SlideShare a Scribd company logo
1 of 5
Download to read offline
CV of Gopal Panchal 
CURRICULUM VITAE
PERSONAL DETAILS
Name Gopal Panchal
Address- Permanent 136 ,Rampuri Roorkee Raod Muzaffarnagar (U.P) 251002
Phone Number +919990100399, +919897293860
Marital Status Single
Passport No Z 2770737 Issued at Ghaziabad on 02 Jan 2014 , valid till 01 Jan 2024
Date/Place of Birth August 20 1989 , Muzaffarnagar
EDUCATIONAL QUALIFICATIONS
Qualifications
10th
Standard, Saraswati vidhya Mandir Muzaffarnagar
12th
Standard, Saraswati vidhya Mandir Muzaffarnagar
B-Tech. Chemical Engineering, Hindustan College of Science and Technology (Mathura) Uttar
Pradesh India
SOFTWARE PROFICIENCY
Familiar and fluent in the standard Word and Data processing software such as Microsoft
WORD, EXCEL, POWER POINT, etc.
Very familiar with risk and HAZOP software such as HAZOP MANAGER V6.0, PHA WORKS,
ALOHA, PHAST & SAFETY (DNV), and others.
CV of Gopal Panchal 
WORK EXPERIENCE
YEARS ORGANIZATION BRIEF DESCRIPTION/ ACTIVITY
June
2012 Till
Date
Techno-Safe
Consultants
PROFILE/ SCOPE: Responsibilities include rendering safety
and environmental services to clients from the oil and gas,
refinery, petrochemical, power and chemical sectors. Actively
involved in over 50 projects. Hazard and Operability
(HAZOP), Quantitative Risk Assessment (QRA), Hazard
Identification (HAZID), SIL, Environment Impact Assessment
(EIAs), External Safety Audits.
REPORTING: Reporting to the Project Manager and working
as Sr. Technical Project Engineer.
KEY ACHIEVEMENT: Responsible for Project Execution,
Project handling, client discussion & and gaining goodwill
from clients.
HAZOP/HAZID/SIL STUDY
Gujarat State Petroleum
Corporation Ltd./Punj Loyd
ltd.
HAZOP for DDFD Submarine Pipeline Project.
Cairn India Ltd. HAZOP for RAVVA LO-110 Well Test Project
Cairn India Ltd.
Hazid for Raag WP 01 & 03 for installation of GEGs and
associated electrical equipment – Dec 2014
Cairn India Ltd./ Tractebel
Engineering
HAZOP, HAZID and SIL Study for Raageshwari to
Palanpur Pipeline Project
Technip India/GAIL HAZID and HAZOP Study for C2-C3 injection in the 350
Km long 30” Vijaypur Auriya NG Pipeline of GAIL –
December 2014
Gail India Ltd. Connectivity to M/s Sanghvi Forgings & Energy Ltd. at
Vadodara, Gujarat
Gail India Ltd. Last Mile Connectivity to Yamunanagar Customers From
Bhavana-Nangal Section of DBNPL
Gujarat State Petronet Ltd. Pipavav Gundala Pipeline Project.
Gujarat State Petronet Ltd. Jhagadia Connectivity Project.
Ramco Industries Ltd.
HAZOP Study for LPG receipt, storage and
transfer/usage at furnaces for Ramco’s Neemrana Plant
GAIL India Ltd./Tractabel HAZOP for Kesanapalli – Ponnamanda Natural gas high
CV of Gopal Panchal 
Engineering pressure pipeline
Transco – Abu Dhabi/ Tata
Consulting Engineers
HAZOP for Fujairah Water Distribution Network involving
two pressurized section on either side of Qidfa Pumping
Station 2. One section upto high point reservoir followed
by gravity section.
Paradeep Phosphates Ltd./
Simon India Ltd.
2000 MTPD grass-root sulphuric acid plant with 23 MW
CPP and retrofit of HRS in the existing 1000 TPD x 2
streams
JP Kenny Woodgroup HAZOP study for GSPL connectivity project at
Panchmahals and Dahej
Qatar Petroleum (QP)/Dopet,
Qatar:
HAZOP, HAZID and SIL Study for EPIC for NGL-3 UPS
Upgrade Project at Meesaied, Qatar
