SlideShare a Scribd company logo
1 of 12
1
MELVILLE Grant Leonard
SURNAME: MELVILLE
NAME: GRANT LEONARD
DOB: 28/05/1969
RESIDENTIAL ADDRESS: 5, Coral Head
56 Marine Drive
LA-LUCIA,
KZN,
4320
SOUTH AFRICA
POSTAL ADDRESS: P.O. Box 127
Umhlanga Rocks
4320 KZN – SOUTH AFRICA
MOBILE: +27 – 824 341 534 (available 24/7)
TEL: +27 – 31 562 01 77
E.MAIL: gmxxx1969@gmail.com
gmxx2@hotmail.com
NATIONALITY: SOUTH AFRICAN
DEPARTING AIRPORT: DURBAN (South Africa)
MARITAL STATUS: DIVORCED
NEXT OF KIN: MELVILLE Neville (Father)
+27 73 2086428 (Mobile)
+27 31 5620177 (Home)
marnev@telkomsa.net
PASSPORT N°: 482996851 – Expiry:20-01-2019
2
MEDICAL CERT.: Expiry: 07/06/2017
SEAMAN BOOK N°: 35492
OVERALLS SIZE: 42
WORKING SHOES SIZE: 44
EDUCATION
1982-1987: High School Matriculation in Durban, South Africa. Natal Senior Certificate
(Matric Higher Grade)
PROFESSIONAL QUALIFICAT IO NS
2016: IMCA QUALIFIED DMT cert no DMTPDC R0675
2016: Diving First Aid& First Aid At Work cert no F304/02/2016
2016: Oxygen Administration cert no OP-004/02/2016
2015: BOSIET (OPITO), cert no.3558/5858/301015/0002, Survival Offshore –
Expiry: 29/10/2019
2012: IMCA AIR DIVE TRAINEE SUPERVISOR-CERT No KBAT-BDS 248
2012: IMCA BELL DIVE TRAINEE SUPERVISOR-CERT No KBAT-ADS-555
2008:IMCA TRAINEE OFFSHORE AIR DIVING SUPERVISOR, Cert. no. INT300-
23018S, issued by Interdive Services Ltd
2008:IMCA TRAINEE CLOSED BELLDIVING SUPERVISOR, Cert. no. INT302-
issued by Interdive Services Ltd
2007:RGIT MONTROSE RIGGING AND LIFTING, Cert no. T&T-RLS-07-0083
2002: HSE/IMCA SURFACE SUPPLIED TOP-UP DIVER/MIXED GAS CLOSED
BELL DIVER, Cert. no. 00502-IIIA
1999:COMMERCIAL DIVER CLASS II, card no. 6323, issued by Department of
Manpower (South Africa)
TOTAL SATURATIONS COMPLETED: 27
TOTAL BELL RUNS COMPLETED: 383
TOTAL TIME IN SATURATION: 14831Hours/ 618 Days
TOTAL LOCKOUT HOURS: 1532 Hours
SKILLS & EXPERIENCE INCLUDES BUT NOT LIMITED TO:
Lift Bag Installation
Spool piece installation 4”to 42”
Concrete Mattressing
3
Metrology
Broko Burning
Hydro tighten /Bolt Tension Systems
Grouting/ Bagging/Pipeline Stabilization
Airlifting
Dredging
High Pressure Water jetting
Hydraulic Tools: Grinding, PunchTool, Linear Cutter, Circular Cutter,
Torque Wrench.
WORK HISTORY
May-June 2015
Employer: Harkand
Client: TAQA Bratani
Location: Cormorant Field/North Sea
Position: Closed Bell diver/DMT
Vessel: DP DSV Da Vinci
Work Description: IRM –Removal and installation of Conductor guide
bucket/Diving on extended umbilical’s /Depth 58m
Days in Saturation 14.
October 2014
Employer: Harkand
Client: Perenco
Location: North Sea
Position: Closed Bell Diver/DMT
Vessel: DSV Da Vinci
Work Description: IRM/Electrical Conductivity Test/ Depth 50m/
Days in Saturation 9.
August 2014- September 2014
Employer: Harkand
Client: Saipem
Location: North Sea/Cygnus Field
Position: Closed Bell Diver/DMT
Vessel: DSV Da Vinci
Work Description: IRM /32” spool piece tie in/ Depth 31m Days in sat 18.
April 2014- June 2014
Employer: Harkand
4
Client: Apache/CNR
Location: North Sea/Ninian Field
Position: Closed Bell Diver/DMT
Vessel: DSV Da Vinci
Work Description: Inspection, Repair and Maintenance Depth 120m Days in
sat 26.
August 2013-November 2013
Employer: Harkand
Client: Petro SA
Location: Mossel Bay/Ikhwezi Field
Position: Closed Bell Diver
Vessel: DSV Da Vinci
Work Description: Control Umbilical Stabilization and flexi tie in,concrete
mattress installation.Depth 145m, days in saturation 28.
July 2013-August 2013
Employer: Harkand
Client: Petro SA
Location: Mossel Bay/Ikhwezi Field
Position: Closed Bell Diver
Vessel: DSV Da Vinci
Work Description: Control Umbilical Stabilization and flexi tie in,concrete
mattress installation.Depth 145m, days in saturation
24.
April 2013-May 2013
Employer: Harkand
Client: Petro SA
Location: Mossel Bay/Ikhwezi Field
Position: Closed Bell Diver
Vessel: DSV Da Vinci
Work Description: Control Umbilical Stabilization and flexi tie in,concrete
mattress installation.Depth 145m, days in saturation 25.
Jan 2013-March 2013
Employer/ CNS
Client: ENI
Location: Burma
Position: Air Supervisor
Vessel: HLB Castorro8
Work Description: Air Diving Support on jacket installation.
5
Dec 2012
Employer: CNS
Client: Saipem
Location: Vietnam
Position: Assistant Trainee Closed Bell Supervisor
Vessel: DSV Crest Odyssey
Work Description: 20"Pipeline installation
July-Oct 2012
Employer: CNS
Client: ENI
Location: Bouri Field/Libya
Position: Sat Diver/Trainee Sat Supervisor
Vessel: DSV Seamec Princess
Work Description: Subsea Valve Repair, flying lead replacement
Caisson maintenance and inspection.
Max Depth 155m, days in sat 28.
JAN-APRIL 2012
NOV-DEC 2011
Employer: Hydrodive
Client: ADDAX
Location: ADDAX Field-West Africa
Position: Sat Diver
Vessel: DSV HD Contender
Work Description: Subsea wellhead commissioning and installation of control
umbilicals.Max Depth 130m, days in sat 32.
