Ques I Ques II Ques III Ques IV Ques V (Ans)
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of Loss of Wages paid to Reduction in All of the All of the
production the workers sales above above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
maintenance cost
Increases Decreases Remain same
Any of the
above
Decreases
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Rectification
Problem–
Diagnosis –
Cause –
Rectification
Problem –
Measure –
Diagnosis –
Rectification
Problem–
Diagnosis –
Measure –
Rectification
Problem –
Cause –
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent TRUE FALSE TRUE
them from happening is the objective
of FMEA.
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
What is Maintainability?
The ease with
which the
aircraft can be
fixed
The ease with
which the
aircraft can
sustain damage
Vulnerability RCS detection
The ease with
which the
aircraft can be
fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
Which type of preventive
maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
Process
control
maintenance
Control
maintenance
Performance-
based
preventive
maintenance
Data-based
preventive
maintenance
Performance-
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
Which of the following loss refers
to the equipment’s inability to get
to steady state quickly after a
change?
Breakdown Start-up loss
Defects and
rework
Benchmarking Start-up loss
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
operating condition is known as
The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Rectification
Problem–
Diagnosis –
Cause –
Rectification
Problem –
Measure –
Diagnosis –
Rectification
Problem–
Diagnosis –
Measure –
Rectification
Problem –
Cause –
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the
objective of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
Establishing the economic life of
equipment that is essentially
utilized steadily each year One year Six month Three month Nine month One year
we can see that as the replacement
age of an item increases, the
operations and maintenance
(O&M) costs per unit time will increase decrease constant none of this increase
Reliability-centered maintenance
(RCM)
an asset-
centered
methodology
non asset-
centered
methodology
non asset-
exteriority
methodology
an asset-
exteriority
methodology
an asset-
centered
methodology
The high resale value associated
with a old vehicle 1-year 2-year 3-year 4-year 1-year
Optimal replacement interval for
capital Equipment:
maximization
of discounted
benefits
minimize of
discounted
benefits
average of
discounted
benefits none of this
maximization
of discounted
benefits
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Optimal Number Of Workshop
Machines
To Meet a
Fluctuating
Workload
To Meet a
remain,
Workload
To Meet a stay
Workload
To Meet a
continue
Workload
To Meet a
Fluctuating
Workload
Optimal size of a maintenance
workforce to meet a fluctuating
workload, taking
Account of
subcontracting
opportunities
Account of
contracting
opportunities
Account of
subcontracting
threat
None of this
Account of
subcontracting
opportunities
A statistical characteristic of
equipment frequently used in
replacement studies is the
hazard rate casualty risk random hazard rate
A study of maintenance personnel
concluded that those who ranked
highest possessed characteristics
as
More
experience
Less experience Inexperience None of this
More
experience
The failed system is repaired and
preventive maintenance is
performed
Periodically One year Two year Six year Periodically
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Total Productive Maintenance is a
systematic approach for
understanding the equipment's
function, the equipment's
relationship to product quality
and the likely cause and
frequency of
failure of the
critical
equipment
components.
failure of the
safe equipment
components.
failure of the
complimentary
equipment
components.
None of this
failure of the
critical
equipment
components.
Total Productive Maintenance
(TPM) aimed at
…………………equipment
effectiveness through the
optimization of equipment
availability, performances,
efficiency and product quality.
Maximizing Minimizing Average None of this Maximizing
Which maintenance the
continuous checking and
prevention of major maintenance.
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Preventive
Maintenance
which maintenance Correction of
problem when occur is very
important to run the production
process smoothly
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Corrective
Maintenance
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this Reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid to
the workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
Increases Decreases Remain same
Any of the
above
Decreases
maintenance cost
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Rectification
Problem–
Diagnosis –
Cause –
Rectification
Problem –
Measure –
Diagnosis –
Rectification
Problem–
Diagnosis –
Measure –
Rectification
Problem –
Cause –
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the objective
of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
What is Maintainability?
The ease with
which the
aircraft can be
fixed
The ease with
which the
aircraft can
sustain damage
Vulnerability RCS detection
The ease with
which the
aircraft can be
fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
Stock value of
the repairable
material in
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
following is correct? the
warehouse is
changed
Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
Which type of preventive
maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
Process
control
maintenance
Control
maintenance
Performance-
based
preventive
maintenance
Data-based
preventive
maintenance
Performance-
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
Which of the following loss refers Breakdown Start-up loss Defects and Benchmarking Start-up loss
to the equipment’s inability to get
to steady state quickly after a
change?
rework
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
operating condition is known as
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Problem–
Diagnosis –
Cause –
Problem –
Measure –
Diagnosis –
Problem–
Diagnosis –
Measure –
Problem –
Cause –
Diagnosis –
Rectification Rectification Rectification Rectification Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the
objective of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
Establishing the economic life of
equipment that is essentially
utilized steadily each year One year Six month Three month Nine month One year
we can see that as the replacement
age of an item increases, the
operations and maintenance
(O&M) costs per unit time will increase decrease constant none of this increase
Reliability-centered maintenance
(RCM)
an asset-
centered
methodology
non asset-
centered
methodology
non asset-
exteriority
methodology
an asset-
exteriority
methodology
an asset-
centered
methodology
The high resale value associated
with a old vehicle 1-year 2-year 3-year 4-year 1-year
Optimal replacement interval for
capital Equipment:
maximization
of discounted
benefits
minimize of
discounted
benefits
average of
discounted
benefits none of this
maximization
of discounted
benefits
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Optimal Number Of Workshop
Machines
To Meet a
Fluctuating
Workload
To Meet a
remain,
Workload
To Meet a stay
Workload
To Meet a
continue
Workload
To Meet a
Fluctuating
Workload
Optimal size of a maintenance
workforce to meet a fluctuating
workload, taking
Account of
subcontracting
opportunities
Account of
contracting
opportunities
Account of
subcontracting
threat
None of this
Account of
subcontracting
opportunities
A statistical characteristic of
equipment frequently used in
replacement studies is the
hazard rate casualty risk random hazard rate
A study of maintenance personnel
concluded that those who ranked
highest possessed characteristics
as
More
experience
Less experience Inexperience None of this
More
experience
The failed system is repaired and
preventive maintenance is
performed
Periodically One year Two year Six year Periodically
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Total Productive Maintenance is a
systematic approach for
understanding the equipment's
function, the equipment's
relationship to product quality
and the likely cause and
frequency of
failure of the
critical
equipment
components.
failure of the
safe equipment
components.
failure of the
complimentary
equipment
components.
None of this
failure of the
critical
equipment
components.
Total Productive Maintenance
(TPM) aimed at
…………………equipment
effectiveness through the
Maximizing Minimizing Average None of this Maximizing
optimization of equipment
availability, performances,
efficiency and product quality.
Which maintenance the
continuous checking and
prevention of major maintenance.
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Preventive
Maintenance
which maintenance Correction of
problem when occur is very
important to run the production
process smoothly
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Corrective
Maintenance
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this Reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid to
the workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
maintenance cost
Increases Decreases Remain same
Any of the
above
Decreases
A systematic approach for
maintenance is
Problem –
Cause –
Problem–
Diagnosis –
Problem –
Measure –
Problem–
Diagnosis –
Problem –
Cause –
Diagnosis –
Rectification
Cause –
Rectification
Diagnosis –
Rectification
Measure –
Rectification
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the objective
of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
What is Maintainability?
The ease with
which the
aircraft can be
The ease with
which the
aircraft can
Vulnerability RCS detection
The ease with
which the
aircraft can be
fixed sustain damage fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
changed
Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
Which type of preventive Process Control Performance- Data-based Performance-
maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
control
maintenance
maintenance based
preventive
maintenance
preventive
maintenance
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
Which of the following loss refers
to the equipment’s inability to get
Breakdown Start-up loss
Defects and
rework
Benchmarking Start-up loss
to steady state quickly after a
change?
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
operating condition is known as
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Problem–
Diagnosis –
Cause –
Problem –
Measure –
Diagnosis –
Problem–
Diagnosis –
Measure –
Problem –
Cause –
Diagnosis –
Rectification Rectification Rectification Rectification Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the
objective of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
Establishing the economic life of
equipment that is essentially
utilized steadily each year One year Six month Three month Nine month One year
we can see that as the replacement
age of an item increases, the
operations and maintenance
(O&M) costs per unit time will increase decrease constant none of this increase
Reliability-centered maintenance
(RCM)
an asset-
centered
methodology
non asset-
centered
methodology
non asset-
exteriority
methodology
an asset-
exteriority
methodology
an asset-
centered
methodology
The high resale value associated
with a old vehicle 1-year 2-year 3-year 4-year 1-year
Optimal replacement interval for
capital Equipment:
maximization
of discounted
benefits
minimize of
discounted
benefits
average of
discounted
benefits none of this
maximization
of discounted
benefits
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Optimal Number Of Workshop
Machines
To Meet a
Fluctuating
Workload
To Meet a
remain,
Workload
To Meet a stay
Workload
To Meet a
continue
Workload
To Meet a
Fluctuating
Workload
Optimal size of a maintenance
workforce to meet a fluctuating
workload, taking
Account of
subcontracting
opportunities
Account of
contracting
opportunities
Account of
subcontracting
threat
None of this
Account of
