SlideShare a Scribd company logo
1 of 25
Download to read offline
1
2
 Ceo’s message
 Mission statement
 Introduction to geesol
 Projector sector’s
 Commitment to work
 Organogram
 Geesol policies
1. Task risk assessment
2. Permit to work
3. Working at height
4. Lifting operation
5. Energy isolation
6. Ground disturbance
7. Confined space
8. Management of change
 Quality policy
 List of tools and equipment
 Currently business area’s
1. General order supplier
2. Maintenance services
3. Project executed
 Metro Bus 400 tons
 Piping of boiler 6000 Dia. Inches
 Plant piping 3970 Dia Inches
 Ongoing project
GEESOL has come a long way since its inception in 2011
and what started as a small-scale contracting company has now
b e c o m i n g a l a r g e o r g a n i z a t i o n .
GEESOL has continued to grow and expanding,
adopting modern engineering equipment and maintaining
strict and safe quality control checks under the supervision and
leadership of highly-qualified project managers at every site.
Client satisfaction is our primary focus and I truly believe that
this has enabled us to win the loyalty and trust of all those who
w e h a v e w o r k e d w i t h .
Pakistan’s large population of over 2200 million offers
great opportunity and potential in the field of Mechanical
construction and engineering. Bright engineers and hard-
working labor from all across the country, with the passion for
building: making the perfect construction family at GEESOL.
To ge t h e r we h o p e t o a c h i e ve g r e a t n e s s .
Muhammad Naseer Aamer
Chief Executive
GEESOL (Global Energy Engineering Solutions)
3
To be a leader in the markets we serve by providing
quality Engineering solutions and superior service to our
Clients, while learning from their feed back to set even
higher standards for our products.
To be a company that continuously enhances its
superior technological competence to provide innovative
engineering solutions to Client needs.
To be a company that attracts and retains
outstanding people by creating a culture that fosters
openness and innovation, promotes individual growth
and rewards initiative and performance.
To be a company which combines its people,
technology, management systems and market
opportunities to achieve profitable growth while
providing fair returns to its investors.
To be a company that endeavors to set the highest
standards in corporate ethics in serving the society.
4
By the grace of ALLAH, GEESOL MECHANICAL is
going to be One of Pakistan’s most renowned and
experience names in Mechanical Engineering Services
Company Since 2011. The dedicated services of our
management, engineers and technically skilled staff
have made Geesol Mechanical is a specialized
organization in the fields of Fabrication, Erection,
Procurement and vendor’s services.
We have successfully met to our contractual
obligations up to the entire satisfaction of our all local
and multinational clients and consultants. Our major
purpose is to achieve a company’s Goal. To facilitate the
local and multinational MNC’s companies in Pakistan,
especially in Mechanical Construction Projects and
other mechanical activities like maintenance,
fabrication, mechanical parts manufacturing also
supplied the mechatronics and automation systems
parts.
5
Geesol target to achieved the company’s Goal. Our
company’s goal to facilitate the following sectors of
industries especially in mechanical projects and in the
field of procurement
Industrial Sector’s
 Power Generation Plants
 Fertilizer Industry
 Oil & Gas Plants
 Chemical Industry
 Cement Industry
 Petro Chemical industry
 Sugar Mill
 Pharmaceuticals
 Food & Beverages
 Paper industries
 Feed mills
6
Commitment is dedication to a particular organization, cause, or
belief, and a willingness to get involved.
People who are committed to an organization or effort truly
believe that it is important, and they show up, follow through, and stick
with it.
The more people who are committed to your organization, the
greater the momentum you can generate to get the job done.
 Work together
 Feel successful at what they do
 Make decisions together
 Support one another's leadership
 Have fun and play together
 Overcome obstacles
 Hold each other to high principles
 Appreciate and respect one another
 Challenge one another to take the next step
 Build relationships
 Experience a victory together
 Learn from mistakes and setbacks
 See their leaders model commitment
7
8
1. TASK RISK ASSESSMENT
2. PERMIT TO WORK (PTW)
3. WORKING AT HEIGHTS
4. LIFTING OPERATION
5. ENERGY ISOLATION
6.GROUND DISTURBANCE
7. MANAGEMENT OF CHANG
8.CONFINED SPACE ENTRY
9
10
An organized and systematic effort to
identify and analyze the significance of
potential hazards associated with the
materials, equipment, instrumentation,
utilities, human actions (routine and non-
routine), and external factors that might
impact the process.
An authorizing document approved by a
responsible person, specifying the conditions
under which potentially hazardous or
interacting activities can take place. Suitable
precautions are given to ensure that the work
is done as safely as possible.
Working at heights of 2meters (6 feet) or higher
above the ground cannot proceed unless:
 A fixed platform is used with guard or hand rails,
verified by a competent person.
 Fall arrest equipment is that has:
 Proper anchor mounted preferably overhead
 Full body harness, using double latch self-locking snap
hooks at each connection
 Shock absorber
 Fall arrest equipment will limit free fall to 2 meters (6
feet) or less
 A visual inspection of the fall arrest equipment and
system is completed and any equipment that is
damaged or has been activated is taken out of service
 Person(s) are competent to perform the work
