Long term rental
    Mines, Spain



                   To treat contact water that has been
                   polluted by contact with the ore before
                   discharge into the natural
                   environment in order to comply with
                   environmental regulations




                   A complete mobile installation set
                   up, comprising sand
                   filtration, decarbonation and reverse
                   osmosis, for a flow rate of 300 m3/h.
                   Continued authorisation to operate
                   the mine from the environmental
                   authorities.


2
Emergency
    Chemical industry, Belgium



                    To ensure continuity of production
                    in the event of breakdown of an ageing
                    demineralisation facility.




                    An O'Ready audit carried out, and the
                    system operational just 2 hours after
                    the customer's phone call, following
                    a breakdown on the facility.




3
Emergency
    Energy industry, France



                    To treat water polluted by nitrates in
                    a lagoon threatening to overflow due to
                    heavy rainfall.




                    Installation of a reverse osmosis unit in a
                    few hours, to treat the water in the
                    lagoon before discharge into the
                    natural environment.




4
Emergency
    Petrochemical industry, Belgium




                    To ensure continuity of production of
                    the petrochemical site despite the sudden
                    failure of the permanent demineralisation
                    facility.




                   Installation of 3 reverse osmosis units and
                   mixed beds in just 6 hours, for a flow rate
                   of 150 m3/h. No break in production at
                   the petrochemical site.




5
Scheduled operations
    Energy industry, Belgium




                   To protect the equipment in the power
                   station boiler despite degradation of the
                   raw water quality before demineralisation.




                   Installation of a reverse osmosis unit
                   between the permanent demineralisation
                   facility and the boiler to reduce the TOC.
                   Equipment protected.




6
Scheduled operations
    Energy industry, France




                    To reduce the operating costs of
                    a resin demineralisation chain.




                    Testing of a double-pass reverse
                    osmosis unit at the demineralisation
                    input with 20 to 40-fold reduction
                    in the purchases of chemicals and
                    decreased risk of accidents.




7
Scheduled operations
    Energy industry, Egypt




                    To provide 30,000 m3 of
                    demineralised water in 4 weeks for
                    the start-up of a new power station.




                    Installation of a double-pass reverse
                    osmosis unit preceded by a sand filtration
                    system for producing the required
                    quality and quantity of pure water.




8
Scheduled operations
    Chemical industry, China



                    To supply pure water to an industrial
                    park in China while awaiting delivery of
                    its permanent demineralisation unit.




                    Installation of a reverse osmosis unit
                    followed by a fractal resin
                    demineralisation unit (90
                    m3/h, conductivity <0.2 µS/cm) in series.
                    Training local operators and
                    monitoring the units using remote
                    management.



9
Scheduled operations
     Petrochemical industry, Belgium



                     To carry out heavy maintenance
                     work on the permanent demineralisation
                     chain without halting production.




                     Installation of a sand filtration
                     system, then a single-pass reverse
                     osmosis system and mixed beds in
                     series, for a flow rate of 100 m3/h during
                     the 6-week maintenance period.
                     Compliance with the maintenance
                     schedule with no loss of production.



10
List of
contacts

More Related Content

Similar to OMOBILE Examples

Novel waste water treatement
Novel waste water treatementNovel waste water treatement
Novel waste water treatementharshaanne
 
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazone
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazoneteAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazone
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazoneACQUEAU, EUREKA Cluster for Water
 
Project Reference - Reverse Osmosis Concentrate ׀ Chemical Industry
Project Reference - Reverse Osmosis Concentrate ׀ Chemical IndustryProject Reference - Reverse Osmosis Concentrate ׀ Chemical Industry
Project Reference - Reverse Osmosis Concentrate ׀ Chemical IndustryBerghof Membranes
 
Tutuka Power Station
Tutuka Power StationTutuka Power Station
Tutuka Power StationSite Web
 
New technology for desalination
New technology for desalinationNew technology for desalination
New technology for desalinationDainik Patel
 