Qatar Petroleum (QP)/Dopet,
Qatar
HAZOP, HAZID and SIL Study report for EPIC for Khuff
Gas Injection into Arab-D gas cap, Qatar
Gujarat State Petronet Ltd.
(GSPL)/ Fernas Construction
HAZOP and SIL Study report for Gana Compressor
Station
Qatar Petroleum (QP)/Dopet,
Qatar:
HAZOP, HAZID, and SIL Verification report for EPIC for
integrated oily water/ Sludge handling system, new drain
system, Fire Protection system for crude oil manifold and
pipeline replacement at HALUL island, Qatar
Qatar Petroleum (QP)/Dopet,
Qatar:
HAZOP, HAZID and SIL Study for EPIC for NGL-3 UPS
Upgrade Project at Meesaied, Qatar
QS Tec/ PL Engineering Ltd. HAZOP, SIL Study for Polysilicon Project (including
Vendor Packages) being set up at Ras Laffan Industrial
City, Qatar
Gujarat State Petronet Ltd.
(GSPL)/ Fernas Construction
HAZOP and SIL Study for Gana Compressor Station
PL Engineering/ QStec HAZOP study for Vendor Package units (HF Scrubber),
NOx package, Lab CVD Reactor, Unloading Unit, Chunk
unit, Granuals, Filter, Boiler and Reactor packeages
QS Tec/ PL Engineering Ltd. SIL Verification for Polysilicon Project being set up at Ras
Laffan Industrial City, Qatar
CV of Gopal Panchal 
RISK ASSESSMENT
Cairn India Ltd. MPT(Mangla Process Terminal)
Cairn India Ltd. RGT(Raageshwari Process Terminal)
Oman Chlorines /
Qatar Design
Consortium (QDC)
QRA for new 70 TPD Caustic Soda Plant coming up at Mesaieed
Indraprastha Gas
Limited
Natural gas pipeline project
Gulbrandson
Chemicals Ltd.,
Gujarat
QRA for Chemicals Complex (Nov. 2014)
Gulf Warehousing
Corporation, Qatar
QRA - Chemicals Warehouse (Oct. 2014)
Cairn India Ltd./
Tractebel
Engineering
QRA for Raageshwari to Palanpur Pipeline Project
Associated
Industries Ltd/ Mott
MacDonald
QRA for Salalah Pipeline Project Salalah, Oman
Petroleum
Technology Co.
W.L.L.
Extension of Existing & Proposed Warehouse, Offices And Workshop
At Ras Laffan - Westside Support Services Area- ON GOING
GAIL/Technip India Hazid and Hazop Study for C2-C3 injection in the 350 Km long 30”
Vijaypur Auriya NG Pipeline of GAIL – December 2014
OTHER PROJECTS
Ministry of Environment and Forests,
Government of India.
Data Collection and Modeling for National Hazardous
Waste Management System (NHWIS) survey with GPS
of Hazardous waste industries in 18 States including
Tamil Nadu, Orissa, Gujarat, Maharastra, Andhra
Prdesh, Uttrakhand, Rajasthan, Uttar Pradesh,
Himachal, Punjab, Haryana, West Bengal, Madhya
Pradesh, Chhatisgarh, Kerala, Uttrakhand, Karnataka,
Pondicherry.
Ministry of Environment and Forests,
Government of India.
GEPR (Geographical Information System (Gis)
Based Emergency Planning And Response
System)
Ministry of Environment and Forests,
Government of India.
Rapid Safety Audit and Offsite Emergency Plans for 13
District including Bharatpur, Jodhpur, Alwar, Udaipur,
Sirohi, Jajpur, Jalpaiguri, Vellore, Nagapattinam, Kota,
Erode, Sbarkantha.
CV of Gopal Panchal 
Indraprastha Gas Limited (IGL) Safety Audits done for over 200 CNG stations,
SVs, Odourizing units, Industrial, large, small &
domestic users
Gujarat State Petroleum Corporation/
Punj Lloyd Engineering
O.M (Operating manual) for Onshore Gas
Terminal (OGT), 20” pipeline from land fall point
(LFP) to OGT, slug catcher and close blow down
drain tank for Deen Dayal Development Field
(DDFD) – April 2013
 