AUG/OCT 2011
APR/JUNE 2011
Employer: CNS
Client: CLOUGH HELIX JOINT VENTURE / COOEC
Location: Huizhou Field – South China Sea
Position: Sat Diver
Vessel: DSV Clough Helix
Work description: Air & sat diving services. BTM installation. Huizhou phase 2
salvageoperations and reinstatement works/Depth 115m
Days in saturation 16.
SEP-NOV2010
Employer: CNS
6
Client: Vietsovpetro
Location: White TigerField Project – Vietnam
Position: Sat Diver
Vessel: DSV Topaz Commander
Work description: 10” Spool and umbilical installation/ hydro tight /and riser tie
in/Depth 100m/days in saturation 29
JUNE/AUG 2010
Employer: CNS
Client: SAIPEM
Location: Chim Sao Project – Vietnam
Position: Sat Diver
Vessel: DSV Topaz Commander
Work description: Spools installation, valve replacement, pre-
commissioning/Max depth100m/.Days in saturation 26.
SEP/OCT2009
Employer: RANA DIVING
Client: SAIPEM
Location: Angola/Congo
Position: Sat Diver/ALST
Vessel: DP DSV Seamac 3
Work description: 42”pipelinetiein, 6”tiein/Hydro tight/lift bags /Depth138m/
Days in saturation 29.
MAY/JUNE 2009
Employer: HYDRODIVE
Client: Chevron
Location: Angola
Position: Sat Diver/DMT
Vessel: Saipem 3000 VHLB
Work description: 42”pipeline tie-in /Hydra tight/Depth 35m/Days in sat 22
NOV/DEC 2008
Employer: GLOBAL DIVING
Client: ARAMCO
Location: Saudi Arabia
Position: Sat Diver/Trainee Sat Supervisor
Vessel: DP DSV Rem Fortress
Work description: 16” Riser & spool piecesinstallation/hydra tight /broko/lift
bags
Depth 30m /Days in sat 23.
SEP/OCT 2008
Employer: GLOBAL DIVING
Client: ARAMCO
Location: Saudi Arabia
Position: Sat Diver/Trainee Sat Supervisor
Vessel: DP DSV Rem Fortress
Work description: Riser installation/ spool piece tiein /Depth 30m/Days in sat
23
APR/MAY 2008
7
Employer: GLOBAL DIVING
Client: ARAMCO
Location: Saudi Arabia
Position: Sat Diver
Vessel: DP DSV Rem Fortress
Work description: 36” pipeline blanking and pigging operations/Depth 30
m/Days in sat 26 days.
DEC 2007-JAN 2008
Employer: SUPERIOR DIVING
Client: BP
Location: Trinidad
Position: Sat Diver
Vessel: Seamac 3
Work description: 36”pipeline and spool piece tie-in (75mt.), subsea wellhead
inspection (170m)/Duration 27 days
AUG/OCT 2007
Employer: SUPERIOR DIVING
Client: BP
Location: Trinidad
Position: Sat Diver
Vessel: Gulmar Condor
Work description: 26”pipeline and spool piece tie-in/Depth 75m /Duration 28
days
MAR/APR 2007
Employer: SUPERIOR DIVING
Client: NEWFIELD
Location: Gulf of Mexico
Position: Sat Diver
Vessel: Toisa Proteus
Work description: Platform salvage from Hurricane Katrina/wellhead
abandonment and capping/Depth: 36m/Duration 31 days –
NOV/DEC 2006
Employer: SUPERIOR DIVING
Client: NEWFIELD
Location: Gulf of Mexico
Position: Sat Diver
Vessel: Toisa Proteus
Work description: Platform salvage, wellhead abandonment and capping/Depth
60m /Duration 39 days.
AUG/OCT 2006
Employer: SUPERIOR DIVING
Client: NEWFIELD
Location: Gulf of Mexico
Position: Sat Diver
Vessel: Toisa Proteus
Work description: Platform salvage, wellhead abandonment and capping/Max
Depth30m/Duration 39 days
APR/JUNE 2006
Employer: SUPERIOR DIVING
8
Client: CHEVRON
Location: Gulf of Mexico
Position: Sat Diver
Vessel: Gulmar Falcon
Work description: Damage repair, tie-in after Hurricane Katrina/Depth: 120m
Duration 30 days.
JAN/MAR 2006
Employer: GLOBAL DIVING
Client: OGS
Location: Bombay High– India
Position: Sat Diver
Vessel: SEAMEC2
Work description: Crossover correction, riser clamp installation, and grouting
/Depth 80m/Duration 30days.
OCT 2005-JAN 2006
Employer: GLOBAL DIVING
Client: ENI
Location: Congo
Position: Saturation Diver (Depth150m) 35 days
Vessel: Barge Global Cheyenne
Work description: pipe lay and spool connection to subsea plem /Depth
150m/Duration 35 days.
AUG/OCT 2005
Employer: AME
Client: PETRONAS
Location: Borneo
Position: Sat Diver
Vessel: Allied Commander
Work description: Anode retrofit and redundant pipeline recovery/ Depth 70
mDuration 20days.
SURFACE SUPPLIED AIR DIVING
MAY/AUG 2005
Employer/Client:SMITH TERMINALS / EXXON MOBIL
Location:Nigeria
Position: Diving Supervisor
Work description: riser hook-ups, Pipeline tie in, Concrete mattress installation
FEB/MAR 2005
Employer/Client:SMITH TERMINALS / CHEVRON/TEXACO
Location:Angola
Position:Mixed gas diver
Work description:Surface mixed gas inspection on jack up legs/spud can welds and
braces.
SEP/DEC 2004
Employer/Client:SMITH TERMINALS / CHEVRON/TEXACO
Location:Angola
9
Position: Air Diver
Work description:Inspection, maintenanceworks and anode installation onto
structures.
AUGUST 2004
Employer/Client:SMITH TERMINALS/ BP
Location:Georgia Black Sea
Position: Air Diver
Work description:Subsea hose recovery and replacement from plem to SBM
JUNE/AUG 2004
Employer/Client:SMITH TERMINALS / ALGOSABI
Location:Saudi Arabia
Position: Air diver
Work description:sat diving assistance: electrical and fibre optic cable installation