11
Lifting operations by their very nature can be
hazardous and result in incidents which can cause
personnel injuries, plant and equipment damage and
business loss. Hence, every lifting operation involving
lifting equipment must be:
 Properly planned by a competent person
 Appropriately Supervised
 Carried out in a Safe manner
Procedure for installing a mechanical device
that physically prevents the release of hazardous
energy in a running processing plant (electrical,
mechanical, hydraulic, pneumatic, chemical, thermal)
during servicing or maintenance, Fabrication and
Erection of plant and equipment
12
Ground disturbance can be defined as
housekeeping. House-keeping can be plays
an important role to avoid the accident at
your working site like waste of metals,
improper tools placements and unarranged
electric wires etc.
A storage tank, process vessel, ditch or
any other enclosure, with limited access /
egress, not designed or intended for human
occupancy except for purpose of
performing work, in which there may be an
oxygen-deficient atmosphere.
13
MOC is a proactive system having two-
fold objectives: firstly to challenge the need for
change and to critically analyze its wider
impacts on the business goals; and secondly to
evaluate, authorize and document changes
before they are made and to ensure proper
closure after the changes are completed. Its
purpose is to establish the procedures
necessary to ensure that the HSE and
operational risks arising from proposed
changes are managed to an acceptable level. It
is also an excellent communication tools to
inform impacted groups of areas that a change
is being considered and / or about to occur.
14
Every employee of Geesol shall ensure the
satisfaction of our customers by providing
them with the best value in every product and
service that carries the name of Geesol.
Geesol will create and retain satisfied
customers, offering for sale products or
services, which respond to customer’s
expectations.
Our customers will be supplied with
products and services of a given quality, to be
delivered by or be available by a given time, and
to be of a price which reflects value for money.
The policy of the company, for the
manufacture and construction of the work and
the services it provides, is clearly defined and
meets the requirement of quality.
15
Geesol places particular emphasis on:-
 Operation and maintenance of a safe system of work.
 Consistent achievement of the specified quality.
 Economy of manufacture and construction activities.
 Provision of Training and Instruction planned to suit
identified needs.
 Adherence to programs with best practices, and to comply
with all applicable requirements.
 Continual improvement of the effectiveness of the QMS
in all spheres, by establishing and reviewing quality
objectives.
These continual practices show that our internal
requirements are being met, whilst maintaining our
client’s requirements for examination, testing, checking
and certification while working within project
specifications and schedules
16
 Welding plants 10 no.
 Argon torches 07 no
 Grinder 9” 10 no.
 Grinder 4” 8 no
 Pencil Grinder 04 no.
 Vernier Caliper’s 0 4no.
 Dial indicators 02 no.
 Power Cutter 02 no.
 Hand drill machine 03 no.
 Pedestal Drill machines 01 no
 Hole saw’s upto 2” 02 no.
 Hilt’s 01 no.
 Bevel Protectors 02 no.
 Gas Cutter’s 03 no.
 Auto Cutter’s 01 no.
 Chain Block’s 05 no.
 Chain Puller’s 01 no.
 Hydrotesting pumps 01 no.
 Hydrotesting Assemblies 01 no.
 Sand Blasting Equipment 01 no.
17
18
In our business area, we have fulfill our
client industrial needs like gear boxes,
centrifugal pumps, screw pumps, hydraulic and
air cylinders, pneumatic & manual valves and
whole rubber and plastic equipment etc. with
the name of Madina Rubber and Amna Traders
Clients:-
 Packages limited
 Bulleh shah paper mill
 Haier
 Treet blades
 Baba fareed sugar mill
 Patoki sugar mill
19
In this business area we have started the
maintenance services. Initially we have completed
the maintenance services of valve’s upto 24” dia.
And in Quantity 112 no. different sizes within last
three months.
Also in this section we have started the
precision machined parts making like pulley’s,
shafts, gears, sliding mechanisms and provided
which once drawings etc.
Clients:-
 Bulleh shah paper mill
 Packages limited
20
We have sound proud privileged
to execute the following projects and
its short details
 METRO BUS 400 Tons
JAN, 2013
 PIPING BOILER 6000 DI
AUG, 2014
 PLANT PIPING 7780 DI
NOV, 2014
 ONGOING PROJECT 600 TONS
21
JAN, 2013
In Bus System Lahore. We have
served our the fast growing
infrastructure projects of Metro
fabrication and erection services of
steel structure & steel pedestrian
bridges in the Process Dynamics
Lahore PDL workshop over 300 tons
And in site we have erected the
canal bus stations 100 tons steel
structure as per Nespak drawings.
22
AUG, 2014
It’s a 31 MW combined cycle
power plant which have a poer
generation boiler 140 TPH at Ghotki
sugar mills power plant from Pak
Asia Engineering Company. This
boiler designed by HMC Texla with
the help of Avant Garde India as
consultant.
In this project we have done the
external piping which is upto 6000
dia. Inches.
23
NOV, 2014
This project is an energy
reducing project which converting
from gas burners to coal boiler. It’s
Rupali Polyester Polymer Plant at
sheikhupura Lahore road,
sheikhupura. In this project we have
done the SS Piping upto 7780 Dia.
inches from Steel Force Engineering
Company with in client required
time period.
24
May,2015
Currently we are working at
rawal pindi metro bus system
fabrication and erection work of
location cunturs bus station 100 ton
and Chaman pedestrian bridge 500
tons. That is in final and completion
stage.
25

