The document contains a peer assessment form for evaluating team members on a project. It has sections for evaluating up to four partners on their team value, readiness to work, team spirit, punctuality, collaboration, and the final product, with a maximum total score of 24 points per partner. Signatures are required at the bottom. A key explains that each aspect is scored from 1 to 4 points.