JAN/APRIL 2004
Employer/Client:STOLT SEAWAYS / SHELL
Location:Bonga FSPO Nigeria
Position: Diver Medic
Work description:Steel Catenary Riser hook up and installation from subsea flowlines
onto FSPO using over the side pulling in system.
OCT-NOV 2003
Employer/Client:SMITH TERMINALS / BLUEWATER MARINE
Location:Equatorial Guinea
Position:Lead Diver
Work description:Hose change out onto FSPO and midwater buoy
MAY/JUNE 2003
Employer/Client:STOLT SEAWAYS /SHELL
Location:Nigeria
Position: Diver Medic
Work description:24” Pipe lay and beach pull
FEB/MAR 2003
Employer/Client:SUFFOLK PETROLEUM SERVICES / EXXON  MOBIL
Location:Nigeria
Position: Dive Superintendent
Work description:Riser revamp and repair project
10
OCT/DEC 2002
Employer/Client:SUFFOLK PETROLEUM SERVICES/ EXXON  MOBIL
Location:Nigeria
Position: Dive Superintendent
Work description:Riser revamp and repair project
JUNE/SEP 2002
Employer/Client:SUFFOLK PETROLEUM SERVICES / EXXON  MOBIL
Location:Nigeria
Position: Dive Superintendent
Work description:12” Gas Riser and line repair with cofferdam installation
AUG 2001-APR 2002
Employer/Client:SUFFOLK PETROLEUM SERVICES / MOBIL
Location:Nigeria
Position: SPV
Work description:Riser revamp and repair project
JAN/JUNE 2001
Employer/Client:SUFFOLK PETROLEUM SERVICES / MOBIL
Location:Nigeria
Work description:Anode installation on field pipelines
SEP/DEC 2000
Employer/Client:ADAMAC MARINE SERVICES / SHELL PETROLEUM
Location:Nigeria
Work description:Cleaning and inspection of jackets(gvi, video& digital photos)
MAY/AUG 2000
Employer/Client:ADAMAC MARINE SERVICES / TEXACO
Location:Nigeria
Position: Photo Tec / Inspection Diver
Work description:Inspection of production, accommodation and tripod platforms
(Digital photographs,video,visual,cp,& ut)
JAN/FEB 2000
Employer/Client:HYDRODIVE / MOBIL
Location:Nigeria
Work description:12” Pipeline and riser recovery and re-route
DEC 1999-JAN 2000
Employer/Client:HYDRODIVE / CHEVRON / SBM
Location:Nigeria
Work description:SBM and hose changeouts
NOV/DEC 1999
Employer/Client:HYDRODIVE / MOBIL
Location:Nigeria
Work description:12” Pipeline and riser recovery and re-route
11
OCT/NOV 1999
Employer/Client:OCTO MARINE /COFLEXIP STENA
Location:Angola
Work description:Umbilical tie in to production tanker using hydrotight system.
JAN 1999-JULY 1999
Employer/Client:STOLT COMEXSEAWAYS / CHEVRON
Location:Nigeria
Work description:Offshore field maintenance contract
NOV 1998
Employer/Client:PROPSHINE DIVING / SAPPI
Location:South Africa
Work description:Offshore pipeline inspection
OCT 1998
Employer/Client:CEANIC WEST AFRICA/ ELF OIL
Location:Cameroon
Work description:Pipeline trenching
SEP/OCT 1998
Employer/Client:CEANIC WEST AFRICA /PECTEN OIL
Location:Cameroon
Work description:Spool piece & riser tie in on 8" & 10" lines, anode installation on
jacket legs
AUG/SEP 1998
Employer/Client:STOLT COMEX SEAWAYS / AGIP
Location:Congo
Work description:Sat diving assistance on pipeline tie-in
JULY/AUG 1998
Employer/Client:CEANIC WEST AFRICA /MOBIL/IDAHO PTF
Location:Nigeria
Work description:Inspection of K-node welds on mud braces. Grouting of mudbraces
on the accommodation and production PTFs
JUNE/JULY 1998
Employer/Client:CEANIC WEST AFRICA/ SHELL OIL
Location:Nigeria
Work description:Salvage and recover 20000ft of 6" abandoned pipeline using broco
torque and cold cutters
MAY/JUNE 1998
Employer/Client:SUBTECH DIVING / MHLATUZEWATERBOARDRICHARDSBAY
Location:South Africa
Work description:Offshore pipeline inspection and maintenance works
MAY/JUNE 1998
Employer/Client:SUBTECH DIVING / BASIL READ CIVILS
Location:South Africa
Work description:Caisson and site inspection prior to flooding of caissons.
12
SEP/OCT 1997
Employer/Client:AMERICAN OILFIELD DIVERS / MOBIL
Location:Nigeria
Work description:USARI PTF: installation of 24" and 4"spool piece to riser and
pipeline, video survey of 32” pipeline
AUG/SEP 1997
Employer/Client:AMERICAN OILFIELD DIVERS / FINA
Location:Angola
Work description:Salvage and recovery of ready-made dolphin, using broco torque
burning gear
JULY/AUG 1997
Employer/Client:AMERICAN OILFIELD DIVERS / MOBIL
Location:Nigeria
Work description:Hot tapping system installation between 24" and 10" pipeline
JUNE/JULY 1997
Employer/Client:AMERICAN OILFIELD DIVERS / GLOBAL DRILLING
Location:Nigeria
Work description:Inspection and cleaning of spud cans on jack up legs
APR/MAY 1997
Employer:SUBTECH DIVING
Location:South Africa
Work description:Civils, airlifting and inspection around pipe outlet
1994-1997
Self employed
1992-1994
Employer:Natal Sharks Board
Location:South Africa
Work description:Shark net installation, net inspection, underwater net recovery,Ski
boat operation, maintenance, and shark identification and tagging
1990-1992
Civil Engineering: Technikon Natal.
Commercial dive course Class 2
1987-1990
South African Defence Force: Infantry Lieutenant

