SlideShare a Scribd company logo
1 of 2
Download to read offline
Education Background
1. PETROLEUM GEOLOGY, M.SC, University of Malaya, Kuala Lumpur, 2008
2. Computational Physics and Electronic, BSc. (Hons), University of Malaya, Kuala Lumpur, 2004
Working Experience
1. GEOLOGIST, UZMA Engineering Sdn Bhd.
Geology & Geomodeling Work for FDP
Conducted a detail geological and geomodeling study for Seligi minor reservoirs project for FDP MR1 that covers:
 Field background/overview by understanding the exploration and development history together with the
production performance
 Identify all data available for subsurface study and perform data quality check to identify the risk and
uncertainties associate with the data.
 Provide mitigation plan in to reduce uncertainties in the absent of data
 Propose project planning that cover:
• Establish scope of work for geology discipline
• Preliminary subsurface study result of the existing data
• Infill drilling/recompletion location for minor reservoirs Assess the need of Appraisal well in the
field
 Prepare project schedule for MR2 for Geology and Geomodeling
2. GEOLOGIST, MURPHY SARAWAK OIL CO. LTD.
Geology & Geomodeling Work for FDP
Conducted a detail geological and geomodeling for Wangsa FDP MR2 work by integrating geophysical and
petrophysical input in building the static model that will be used as an input in dynamic model by:
 Constructed well correlation that consistent with sequence stratigraphic principle and establish depofacies
interpretation by integrating OBMI interpretation, biostratigraphic data, MSCT description and log motif
interpretation.
 Established depositional of environment that consistent with the regional geology understanding,
depofacies interpretation and modern analogue.
 Identified and determine the depofacies dimension and geometry using all available data such as seismic
attribute, regional geology data and statistic from literature.
 Integrated all the geophysical data or interpretation such as fault and horizon interpretation, coherency
volume and seismic attribute in building the structure model.
 Constructed facies modelling using object based method by integrating the entire geological element for
the field.
 Constructed properties modelling such as V shale, porosity, permeability and water saturation modelling by
utilize all of the petrophysical analysis and interpretation.
 Ran the static model assessment deterministic and probabilistically in order to capture all of the
uncertainties that may associated to the static model
Person in charge and coordinator for Pertang Kenarong FDP MR2 work. Keys responsibilities of the work are:
 Agreed on the work scope that consistent with the SOW and the MR2 timeline
 Reviewed the work progress and update to Murphy project management team.
 Determined all the technical work and the expected deliverables completed on time.
 Undertook QC work on geology discipline such as the stratigraphic correlation, structural mapping, fluids
contact definition, facies modelling, properties modelling and resource assessment (deterministic and
probabilistic) are technically sound.
Name : HAILMY BIN RIZUAN
Address : No 13, Jalan Sari Iltizam 1/1, Alam Sari, 43000 Kajang, Selangor
IC No : 810217-07-5391
Date of Birth : 17 Feb 1981
Nationality : Malaysian
Marital Status : Married
Mobile : 012-6780607
Email : hailmy.rizuan@gmail.com.my
 Initiated a pre MR2 technical engagement for geology and geomodeling with PMU-TRC
 Presented the MR2 review for the geology and geomodeling discipline to PCSB and PMU.
Focus person for geology and geomodeling work for East Patricia, Tiram andSapih.
 Determined all the technical work and the expected deliverables completed on time.
 Undertook QC work on geology discipline such as the stratigraphic correlation, structural mapping, fluids
contact definition, facies modeling, properties modelling and resource assessment (deterministic and
probabilistic) are technically sound
 Initiated a pre MR2 technical engagement for geology and geomodeling with PMU-TRC.
Drilling Operation
Involved in drilling about 15 exploration or appraisals well in oil and gas field and 5 developments well in Serendah
field. Keys responsibility for the pre and post drilling operation are:
 Performed prospect evaluation and well planning in Permas, Serendah, Wangsa and South Acis field for
appraisal well drilling campaign that consists of determine and preparing the target identification, well
objective, logging program, well proposal reviews with management, partners and authorities and well
proposal write-up.
 Involve in drilling operation and provide geological work and input such as well correlation, picking coring
point, provide the prognoses depth, and preparing preliminary well result in various oil and gas drilling
campaign in Sarawak field such as in Permas, Serendah, Wangsa and South Acis.
 Conducted detailed post drill evaluation in term of mapping, correlation, sand development and fluids
distribution in individual reservoirs system by utilizing and integrating geophysical, geology and
petrophysical data in order to establish the hydrocarbon in-place.
 Present the well result to management, PCSB and the PMU-TRC.
ADP Preparation
Perform the geological work for Wangsa such as:
 Establish well correlation and build 3D structural model by integrating new geophysics interpretation
 Performed deterministic assessment by integrating the new structural model and the new petrophysical
interpretation.
 Prepared the Wangsa field ADP documentation and write-up
 Provided the final structure model and resource assessment to auditor forvalidation.
Key person to in-charge, steer and monitor the geophysics, geology and documentation work done by consultant
for South Acis, East Patricia, Tiram, Sapih and Kerambit field. Keys responsibilities are:
 Agreed on the work scope and the timeline for each field and consistent with the SOW.
 Reviewed work progress and update to Murphy project management team.
 Determined all the technical work and the expected deliverables completed on time.
 Undertook QC work on the stratigraphic correlation, structural mapping and resource assessment for all
five fields and make sure the quality of the deliverables are technicallysound.
ARPR Reporting
 Focal point for the SK Appraisal team. Prepared ARPR package for Wangsa and South Acis and compile
the ARPR package for Tiram and Patricia.
 Focal point for SK Appraisal team. Prepared ARPR package for Permas and Wangsa and compile the
ARPR package for submission.
 Prepared ARPR table for Sompotan and Patricia field.
SKILL SET & TRAININGS
 An Introduction to Drilling & Well Site Operation
 Core Analysis Workshop
 Introduction to Clastic, Depositional System : A Petroleum Perspective
 Applied Subsurface Geological Mapping
 PETREL Introduction
Software Skills
 PETREL
 Geo-X
 Microsoft Word
 Microsoft Excel
 Power Point

