In addition to the hazard/risks normally associated with the types of work
detailed on this drawing take note of above.
It is assumed that all works on this drawing will be carried out by a competent
contractor working, where appropriate, to an appropriate method statement.
SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION BOX
CONSTRUCTION RISKS MAINTENANCE / CLEANING
RISK
DEMOLITION RISKS
Drawing Title
Drawn Checked Approved Date
URS Internal Project No. Suitability.
Scale @ A1 Zone / Mileage
This document has been prepared in accordance with the scope of URS' appointment
with its client and is subject to the terms of that appointment. URS accepts no liability
for any use of this document other than by its client and only for the purposes for
which it was prepared and provided. Only written dimensions shall be used.
© URS Infrastructure & Environment UK Limited
URS Infrastructure & Environment UK Limited
www.ursglobal.com
Drawing Number. Rev
NOTES
Victoria Square House, Victoria Square
Birmingham
B2 4AJ
TEL +44 (0)121 212 3035
FAX +44 (0)121 212 1938
26/08/201509:45:35
T:470XXXXX-47071156CheshireOaksTechnicalSWDrawingsRevitChesireOaks.rvt
HENDERSON OUTLET MALL
NO. 2 LP
ISOMETRIC VIEWS
SDR AW AW SEPT 2014
47071156
TENDER
CHESHIRE OAKS
0007
FULL ISOMETRIC VIEW
FIRST FLOOR ISOMETRIC VIEW
47071156-S-GA- C1
PRELIM ISSUE
SDR
AW 02.10.14 P1
TENDER ISSUE
SDR
AW 08.10.14 T1
REVISED TENDER ISSUE
SDR
CM 08.01.15 T2
PRELIMINARY FINAL ISSUE
GH
CM 24.02.15 T3
CONSTRUCTION ISSUE
GH
CM 13.03.15 C1

More Related Content

What's hot

Mohamed Ezzat Khedr.doc
Mohamed Ezzat Khedr.docMohamed Ezzat Khedr.doc
Mohamed Ezzat Khedr.docmohamed ezzat
 
Mechanical engineering magazine subscription
Mechanical engineering magazine subscriptionMechanical engineering magazine subscription
Mechanical engineering magazine subscriptionNabiel Abdul Jaliel
 
George Samir_s C V
George Samir_s C VGeorge Samir_s C V
George Samir_s C VGeorge Samir
 
khalid cv english
khalid cv english khalid cv english
khalid cv english KHALED ADEL
 
Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015ahmed elzidy
 
SYED (HVAC ENGINEER)
SYED (HVAC ENGINEER)SYED (HVAC ENGINEER)
SYED (HVAC ENGINEER)syed ali
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity SurveyingLIJI A
 

What's hot (12)

Resume-Wail
Resume-WailResume-Wail
Resume-Wail
 
Introduction of cost engineering
Introduction of cost engineeringIntroduction of cost engineering
Introduction of cost engineering
 
Cv.
Cv.Cv.
Cv.
 
Mohamed Ezzat Khedr.doc
Mohamed Ezzat Khedr.docMohamed Ezzat Khedr.doc
Mohamed Ezzat Khedr.doc
 
Mechanical engineering magazine subscription
Mechanical engineering magazine subscriptionMechanical engineering magazine subscription
Mechanical engineering magazine subscription
 
ENGINEERING
ENGINEERINGENGINEERING
ENGINEERING
 
George Samir_s C V
George Samir_s C VGeorge Samir_s C V
George Samir_s C V
 
khalid cv english
khalid cv english khalid cv english
khalid cv english
 
Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015
 
Emad Medhat Resume
Emad Medhat ResumeEmad Medhat Resume
Emad Medhat Resume
 
SYED (HVAC ENGINEER)
SYED (HVAC ENGINEER)SYED (HVAC ENGINEER)
SYED (HVAC ENGINEER)
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
 

Similar to Chesire Oaks

SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSunit Dhingra
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management ContractSAJJAD KHUDHUR ABBAS
 
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANPROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANDwarika Bhushan Sharma
 
C.A.R SLIDES-FEB. 2021.pdf
C.A.R SLIDES-FEB. 2021.pdfC.A.R SLIDES-FEB. 2021.pdf
C.A.R SLIDES-FEB. 2021.pdfFaithMwikali6
 
Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 
UON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfUON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfHabtamuGaroma3
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CVmuhammad abdullah
 
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANPROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANDwarika Bhushan Sharma
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationHarish Mahavar
 
Design appraisal for the construction of a water off-take channel following c...
Design appraisal for the construction of a water off-take channel following c...Design appraisal for the construction of a water off-take channel following c...
Design appraisal for the construction of a water off-take channel following c...Khalid Abdel Naser Abdel Rahim
 
contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14David King
 
HSE construction environment management plan
HSE construction environment management planHSE construction environment management plan
HSE construction environment management planDwarika Bhushan Sharma
 
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...Sarah Adams
 
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)BenMohamedHedi
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 CompleteJohn Ashton
 
Strategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksStrategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksPankaj K Sinha
 
Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 

Similar to Chesire Oaks (20)

SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management Contract
 
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANPROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
 
C.A.R SLIDES-FEB. 2021.pdf
C.A.R SLIDES-FEB. 2021.pdfC.A.R SLIDES-FEB. 2021.pdf
C.A.R SLIDES-FEB. 2021.pdf
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
UON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdfUON-Project-Handover-Guideline-v1.2-010920.pdf
UON-Project-Handover-Guideline-v1.2-010920.pdf
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
Matrix207
Matrix207Matrix207
Matrix207
 
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANPROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
 
Design appraisal for the construction of a water off-take channel following c...
Design appraisal for the construction of a water off-take channel following c...Design appraisal for the construction of a water off-take channel following c...
Design appraisal for the construction of a water off-take channel following c...
 
contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14contract difference for 12 sod modified 28_1_14
contract difference for 12 sod modified 28_1_14
 
HSE construction environment management plan
HSE construction environment management planHSE construction environment management plan
HSE construction environment management plan
 
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...
ACC ORASCOM PROJECT HANDOVER DOCUMENTATION PROCEDURE ACC Orascom Assiut PROJE...
 
Doing Business in Myanmar
Doing Business in MyanmarDoing Business in Myanmar
Doing Business in Myanmar
 
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)
Toaz.info method-statement-for-tie-ins-pr d35edff4590d2bfb72016845a98313fb (1)
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 Complete
 
Strategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract RisksStrategic Planning : the best way to manage EPC Contract Risks
Strategic Planning : the best way to manage EPC Contract Risks
 
Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 

Chesire Oaks

  • 1. Revision Details By Check Date Suffix Purpose of issue Client Project Title In addition to the hazard/risks normally associated with the types of work detailed on this drawing take note of above. It is assumed that all works on this drawing will be carried out by a competent contractor working, where appropriate, to an appropriate method statement. SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION BOX CONSTRUCTION RISKS MAINTENANCE / CLEANING RISK DEMOLITION RISKS Drawing Title Drawn Checked Approved Date URS Internal Project No. Suitability. Scale @ A1 Zone / Mileage This document has been prepared in accordance with the scope of URS' appointment with its client and is subject to the terms of that appointment. URS accepts no liability for any use of this document other than by its client and only for the purposes for which it was prepared and provided. Only written dimensions shall be used. © URS Infrastructure & Environment UK Limited URS Infrastructure & Environment UK Limited www.ursglobal.com Drawing Number. Rev NOTES Victoria Square House, Victoria Square Birmingham B2 4AJ TEL +44 (0)121 212 3035 FAX +44 (0)121 212 1938 26/08/201509:45:35 T:470XXXXX-47071156CheshireOaksTechnicalSWDrawingsRevitChesireOaks.rvt HENDERSON OUTLET MALL NO. 2 LP ISOMETRIC VIEWS SDR AW AW SEPT 2014 47071156 TENDER CHESHIRE OAKS 0007 FULL ISOMETRIC VIEW FIRST FLOOR ISOMETRIC VIEW 47071156-S-GA- C1 PRELIM ISSUE SDR AW 02.10.14 P1 TENDER ISSUE SDR AW 08.10.14 T1 REVISED TENDER ISSUE SDR CM 08.01.15 T2 PRELIMINARY FINAL ISSUE GH CM 24.02.15 T3 CONSTRUCTION ISSUE GH CM 13.03.15 C1