More Related Content

Similar to MELVILLE CV 2016

Similar to MELVILLE CV 2016 (20)

PIER-CV
PIER-CVPIER-CV
PIER-CV
 
PIER-CV
PIER-CVPIER-CV
PIER-CV
 
Ashleys Buckle CV
Ashleys Buckle CVAshleys Buckle CV
Ashleys Buckle CV
 
Curriculum_Vitae_-_Marhum_Pardede_(Autosaved)_-_Copy
Curriculum_Vitae_-_Marhum_Pardede_(Autosaved)_-_CopyCurriculum_Vitae_-_Marhum_Pardede_(Autosaved)_-_Copy
Curriculum_Vitae_-_Marhum_Pardede_(Autosaved)_-_Copy
 
New CV Amended
New CV Amended New CV Amended
New CV Amended
 
JamieCV 2013
JamieCV 2013JamieCV 2013
JamieCV 2013
 
C.V. Aug 2015
C.V. Aug 2015 C.V. Aug 2015
C.V. Aug 2015
 
GRANT GREEN OFFSHORE CV
GRANT GREEN OFFSHORE CVGRANT GREEN OFFSHORE CV
GRANT GREEN OFFSHORE CV
 
Venthan-Cv_Rov Supervisor - Submersible Engineer_TMT
Venthan-Cv_Rov Supervisor - Submersible Engineer_TMTVenthan-Cv_Rov Supervisor - Submersible Engineer_TMT
Venthan-Cv_Rov Supervisor - Submersible Engineer_TMT
 
Andrew-CV Crane Operator
Andrew-CV Crane OperatorAndrew-CV Crane Operator
Andrew-CV Crane Operator
 
CVword
CVwordCVword
CVword
 
Venthan cv rov supervisor - submersible engineer-tmt
Venthan cv rov supervisor - submersible engineer-tmtVenthan cv rov supervisor - submersible engineer-tmt
Venthan cv rov supervisor - submersible engineer-tmt
 
CV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERG
CV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERGCV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERG
CV - 2nd Mate YACHTS:DPO - FREDERIK LIEBENBERG
 
Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015
 
Rogers cv feb 2016
Rogers cv feb 2016Rogers cv feb 2016
Rogers cv feb 2016
 
Cv-Deon Absolom
Cv-Deon AbsolomCv-Deon Absolom
Cv-Deon Absolom
 
Quang CV - SEAMAP
Quang CV - SEAMAPQuang CV - SEAMAP
Quang CV - SEAMAP
 
Quang CV - SEAMAP
Quang CV - SEAMAPQuang CV - SEAMAP
Quang CV - SEAMAP
 
CURRICULUM VITAE JULY 2015
CURRICULUM VITAE JULY 2015CURRICULUM VITAE JULY 2015
CURRICULUM VITAE JULY 2015
 
Cv actualizado 2016
Cv actualizado 2016Cv actualizado 2016
Cv actualizado 2016
 

MELVILLE CV 2016

  • 1. 1 MELVILLE Grant Leonard SURNAME: MELVILLE NAME: GRANT LEONARD DOB: 28/05/1969 RESIDENTIAL ADDRESS: 5, Coral Head 56 Marine Drive LA-LUCIA, KZN, 4320 SOUTH AFRICA POSTAL ADDRESS: P.O. Box 127 Umhlanga Rocks 4320 KZN – SOUTH AFRICA MOBILE: +27 – 824 341 534 (available 24/7) TEL: +27 – 31 562 01 77 E.MAIL: gmxxx1969@gmail.com gmxx2@hotmail.com NATIONALITY: SOUTH AFRICAN DEPARTING AIRPORT: DURBAN (South Africa) MARITAL STATUS: DIVORCED NEXT OF KIN: MELVILLE Neville (Father) +27 73 2086428 (Mobile) +27 31 5620177 (Home) marnev@telkomsa.net PASSPORT N°: 482996851 – Expiry:20-01-2019
  • 2. 2 MEDICAL CERT.: Expiry: 07/06/2017 SEAMAN BOOK N°: 35492 OVERALLS SIZE: 42 WORKING SHOES SIZE: 44 EDUCATION 1982-1987: High School Matriculation in Durban, South Africa. Natal Senior Certificate (Matric Higher Grade) PROFESSIONAL QUALIFICAT IO NS 2016: IMCA QUALIFIED DMT cert no DMTPDC R0675 2016: Diving First Aid& First Aid At Work cert no F304/02/2016 2016: Oxygen Administration cert no OP-004/02/2016 2015: BOSIET (OPITO), cert no.3558/5858/301015/0002, Survival Offshore – Expiry: 29/10/2019 2012: IMCA AIR DIVE TRAINEE SUPERVISOR-CERT No KBAT-BDS 248 2012: IMCA BELL DIVE TRAINEE SUPERVISOR-CERT No KBAT-ADS-555 2008:IMCA TRAINEE OFFSHORE AIR DIVING SUPERVISOR, Cert. no. INT300- 23018S, issued by Interdive Services Ltd 2008:IMCA TRAINEE CLOSED BELLDIVING SUPERVISOR, Cert. no. INT302- issued by Interdive Services Ltd 2007:RGIT MONTROSE RIGGING AND LIFTING, Cert no. T&T-RLS-07-0083 2002: HSE/IMCA SURFACE SUPPLIED TOP-UP DIVER/MIXED GAS CLOSED BELL DIVER, Cert. no. 00502-IIIA 1999:COMMERCIAL DIVER CLASS II, card no. 6323, issued by Department of Manpower (South Africa) TOTAL SATURATIONS COMPLETED: 27 TOTAL BELL RUNS COMPLETED: 383 TOTAL TIME IN SATURATION: 14831Hours/ 618 Days TOTAL LOCKOUT HOURS: 1532 Hours SKILLS & EXPERIENCE INCLUDES BUT NOT LIMITED TO: Lift Bag Installation Spool piece installation 4”to 42” Concrete Mattressing
  • 3. 3 Metrology Broko Burning Hydro tighten /Bolt Tension Systems Grouting/ Bagging/Pipeline Stabilization Airlifting Dredging High Pressure Water jetting Hydraulic Tools: Grinding, PunchTool, Linear Cutter, Circular Cutter, Torque Wrench. WORK HISTORY May-June 2015 Employer: Harkand Client: TAQA Bratani Location: Cormorant Field/North Sea Position: Closed Bell diver/DMT Vessel: DP DSV Da Vinci Work Description: IRM –Removal and installation of Conductor guide bucket/Diving on extended umbilical’s /Depth 58m Days in Saturation 14. October 2014 Employer: Harkand Client: Perenco Location: North Sea Position: Closed Bell Diver/DMT Vessel: DSV Da Vinci Work Description: IRM/Electrical Conductivity Test/ Depth 50m/ Days in Saturation 9. August 2014- September 2014 Employer: Harkand Client: Saipem Location: North Sea/Cygnus Field Position: Closed Bell Diver/DMT Vessel: DSV Da Vinci Work Description: IRM /32” spool piece tie in/ Depth 31m Days in sat 18. April 2014- June 2014 Employer: Harkand