More Related Content

What's hot

Lewis Chapman Resume
Lewis Chapman ResumeLewis Chapman Resume
Lewis Chapman ResumeLewis Chapman
 
Nicholas Antonio-01302016
Nicholas Antonio-01302016Nicholas Antonio-01302016
Nicholas Antonio-01302016Nick Antonio
 
Jeo Consultancy Engineering Mining
Jeo Consultancy Engineering MiningJeo Consultancy Engineering Mining
Jeo Consultancy Engineering MiningMurat Cetintas
 
David Tyree resume.docx
David Tyree resume.docxDavid Tyree resume.docx
David Tyree resume.docxDavid Tyree
 
Resume Dwyer 9-16
Resume Dwyer 9-16Resume Dwyer 9-16
Resume Dwyer 9-16Don Dwyer
 
Tim_Robb_Resume_PMS_ProjectDutyList_Mueller
Tim_Robb_Resume_PMS_ProjectDutyList_MuellerTim_Robb_Resume_PMS_ProjectDutyList_Mueller
Tim_Robb_Resume_PMS_ProjectDutyList_MuellerTim Robb
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther
 
E J Piekenbrock Resume 5-2014 Revised
E  J  Piekenbrock Resume 5-2014 RevisedE  J  Piekenbrock Resume 5-2014 Revised
E J Piekenbrock Resume 5-2014 RevisedEugene Piekenbrock
 
Victoria King Resume
Victoria King ResumeVictoria King Resume
Victoria King ResumeVictoria King
 
JKULL_RESUME_AUG2016
JKULL_RESUME_AUG2016JKULL_RESUME_AUG2016
JKULL_RESUME_AUG2016Josh Kull
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone ResumeLagrone Andy
 
Bmartin_Resume_Feb_2015.GRNO
Bmartin_Resume_Feb_2015.GRNOBmartin_Resume_Feb_2015.GRNO
Bmartin_Resume_Feb_2015.GRNOBrent Martin
 

What's hot (19)

Resume Mrk
Resume MrkResume Mrk
Resume Mrk
 
Lewis Chapman Resume
Lewis Chapman ResumeLewis Chapman Resume
Lewis Chapman Resume
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
Nicholas Antonio-01302016
Nicholas Antonio-01302016Nicholas Antonio-01302016
Nicholas Antonio-01302016
 