subcontracting
opportunities
A statistical characteristic of
equipment frequently used in
replacement studies is the
hazard rate casualty risk random hazard rate
A study of maintenance personnel
concluded that those who ranked
highest possessed characteristics
as
More
experience
Less experience Inexperience None of this
More
experience
The failed system is repaired and
preventive maintenance is
performed
Periodically One year Two year Six year Periodically
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Total Productive Maintenance is a
systematic approach for
understanding the equipment's
function, the equipment's
relationship to product quality
and the likely cause and
frequency of
failure of the
critical
equipment
components.
failure of the
safe equipment
components.
failure of the
complimentary
equipment
components.
None of this
failure of the
critical
equipment
components.
Total Productive Maintenance
(TPM) aimed at
…………………equipment
effectiveness through the
Maximizing Minimizing Average None of this Maximizing
optimization of equipment
availability, performances,
efficiency and product quality.
Which maintenance the
continuous checking and
prevention of major maintenance.
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Preventive
Maintenance
which maintenance Correction of
problem when occur is very
important to run the production
process smoothly
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Corrective
Maintenance
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this Reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid to
the workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
maintenance cost
Increases Decreases Remain same
Any of the
above
Decreases
A systematic approach for
maintenance is
Problem –
Cause –
Problem–
Diagnosis –
Problem –
Measure –
Problem–
Diagnosis –
Problem –
Cause –
Diagnosis –
Rectification
Cause –
Rectification
Diagnosis –
Rectification
Measure –
Rectification
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the objective
of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
What is Maintainability?
The ease with
which the
aircraft can be
The ease with
which the
aircraft can
Vulnerability RCS detection
The ease with
which the
aircraft can be
fixed sustain damage fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
changed
Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
Which type of preventive Process Control Performance- Data-based Performance-
maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
control
maintenance
maintenance based
preventive
maintenance
preventive
maintenance
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
Which of the following loss refers
to the equipment’s inability to get
Breakdown Start-up loss
Defects and
rework
Benchmarking Start-up loss
to steady state quickly after a
change?
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
operating condition is known as
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Problem–
Diagnosis –
Cause –
Problem –
Measure –
Diagnosis –
Problem–
Diagnosis –
Measure –
Problem –
Cause –
Diagnosis –
Rectification Rectification Rectification Rectification Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the
objective of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
Establishing the economic life of
equipment that is essentially
utilized steadily each year One year Six month Three month Nine month One year
we can see that as the replacement
age of an item increases, the
operations and maintenance
(O&M) costs per unit time will increase decrease constant none of this increase
Reliability-centered maintenance
(RCM)
an asset-
centered
methodology
non asset-
centered
methodology
non asset-
exteriority
methodology
an asset-
exteriority
methodology
an asset-
centered
methodology
The high resale value associated
with a old vehicle 1-year 2-year 3-year 4-year 1-year
Optimal replacement interval for
capital Equipment:
maximization
of discounted
benefits
minimize of
discounted
benefits
average of
discounted
benefits none of this
maximization
of discounted
benefits
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Optimal Number Of Workshop
Machines
To Meet a
Fluctuating
Workload
To Meet a
remain,
Workload
To Meet a stay
Workload
To Meet a
continue
Workload
To Meet a
Fluctuating
Workload
Optimal size of a maintenance
workforce to meet a fluctuating
workload, taking
Account of
subcontracting
opportunities
Account of
contracting
opportunities
Account of
subcontracting
threat
None of this
Account of
subcontracting
opportunities
A statistical characteristic of
equipment frequently used in
replacement studies is the
hazard rate casualty risk random hazard rate
A study of maintenance personnel
concluded that those who ranked
highest possessed characteristics
as
More
experience
Less experience Inexperience None of this
More
experience
The failed system is repaired and
preventive maintenance is
performed
Periodically One year Two year Six year Periodically
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Total Productive Maintenance is a
systematic approach for
understanding the equipment's
function, the equipment's
relationship to product quality
and the likely cause and
frequency of
failure of the
critical
equipment
components.
failure of the
safe equipment
components.
failure of the
complimentary
equipment
components.
None of this
failure of the
critical
equipment
components.
Total Productive Maintenance
(TPM) aimed at
…………………equipment
effectiveness through the
Maximizing Minimizing Average None of this Maximizing
optimization of equipment
availability, performances,
efficiency and product quality.
Which maintenance the
continuous checking and
prevention of major maintenance.
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Preventive
Maintenance
which maintenance Correction of
problem when occur is very
important to run the production
process smoothly
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Corrective
Maintenance
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this Reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid to
the workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
maintenance cost
Increases Decreases Remain same
Any of the
above
Decreases
A systematic approach for
maintenance is
Problem –
Cause –
Problem–
Diagnosis –
Problem –
Measure –
Problem–
Diagnosis –
Problem –
Cause –
Diagnosis –
Rectification
Cause –
Rectification
Diagnosis –
Rectification
Measure –
Rectification
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the objective
of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
What is Maintainability?
The ease with
which the
aircraft can be
The ease with
which the
aircraft can
Vulnerability RCS detection
The ease with
which the
aircraft can be
fixed sustain damage fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
changed
Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
Which type of preventive Process Control Performance- Data-based Performance-
maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
control
maintenance
maintenance based
preventive
maintenance
preventive
maintenance
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
Which of the following loss refers
to the equipment’s inability to get
Breakdown Start-up loss
Defects and
rework
Benchmarking Start-up loss
to steady state quickly after a
change?
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
operating condition is known as
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Problem–
Diagnosis –
Cause –
Problem –
Measure –
Diagnosis –
Problem–
Diagnosis –
Measure –
Problem –
Cause –
Diagnosis –
Rectification Rectification Rectification Rectification Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the
objective of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
Establishing the economic life of
equipment that is essentially
utilized steadily each year One year Six month Three month Nine month One year
we can see that as the replacement
age of an item increases, the
operations and maintenance
(O&M) costs per unit time will increase decrease constant none of this increase
Reliability-centered maintenance
(RCM)
an asset-
centered
methodology
non asset-
centered
methodology
non asset-
exteriority
methodology
an asset-
exteriority
methodology
an asset-
centered
methodology
The high resale value associated
with a old vehicle 1-year 2-year 3-year 4-year 1-year
Optimal replacement interval for
capital Equipment:
maximization
of discounted
benefits
minimize of
discounted
benefits
average of
discounted
benefits none of this
maximization
of discounted
benefits
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Optimal Number Of Workshop
Machines
To Meet a
Fluctuating
Workload
To Meet a
remain,
Workload
To Meet a stay
Workload
To Meet a
continue
Workload
To Meet a
Fluctuating
Workload
Optimal size of a maintenance
workforce to meet a fluctuating
workload, taking
Account of
subcontracting
opportunities
Account of
contracting
opportunities
Account of
subcontracting
threat
None of this
Account of
subcontracting
opportunities
A statistical characteristic of
equipment frequently used in
replacement studies is the
hazard rate casualty risk random hazard rate
A study of maintenance personnel
concluded that those who ranked
highest possessed characteristics
as
More
experience
Less experience Inexperience None of this
More
experience
The failed system is repaired and
preventive maintenance is
performed
Periodically One year Two year Six year Periodically
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Total Productive Maintenance is a
systematic approach for
understanding the equipment's
function, the equipment's
relationship to product quality
and the likely cause and
frequency of
failure of the
critical
equipment
components.
failure of the
safe equipment
components.
failure of the
complimentary
equipment
components.
None of this
failure of the
critical
equipment
components.
Total Productive Maintenance
(TPM) aimed at
…………………equipment
effectiveness through the
Maximizing Minimizing Average None of this Maximizing
optimization of equipment
availability, performances,
efficiency and product quality.
Which maintenance the
continuous checking and
prevention of major maintenance.
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Preventive
Maintenance
which maintenance Correction of
problem when occur is very
important to run the production
process smoothly
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Corrective
Maintenance
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this Reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid to
the workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
maintenance cost
Increases Decreases Remain same
Any of the
above
Decreases
A systematic approach for
maintenance is
Problem –
Cause –
Problem–
Diagnosis –
Problem –
Measure –
Problem–
Diagnosis –
Problem –
Cause –
Diagnosis –
Rectification
Cause –
Rectification
Diagnosis –
Rectification
Measure –
Rectification
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the objective
of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
What is Maintainability?
The ease with
which the
aircraft can be
The ease with
which the
aircraft can
Vulnerability RCS detection
The ease with
which the
aircraft can be
fixed sustain damage fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
changed
Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
Which type of preventive Process Control Performance- Data-based Performance-
maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
control
maintenance
maintenance based
preventive
maintenance
preventive
maintenance
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
Which of the following loss refers
to the equipment’s inability to get
Breakdown Start-up loss
Defects and
rework
Benchmarking Start-up loss
to steady state quickly after a
change?
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
operating condition is known as
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Problem–
Diagnosis –
Cause –
Problem –
Measure –
Diagnosis –
Problem–
Diagnosis –
Measure –
Problem –
Cause –
Diagnosis –
Essential Maintenance Concepts
Essential Maintenance Concepts
Essential Maintenance Concepts
Essential Maintenance Concepts