  • 4. 4 Client: Apache/CNR Location: North Sea/Ninian Field Position: Closed Bell Diver/DMT Vessel: DSV Da Vinci Work Description: Inspection, Repair and Maintenance Depth 120m Days in sat 26. August 2013-November 2013 Employer: Harkand Client: Petro SA Location: Mossel Bay/Ikhwezi Field Position: Closed Bell Diver Vessel: DSV Da Vinci Work Description: Control Umbilical Stabilization and flexi tie in,concrete mattress installation.Depth 145m, days in saturation 28. July 2013-August 2013 Employer: Harkand Client: Petro SA Location: Mossel Bay/Ikhwezi Field Position: Closed Bell Diver Vessel: DSV Da Vinci Work Description: Control Umbilical Stabilization and flexi tie in,concrete mattress installation.Depth 145m, days in saturation 24. April 2013-May 2013 Employer: Harkand Client: Petro SA Location: Mossel Bay/Ikhwezi Field Position: Closed Bell Diver Vessel: DSV Da Vinci Work Description: Control Umbilical Stabilization and flexi tie in,concrete mattress installation.Depth 145m, days in saturation 25. Jan 2013-March 2013 Employer/ CNS Client: ENI Location: Burma Position: Air Supervisor Vessel: HLB Castorro8 Work Description: Air Diving Support on jacket installation.
  • 5. 5 Dec 2012 Employer: CNS Client: Saipem Location: Vietnam Position: Assistant Trainee Closed Bell Supervisor Vessel: DSV Crest Odyssey Work Description: 20"Pipeline installation July-Oct 2012 Employer: CNS Client: ENI Location: Bouri Field/Libya Position: Sat Diver/Trainee Sat Supervisor Vessel: DSV Seamec Princess Work Description: Subsea Valve Repair, flying lead replacement Caisson maintenance and inspection. Max Depth 155m, days in sat 28. JAN-APRIL 2012 NOV-DEC 2011 Employer: Hydrodive Client: ADDAX Location: ADDAX Field-West Africa Position: Sat Diver Vessel: DSV HD Contender Work Description: Subsea wellhead commissioning and installation of control umbilicals.Max Depth 130m, days in sat 32. AUG/OCT 2011 APR/JUNE 2011 Employer: CNS Client: CLOUGH HELIX JOINT VENTURE / COOEC Location: Huizhou Field – South China Sea Position: Sat Diver Vessel: DSV Clough Helix Work description: Air & sat diving services. BTM installation. Huizhou phase 2 salvageoperations and reinstatement works/Depth 115m Days in saturation 16. SEP-NOV2010 Employer: CNS
  • 6. 6 Client: Vietsovpetro Location: White TigerField Project – Vietnam Position: Sat Diver Vessel: DSV Topaz Commander Work description: 10” Spool and umbilical installation/ hydro tight /and riser tie in/Depth 100m/days in saturation 29 JUNE/AUG 2010 Employer: CNS Client: SAIPEM Location: Chim Sao Project – Vietnam Position: Sat Diver Vessel: DSV Topaz Commander Work description: Spools installation, valve replacement, pre- commissioning/Max depth100m/.Days in saturation 26. SEP/OCT2009 Employer: RANA DIVING Client: SAIPEM Location: Angola/Congo Position: Sat Diver/ALST Vessel: DP DSV Seamac 3 Work description: 42”pipelinetiein, 6”tiein/Hydro tight/lift bags /Depth138m/ Days in saturation 29. MAY/JUNE 2009 Employer: HYDRODIVE Client: Chevron Location: Angola Position: Sat Diver/DMT Vessel: Saipem 3000 VHLB Work description: 42”pipeline tie-in /Hydra tight/Depth 35m/Days in sat 22 NOV/DEC 2008 Employer: GLOBAL DIVING Client: ARAMCO Location: Saudi Arabia Position: Sat Diver/Trainee Sat Supervisor Vessel: DP DSV Rem Fortress Work description: 16” Riser & spool piecesinstallation/hydra tight /broko/lift bags Depth 30m /Days in sat 23. SEP/OCT 2008 Employer: GLOBAL DIVING Client: ARAMCO Location: Saudi Arabia Position: Sat Diver/Trainee Sat Supervisor Vessel: DP DSV Rem Fortress Work description: Riser installation/ spool piece tiein /Depth 30m/Days in sat 23 APR/MAY 2008