Jeo Consultancy Engineering Mining
Jeo Consultancy Engineering MiningJeo Consultancy Engineering Mining
Jeo Consultancy Engineering Mining
 
David Tyree resume.docx
David Tyree resume.docxDavid Tyree resume.docx
David Tyree resume.docx
 
Resume Dwyer 9-16
Resume Dwyer 9-16Resume Dwyer 9-16
Resume Dwyer 9-16
 
Tim_Robb_Resume_PMS_ProjectDutyList_Mueller
Tim_Robb_Resume_PMS_ProjectDutyList_MuellerTim_Robb_Resume_PMS_ProjectDutyList_Mueller
Tim_Robb_Resume_PMS_ProjectDutyList_Mueller
 
Patrick L Scher Aug 16-fit2Pg
Patrick L Scher Aug 16-fit2PgPatrick L Scher Aug 16-fit2Pg
Patrick L Scher Aug 16-fit2Pg
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr Resume
 
JakeA_resume Oct14
JakeA_resume Oct14JakeA_resume Oct14
JakeA_resume Oct14
 
E J Piekenbrock Resume 5-2014 Revised
E  J  Piekenbrock Resume 5-2014 RevisedE  J  Piekenbrock Resume 5-2014 Revised
E J Piekenbrock Resume 5-2014 Revised
 
MDE_Projects_history_2016
MDE_Projects_history_2016MDE_Projects_history_2016
MDE_Projects_history_2016
 
Victoria King Resume
Victoria King ResumeVictoria King Resume
Victoria King Resume
 
JKULL_RESUME_AUG2016
JKULL_RESUME_AUG2016JKULL_RESUME_AUG2016
JKULL_RESUME_AUG2016
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
AndrewRussellResume
AndrewRussellResumeAndrewRussellResume
AndrewRussellResume
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone Resume
 
Bmartin_Resume_Feb_2015.GRNO
Bmartin_Resume_Feb_2015.GRNOBmartin_Resume_Feb_2015.GRNO
Bmartin_Resume_Feb_2015.GRNO
 

Viewers also liked (13)

Collective Dominance
Collective DominanceCollective Dominance
Collective Dominance
 
Chan Chan
Chan ChanChan Chan
Chan Chan
 
Cualidades personales
Cualidades personalesCualidades personales
Cualidades personales
 
Android in China
Android in China Android in China
Android in China
 
Changes to S
Changes to SChanges to S
Changes to S
 
HNW Strategies for SMSFs - August 2010
HNW Strategies for SMSFs - August 2010HNW Strategies for SMSFs - August 2010
HNW Strategies for SMSFs - August 2010
 
A&e24
A&e24A&e24
A&e24
 
Forsket på momsen i det siste?
Forsket på momsen i det siste?Forsket på momsen i det siste?
Forsket på momsen i det siste?
 
Encuesta sobre linea de credito
Encuesta sobre linea de creditoEncuesta sobre linea de credito
Encuesta sobre linea de credito
 
SUPERVISION EXPERT OF NEW SHIPBUILDING
SUPERVISION EXPERT OF NEW SHIPBUILDINGSUPERVISION EXPERT OF NEW SHIPBUILDING
SUPERVISION EXPERT OF NEW SHIPBUILDING
 
SOAP, WSDL and UDDI
SOAP, WSDL and UDDISOAP, WSDL and UDDI
SOAP, WSDL and UDDI
 
Regulation of combinations seminar on competition policy and law goa_2008
Regulation of combinations seminar on competition policy and law goa_2008Regulation of combinations seminar on competition policy and law goa_2008
Regulation of combinations seminar on competition policy and law goa_2008
 
kottayam Tourism | vacation Homes
kottayam Tourism | vacation Homeskottayam Tourism | vacation Homes
kottayam Tourism | vacation Homes
 

Similar to HailmyRizuan_CV

Similar to HailmyRizuan_CV (20)

Yassir C.V 2015
Yassir C.V 2015Yassir C.V 2015
Yassir C.V 2015
 
KMac_CV_November 2016
KMac_CV_November 2016KMac_CV_November 2016
KMac_CV_November 2016
 