More Related Content

What's hot

002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]lcgg59
 
Floyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenanceFloyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenanceFloyd Patterson
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.Hal Frohreich
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered MaintenanceRonald Shewchuk
 
Types of Maintenance Evaluation
Types of Maintenance EvaluationTypes of Maintenance Evaluation
Types of Maintenance EvaluationRohit Arora
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenancefljungbe
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Sanjeev Deshmukh
 
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997Ricky Smith CMRP, CMRT
 
Maintenance Strategies for SMEs
Maintenance Strategies for SMEs Maintenance Strategies for SMEs
Maintenance Strategies for SMEs Patrick Chester
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAshok Muthusamy
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)ranviry49
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenanceJames Shearer
 
Maintenance strategy
Maintenance strategyMaintenance strategy
Maintenance strategygumma alsgier
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018Timothy Wooi
 

What's hot (20)

002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]
 
Floyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenanceFloyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenance
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
 
Types of Maintenance Evaluation
Types of Maintenance EvaluationTypes of Maintenance Evaluation
Types of Maintenance Evaluation
 
Maintenance and Asset Management
Maintenance and Asset ManagementMaintenance and Asset Management
Maintenance and Asset Management
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
Preventive maintenance
Preventive maintenance Preventive maintenance
Preventive maintenance
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenance
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997SMRP (1997) Proactive Maintenance Slides by John Day - 1997
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
 
Maintenance Strategies for SMEs
Maintenance Strategies for SMEs Maintenance Strategies for SMEs
Maintenance Strategies for SMEs
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Asset Managment
Asset ManagmentAsset Managment
Asset Managment
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
Maintenance strategy
Maintenance strategyMaintenance strategy
Maintenance strategy
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Lubrication Maturity Matrix
Lubrication Maturity MatrixLubrication Maturity Matrix
Lubrication Maturity Matrix
 
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
Total Productive Maintenance (TPM) for EVERTS  20Aug2018Total Productive Maintenance (TPM) for EVERTS  20Aug2018
Total Productive Maintenance (TPM) for EVERTS 20Aug2018
 

Similar to Essential Maintenance Concepts

Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programshossam hassanein
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenancefljungbe
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementBisina Keshara
 
IMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEIMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEDrBiz Arikrishnan
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET Journal
 
tpm main.pptx
tpm main.pptxtpm main.pptx
tpm main.pptxEzraDhigo
 
Reliability Presentation
Reliability PresentationReliability Presentation
Reliability Presentationematzan
 
Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Sushil Anand
 

Similar to Essential Maintenance Concepts (20)

Implementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programsImplementing effective preventive and predictive maintenance programs
Implementing effective preventive and predictive maintenance programs
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenance
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Rcm
RcmRcm
Rcm
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
IMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEIMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCE
 
Ole training
Ole trainingOle training
Ole training
 
OLE training
OLE trainingOLE training
OLE training
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
tpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadamtpm tracking for machine shope--by ganesh kadam
tpm tracking for machine shope--by ganesh kadam
 
tpm main.pptx
tpm main.pptxtpm main.pptx
tpm main.pptx
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
Reliability Presentation
Reliability PresentationReliability Presentation
Reliability Presentation
 
Lecture 1 - part 1.pptx
Lecture 1 - part 1.pptxLecture 1 - part 1.pptx
Lecture 1 - part 1.pptx
 
Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011
 

More from Er.JOE.S 09943145604

More from Er.JOE.S 09943145604 (16)

Video Link for Materials Testing.docx
Video Link for Materials Testing.docxVideo Link for Materials Testing.docx
Video Link for Materials Testing.docx
 
2 marks heat and mass transfer
2 marks   heat and mass transfer2 marks   heat and mass transfer
2 marks heat and mass transfer
 
Cams
CamsCams
Cams
 
Me8492 kinematics of machinery material
Me8492 kinematics of machinery materialMe8492 kinematics of machinery material
Me8492 kinematics of machinery material
 
Kom lecture notes
Kom lecture notesKom lecture notes
Kom lecture notes
 
Engineeringthermodynamicsintroduction 170621082938
Engineeringthermodynamicsintroduction 170621082938Engineeringthermodynamicsintroduction 170621082938
Engineeringthermodynamicsintroduction 170621082938
 
Engineeringthermodynamicsintroduction 170621082938
Engineeringthermodynamicsintroduction 170621082938Engineeringthermodynamicsintroduction 170621082938
Engineeringthermodynamicsintroduction 170621082938
 
99925260 kom-unit-1-ppt
99925260 kom-unit-1-ppt99925260 kom-unit-1-ppt
99925260 kom-unit-1-ppt
 
Optimization on performance of single-slope solar still linked solar pond via...
Optimization on performance of single-slope solar still linked solar pond via...Optimization on performance of single-slope solar still linked solar pond via...
Optimization on performance of single-slope solar still linked solar pond via...
 
Enhancing the productivity of double slope single basin solar still with inte...
Enhancing the productivity of double slope single basin solar still with inte...Enhancing the productivity of double slope single basin solar still with inte...
Enhancing the productivity of double slope single basin solar still with inte...
 
80 2017 27
80 2017 2780 2017 27
80 2017 27
 
10 002
10 00210 002
10 002
 
2
22
2
 
1
11
1
 
Brochure rd - fxec
Brochure   rd - fxecBrochure   rd - fxec
Brochure rd - fxec
 
Lab details
Lab detailsLab details
Lab details
 

Recently uploaded

VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...Suhani Kapoor
 
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...Suhani Kapoor
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...Suhani Kapoor
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawnitinraj1000000
 
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
VIP Call Girls Moti Ganpur ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With R...
 