 

More Related Content

Similar to GP - Brief CV_2015

photo&i.fitter resume
photo&i.fitter resumephoto&i.fitter resume
photo&i.fitter resumeJohn Peter
 
Vinod Kumar__Process_Engineer-11+ years_Exp
Vinod Kumar__Process_Engineer-11+ years_ExpVinod Kumar__Process_Engineer-11+ years_Exp
Vinod Kumar__Process_Engineer-11+ years_Exppatelvr05
 
CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016Sujit Basu
 
PIPING ENGINEER_CV2017
PIPING ENGINEER_CV2017PIPING ENGINEER_CV2017
PIPING ENGINEER_CV2017karthik g
 
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier Richa_Environmental
 
Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)piyush_deks
 
Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Ravinder Raina
 
Updated_Resume2017
Updated_Resume2017Updated_Resume2017
Updated_Resume2017Torres C
 
Veerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress EngineerVeerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress Engineerveerappa panchal
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekar ramamurthy
 

Similar to GP - Brief CV_2015 (20)

Site Visits 6.5
Site Visits 6.5Site Visits 6.5
Site Visits 6.5
 
CV-Dipesh
CV-DipeshCV-Dipesh
CV-Dipesh
 
photo&i.fitter resume
photo&i.fitter resumephoto&i.fitter resume
photo&i.fitter resume
 
Vinod Kumar__Process_Engineer-11+ years_Exp
Vinod Kumar__Process_Engineer-11+ years_ExpVinod Kumar__Process_Engineer-11+ years_Exp
Vinod Kumar__Process_Engineer-11+ years_Exp
 
Mechanical Supervisor
Mechanical SupervisorMechanical Supervisor
Mechanical Supervisor
 
CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016
 
PIPING ENGINEER_CV2017
PIPING ENGINEER_CV2017PIPING ENGINEER_CV2017
PIPING ENGINEER_CV2017
 
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier
 
Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)Piyush Dekavadiya_CV(06.12.14)
Piyush Dekavadiya_CV(06.12.14)
 
Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516Resume_Ravinder Kumar Raina dtd 080516
Resume_Ravinder Kumar Raina dtd 080516
 
Ajay K Gautam Cv
Ajay K Gautam CvAjay K Gautam Cv
Ajay K Gautam Cv
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
Updated_Resume2017
Updated_Resume2017Updated_Resume2017
Updated_Resume2017
 
pugal.resume. new
pugal.resume. newpugal.resume. new
pugal.resume. new
 
VISHNU CV
VISHNU CVVISHNU CV
VISHNU CV
 
amitgharat41
amitgharat41amitgharat41
amitgharat41
 
Veerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress EngineerVeerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress Engineer
 
cv
cvcv
cv
 
RESUME RKS.doc
RESUME RKS.docRESUME RKS.doc
RESUME RKS.doc
 
Rajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.DesignerRajasekaran Ramamurthy - Sr.Designer
Rajasekaran Ramamurthy - Sr.Designer
 