  • 7. 7 Employer: GLOBAL DIVING Client: ARAMCO Location: Saudi Arabia Position: Sat Diver Vessel: DP DSV Rem Fortress Work description: 36” pipeline blanking and pigging operations/Depth 30 m/Days in sat 26 days. DEC 2007-JAN 2008 Employer: SUPERIOR DIVING Client: BP Location: Trinidad Position: Sat Diver Vessel: Seamac 3 Work description: 36”pipeline and spool piece tie-in (75mt.), subsea wellhead inspection (170m)/Duration 27 days AUG/OCT 2007 Employer: SUPERIOR DIVING Client: BP Location: Trinidad Position: Sat Diver Vessel: Gulmar Condor Work description: 26”pipeline and spool piece tie-in/Depth 75m /Duration 28 days MAR/APR 2007 Employer: SUPERIOR DIVING Client: NEWFIELD Location: Gulf of Mexico Position: Sat Diver Vessel: Toisa Proteus Work description: Platform salvage from Hurricane Katrina/wellhead abandonment and capping/Depth: 36m/Duration 31 days – NOV/DEC 2006 Employer: SUPERIOR DIVING Client: NEWFIELD Location: Gulf of Mexico Position: Sat Diver Vessel: Toisa Proteus Work description: Platform salvage, wellhead abandonment and capping/Depth 60m /Duration 39 days. AUG/OCT 2006 Employer: SUPERIOR DIVING Client: NEWFIELD Location: Gulf of Mexico Position: Sat Diver Vessel: Toisa Proteus Work description: Platform salvage, wellhead abandonment and capping/Max Depth30m/Duration 39 days APR/JUNE 2006 Employer: SUPERIOR DIVING
  • 8. 8 Client: CHEVRON Location: Gulf of Mexico Position: Sat Diver Vessel: Gulmar Falcon Work description: Damage repair, tie-in after Hurricane Katrina/Depth: 120m Duration 30 days. JAN/MAR 2006 Employer: GLOBAL DIVING Client: OGS Location: Bombay High– India Position: Sat Diver Vessel: SEAMEC2 Work description: Crossover correction, riser clamp installation, and grouting /Depth 80m/Duration 30days. OCT 2005-JAN 2006 Employer: GLOBAL DIVING Client: ENI Location: Congo Position: Saturation Diver (Depth150m) 35 days Vessel: Barge Global Cheyenne Work description: pipe lay and spool connection to subsea plem /Depth 150m/Duration 35 days. AUG/OCT 2005 Employer: AME Client: PETRONAS Location: Borneo Position: Sat Diver Vessel: Allied Commander Work description: Anode retrofit and redundant pipeline recovery/ Depth 70 mDuration 20days. SURFACE SUPPLIED AIR DIVING MAY/AUG 2005 Employer/Client:SMITH TERMINALS / EXXON MOBIL Location:Nigeria Position: Diving Supervisor Work description: riser hook-ups, Pipeline tie in, Concrete mattress installation FEB/MAR 2005 Employer/Client:SMITH TERMINALS / CHEVRON/TEXACO Location:Angola Position:Mixed gas diver Work description:Surface mixed gas inspection on jack up legs/spud can welds and braces. SEP/DEC 2004 Employer/Client:SMITH TERMINALS / CHEVRON/TEXACO Location:Angola
  • 9. 9 Position: Air Diver Work description:Inspection, maintenanceworks and anode installation onto structures. AUGUST 2004 Employer/Client:SMITH TERMINALS/ BP Location:Georgia Black Sea Position: Air Diver Work description:Subsea hose recovery and replacement from plem to SBM JUNE/AUG 2004 Employer/Client:SMITH TERMINALS / ALGOSABI Location:Saudi Arabia Position: Air diver Work description:sat diving assistance: electrical and fibre optic cable installation JAN/APRIL 2004 Employer/Client:STOLT SEAWAYS / SHELL Location:Bonga FSPO Nigeria Position: Diver Medic Work description:Steel Catenary Riser hook up and installation from subsea flowlines onto FSPO using over the side pulling in system. OCT-NOV 2003 Employer/Client:SMITH TERMINALS / BLUEWATER MARINE Location:Equatorial Guinea Position:Lead Diver Work description:Hose change out onto FSPO and midwater buoy MAY/JUNE 2003 Employer/Client:STOLT SEAWAYS /SHELL Location:Nigeria Position: Diver Medic Work description:24” Pipe lay and beach pull FEB/MAR 2003 Employer/Client:SUFFOLK PETROLEUM SERVICES / EXXON MOBIL Location:Nigeria Position: Dive Superintendent Work description:Riser revamp and repair project