More Related Content

What's hot

What's hot (20)

Company Profile Emelco Qatar1
Company Profile Emelco Qatar1Company Profile Emelco Qatar1
Company Profile Emelco Qatar1
 
Cv shravan 3
Cv shravan 3Cv shravan 3
Cv shravan 3
 
Ian Powell CV 27:04:16
Ian Powell CV 27:04:16 Ian Powell CV 27:04:16
Ian Powell CV 27:04:16
 
prashat resume
prashat resumeprashat resume
prashat resume
 
Standard Plastics
Standard PlasticsStandard Plastics
Standard Plastics
 
Cover Letter &C.V. of Vinod Gholap
Cover Letter &C.V. of Vinod GholapCover Letter &C.V. of Vinod Gholap
Cover Letter &C.V. of Vinod Gholap
 
Company PRofile new
Company PRofile newCompany PRofile new
Company PRofile new
 
Subrat Kumar Pradhan
Subrat Kumar PradhanSubrat Kumar Pradhan
Subrat Kumar Pradhan
 
Gensets & Pumps By Jakson & Company, New Delhi
Gensets & Pumps By Jakson & Company, New DelhiGensets & Pumps By Jakson & Company, New Delhi
Gensets & Pumps By Jakson & Company, New Delhi
 
tejinder Resume
tejinder Resumetejinder Resume
tejinder Resume
 
Jal catalog 1
Jal catalog 1Jal catalog 1
Jal catalog 1
 
CV-hakeem2016
CV-hakeem2016CV-hakeem2016
CV-hakeem2016
 
company profile
company profilecompany profile
company profile
 
Expansion Joints & Bellows By India Flex Engineering
Expansion Joints & Bellows By India Flex EngineeringExpansion Joints & Bellows By India Flex Engineering
Expansion Joints & Bellows By India Flex Engineering
 
Ajaya cv 1 1
Ajaya cv 1  1 Ajaya cv 1  1
Ajaya cv 1 1
 
Ardee Engineering Company profile
Ardee Engineering Company profileArdee Engineering Company profile
Ardee Engineering Company profile
 
Resume_B.E.chemical
Resume_B.E.chemicalResume_B.E.chemical
Resume_B.E.chemical
 
CV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHANCV_HARDIK_CHAUHAN
CV_HARDIK_CHAUHAN
 
Oil Industry Safety Directorate Training
Oil Industry Safety Directorate TrainingOil Industry Safety Directorate Training
Oil Industry Safety Directorate Training
 
jayesh new resume
jayesh new resumejayesh new resume
jayesh new resume
 

Similar to GEESOL MECHANICAL PRofile

Similar to GEESOL MECHANICAL PRofile (20)

Auspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _ProposalAuspicious_Profile_Teletalk(DT)_technical _Proposal
Auspicious_Profile_Teletalk(DT)_technical _Proposal
 
2015 Company Profile
2015 Company Profile2015 Company Profile
2015 Company Profile
 
ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1ALAQ ALEZDEHAR1
ALAQ ALEZDEHAR1
 
ADIMASU TAFESA CMPANY PROFILE 2-signed.pdf
ADIMASU TAFESA CMPANY PROFILE 2-signed.pdfADIMASU TAFESA CMPANY PROFILE 2-signed.pdf
ADIMASU TAFESA CMPANY PROFILE 2-signed.pdf
 
ADIMASU TAFESA CMPANY PROFILE 2-signed.pdf
ADIMASU TAFESA CMPANY PROFILE 2-signed.pdfADIMASU TAFESA CMPANY PROFILE 2-signed.pdf
ADIMASU TAFESA CMPANY PROFILE 2-signed.pdf
 
SELGO COMPANY PROFILE 2015
SELGO COMPANY PROFILE 2015SELGO COMPANY PROFILE 2015
SELGO COMPANY PROFILE 2015
 
PPM Corporate Profile
PPM Corporate ProfilePPM Corporate Profile
PPM Corporate Profile
 
4M Engineering Group Pty Ltd
4M Engineering Group Pty Ltd4M Engineering Group Pty Ltd
4M Engineering Group Pty Ltd
 
Green line profile
Green line profile Green line profile
Green line profile
 
Alkaiser Leading Projects.
Alkaiser Leading Projects.Alkaiser Leading Projects.
Alkaiser Leading Projects.
 
MMC Presentation
MMC PresentationMMC Presentation
MMC Presentation
 
Micro Presentation
Micro PresentationMicro Presentation
Micro Presentation
 
SKC ENGINEERING_Company Profile (Sep-2020).pptx
SKC ENGINEERING_Company Profile    (Sep-2020).pptxSKC ENGINEERING_Company Profile    (Sep-2020).pptx
SKC ENGINEERING_Company Profile (Sep-2020).pptx
 
KAYSON_Oil_and_Gas
KAYSON_Oil_and_GasKAYSON_Oil_and_Gas
KAYSON_Oil_and_Gas
 
BERR Industry / MAIN Presentation
BERR Industry / MAIN PresentationBERR Industry / MAIN Presentation
BERR Industry / MAIN Presentation
 
EMI Brochure
EMI Brochure  EMI Brochure
EMI Brochure
 
Company Profile_MIKCO Group
Company Profile_MIKCO GroupCompany Profile_MIKCO Group
Company Profile_MIKCO Group
 
Gapesco Profile 2021
Gapesco Profile 2021Gapesco Profile 2021
Gapesco Profile 2021
 
Techmar Industries LLC Presentation
Techmar Industries LLC PresentationTechmar Industries LLC Presentation
Techmar Industries LLC Presentation
 
Mosanada-UGL-Company-Profile
Mosanada-UGL-Company-ProfileMosanada-UGL-Company-Profile
Mosanada-UGL-Company-Profile
 