GP - Brief CV_2015

  • 1. CV of Gopal Panchal  CURRICULUM VITAE PERSONAL DETAILS Name Gopal Panchal Address- Permanent 136 ,Rampuri Roorkee Raod Muzaffarnagar (U.P) 251002 Phone Number +919990100399, +919897293860 Marital Status Single Passport No Z 2770737 Issued at Ghaziabad on 02 Jan 2014 , valid till 01 Jan 2024 Date/Place of Birth August 20 1989 , Muzaffarnagar EDUCATIONAL QUALIFICATIONS Qualifications 10th Standard, Saraswati vidhya Mandir Muzaffarnagar 12th Standard, Saraswati vidhya Mandir Muzaffarnagar B-Tech. Chemical Engineering, Hindustan College of Science and Technology (Mathura) Uttar Pradesh India SOFTWARE PROFICIENCY Familiar and fluent in the standard Word and Data processing software such as Microsoft WORD, EXCEL, POWER POINT, etc. Very familiar with risk and HAZOP software such as HAZOP MANAGER V6.0, PHA WORKS, ALOHA, PHAST & SAFETY (DNV), and others.
  • 2. CV of Gopal Panchal  WORK EXPERIENCE YEARS ORGANIZATION BRIEF DESCRIPTION/ ACTIVITY June 2012 Till Date Techno-Safe Consultants PROFILE/ SCOPE: Responsibilities include rendering safety and environmental services to clients from the oil and gas, refinery, petrochemical, power and chemical sectors. Actively involved in over 50 projects. Hazard and Operability (HAZOP), Quantitative Risk Assessment (QRA), Hazard Identification (HAZID), SIL, Environment Impact Assessment (EIAs), External Safety Audits. REPORTING: Reporting to the Project Manager and working as Sr. Technical Project Engineer. KEY ACHIEVEMENT: Responsible for Project Execution, Project handling, client discussion & and gaining goodwill from clients. HAZOP/HAZID/SIL STUDY Gujarat State Petroleum Corporation Ltd./Punj Loyd ltd. HAZOP for DDFD Submarine Pipeline Project. Cairn India Ltd. HAZOP for RAVVA LO-110 Well Test Project Cairn India Ltd. Hazid for Raag WP 01 & 03 for installation of GEGs and associated electrical equipment – Dec 2014 Cairn India Ltd./ Tractebel Engineering HAZOP, HAZID and SIL Study for Raageshwari to Palanpur Pipeline Project Technip India/GAIL HAZID and HAZOP Study for C2-C3 injection in the 350 Km long 30” Vijaypur Auriya NG Pipeline of GAIL – December 2014 Gail India Ltd. Connectivity to M/s Sanghvi Forgings & Energy Ltd. at Vadodara, Gujarat Gail India Ltd. Last Mile Connectivity to Yamunanagar Customers From Bhavana-Nangal Section of DBNPL Gujarat State Petronet Ltd. Pipavav Gundala Pipeline Project. Gujarat State Petronet Ltd. Jhagadia Connectivity Project. Ramco Industries Ltd. HAZOP Study for LPG receipt, storage and transfer/usage at furnaces for Ramco’s Neemrana Plant GAIL India Ltd./Tractabel HAZOP for Kesanapalli – Ponnamanda Natural gas high
  • 3. CV of Gopal Panchal  Engineering pressure pipeline Transco – Abu Dhabi/ Tata Consulting Engineers HAZOP for Fujairah Water Distribution Network involving two pressurized section on either side of Qidfa Pumping Station 2. One section upto high point reservoir followed by gravity section. Paradeep Phosphates Ltd./ Simon India Ltd. 2000 MTPD grass-root sulphuric acid plant with 23 MW CPP and retrofit of HRS in the existing 1000 TPD x 2 streams JP Kenny Woodgroup HAZOP study for GSPL connectivity project at Panchmahals and Dahej Qatar Petroleum (QP)/Dopet, Qatar: HAZOP, HAZID and SIL Study for EPIC for NGL-3 UPS Upgrade Project at Meesaied, Qatar Qatar