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Aditi Call 7001035870 Meet With Nagpur Escorts
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
VIP Call Girls Mahadevpur Colony ( Hyderabad ) Phone 8250192130 | ₹5k To 25k ...
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Green Banking
Green Banking Green Banking
Green Banking
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
 
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
VIP Call Girls Saharanpur Aaradhya 8250192130 Independent Escort Service Saha...
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
VIP Call Girls Service Tolichowki Hyderabad Call +91-8250192130
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
Call Girls In Delhi 9953056974 (Low Price) Escort Service Pushp Vihar
Call Girls In Delhi 9953056974 (Low Price) Escort Service Pushp ViharCall Girls In Delhi 9953056974 (Low Price) Escort Service Pushp Vihar
Call Girls In Delhi 9953056974 (Low Price) Escort Service Pushp Vihar
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
ENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental lawENVIRONMENTAL LAW ppt on laws of environmental law
ENVIRONMENTAL LAW ppt on laws of environmental law
 
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escorts
 

Essential Maintenance Concepts

  • 1. Ques I Ques II Ques III Ques IV Ques V (Ans) To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above Which of the following is not the responsibility of maintenance department ? Breakdown maintenance Protection against fire hazards To keep machine in good condition None of the above None of the above Which of the following is types of Maintenance ? Condition- Based Maintenance Predictive maintenance Preventive maintenance All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as Down time Break Down time Both (A) and (B) Idle time Both (A) and (B) The down time cost consists of Loss of Wages paid to Reduction in All of the All of the
  • 2. production the workers sales above above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Scheduled maintenance is _______ between breakdown maintenance and the preventive maintenance. Joint Compromise Bridge In Compromise Equipment history cards are meant to record The way equipment behaves Total down time of the equipment The rate at which different components wear off All of the above Total down time of the equipment The ____ goes on increasing with the increase in degree of maintenance efforts. Cost of down time Cost of spares and maintenance Labour and Overhead Cost All of the above Labour and Overhead Cost With the increase in preventive maintenance cost, breakdown maintenance cost Increases Decreases Remain same Any of the above Decreases A systematic approach for maintenance is Problem – Cause – Diagnosis – Rectification Problem– Diagnosis – Cause – Rectification Problem – Measure – Diagnosis – Rectification Problem– Diagnosis – Measure – Rectification Problem – Cause – Diagnosis – Rectification (Down time in hours / Available hours) = Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Maintenance effectiveness (Number of breakdowns / Available machine hours) Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Frequency of breakdown Total productive maintenance aims at Less idle time Increase in productivity Zero down time None of the above Zero down time To anticipate failures and prevent TRUE FALSE TRUE
  • 3. them from happening is the objective of FMEA. Find the odd one out related to the FMEA team. Assembly engineer Manufacturing engineer Quality engineer Process variability data Process variability data Find the odd one out related to the data inputs required to prepare FMEA. Product and process specifications Reliability data Customer priority data Quality engineer Quality engineer Which of the following is not a benefit of FMEA? Increase in customer satisfaction Prioritize product/process deficiencies Maximize late changes and associated cost Document and track actions taken to reduce risk Maximize late changes and associated cost A particular product has been given the following rankings for calculating RPN while preparing FMEA chart, S=10, O=2, D=2. What is the value of RPN? 20 10 40 2 40 What is Maintainability? The ease with which the aircraft can be fixed The ease with which the aircraft can sustain damage Vulnerability RCS detection The ease with which the aircraft can be fixed There are four stages of FMEA. i) Specifyingthe possibilities ii) Quantifying risk iii) Correcting high risk causes iv) Re-evaluation of Risk Which is the correct order of proceeding with these stages of FMEA? i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv) According to common industry scale, what does severity ranking (S) 1 indicate? Very serious effect No effect Sometimes serious effect The value doesn’t exist No effect
  • 4. Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution Which of the following is not a function of SAP Plant Maintenance? Inspection and Notifications Corrective and Preventive Maintenance Breakdown Maintenance Material Requirement Planning (MRP) run Material Requirement Planning (MRP) run Which of the following is used to define the sequence of activities that are performed as part of Preventive Maintenance in an organization? Task Lists Notification Work Order Maintenance Order Task Lists In Plant Maintenance, after refurbishment is done and material is returned, which of the following is correct? Stock value of the repairable material in the warehouse is changed Charges to the cost center changes A credit memo is applied to the order All of the above All of the above
  • 5. Which of the following is correct? Maintenance Plan Type Maintenance Strategy 1) Single cycle plan, time-based - No 2) Single cycle plan, performance- based - No 3) Strategy plan, time-based - Yes 4) Strategy plan, performance- based - Yes 5) Multiple counter plan - No 1,2,3 are correct 1,2,3,4 are correct 2,3,4,5 are correct 1,2,3,4,5 are correct 1,2,3,4,5 are correct Which of the following correctly defines a Maintenance Plant? Maintenance Department Plant at which maintenance activities are planned Plant at which Maintenance of material done A plant in which the technical objects of a company are installed A plant in which the technical objects of a company are installed Assume a scenario where a system engineer accidentally entered a functional location with an incorrect label. Flow do you correct it without making a new entry? Alternative Labeling Changing the primary key Duplicate Labeling Flierarchical Labeling Alternative Labeling
  • 6. Which type of preventive maintenance enables you to plan maintenance based on counter reading that are managed for the technical objects to be maintained? Process control maintenance Control maintenance Performance- based preventive maintenance Data-based preventive maintenance Performance- based preventive maintenance Which types of task list are object- based and created for a specific, individual piece of equipment? Task lists for functional locations General maintenance task lists Equipment task list Preventive task list Equipment task list What happens if no scheduling period is defined in the maintenance plan when the current waiting call is converted into an order? Order will not be processed Order is blocked A new planned date is automatically added Previous scheduling date will be entered A new planned date is automatically added Which of the following is not a type of loss examined by TPM? Down-time loss Speed loss Defect loss Forecasting loss Forecasting loss Which of the following loss refers to the gradual deterioration in equipment cycle times? Increased speed Reduced speed Maximum speed Optimum speed Reduced speed Which of the following is not a loss that TPM focuses on reducing? Equipment breakdown Defects and rework Idling and minor stoppages Optimized equipment cycle time Optimized equipment cycle time Which of the following is not a goal shared by TPM? Zero defects Maximum productivity Minimum productivity Zero breakdowns Minimum productivity Which pillar of TPM focuses on routine maintenance? Training and Education Just-in-time 5S Autonomous maintenance Autonomous maintenance Which of the following is not an advantage of autonomous maintenance? Sense of ownership in operators Increases operator knowledge of equipment Ensures clean and lubricated equipment Demotes customer satisfaction Demotes customer satisfaction
  • 7. Which of the following loss refers to the equipment’s inability to get to steady state quickly after a change? Breakdown Start-up loss Defects and rework Benchmarking Start-up loss Which of the following is the most reasonable time taken by an organization to implement TPM? Two days Three years Five days Fifty years Three years Quality is improved as a result , that the failures and malfunctions are reduced reduced Increased constant None of this reduced To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into Down time Break Down time Both (A) and (B) Idle time Both (A) and (B)
  • 8. operating condition is known as The down time cost consists of Loss of production Wages paid to the workers Reduction in sales All of the above All of the above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance Belt of an electric motor is broken, it needs Corrective maintenance Scheduled maintenance Preventive maintenance Timely maintenance Corrective maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution The total cost of the replacement must be greater after failure than before. This may be caused by A greater loss of production because replacement A greater profit of production because replacement A avg profit of production because replacement None of this A greater loss of production because replacement The hazard rate of equipment must be increasing before preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile the optimal frequency of inspection and associated ……….. maintenance of complex equipment. Minor Major Primary None of this Minor To reduce the number of failures, preventive replacements can be scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
