Project Delivery Approaches:
“Which one is right for my facility?”
March 27, 2014
Jacob Gonzalez, P.E.
Brian Lozano, PMP
©
AGENDA
INTRODUCTION
DESIGN BID BUILD
DESIGN BUILD
CONSTRUCTION MANAGEMENT AT RISK
INTEGRATED PROJECT DELIVERY
OPEN DISCUSSION
©
Which project delivery approach was utilized?
Marq-E Entertainment Garage
Buffalo Niagara Medical Campus MiGo GarageWoodlands Waterway Square Garage
©
DESIGN TEAM PROJECT MANAGER
©
PROJECT MANAGER RESPONSIBILITIES
scope
budget schedule
©
DESIGN TEAM PROJECT MANAGER RESPONSIBILITIES
Scope
Budget Schedule
Scope
Budget Schedule
Scope
Budget Schedule
Scope
Budget Schedule
Scope
Budget Schedule
Scope
Budget Schedule
Landscape
Architecture
MEP/IT
Civil
Traffic
Parking Design
Scope
Budget Schedule
Structural
©
DESIGN TEAM CONSTRUCTION COST EXAMPLE
70.0%
15.0%
7.0%
5.0%
1.5%
1.0% 0.5%
Structural
Architect
MEP/IT
Civil
Parking Consultant
Landscape
Traffic
©
PROJECT ALIGNMENT
©
PROJECT ALIGNMENT
DEFINE VISION AND GOALS
UNDERSTAND THE DELIVERY APPROACH
UNDERSTAND THE PROCUREMENT METHOD
PERFORM A SCOPE GAP ANALYSIS
PERFORM A PULL SCHEDULE
MAINTAIN ALIGNMENT THROUGHOUT
©
DESIGN BID BUILD
Terminal E FIS Garage Phasing
Marq-E Entertainment Garage Harris County Parking Garage
©
The Construction Management Association of America
DESIGN BID BUILD
©
OWNER
DTPM CONTRACTOR
SUB CONTRACTORSDESIGN TEAM
contractual obligation,
direct communication
& collaboration
Indirect communication
& minimal collaboration
DESIGN BID BUILD
STRUCTURE
©
PROJECT SCHEDULE
DESIGN-BID-BUILD: 25 MONTHS
RFP Design Permit Procure Construction
2 5 2 142
©
DESIGN BID BUILD ADVANTAGES/DISADVANTAGES
• LONGER DURATION
• MORE RISK FOR OWNER
• CHANGE ORDERS
• OPEN COMMUNICATION
BETWEEN OWNERS AND
DESIGNERS
• DESIGN CONTROL
• COMPETITIVE PRICING
X
©
DESIGN BID BUILD PROJECT EXAMPLE
Rusk Garage Ramp Reconfiguration
©
DESIGN BUILD
500 South Main Garage, Las Vegas, NV
Buffalo Niagara Medical Campus MiGo Garage UTMDACC Braeswood Garage
©
DESIGN BUILD DEFINITION
The Construction Management Association of America
©
OWNER
DESIGN
BUILDER
SUB CONTRACTORSDTPM / DESIGN TEAM
direct communication
& collaboration
contractual obligation, direct communication
& collaboration