Frankovitch Resume-July 2015
Frankovitch Resume-July 2015Frankovitch Resume-July 2015
Frankovitch Resume-July 2015
 
SENIOR GEOLOGIST
SENIOR GEOLOGISTSENIOR GEOLOGIST
SENIOR GEOLOGIST
 
RESUME SAMI RASSAS
RESUME SAMI RASSASRESUME SAMI RASSAS
RESUME SAMI RASSAS
 
RESUME_KALAM
RESUME_KALAMRESUME_KALAM
RESUME_KALAM
 
Mostafa_F_Kermanqqqqi
Mostafa_F_KermanqqqqiMostafa_F_Kermanqqqqi
Mostafa_F_Kermanqqqqi
 
Pekka_Bergström_2016
Pekka_Bergström_2016Pekka_Bergström_2016
Pekka_Bergström_2016
 
bshaffer_resume_may15
bshaffer_resume_may15bshaffer_resume_may15
bshaffer_resume_may15
 
bshaffer_resume_may15
bshaffer_resume_may15bshaffer_resume_may15
bshaffer_resume_may15
 
bshaffer_resume_may15
bshaffer_resume_may15bshaffer_resume_may15
bshaffer_resume_may15
 
bshaffer_resume_may15
bshaffer_resume_may15bshaffer_resume_may15
bshaffer_resume_may15
 
bshaffer_resume_may15
bshaffer_resume_may15bshaffer_resume_may15
bshaffer_resume_may15
 
bshaffer_resume_may15
bshaffer_resume_may15bshaffer_resume_may15
bshaffer_resume_may15
 
bshaffer_resume_may15
bshaffer_resume_may15bshaffer_resume_may15
bshaffer_resume_may15
 
bshaffer_resume_may15
bshaffer_resume_may15bshaffer_resume_may15
bshaffer_resume_may15
 
bshaffer_resume_may15
bshaffer_resume_may15bshaffer_resume_may15
bshaffer_resume_may15
 
CV Colin Little_June2016
CV Colin Little_June2016CV Colin Little_June2016
CV Colin Little_June2016
 
Erich Zorn's Curriculum Vitae
Erich Zorn's Curriculum Vitae Erich Zorn's Curriculum Vitae
Erich Zorn's Curriculum Vitae
 