  • 9. A systematic approach for maintenance is Problem – Cause – Diagnosis – Rectification Problem– Diagnosis – Cause – Rectification Problem – Measure – Diagnosis – Rectification Problem– Diagnosis – Measure – Rectification Problem – Cause – Diagnosis – Rectification (Down time in hours / Available hours) = Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Maintenance effectiveness (Number of breakdowns / Available machine hours) Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Frequency of breakdown Total productive maintenance aims at Less idle time Increase in productivity Zero down time None of the above Zero down time To anticipate failures and prevent them from happening is the objective of FMEA. TRUE FALSE TRUE Find the odd one out related to the FMEA team. Assembly engineer Manufacturing engineer Quality engineer Process variability data Process variability data Find the odd one out related to the data inputs required to prepare FMEA. Product and process specifications Reliability data Customer priority data Quality engineer Quality engineer Which of the following is not a benefit of FMEA? Increase in customer satisfaction Prioritize product/process deficiencies Maximize late changes and associated cost Document and track actions taken to reduce risk Maximize late changes and associated cost Establishing the economic life of equipment that is essentially utilized steadily each year One year Six month Three month Nine month One year we can see that as the replacement age of an item increases, the operations and maintenance (O&M) costs per unit time will increase decrease constant none of this increase
  • 10. Reliability-centered maintenance (RCM) an asset- centered methodology non asset- centered methodology non asset- exteriority methodology an asset- exteriority methodology an asset- centered methodology The high resale value associated with a old vehicle 1-year 2-year 3-year 4-year 1-year Optimal replacement interval for capital Equipment: maximization of discounted benefits minimize of discounted benefits average of discounted benefits none of this maximization of discounted benefits Which of the following is not a function of SAP Plant Maintenance? Inspection and Notifications Corrective and Preventive Maintenance Breakdown Maintenance Material Requirement Planning (MRP) run Material Requirement Planning (MRP) run Which of the following is used to define the sequence of activities that are performed as part of Preventive Maintenance in an organization? Task Lists Notification Work Order Maintenance Order Task Lists In Plant Maintenance, after refurbishment is done and material is returned, which of the following is correct? Stock value of the repairable material in the warehouse is changed Charges to the cost center changes A credit memo is applied to the order All of the above All of the above Which of the following correctly defines a Maintenance Plant? Maintenance Department Plant at which maintenance activities are planned Plant at which Maintenance of material done A plant in which the technical objects of a company are installed A plant in which the technical objects of a company are installed Optimal Number Of Workshop Machines To Meet a Fluctuating Workload To Meet a remain, Workload To Meet a stay Workload To Meet a continue Workload To Meet a Fluctuating Workload
  • 11. Optimal size of a maintenance workforce to meet a fluctuating workload, taking Account of subcontracting opportunities Account of contracting opportunities Account of subcontracting threat None of this Account of subcontracting opportunities A statistical characteristic of equipment frequently used in replacement studies is the hazard rate casualty risk random hazard rate A study of maintenance personnel concluded that those who ranked highest possessed characteristics as More experience Less experience Inexperience None of this More experience The failed system is repaired and preventive maintenance is performed Periodically One year Two year Six year Periodically Which of the following is not a type of loss examined by TPM? Down-time loss Speed loss Defect loss Forecasting loss Forecasting loss Which of the following loss refers to the gradual deterioration in equipment cycle times? Increased speed Reduced speed Maximum speed Optimum speed Reduced speed Which of the following is not a loss that TPM focuses on reducing? Equipment breakdown Defects and rework Idling and minor stoppages Optimized equipment cycle time Optimized equipment cycle time Which of the following is not a goal shared by TPM? Zero defects Maximum productivity Minimum productivity Zero breakdowns Minimum productivity Total Productive Maintenance is a systematic approach for understanding the equipment's function, the equipment's relationship to product quality and the likely cause and frequency of failure of the critical equipment components. failure of the safe equipment components. failure of the complimentary equipment components. None of this failure of the critical equipment components.
  • 12. Total Productive Maintenance (TPM) aimed at …………………equipment effectiveness through the optimization of equipment availability, performances, efficiency and product quality. Maximizing Minimizing Average None of this Maximizing Which maintenance the continuous checking and prevention of major maintenance. Preventive Maintenance Corrective Maintenance Condition- Based Maintenanc Predictive Maintenance Preventive Maintenance which maintenance Correction of problem when occur is very important to run the production process smoothly Preventive Maintenance Corrective Maintenance Condition- Based Maintenanc Predictive Maintenance Corrective Maintenance Quality is improved as a result , that the failures and malfunctions are reduced reduced Increased constant None of this Reduced To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above
  • 13. Which of the following is not the responsibility of maintenance department ? Breakdown maintenance Protection against fire hazards To keep machine in good condition None of the above None of the above Which of the following is types of Maintenance ? Condition- Based Maintenance Predictive maintenance Preventive maintenance All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as Down time Break Down time Both (A) and (B) Idle time Both (A) and (B) The down time cost consists of Loss of production Wages paid to the workers Reduction in sales All of the above All of the above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Scheduled maintenance is _______ between breakdown maintenance and the preventive maintenance. Joint Compromise Bridge In Compromise Equipment history cards are meant to record The way equipment behaves Total down time of the equipment The rate at which different components wear off All of the above Total down time of the equipment The ____ goes on increasing with the increase in degree of maintenance efforts. Cost of down time Cost of spares and maintenance Labour and Overhead Cost All of the above Labour and Overhead Cost With the increase in preventive maintenance cost, breakdown Increases Decreases Remain same Any of the above Decreases
  • 14. maintenance cost A systematic approach for maintenance is Problem – Cause – Diagnosis – Rectification Problem– Diagnosis – Cause – Rectification Problem – Measure – Diagnosis – Rectification Problem– Diagnosis – Measure – Rectification Problem – Cause – Diagnosis – Rectification (Down time in hours / Available hours) = Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Maintenance effectiveness (Number of breakdowns / Available machine hours) Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Frequency of breakdown Total productive maintenance aims at Less idle time Increase in productivity Zero down time None of the above Zero down time To anticipate failures and prevent them from happening is the objective of FMEA. TRUE FALSE TRUE Find the odd one out related to the FMEA team. Assembly engineer Manufacturing engineer Quality engineer Process variability data Process variability data Find the odd one out related to the data inputs required to prepare FMEA. Product and process specifications Reliability data Customer priority data Quality engineer Quality engineer Which of the following is not a benefit of FMEA? Increase in customer satisfaction Prioritize product/process deficiencies Maximize late changes and associated cost Document and track actions taken to reduce risk Maximize late changes and associated cost A particular product has been given the following rankings for calculating RPN while preparing FMEA chart, S=10, O=2, D=2. What is the value of RPN? 20 10 40 2 40
  • 15. What is Maintainability? The ease with which the aircraft can be fixed The ease with which the aircraft can sustain damage Vulnerability RCS detection The ease with which the aircraft can be fixed There are four stages of FMEA. i) Specifyingthe possibilities ii) Quantifying risk iii) Correcting high risk causes iv) Re-evaluation of Risk Which is the correct order of proceeding with these stages of FMEA? i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv) According to common industry scale, what does severity ranking (S) 1 indicate? Very serious effect No effect Sometimes serious effect The value doesn’t exist No effect Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution Which of the following is not a function of SAP Plant Maintenance? Inspection and Notifications Corrective and Preventive Maintenance Breakdown Maintenance Material Requirement Planning (MRP) run Material Requirement Planning (MRP) run Which of the following is used to define the sequence of activities that are performed as part of Preventive Maintenance in an organization? Task Lists Notification Work Order Maintenance Order Task Lists In Plant Maintenance, after refurbishment is done and material is returned, which of the Stock value of the repairable material in Charges to the cost center changes A credit memo is applied to the order All of the above All of the above
  • 16. following is correct? the warehouse is changed Which of the following is correct? Maintenance Plan Type Maintenance Strategy 1) Single cycle plan, time-based - No 2) Single cycle plan, performance- based - No 3) Strategy plan, time-based - Yes 4) Strategy plan, performance- based - Yes 5) Multiple counter plan - No 1,2,3 are correct 1,2,3,4 are correct 2,3,4,5 are correct 1,2,3,4,5 are correct 1,2,3,4,5 are correct Which of the following correctly defines a Maintenance Plant? Maintenance Department Plant at which maintenance activities are planned Plant at which Maintenance of material done A plant in which the technical objects of a company are installed A plant in which the technical objects of a company are installed Assume a scenario where a system engineer accidentally entered a functional location with an incorrect label. Flow do you correct it without making a new entry? Alternative Labeling Changing the primary key Duplicate Labeling Flierarchical Labeling Alternative Labeling