GEESOL MECHANICAL PRofile

  • 1. 1
  • 2. 2  Ceo’s message  Mission statement  Introduction to geesol  Projector sector’s  Commitment to work  Organogram  Geesol policies 1. Task risk assessment 2. Permit to work 3. Working at height 4. Lifting operation 5. Energy isolation 6. Ground disturbance 7. Confined space 8. Management of change  Quality policy  List of tools and equipment  Currently business area’s 1. General order supplier 2. Maintenance services 3. Project executed  Metro Bus 400 tons  Piping of boiler 6000 Dia. Inches  Plant piping 3970 Dia Inches  Ongoing project
  • 3. GEESOL has come a long way since its inception in 2011 and what started as a small-scale contracting company has now b e c o m i n g a l a r g e o r g a n i z a t i o n . GEESOL has continued to grow and expanding, adopting modern engineering equipment and maintaining strict and safe quality control checks under the supervision and leadership of highly-qualified project managers at every site. Client satisfaction is our primary focus and I truly believe that this has enabled us to win the loyalty and trust of all those who w e h a v e w o r k e d w i t h . Pakistan’s large population of over 2200 million offers great opportunity and potential in the field of Mechanical construction and engineering. Bright engineers and hard- working labor from all across the country, with the passion for building: making the perfect construction family at GEESOL. To ge t h e r we h o p e t o a c h i e ve g r e a t n e s s . Muhammad Naseer Aamer Chief Executive GEESOL (Global Energy Engineering Solutions) 3
  • 4. To be a leader in the markets we serve by providing quality Engineering solutions and superior service to our Clients, while learning from their feed back to set even higher standards for our products. To be a company that continuously enhances its superior technological competence to provide innovative engineering solutions to Client needs. To be a company that attracts and retains outstanding people by creating a culture that fosters openness and innovation, promotes individual growth and rewards initiative and performance. To be a company which combines its people, technology, management systems and market opportunities to achieve profitable growth while providing fair returns to its investors. To be a company that endeavors to set the highest standards in corporate ethics in serving the society. 4
  • 5. By the grace of ALLAH, GEESOL MECHANICAL is going to be One of Pakistan’s most renowned and experience names in Mechanical Engineering Services Company Since 2011. The dedicated services of our management, engineers and technically skilled staff have made Geesol Mechanical is a specialized organization in the fields of Fabrication, Erection, Procurement and vendor’s services. We have successfully met to our contractual obligations up to the entire satisfaction of our all local and multinational clients and consultants. Our major purpose is to achieve a company’s Goal. To facilitate the local and multinational MNC’s companies in Pakistan, especially in Mechanical Construction Projects and other mechanical activities like maintenance, fabrication, mechanical parts manufacturing also supplied the mechatronics and automation systems parts. 5
  • 6. Geesol target to achieved the company’s Goal. Our company’s goal to facilitate the following sectors of industries especially in mechanical projects and in the field of procurement Industrial Sector’s  Power Generation Plants  Fertilizer Industry  Oil & Gas Plants  Chemical Industry  Cement Industry  Petro Chemical industry  Sugar Mill  Pharmaceuticals  Food & Beverages  Paper industries  Feed mills 6
  • 7. Commitment is dedication to a particular organization, cause, or belief, and a willingness to get involved. People who are committed to an organization or effort truly believe that it is important, and they show up, follow through, and stick with it. The more people who are committed to your organization, the greater the momentum you can generate to get the job done.  Work together  Feel successful at what they do  Make decisions together  Support one another's leadership  Have fun and play together  Overcome obstacles  Hold each other to high principles  Appreciate and respect one another  Challenge one another to take the next step  Build relationships  Experience a victory together  Learn from mistakes and setbacks  See their leaders model commitment 7
  • 8. 8
  • 9. 1. TASK RISK ASSESSMENT 2. PERMIT TO WORK (PTW) 3. WORKING AT HEIGHTS 4. LIFTING OPERATION 5. ENERGY ISOLATION 6.GROUND DISTURBANCE 7. MANAGEMENT OF CHANG 8.CONFINED SPACE ENTRY 9
  • 10. 10 An organized and systematic effort to identify and analyze the significance of potential hazards associated with the materials, equipment, instrumentation, utilities, human actions (routine and non- routine), and external factors that might impact the process. An authorizing document approved by a responsible person, specifying the conditions under which potentially hazardous or interacting activities can take place. Suitable precautions are given to ensure that the work is done as safely as possible.
  • 11. Working at heights of 2meters (6 feet) or higher above the ground cannot proceed unless:  A fixed platform is used with guard or hand rails, verified by a competent person.  Fall arrest equipment is that has:  Proper anchor mounted preferably overhead  Full body harness, using double latch self-locking snap hooks at each connection  Shock absorber  Fall arrest equipment will limit free fall to 2 meters (6 feet) or less  A visual inspection of the fall arrest equipment and system is completed and any equipment that is damaged or has been activated is taken out of service  Person(s) are competent to perform the work 11