CV_ Dec-2014_Final
CV_ Dec-2014_FinalCV_ Dec-2014_Final
CV_ Dec-2014_Final
 

HailmyRizuan_CV

  • 1. Education Background 1. PETROLEUM GEOLOGY, M.SC, University of Malaya, Kuala Lumpur, 2008 2. Computational Physics and Electronic, BSc. (Hons), University of Malaya, Kuala Lumpur, 2004 Working Experience 1. GEOLOGIST, UZMA Engineering Sdn Bhd. Geology & Geomodeling Work for FDP Conducted a detail geological and geomodeling study for Seligi minor reservoirs project for FDP MR1 that covers:  Field background/overview by understanding the exploration and development history together with the production performance  Identify all data available for subsurface study and perform data quality check to identify the risk and uncertainties associate with the data.  Provide mitigation plan in to reduce uncertainties in the absent of data  Propose project planning that cover: • Establish scope of work for geology discipline • Preliminary subsurface study result of the existing data • Infill drilling/recompletion location for minor reservoirs Assess the need of Appraisal well in the field  Prepare project schedule for MR2 for Geology and Geomodeling 2. GEOLOGIST, MURPHY SARAWAK OIL CO. LTD. Geology & Geomodeling Work for FDP Conducted a detail geological and geomodeling for Wangsa FDP MR2 work by integrating geophysical and petrophysical input in building the static model that will be used as an input in dynamic model by:  Constructed well correlation that consistent with sequence stratigraphic principle and establish depofacies interpretation by integrating OBMI interpretation, biostratigraphic data, MSCT description and log motif interpretation.  Established depositional of environment that consistent with the regional geology understanding, depofacies interpretation and modern analogue.  Identified and determine the depofacies dimension and geometry using all available data such as seismic attribute, regional geology data and statistic from literature.  Integrated all the geophysical data or interpretation such as fault and horizon interpretation, coherency volume and seismic attribute in building the structure model.  Constructed facies modelling using object based method by integrating the entire geological element for the field.  Constructed properties modelling such as V shale, porosity, permeability and water saturation modelling by utilize all of the petrophysical analysis and interpretation.  Ran the static model assessment deterministic and probabilistically in order to capture all of the uncertainties that may associated to the static model Person in charge and coordinator for Pertang Kenarong FDP MR2 work. Keys responsibilities of the work are:  Agreed on the work scope that consistent with the SOW and the MR2 timeline  Reviewed the work progress and update to Murphy project management team.  Determined all the technical work and the expected deliverables completed on time.  Undertook QC work on geology discipline such as the stratigraphic correlation, structural mapping, fluids contact definition, facies modelling, properties modelling and resource assessment (deterministic and probabilistic) are technically sound. Name : HAILMY BIN RIZUAN Address : No 13, Jalan Sari Iltizam 1/1, Alam Sari, 43000 Kajang, Selangor IC No : 810217-07-5391 Date of Birth : 17 Feb 1981 Nationality : Malaysian Marital Status : Married Mobile : 012-6780607 Email : hailmy.rizuan@gmail.com.my
  • 2.  Initiated a pre MR2 technical engagement for geology and geomodeling with PMU-TRC  Presented the MR2 review for the geology and geomodeling discipline to PCSB and PMU. Focus person for geology and geomodeling work for East Patricia, Tiram andSapih.  Determined all the technical work and the expected deliverables completed on time.  Undertook QC work on geology discipline such as the stratigraphic correlation, structural mapping, fluids contact definition, facies modeling, properties modelling and resource assessment (deterministic and probabilistic) are technically sound  Initiated a pre MR2 technical engagement for geology and geomodeling with PMU-TRC. Drilling Operation Involved in drilling about 15 exploration or appraisals well in oil and gas field and 5 developments well in Serendah field. Keys responsibility for the pre and post drilling operation are:  Performed prospect evaluation and well planning in Permas, Serendah, Wangsa and South Acis field for appraisal well drilling campaign that consists of determine and preparing the target identification, well objective, logging program, well proposal reviews with management, partners and authorities and well proposal write-up.  Involve in drilling operation and provide geological work and input such as well correlation, picking coring point, provide the prognoses depth, and preparing preliminary well result in various oil and gas drilling campaign in Sarawak field such as in Permas, Serendah, Wangsa and South Acis.  Conducted detailed post drill evaluation in term of mapping, correlation, sand development and fluids distribution in individual reservoirs system by utilizing and integrating geophysical, geology and petrophysical data in order to establish the hydrocarbon in-place.  Present the well result to management, PCSB and the PMU-TRC. ADP Preparation Perform the geological work for Wangsa such as:  Establish well correlation and build 3D structural model by integrating new geophysics interpretation  Performed deterministic assessment by integrating the new structural model and the new petrophysical interpretation.  Prepared the Wangsa field ADP documentation and write-up  Provided the final structure model and resource assessment to auditor forvalidation. Key person to in-charge, steer and monitor the geophysics, geology and documentation work done by consultant for South Acis, East Patricia, Tiram, Sapih and Kerambit field. Keys responsibilities are:  Agreed on the work scope and the timeline for each field and consistent with the SOW.  Reviewed work progress and update to Murphy project management team.  Determined all the technical work and the expected deliverables completed on time.  Undertook QC work on the stratigraphic correlation, structural mapping and resource assessment for all five fields and make sure the quality of the deliverables are technicallysound. ARPR Reporting  Focal point for the SK Appraisal team. Prepared ARPR package for Wangsa and South Acis and compile the ARPR package for Tiram and Patricia.  Focal point for SK Appraisal team. Prepared ARPR package for Permas and Wangsa and compile the ARPR package for submission.  Prepared ARPR table for Sompotan and Patricia field. SKILL SET & TRAININGS  An Introduction to Drilling & Well Site Operation  Core Analysis Workshop  Introduction to Clastic, Depositional System : A Petroleum Perspective  Applied Subsurface Geological Mapping  PETREL Introduction Software Skills  PETREL  Geo-X  Microsoft Word  Microsoft Excel  Power Point