  • 10. 10 OCT/DEC 2002 Employer/Client:SUFFOLK PETROLEUM SERVICES/ EXXON MOBIL Location:Nigeria Position: Dive Superintendent Work description:Riser revamp and repair project JUNE/SEP 2002 Employer/Client:SUFFOLK PETROLEUM SERVICES / EXXON MOBIL Location:Nigeria Position: Dive Superintendent Work description:12” Gas Riser and line repair with cofferdam installation AUG 2001-APR 2002 Employer/Client:SUFFOLK PETROLEUM SERVICES / MOBIL Location:Nigeria Position: SPV Work description:Riser revamp and repair project JAN/JUNE 2001 Employer/Client:SUFFOLK PETROLEUM SERVICES / MOBIL Location:Nigeria Work description:Anode installation on field pipelines SEP/DEC 2000 Employer/Client:ADAMAC MARINE SERVICES / SHELL PETROLEUM Location:Nigeria Work description:Cleaning and inspection of jackets(gvi, video& digital photos) MAY/AUG 2000 Employer/Client:ADAMAC MARINE SERVICES / TEXACO Location:Nigeria Position: Photo Tec / Inspection Diver Work description:Inspection of production, accommodation and tripod platforms (Digital photographs,video,visual,cp,& ut) JAN/FEB 2000 Employer/Client:HYDRODIVE / MOBIL Location:Nigeria Work description:12” Pipeline and riser recovery and re-route DEC 1999-JAN 2000 Employer/Client:HYDRODIVE / CHEVRON / SBM Location:Nigeria Work description:SBM and hose changeouts NOV/DEC 1999 Employer/Client:HYDRODIVE / MOBIL Location:Nigeria Work description:12” Pipeline and riser recovery and re-route
  • 11. 11 OCT/NOV 1999 Employer/Client:OCTO MARINE /COFLEXIP STENA Location:Angola Work description:Umbilical tie in to production tanker using hydrotight system. JAN 1999-JULY 1999 Employer/Client:STOLT COMEXSEAWAYS / CHEVRON Location:Nigeria Work description:Offshore field maintenance contract NOV 1998 Employer/Client:PROPSHINE DIVING / SAPPI Location:South Africa Work description:Offshore pipeline inspection OCT 1998 Employer/Client:CEANIC WEST AFRICA/ ELF OIL Location:Cameroon Work description:Pipeline trenching SEP/OCT 1998 Employer/Client:CEANIC WEST AFRICA /PECTEN OIL Location:Cameroon Work description:Spool piece & riser tie in on 8" & 10" lines, anode installation on jacket legs AUG/SEP 1998 Employer/Client:STOLT COMEX SEAWAYS / AGIP Location:Congo Work description:Sat diving assistance on pipeline tie-in JULY/AUG 1998 Employer/Client:CEANIC WEST AFRICA /MOBIL/IDAHO PTF Location:Nigeria Work description:Inspection of K-node welds on mud braces. Grouting of mudbraces on the accommodation and production PTFs JUNE/JULY 1998 Employer/Client:CEANIC WEST AFRICA/ SHELL OIL Location:Nigeria Work description:Salvage and recover 20000ft of 6" abandoned pipeline using broco torque and cold cutters MAY/JUNE 1998 Employer/Client:SUBTECH DIVING / MHLATUZEWATERBOARDRICHARDSBAY Location:South Africa Work description:Offshore pipeline inspection and maintenance works MAY/JUNE 1998 Employer/Client:SUBTECH DIVING / BASIL READ CIVILS Location:South Africa Work description:Caisson and site inspection prior to flooding of caissons.
  • 12. 12 SEP/OCT 1997 Employer/Client:AMERICAN OILFIELD DIVERS / MOBIL Location:Nigeria Work description:USARI PTF: installation of 24" and 4"spool piece to riser and pipeline, video survey of 32” pipeline AUG/SEP 1997 Employer/Client:AMERICAN OILFIELD DIVERS / FINA Location:Angola Work description:Salvage and recovery of ready-made dolphin, using broco torque burning gear JULY/AUG 1997 Employer/Client:AMERICAN OILFIELD DIVERS / MOBIL Location:Nigeria Work description:Hot tapping system installation between 24" and 10" pipeline JUNE/JULY 1997 Employer/Client:AMERICAN OILFIELD DIVERS / GLOBAL DRILLING Location:Nigeria Work description:Inspection and cleaning of spud cans on jack up legs APR/MAY 1997 Employer:SUBTECH DIVING Location:South Africa Work description:Civils, airlifting and inspection around pipe outlet 1994-1997 Self employed 1992-1994 Employer:Natal Sharks Board Location:South Africa Work description:Shark net installation, net inspection, underwater net recovery,Ski boat operation, maintenance, and shark identification and tagging 1990-1992 Civil Engineering: Technikon Natal. Commercial dive course Class 2 1987-1990 South African Defence Force: Infantry Lieutenant