DESIGN BUILD
STRUCTURE
©
PROJECT SCHEDULE
DESIGN-BID-BUILD: 25 MONTHS
DESIGN-BUILD: 21 MONTHS
RFP Design Permit Construction
ConstructionRFP Design PermitBridging
Documents
2 5 2 14
122 22 3
2
Procure
©
DESIGN BUILD ADVANTAGES/DISADVANTAGES
• LESS DESIGN CONTROL
• DESIGN BUILDER CONTROLS
COMMUNICATION
• QUALITY OF MATERIALS
DICTATED BY DESIGN BUILDER
• RISK BY DESIGN BUILDER
• FASTER SCHEDULE
• LOWER COST
X
©
DESIGN BUILD PROJECT EXAMPLE
500 South Main Garage, Las Vegas, NV
©
CONSTRUCTION MANAGEMENT AT RISK
Texas Medical Center Garage 19
Texas Medical Center Garage 18Woodlands Waterway Square Garage
©
OWNER
DTPM CONTRACTOR
SUB CONTRACTORSDESIGN TEAM
contractual obligation, direct communication
& collaboration
direct communication
& collaboration
CONSTRUCTION MANAGEMENT AT RISK STRUCTURE
©
PROJECT SCHEDULE
DESIGN-BID-BUILD: 25 MONTHS
DESIGN-BUILD: 21 MONTHS
CM@RISK: 21 MONTHS
RFP Design Permit Construction
Construction
Construction
RFP
RFP
Design
Design
Permit
Permit
Bridging
Documents
2 5 2 14
12
12
2 5 2
2 22 3
2
Procure
©
CMAR ADVANTAGES/DISADVANTAGES
• ADDITIONAL FEES PAID FOR CM
SERVICES
• ESTIMATES CARRY LARGER
CONTINGENCY
• REQUIRES STRONG PRECON
TEAM FROM CONTRACTOR
• MORE CONTROL OVER DESIGN
• CAN ESTABLISH GMP SOONER
• OPEN COMMUNICATION
BETWEEN ALL TEAM MEMBER
X
©
CMAR PROJECT EXAMPLE
Texas Medical Center Garage 19
©
George Washington University Hospital Renovations
INTEGRATED PROJECT DELIVERY
©
INTEGRATED PROJECT DELIVERY
-The Construction Management Association of America
©
OWNER
INTEGRATED PROJECT DELIVERY
DTPM CONTRACTOR
SUB CONTRACTORSDESIGN TEAM
Contractual obligation,
direct communication
& collaboration
©
IPD ADVANTAGES/DISADVANTAGES
• TEAM SHOULD HAVE LONG
HISTORY OF WORKING
TOGETHER
• OWNER SACRIFICES FINANCIAL
STAKE IF TARGETS NOT MET
• BETTER FOR COMPLEX
PROJECTS
• REQUIRES STRONG
LEADERSHIP OR FACILITATORS
• INCENTIVE CONTRACTS
• RISK SHARED EQUALLY BY ALL
PARTIES
• HIGHLY COLLABORATIVE
• FASTER SCHEDULE
• LOWER COST
X
©
OPEN DISCUSSION
©
Jacob H. Gonzalez, P.E.
jgonzalez@walterpmoore.com
713.410.6760
Brian Lozano, PMP
blozano@walterpmoore.com
713.231.3417
Walter P Moore
1301 McKinney, Suite 1100
Houston, Texas 77010
©