  • 17. Which type of preventive maintenance enables you to plan maintenance based on counter reading that are managed for the technical objects to be maintained? Process control maintenance Control maintenance Performance- based preventive maintenance Data-based preventive maintenance Performance- based preventive maintenance Which types of task list are object- based and created for a specific, individual piece of equipment? Task lists for functional locations General maintenance task lists Equipment task list Preventive task list Equipment task list What happens if no scheduling period is defined in the maintenance plan when the current waiting call is converted into an order? Order will not be processed Order is blocked A new planned date is automatically added Previous scheduling date will be entered A new planned date is automatically added Which of the following is not a type of loss examined by TPM? Down-time loss Speed loss Defect loss Forecasting loss Forecasting loss Which of the following loss refers to the gradual deterioration in equipment cycle times? Increased speed Reduced speed Maximum speed Optimum speed Reduced speed Which of the following is not a loss that TPM focuses on reducing? Equipment breakdown Defects and rework Idling and minor stoppages Optimized equipment cycle time Optimized equipment cycle time Which of the following is not a goal shared by TPM? Zero defects Maximum productivity Minimum productivity Zero breakdowns Minimum productivity Which pillar of TPM focuses on routine maintenance? Training and Education Just-in-time 5S Autonomous maintenance Autonomous maintenance Which of the following is not an advantage of autonomous maintenance? Sense of ownership in operators Increases operator knowledge of equipment Ensures clean and lubricated equipment Demotes customer satisfaction Demotes customer satisfaction Which of the following loss refers Breakdown Start-up loss Defects and Benchmarking Start-up loss
  • 18. to the equipment’s inability to get to steady state quickly after a change? rework Which of the following is the most reasonable time taken by an organization to implement TPM? Two days Three years Five days Fifty years Three years Quality is improved as a result , that the failures and malfunctions are reduced reduced Increased constant None of this reduced To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as Down time Break Down time Both (A) and (B) Idle time Both (A) and (B)
  • 19. The down time cost consists of Loss of production Wages paid to the workers Reduction in sales All of the above All of the above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance Belt of an electric motor is broken, it needs Corrective maintenance Scheduled maintenance Preventive maintenance Timely maintenance Corrective maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution The total cost of the replacement must be greater after failure than before. This may be caused by A greater loss of production because replacement A greater profit of production because replacement A avg profit of production because replacement None of this A greater loss of production because replacement The hazard rate of equipment must be increasing before preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile the optimal frequency of inspection and associated ……….. maintenance of complex equipment. Minor Major Primary None of this Minor To reduce the number of failures, preventive replacements can be scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals. A systematic approach for maintenance is Problem – Cause – Diagnosis – Problem– Diagnosis – Cause – Problem – Measure – Diagnosis – Problem– Diagnosis – Measure – Problem – Cause – Diagnosis –
  • 20. Rectification Rectification Rectification Rectification Rectification (Down time in hours / Available hours) = Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Maintenance effectiveness (Number of breakdowns / Available machine hours) Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Frequency of breakdown Total productive maintenance aims at Less idle time Increase in productivity Zero down time None of the above Zero down time To anticipate failures and prevent them from happening is the objective of FMEA. TRUE FALSE TRUE Find the odd one out related to the FMEA team. Assembly engineer Manufacturing engineer Quality engineer Process variability data Process variability data Find the odd one out related to the data inputs required to prepare FMEA. Product and process specifications Reliability data Customer priority data Quality engineer Quality engineer Which of the following is not a benefit of FMEA? Increase in customer satisfaction Prioritize product/process deficiencies Maximize late changes and associated cost Document and track actions taken to reduce risk Maximize late changes and associated cost Establishing the economic life of equipment that is essentially utilized steadily each year One year Six month Three month Nine month One year we can see that as the replacement age of an item increases, the operations and maintenance (O&M) costs per unit time will increase decrease constant none of this increase Reliability-centered maintenance (RCM) an asset- centered methodology non asset- centered methodology non asset- exteriority methodology an asset- exteriority methodology an asset- centered methodology
  • 21. The high resale value associated with a old vehicle 1-year 2-year 3-year 4-year 1-year Optimal replacement interval for capital Equipment: maximization of discounted benefits minimize of discounted benefits average of discounted benefits none of this maximization of discounted benefits Which of the following is not a function of SAP Plant Maintenance? Inspection and Notifications Corrective and Preventive Maintenance Breakdown Maintenance Material Requirement Planning (MRP) run Material Requirement Planning (MRP) run Which of the following is used to define the sequence of activities that are performed as part of Preventive Maintenance in an organization? Task Lists Notification Work Order Maintenance Order Task Lists In Plant Maintenance, after refurbishment is done and material is returned, which of the following is correct? Stock value of the repairable material in the warehouse is changed Charges to the cost center changes A credit memo is applied to the order All of the above All of the above Which of the following correctly defines a Maintenance Plant? Maintenance Department Plant at which maintenance activities are planned Plant at which Maintenance of material done A plant in which the technical objects of a company are installed A plant in which the technical objects of a company are installed Optimal Number Of Workshop Machines To Meet a Fluctuating Workload To Meet a remain, Workload To Meet a stay Workload To Meet a continue Workload To Meet a Fluctuating Workload Optimal size of a maintenance workforce to meet a fluctuating workload, taking Account of subcontracting opportunities Account of contracting opportunities Account of subcontracting threat None of this Account of subcontracting opportunities
  • 22. A statistical characteristic of equipment frequently used in replacement studies is the hazard rate casualty risk random hazard rate A study of maintenance personnel concluded that those who ranked highest possessed characteristics as More experience Less experience Inexperience None of this More experience The failed system is repaired and preventive maintenance is performed Periodically One year Two year Six year Periodically Which of the following is not a type of loss examined by TPM? Down-time loss Speed loss Defect loss Forecasting loss Forecasting loss Which of the following loss refers to the gradual deterioration in equipment cycle times? Increased speed Reduced speed Maximum speed Optimum speed Reduced speed Which of the following is not a loss that TPM focuses on reducing? Equipment breakdown Defects and rework Idling and minor stoppages Optimized equipment cycle time Optimized equipment cycle time Which of the following is not a goal shared by TPM? Zero defects Maximum productivity Minimum productivity Zero breakdowns Minimum productivity Total Productive Maintenance is a systematic approach for understanding the equipment's function, the equipment's relationship to product quality and the likely cause and frequency of failure of the critical equipment components. failure of the safe equipment components. failure of the complimentary equipment components. None of this failure of the critical equipment components. Total Productive Maintenance (TPM) aimed at …………………equipment effectiveness through the Maximizing Minimizing Average None of this Maximizing
  • 23. optimization of equipment availability, performances, efficiency and product quality. Which maintenance the continuous checking and prevention of major maintenance. Preventive Maintenance Corrective Maintenance Condition- Based Maintenanc Predictive Maintenance Preventive Maintenance which maintenance Correction of problem when occur is very important to run the production process smoothly Preventive Maintenance Corrective Maintenance Condition- Based Maintenanc Predictive Maintenance Corrective Maintenance Quality is improved as a result , that the failures and malfunctions are reduced reduced Increased constant None of this Reduced To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above Which of the following is not the responsibility of maintenance department ? Breakdown maintenance Protection against fire hazards To keep machine in good condition None of the above None of the above