Commissioning of a 10 mld wwtp with flat sheet mbr technology the arenales de...
Commissioning of a 10 mld wwtp with flat sheet mbr technology the arenales de...Commissioning of a 10 mld wwtp with flat sheet mbr technology the arenales de...
Commissioning of a 10 mld wwtp with flat sheet mbr technology the arenales de...WALEBUBLÉ
 
DENMEK solution.ppt
DENMEK solution.pptDENMEK solution.ppt
DENMEK solution.pptAnton221372
 
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...Global CCS Institute
 
Feasibility Study on Implementing Dry Fermentation Tech - Spencer
Feasibility Study on Implementing Dry Fermentation Tech - SpencerFeasibility Study on Implementing Dry Fermentation Tech - Spencer
Feasibility Study on Implementing Dry Fermentation Tech - SpencerMassRecycle .
 
AMMONIA RECOVERY FROM WASTEWATER – TECHNOLOGY AND USES
AMMONIA RECOVERY FROM WASTEWATER – TECHNOLOGY AND USESAMMONIA RECOVERY FROM WASTEWATER – TECHNOLOGY AND USES
AMMONIA RECOVERY FROM WASTEWATER – TECHNOLOGY AND USESiQHub
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012Mike Vernon
 
Amrt technology overview september 2014
Amrt technology overview september 2014Amrt technology overview september 2014
Amrt technology overview september 2014Victor James
 
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfINNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfPRITI CHHATOI
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeRick Nabett
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternativeRick Nabett
 
Mobile solution - optimal water management
Mobile solution - optimal water managementMobile solution - optimal water management
Mobile solution - optimal water managementRick Nabett
 
Mexel presentation for seawater intake
Mexel presentation for seawater intakeMexel presentation for seawater intake
Mexel presentation for seawater intakeMaxmanazarov Komiljon
 
Mexel presentation for seawater intake
Mexel presentation for seawater intakeMexel presentation for seawater intake
Mexel presentation for seawater intakeMaxmanazarov Komiljon
 
Thames_Beckton_Crossness_THPs_2014
Thames_Beckton_Crossness_THPs_2014Thames_Beckton_Crossness_THPs_2014
Thames_Beckton_Crossness_THPs_2014Jason Adams
 

Similar to OMOBILE Examples (20)

Novel waste water treatement
Novel waste water treatementNovel waste water treatement
Novel waste water treatement
 
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazone
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazoneteAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazone
teAcqueau workshop helsinki 2015 brokerage session johanna hentunen_aquazone
 
Project Reference - Reverse Osmosis Concentrate ׀ Chemical Industry
Project Reference - Reverse Osmosis Concentrate ׀ Chemical IndustryProject Reference - Reverse Osmosis Concentrate ׀ Chemical Industry
Project Reference - Reverse Osmosis Concentrate ׀ Chemical Industry
 
Tutuka Power Station
Tutuka Power StationTutuka Power Station
Tutuka Power Station
 
New technology for desalination
New technology for desalinationNew technology for desalination
New technology for desalination
 
Commissioning of a 10 mld wwtp with flat sheet mbr technology the arenales de...
Commissioning of a 10 mld wwtp with flat sheet mbr technology the arenales de...Commissioning of a 10 mld wwtp with flat sheet mbr technology the arenales de...
Commissioning of a 10 mld wwtp with flat sheet mbr technology the arenales de...
 