More Related Content

Similar to Project Delivery Approaches: "Which one is right for my Parking Facility?" Walter P Moore

GIS Engineering & Construction Web
GIS Engineering & Construction WebGIS Engineering & Construction Web
GIS Engineering & Construction WebJoshua Clemens
 
Swaraj.p c.v(m (1)
Swaraj.p c.v(m (1)Swaraj.p c.v(m (1)
Swaraj.p c.v(m (1)Swaraj P
 
Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)Mujtaba Khan
 
GIS Project Management Web
GIS Project Management WebGIS Project Management Web
GIS Project Management WebJoshua Clemens
 
DESIGN & BUILD OPINION PIECE
DESIGN & BUILD OPINION PIECEDESIGN & BUILD OPINION PIECE
DESIGN & BUILD OPINION PIECEWill Bennett
 
Your Strategy Guide for Managing Project Scope
Your Strategy Guide for Managing Project ScopeYour Strategy Guide for Managing Project Scope
Your Strategy Guide for Managing Project ScopeMatthew Hunt
 
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo
 
Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...Aconex
 
Resume - Nick Fuentes
Resume - Nick FuentesResume - Nick Fuentes
Resume - Nick FuentesNick Fuentes
 
Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015Robert Retsch
 
CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)sundeep khare
 
Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph Raftery
 
NDGeospatialSummit2022 - GIS Applications in Right of Way: A Case Study on th...
NDGeospatialSummit2022 - GIS Applications in Right of Way: A Case Study on th...NDGeospatialSummit2022 - GIS Applications in Right of Way: A Case Study on th...
NDGeospatialSummit2022 - GIS Applications in Right of Way: A Case Study on th...North Dakota GIS Hub
 
Guide to Architectural Surveys and the RIBA Digital Plan of Works
Guide to Architectural Surveys and the RIBA Digital Plan of WorksGuide to Architectural Surveys and the RIBA Digital Plan of Works
Guide to Architectural Surveys and the RIBA Digital Plan of WorksC A Design Services
 
Vadim Synakh estimation ITEM 2017
Vadim Synakh estimation ITEM 2017Vadim Synakh estimation ITEM 2017
Vadim Synakh estimation ITEM 2017ITEM
 

Similar to Project Delivery Approaches: "Which one is right for my Parking Facility?" Walter P Moore (20)

GIS Engineering & Construction Web
GIS Engineering & Construction WebGIS Engineering & Construction Web
GIS Engineering & Construction Web
 
Mostafa Elshamy Resume
Mostafa Elshamy ResumeMostafa Elshamy Resume
Mostafa Elshamy Resume
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
Swaraj.p c.v(m (1)
Swaraj.p c.v(m (1)Swaraj.p c.v(m (1)
Swaraj.p c.v(m (1)
 
Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)Mujtaba Ahmed Khan Resume (2)
Mujtaba Ahmed Khan Resume (2)
 
GIS Project Management Web
GIS Project Management WebGIS Project Management Web
GIS Project Management Web
 
DESIGN & BUILD OPINION PIECE
DESIGN & BUILD OPINION PIECEDESIGN & BUILD OPINION PIECE
DESIGN & BUILD OPINION PIECE
 
Your Strategy Guide for Managing Project Scope
Your Strategy Guide for Managing Project ScopeYour Strategy Guide for Managing Project Scope
Your Strategy Guide for Managing Project Scope
 
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
 
Sai vivek goud
Sai vivek goudSai vivek goud
Sai vivek goud
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...
 
Resume - Nick Fuentes
Resume - Nick FuentesResume - Nick Fuentes
Resume - Nick Fuentes
 
Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015Cognitive Portfolio Aug 2015
Cognitive Portfolio Aug 2015
 
CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)CV Planning Manager (Sundeep Khare)
CV Planning Manager (Sundeep Khare)
 
Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.
 
NDGeospatialSummit2022 - GIS Applications in Right of Way: A Case Study on th...
NDGeospatialSummit2022 - GIS Applications in Right of Way: A Case Study on th...NDGeospatialSummit2022 - GIS Applications in Right of Way: A Case Study on th...
NDGeospatialSummit2022 - GIS Applications in Right of Way: A Case Study on th...
 
QQSS/PPM Planning and Project Controls Services
QQSS/PPM Planning and Project Controls ServicesQQSS/PPM Planning and Project Controls Services
QQSS/PPM Planning and Project Controls Services
 
Guide to Architectural Surveys and the RIBA Digital Plan of Works
Guide to Architectural Surveys and the RIBA Digital Plan of WorksGuide to Architectural Surveys and the RIBA Digital Plan of Works
Guide to Architectural Surveys and the RIBA Digital Plan of Works
 
Vadim Synakh estimation ITEM 2017
Vadim Synakh estimation ITEM 2017Vadim Synakh estimation ITEM 2017
Vadim Synakh estimation ITEM 2017
 

Recently uploaded

kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 

Recently uploaded (20)

kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 

Project Delivery Approaches: "Which one is right for my Parking Facility?" Walter P Moore