  • 24. Which of the following is types of Maintenance ? Condition- Based Maintenance Predictive maintenance Preventive maintenance All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as Down time Break Down time Both (A) and (B) Idle time Both (A) and (B) The down time cost consists of Loss of production Wages paid to the workers Reduction in sales All of the above All of the above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Scheduled maintenance is _______ between breakdown maintenance and the preventive maintenance. Joint Compromise Bridge In Compromise Equipment history cards are meant to record The way equipment behaves Total down time of the equipment The rate at which different components wear off All of the above Total down time of the equipment The ____ goes on increasing with the increase in degree of maintenance efforts. Cost of down time Cost of spares and maintenance Labour and Overhead Cost All of the above Labour and Overhead Cost With the increase in preventive maintenance cost, breakdown maintenance cost Increases Decreases Remain same Any of the above Decreases A systematic approach for maintenance is Problem – Cause – Problem– Diagnosis – Problem – Measure – Problem– Diagnosis – Problem – Cause –
  • 25. Diagnosis – Rectification Cause – Rectification Diagnosis – Rectification Measure – Rectification Diagnosis – Rectification (Down time in hours / Available hours) = Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Maintenance effectiveness (Number of breakdowns / Available machine hours) Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Frequency of breakdown Total productive maintenance aims at Less idle time Increase in productivity Zero down time None of the above Zero down time To anticipate failures and prevent them from happening is the objective of FMEA. TRUE FALSE TRUE Find the odd one out related to the FMEA team. Assembly engineer Manufacturing engineer Quality engineer Process variability data Process variability data Find the odd one out related to the data inputs required to prepare FMEA. Product and process specifications Reliability data Customer priority data Quality engineer Quality engineer Which of the following is not a benefit of FMEA? Increase in customer satisfaction Prioritize product/process deficiencies Maximize late changes and associated cost Document and track actions taken to reduce risk Maximize late changes and associated cost A particular product has been given the following rankings for calculating RPN while preparing FMEA chart, S=10, O=2, D=2. What is the value of RPN? 20 10 40 2 40 What is Maintainability? The ease with which the aircraft can be The ease with which the aircraft can Vulnerability RCS detection The ease with which the aircraft can be
  • 26. fixed sustain damage fixed There are four stages of FMEA. i) Specifyingthe possibilities ii) Quantifying risk iii) Correcting high risk causes iv) Re-evaluation of Risk Which is the correct order of proceeding with these stages of FMEA? i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv) According to common industry scale, what does severity ranking (S) 1 indicate? Very serious effect No effect Sometimes serious effect The value doesn’t exist No effect Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution Which of the following is not a function of SAP Plant Maintenance? Inspection and Notifications Corrective and Preventive Maintenance Breakdown Maintenance Material Requirement Planning (MRP) run Material Requirement Planning (MRP) run Which of the following is used to define the sequence of activities that are performed as part of Preventive Maintenance in an organization? Task Lists Notification Work Order Maintenance Order Task Lists In Plant Maintenance, after refurbishment is done and material is returned, which of the following is correct? Stock value of the repairable material in the warehouse is Charges to the cost center changes A credit memo is applied to the order All of the above All of the above
  • 27. changed Which of the following is correct? Maintenance Plan Type Maintenance Strategy 1) Single cycle plan, time-based - No 2) Single cycle plan, performance- based - No 3) Strategy plan, time-based - Yes 4) Strategy plan, performance- based - Yes 5) Multiple counter plan - No 1,2,3 are correct 1,2,3,4 are correct 2,3,4,5 are correct 1,2,3,4,5 are correct 1,2,3,4,5 are correct Which of the following correctly defines a Maintenance Plant? Maintenance Department Plant at which maintenance activities are planned Plant at which Maintenance of material done A plant in which the technical objects of a company are installed A plant in which the technical objects of a company are installed Assume a scenario where a system engineer accidentally entered a functional location with an incorrect label. Flow do you correct it without making a new entry? Alternative Labeling Changing the primary key Duplicate Labeling Flierarchical Labeling Alternative Labeling Which type of preventive Process Control Performance- Data-based Performance-
  • 28. maintenance enables you to plan maintenance based on counter reading that are managed for the technical objects to be maintained? control maintenance maintenance based preventive maintenance preventive maintenance based preventive maintenance Which types of task list are object- based and created for a specific, individual piece of equipment? Task lists for functional locations General maintenance task lists Equipment task list Preventive task list Equipment task list What happens if no scheduling period is defined in the maintenance plan when the current waiting call is converted into an order? Order will not be processed Order is blocked A new planned date is automatically added Previous scheduling date will be entered A new planned date is automatically added Which of the following is not a type of loss examined by TPM? Down-time loss Speed loss Defect loss Forecasting loss Forecasting loss Which of the following loss refers to the gradual deterioration in equipment cycle times? Increased speed Reduced speed Maximum speed Optimum speed Reduced speed Which of the following is not a loss that TPM focuses on reducing? Equipment breakdown Defects and rework Idling and minor stoppages Optimized equipment cycle time Optimized equipment cycle time Which of the following is not a goal shared by TPM? Zero defects Maximum productivity Minimum productivity Zero breakdowns Minimum productivity Which pillar of TPM focuses on routine maintenance? Training and Education Just-in-time 5S Autonomous maintenance Autonomous maintenance Which of the following is not an advantage of autonomous maintenance? Sense of ownership in operators Increases operator knowledge of equipment Ensures clean and lubricated equipment Demotes customer satisfaction Demotes customer satisfaction Which of the following loss refers to the equipment’s inability to get Breakdown Start-up loss Defects and rework Benchmarking Start-up loss
  • 29. to steady state quickly after a change? Which of the following is the most reasonable time taken by an organization to implement TPM? Two days Three years Five days Fifty years Three years Quality is improved as a result , that the failures and malfunctions are reduced reduced Increased constant None of this reduced To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as Down time Break Down time Both (A) and (B) Idle time Both (A) and (B)
  • 30. The down time cost consists of Loss of production Wages paid to the workers Reduction in sales All of the above All of the above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance Belt of an electric motor is broken, it needs Corrective maintenance Scheduled maintenance Preventive maintenance Timely maintenance Corrective maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution The total cost of the replacement must be greater after failure than before. This may be caused by A greater loss of production because replacement A greater profit of production because replacement A avg profit of production because replacement None of this A greater loss of production because replacement The hazard rate of equipment must be increasing before preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile the optimal frequency of inspection and associated ……….. maintenance of complex equipment. Minor Major Primary None of this Minor To reduce the number of failures, preventive replacements can be scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals. A systematic approach for maintenance is Problem – Cause – Diagnosis – Problem– Diagnosis – Cause – Problem – Measure – Diagnosis – Problem– Diagnosis – Measure – Problem – Cause – Diagnosis –
  • 31. Rectification Rectification Rectification Rectification Rectification (Down time in hours / Available hours) = Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Maintenance effectiveness (Number of breakdowns / Available machine hours) Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Frequency of breakdown Total productive maintenance aims at Less idle time Increase in productivity Zero down time None of the above Zero down time To anticipate failures and prevent them from happening is the objective of FMEA. TRUE FALSE TRUE Find the odd one out related to the FMEA team. Assembly engineer Manufacturing engineer Quality engineer Process variability data Process variability data Find the odd one out related to the data inputs required to prepare FMEA. Product and process specifications Reliability data Customer priority data Quality engineer Quality engineer Which of the following is not a benefit of FMEA? Increase in customer satisfaction Prioritize product/process deficiencies Maximize late changes and associated cost Document and track actions taken to reduce risk Maximize late changes and associated cost Establishing the economic life of equipment that is essentially utilized steadily each year One year Six month Three month Nine month One year we can see that as the replacement age of an item increases, the operations and maintenance (O&M) costs per unit time will increase decrease constant none of this increase Reliability-centered maintenance (RCM) an asset- centered methodology non asset- centered methodology non asset- exteriority methodology an asset- exteriority methodology an asset- centered methodology
