
Orders "free list" stock items and maintains replenishment of "free list" materials. May be required to order
parts after regular business hours.
Ships hazardous materials in accordance with IATA/ICAO.
Complies with all applicable Federal Aviation Regulations (FARs) Quality Procedures (QPs) and local work
instructions.
Average computer skills (Knowledgeable at Asset Manager Software and SAP).
Able to read and comprehend written instructions and speak and write clearly to communicate with
employees, customers and vendors and document work performed.
Electrical, Telecom and Instrumentation Foreman
Kentech International LTD
GASCO NGL-4 Abu Dhabi, UAE
April 18, 2012 to Oct.29 2013
Supervising that the entire worker has work.
Planning the distribution of work.
Preparation of all drawing and material.
Processed that all safe and fit to the job.
2. Install Instrument Devices such as pressure element, pressure transmitter, pressure indicator,
temperature gauge, temperature transmitter, temperature indicator, flow transmitter, flow indicator, and
level gauge, level transmitter.
Cable glanding from instrument devices up to distribution box (DB) and main control cabinet (MCC).
Cable termination from instrument devices up to distribution box (DB) and main control cabinet (MCC).
lnstall instrument tray and support.
Installation of stanchion.
Lightings support installation.
Glanding and termination for electrical
Install Telephone unit.
Install Telephone Beacon and Sounder.
Glanding and termination of copper cable and fiber optic cable.
Using fusion machine for fiber optic cable have small knowledge.
Even Cable pulling of instrument cable and electrical cable.
Daily reporting
Electrician & Store Man
Kentech International LTD
SHELL GTL Ras Laffan City, Qatar
June 17, 2009 to June 17, 2010
Performs electrical works, telecom work and instrument work such as glanding and termination.
Install Cable Tray & Cable Ladders.
Install Electrical, Telecom and Instrument Devices such as pressure transmitter, temperature transmitter,
flow transmitter and level transmitter. Lightings fixture, tray and lighting support installation, install
Telephone unit, Telephone Beacon and Sounder.
Start working at E & I Store
Maintenance
AMAZONIA BAR AND HOTEL PHIL.
Ermita Manila, Philippines
May 13, 2008 to October 22, 2008
Set-up sound system
Repair lights and outlet
Repair appliances
Daily checking of all genset
Daily reporting
Mig Welder
YUTAKA PHILIPPINES INC.
Binan Laguna, Philippines
June 07, 2004 to December 07, 2004
Welding Parts of Muffler
Mig Welder
MASUDA PHILIPPINES INC.
Binan Laguna, Philippines
November 08, 2003 to April 07, 2004
Welding Parts of Muffler
Character References:
Mr. Stacy Williams - Kentech Project Manager
Mr. Jhames Macnamara - Kentech Project Manager
Mr. Ronald Edjec - Kentech QA/QC Engineer
Mr. Elbert Tan - Kentech Work Pack Enginner
Personal Profile:
3. I’m hard working person with good communication skills. As a team I have ability to work with a standard
procedure. Hard works makes me challenge to apply my existing skills further improve my knowledge.
Sex : Male
Height : 5’5”
Weight :120 lbs
Civil Status : Single
Date of Birth : Nov.16,1978
Place of Birth : San Pedro Laguna
Citizenship : Filipino
Languages Spoken : English & Tagalog
Skill and Education:
SKILL:
Repair Appliances
House Installation
Welding
Driving
Bible Study
EDUCATION:
Working Hands Discipleship Vocational School (WHDVS TESDA) Silang, Cavite
2001 Computer Automotive
Engine Overhauling
Welding
Auto Electrical
Bible Study
San Pedro Manpower Training School Center (SPMTSC TESDA) San Pedro, Laguna
1999 Industrial Electricity
House and Building Wiring
San Pedro Manpower Training School Center (SPMTSC TESDA) San Pedro, Laguna
1999 Electronics
Repair Appliances
I hereby certify that the above information are true and correct to the best of my knowledge and belief.
Signature