Petroleum (QP)/Dopet, Qatar HAZOP, HAZID and SIL Study report for EPIC for Khuff Gas Injection into Arab-D gas cap, Qatar Gujarat State Petronet Ltd. (GSPL)/ Fernas Construction HAZOP and SIL Study report for Gana Compressor Station Qatar Petroleum (QP)/Dopet, Qatar: HAZOP, HAZID, and SIL Verification report for EPIC for integrated oily water/ Sludge handling system, new drain system, Fire Protection system for crude oil manifold and pipeline replacement at HALUL island, Qatar Qatar Petroleum (QP)/Dopet, Qatar: HAZOP, HAZID and SIL Study for EPIC for NGL-3 UPS Upgrade Project at Meesaied, Qatar QS Tec/ PL Engineering Ltd. HAZOP, SIL Study for Polysilicon Project (including Vendor Packages) being set up at Ras Laffan Industrial City, Qatar Gujarat State Petronet Ltd. (GSPL)/ Fernas Construction HAZOP and SIL Study for Gana Compressor Station PL Engineering/ QStec HAZOP study for Vendor Package units (HF Scrubber), NOx package, Lab CVD Reactor, Unloading Unit, Chunk unit, Granuals, Filter, Boiler and Reactor packeages QS Tec/ PL Engineering Ltd. SIL Verification for Polysilicon Project being set up at Ras Laffan Industrial City, Qatar
  • 4. CV of Gopal Panchal  RISK ASSESSMENT Cairn India Ltd. MPT(Mangla Process Terminal) Cairn India Ltd. RGT(Raageshwari Process Terminal) Oman Chlorines / Qatar Design Consortium (QDC) QRA for new 70 TPD Caustic Soda Plant coming up at Mesaieed Indraprastha Gas Limited Natural gas pipeline project Gulbrandson Chemicals Ltd., Gujarat QRA for Chemicals Complex (Nov. 2014) Gulf Warehousing Corporation, Qatar QRA - Chemicals Warehouse (Oct. 2014) Cairn India Ltd./ Tractebel Engineering QRA for Raageshwari to Palanpur Pipeline Project Associated Industries Ltd/ Mott MacDonald QRA for Salalah Pipeline Project Salalah, Oman Petroleum Technology Co. W.L.L. Extension of Existing & Proposed Warehouse, Offices And Workshop At Ras Laffan - Westside Support Services Area- ON GOING GAIL/Technip India Hazid and Hazop Study for C2-C3 injection in the 350 Km long 30” Vijaypur Auriya NG Pipeline of GAIL – December 2014 OTHER PROJECTS Ministry of Environment and Forests, Government of India. Data Collection and Modeling for National Hazardous Waste Management System (NHWIS) survey with GPS of Hazardous waste industries in 18 States including Tamil Nadu, Orissa, Gujarat, Maharastra, Andhra Prdesh, Uttrakhand, Rajasthan, Uttar Pradesh, Himachal, Punjab, Haryana, West Bengal, Madhya Pradesh, Chhatisgarh, Kerala, Uttrakhand, Karnataka, Pondicherry. Ministry of Environment and Forests, Government of India. GEPR (Geographical Information System (Gis) Based Emergency Planning And Response System) Ministry of Environment and Forests, Government of India. Rapid Safety Audit and Offsite Emergency Plans for 13 District including Bharatpur, Jodhpur, Alwar, Udaipur, Sirohi, Jajpur, Jalpaiguri, Vellore, Nagapattinam, Kota, Erode, Sbarkantha.
  • 5. CV of Gopal Panchal  Indraprastha Gas Limited (IGL) Safety Audits done for over 200 CNG stations, SVs, Odourizing units, Industrial, large, small & domestic users Gujarat State Petroleum Corporation/ Punj Lloyd Engineering O.M (Operating manual) for Onshore Gas Terminal (OGT), 20” pipeline from land fall point (LFP) to OGT, slug catcher and close blow down drain tank for Deen Dayal Development Field (DDFD) – April 2013