  • 12. Lifting operations by their very nature can be hazardous and result in incidents which can cause personnel injuries, plant and equipment damage and business loss. Hence, every lifting operation involving lifting equipment must be:  Properly planned by a competent person  Appropriately Supervised  Carried out in a Safe manner Procedure for installing a mechanical device that physically prevents the release of hazardous energy in a running processing plant (electrical, mechanical, hydraulic, pneumatic, chemical, thermal) during servicing or maintenance, Fabrication and Erection of plant and equipment 12
  • 13. Ground disturbance can be defined as housekeeping. House-keeping can be plays an important role to avoid the accident at your working site like waste of metals, improper tools placements and unarranged electric wires etc. A storage tank, process vessel, ditch or any other enclosure, with limited access / egress, not designed or intended for human occupancy except for purpose of performing work, in which there may be an oxygen-deficient atmosphere. 13
  • 14. MOC is a proactive system having two- fold objectives: firstly to challenge the need for change and to critically analyze its wider impacts on the business goals; and secondly to evaluate, authorize and document changes before they are made and to ensure proper closure after the changes are completed. Its purpose is to establish the procedures necessary to ensure that the HSE and operational risks arising from proposed changes are managed to an acceptable level. It is also an excellent communication tools to inform impacted groups of areas that a change is being considered and / or about to occur. 14
  • 15. Every employee of Geesol shall ensure the satisfaction of our customers by providing them with the best value in every product and service that carries the name of Geesol. Geesol will create and retain satisfied customers, offering for sale products or services, which respond to customer’s expectations. Our customers will be supplied with products and services of a given quality, to be delivered by or be available by a given time, and to be of a price which reflects value for money. The policy of the company, for the manufacture and construction of the work and the services it provides, is clearly defined and meets the requirement of quality. 15
  • 16. Geesol places particular emphasis on:-  Operation and maintenance of a safe system of work.  Consistent achievement of the specified quality.  Economy of manufacture and construction activities.  Provision of Training and Instruction planned to suit identified needs.  Adherence to programs with best practices, and to comply with all applicable requirements.  Continual improvement of the effectiveness of the QMS in all spheres, by establishing and reviewing quality objectives. These continual practices show that our internal requirements are being met, whilst maintaining our client’s requirements for examination, testing, checking and certification while working within project specifications and schedules 16
  • 17.  Welding plants 10 no.  Argon torches 07 no  Grinder 9” 10 no.  Grinder 4” 8 no  Pencil Grinder 04 no.  Vernier Caliper’s 0 4no.  Dial indicators 02 no.  Power Cutter 02 no.  Hand drill machine 03 no.  Pedestal Drill machines 01 no  Hole saw’s upto 2” 02 no.  Hilt’s 01 no.  Bevel Protectors 02 no.  Gas Cutter’s 03 no.  Auto Cutter’s 01 no.  Chain Block’s 05 no.  Chain Puller’s 01 no.  Hydrotesting pumps 01 no.  Hydrotesting Assemblies 01 no.  Sand Blasting Equipment 01 no. 17
  • 18. 18
  • 19. In our business area, we have fulfill our client industrial needs like gear boxes, centrifugal pumps, screw pumps, hydraulic and air cylinders, pneumatic & manual valves and whole rubber and plastic equipment etc. with the name of Madina Rubber and Amna Traders Clients:-  Packages limited  Bulleh shah paper mill  Haier  Treet blades  Baba fareed sugar mill  Patoki sugar mill 19
  • 20. In this business area we have started the maintenance services. Initially we have completed the maintenance services of valve’s upto 24” dia. And in Quantity 112 no. different sizes within last three months. Also in this section we have started the precision machined parts making like pulley’s, shafts, gears, sliding mechanisms and provided which once drawings etc. Clients:-  Bulleh shah paper mill  Packages limited 20
  • 21. We have sound proud privileged to execute the following projects and its short details  METRO BUS 400 Tons JAN, 2013  PIPING BOILER 6000 DI AUG, 2014  PLANT PIPING 7780 DI NOV, 2014  ONGOING PROJECT 600 TONS 21
  • 22. JAN, 2013 In Bus System Lahore. We have served our the fast growing infrastructure projects of Metro fabrication and erection services of steel structure & steel pedestrian bridges in the Process Dynamics Lahore PDL workshop over 300 tons And in site we have erected the canal bus stations 100 tons steel structure as per Nespak drawings. 22
  • 23. AUG, 2014 It’s a 31 MW combined cycle power plant which have a poer generation boiler 140 TPH at Ghotki sugar mills power plant from Pak Asia Engineering Company. This boiler designed by HMC Texla with the help of Avant Garde India as consultant. In this project we have done the external piping which is upto 6000 dia. Inches. 23
  • 24. NOV, 2014 This project is an energy reducing project which converting from gas burners to coal boiler. It’s Rupali Polyester Polymer Plant at sheikhupura Lahore road, sheikhupura. In this project we have done the SS Piping upto 7780 Dia. inches from Steel Force Engineering Company with in client required time period. 24
  • 25. May,2015 Currently we are working at rawal pindi metro bus system fabrication and erection work of location cunturs bus station 100 ton and Chaman pedestrian bridge 500 tons. That is in final and completion stage. 25