DENMEK solution.ppt
DENMEK solution.pptDENMEK solution.ppt
DENMEK solution.ppt
 
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
 
Feasibility Study on Implementing Dry Fermentation Tech - Spencer
Feasibility Study on Implementing Dry Fermentation Tech - SpencerFeasibility Study on Implementing Dry Fermentation Tech - Spencer
Feasibility Study on Implementing Dry Fermentation Tech - Spencer
 
AMMONIA RECOVERY FROM WASTEWATER – TECHNOLOGY AND USES
AMMONIA RECOVERY FROM WASTEWATER – TECHNOLOGY AND USESAMMONIA RECOVERY FROM WASTEWATER – TECHNOLOGY AND USES
AMMONIA RECOVERY FROM WASTEWATER – TECHNOLOGY AND USES
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
 
Amrt technology overview september 2014
Amrt technology overview september 2014Amrt technology overview september 2014
Amrt technology overview september 2014
 
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdfINNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
INNOVATIVE APPROACH OF SEWAGE DISPOSAL SYSTEM.pdf
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable Alternative
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternative
 
IES PPT 28.01.2016
IES PPT 28.01.2016IES PPT 28.01.2016
IES PPT 28.01.2016
 
Mobile solution - optimal water management
Mobile solution - optimal water managementMobile solution - optimal water management
Mobile solution - optimal water management
 
Mexel presentation for seawater intake
Mexel presentation for seawater intakeMexel presentation for seawater intake
Mexel presentation for seawater intake
 
Mexel presentation for seawater intake
Mexel presentation for seawater intakeMexel presentation for seawater intake
Mexel presentation for seawater intake
 
Thames_Beckton_Crossness_THPs_2014
Thames_Beckton_Crossness_THPs_2014Thames_Beckton_Crossness_THPs_2014
Thames_Beckton_Crossness_THPs_2014
 

OMOBILE Examples

  • 1. Examples OMOBILE 11/2010
  • 2. Long term rental Mines, Spain To treat contact water that has been polluted by contact with the ore before discharge into the natural environment in order to comply with environmental regulations A complete mobile installation set up, comprising sand filtration, decarbonation and reverse osmosis, for a flow rate of 300 m3/h. Continued authorisation to operate the mine from the environmental authorities. 2
  • 3. Emergency Chemical industry, Belgium To ensure continuity of production in the event of breakdown of an ageing demineralisation facility. An O'Ready audit carried out, and the system operational just 2 hours after the customer's phone call, following a breakdown on the facility. 3
  • 4. Emergency Energy industry, France To treat water polluted by nitrates in a lagoon threatening to overflow due to heavy rainfall. Installation of a reverse osmosis unit in a few hours, to treat the water in the lagoon before discharge into the natural environment. 4
  • 5. Emergency Petrochemical industry, Belgium To ensure continuity of production of the petrochemical site despite the sudden failure of the permanent demineralisation facility. Installation of 3 reverse osmosis units and mixed beds in just 6 hours, for a flow rate of 150 m3/h. No break in production at the petrochemical site. 5
  • 6. Scheduled operations Energy industry, Belgium To protect the equipment in the power station boiler despite degradation of the raw water quality before demineralisation. Installation of a reverse osmosis unit between the permanent demineralisation facility and the boiler to reduce the TOC. Equipment protected. 6
  • 7. Scheduled operations Energy industry, France To reduce the operating costs of a resin demineralisation chain. Testing of a double-pass reverse osmosis unit at the demineralisation input with 20 to 40-fold reduction in the purchases of chemicals and decreased risk of accidents. 7
  • 8. Scheduled operations Energy industry, Egypt To provide 30,000 m3 of demineralised water in 4 weeks for the start-up of a new power station. Installation of a double-pass reverse osmosis unit preceded by a sand filtration system for producing the required quality and quantity of pure water. 8
  • 9. Scheduled operations Chemical industry, China To supply pure water to an industrial park in China while awaiting delivery of its permanent demineralisation unit. Installation of a reverse osmosis unit followed by a fractal resin demineralisation unit (90 m3/h, conductivity <0.2 µS/cm) in series. Training local operators and monitoring the units using remote management. 9
  • 10. Scheduled operations Petrochemical industry, Belgium To carry out heavy maintenance work on the permanent demineralisation chain without halting production. Installation of a sand filtration system, then a single-pass reverse osmosis system and mixed beds in series, for a flow rate of 100 m3/h during the 6-week maintenance period. Compliance with the maintenance schedule with no loss of production. 10