  • 32. The high resale value associated with a old vehicle 1-year 2-year 3-year 4-year 1-year Optimal replacement interval for capital Equipment: maximization of discounted benefits minimize of discounted benefits average of discounted benefits none of this maximization of discounted benefits Which of the following is not a function of SAP Plant Maintenance? Inspection and Notifications Corrective and Preventive Maintenance Breakdown Maintenance Material Requirement Planning (MRP) run Material Requirement Planning (MRP) run Which of the following is used to define the sequence of activities that are performed as part of Preventive Maintenance in an organization? Task Lists Notification Work Order Maintenance Order Task Lists In Plant Maintenance, after refurbishment is done and material is returned, which of the following is correct? Stock value of the repairable material in the warehouse is changed Charges to the cost center changes A credit memo is applied to the order All of the above All of the above Which of the following correctly defines a Maintenance Plant? Maintenance Department Plant at which maintenance activities are planned Plant at which Maintenance of material done A plant in which the technical objects of a company are installed A plant in which the technical objects of a company are installed Optimal Number Of Workshop Machines To Meet a Fluctuating Workload To Meet a remain, Workload To Meet a stay Workload To Meet a continue Workload To Meet a Fluctuating Workload Optimal size of a maintenance workforce to meet a fluctuating workload, taking Account of subcontracting opportunities Account of contracting opportunities Account of subcontracting threat None of this Account of subcontracting opportunities
  • 33. A statistical characteristic of equipment frequently used in replacement studies is the hazard rate casualty risk random hazard rate A study of maintenance personnel concluded that those who ranked highest possessed characteristics as More experience Less experience Inexperience None of this More experience The failed system is repaired and preventive maintenance is performed Periodically One year Two year Six year Periodically Which of the following is not a type of loss examined by TPM? Down-time loss Speed loss Defect loss Forecasting loss Forecasting loss Which of the following loss refers to the gradual deterioration in equipment cycle times? Increased speed Reduced speed Maximum speed Optimum speed Reduced speed Which of the following is not a loss that TPM focuses on reducing? Equipment breakdown Defects and rework Idling and minor stoppages Optimized equipment cycle time Optimized equipment cycle time Which of the following is not a goal shared by TPM? Zero defects Maximum productivity Minimum productivity Zero breakdowns Minimum productivity Total Productive Maintenance is a systematic approach for understanding the equipment's function, the equipment's relationship to product quality and the likely cause and frequency of failure of the critical equipment components. failure of the safe equipment components. failure of the complimentary equipment components. None of this failure of the critical equipment components. Total Productive Maintenance (TPM) aimed at …………………equipment effectiveness through the Maximizing Minimizing Average None of this Maximizing
  • 34. optimization of equipment availability, performances, efficiency and product quality. Which maintenance the continuous checking and prevention of major maintenance. Preventive Maintenance Corrective Maintenance Condition- Based Maintenanc Predictive Maintenance Preventive Maintenance which maintenance Correction of problem when occur is very important to run the production process smoothly Preventive Maintenance Corrective Maintenance Condition- Based Maintenanc Predictive Maintenance Corrective Maintenance Quality is improved as a result , that the failures and malfunctions are reduced reduced Increased constant None of this Reduced To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above Which of the following is not the responsibility of maintenance department ? Breakdown maintenance Protection against fire hazards To keep machine in good condition None of the above None of the above
  • 35. Which of the following is types of Maintenance ? Condition- Based Maintenance Predictive maintenance Preventive maintenance All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as Down time Break Down time Both (A) and (B) Idle time Both (A) and (B) The down time cost consists of Loss of production Wages paid to the workers Reduction in sales All of the above All of the above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Scheduled maintenance is _______ between breakdown maintenance and the preventive maintenance. Joint Compromise Bridge In Compromise Equipment history cards are meant to record The way equipment behaves Total down time of the equipment The rate at which different components wear off All of the above Total down time of the equipment The ____ goes on increasing with the increase in degree of maintenance efforts. Cost of down time Cost of spares and maintenance Labour and Overhead Cost All of the above Labour and Overhead Cost With the increase in preventive maintenance cost, breakdown maintenance cost Increases Decreases Remain same Any of the above Decreases A systematic approach for maintenance is Problem – Cause – Problem– Diagnosis – Problem – Measure – Problem– Diagnosis – Problem – Cause –
  • 36. Diagnosis – Rectification Cause – Rectification Diagnosis – Rectification Measure – Rectification Diagnosis – Rectification (Down time in hours / Available hours) = Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Maintenance effectiveness (Number of breakdowns / Available machine hours) Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Frequency of breakdown Total productive maintenance aims at Less idle time Increase in productivity Zero down time None of the above Zero down time To anticipate failures and prevent them from happening is the objective of FMEA. TRUE FALSE TRUE Find the odd one out related to the FMEA team. Assembly engineer Manufacturing engineer Quality engineer Process variability data Process variability data Find the odd one out related to the data inputs required to prepare FMEA. Product and process specifications Reliability data Customer priority data Quality engineer Quality engineer Which of the following is not a benefit of FMEA? Increase in customer satisfaction Prioritize product/process deficiencies Maximize late changes and associated cost Document and track actions taken to reduce risk Maximize late changes and associated cost A particular product has been given the following rankings for calculating RPN while preparing FMEA chart, S=10, O=2, D=2. What is the value of RPN? 20 10 40 2 40 What is Maintainability? The ease with which the aircraft can be The ease with which the aircraft can Vulnerability RCS detection The ease with which the aircraft can be
  • 37. fixed sustain damage fixed There are four stages of FMEA. i) Specifyingthe possibilities ii) Quantifying risk iii) Correcting high risk causes iv) Re-evaluation of Risk Which is the correct order of proceeding with these stages of FMEA? i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv) According to common industry scale, what does severity ranking (S) 1 indicate? Very serious effect No effect Sometimes serious effect The value doesn’t exist No effect Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution Which of the following is not a function of SAP Plant Maintenance? Inspection and Notifications Corrective and Preventive Maintenance Breakdown Maintenance Material Requirement Planning (MRP) run Material Requirement Planning (MRP) run Which of the following is used to define the sequence of activities that are performed as part of Preventive Maintenance in an organization? Task Lists Notification Work Order Maintenance Order Task Lists In Plant Maintenance, after refurbishment is done and material is returned, which of the following is correct? Stock value of the repairable material in the warehouse is Charges to the cost center changes A credit memo is applied to the order All of the above All of the above
  • 38. changed Which of the following is correct? Maintenance Plan Type Maintenance Strategy 1) Single cycle plan, time-based - No 2) Single cycle plan, performance- based - No 3) Strategy plan, time-based - Yes 4) Strategy plan, performance- based - Yes 5) Multiple counter plan - No 1,2,3 are correct 1,2,3,4 are correct 2,3,4,5 are correct 1,2,3,4,5 are correct 1,2,3,4,5 are correct Which of the following correctly defines a Maintenance Plant? Maintenance Department Plant at which maintenance activities are planned Plant at which Maintenance of material done A plant in which the technical objects of a company are installed A plant in which the technical objects of a company are installed Assume a scenario where a system engineer accidentally entered a functional location with an incorrect label. Flow do you correct it without making a new entry? Alternative Labeling Changing the primary key Duplicate Labeling Flierarchical Labeling Alternative Labeling Which type of preventive Process Control Performance- Data-based Performance-
  • 39. maintenance enables you to plan maintenance based on counter reading that are managed for the technical objects to be maintained? control maintenance maintenance based preventive maintenance preventive maintenance based preventive maintenance Which types of task list are object- based and created for a specific, individual piece of equipment? Task lists for functional locations General maintenance task lists Equipment task list Preventive task list Equipment task list What happens if no scheduling period is defined in the maintenance plan when the current waiting call is converted into an order? Order will not be processed Order is blocked A new planned date is automatically added Previous scheduling date will be entered A new planned date is automatically added Which of the following is not a type of loss examined by TPM? Down-time loss Speed loss Defect loss Forecasting loss Forecasting loss Which of the following loss refers to the gradual deterioration in equipment cycle times? Increased speed Reduced speed Maximum speed Optimum speed Reduced speed Which of the following is not a loss that TPM focuses on reducing? Equipment breakdown Defects and rework Idling and minor stoppages Optimized equipment cycle time Optimized equipment cycle time Which of the following is not a goal shared by TPM? Zero defects Maximum productivity Minimum productivity Zero breakdowns Minimum productivity Which pillar of TPM focuses on routine maintenance? Training and Education Just-in-time 5S Autonomous maintenance Autonomous maintenance Which of the following is not an advantage of autonomous maintenance? Sense of ownership in operators Increases operator knowledge of equipment Ensures clean and lubricated equipment Demotes customer satisfaction Demotes customer satisfaction Which of the following loss refers to the equipment’s inability to get Breakdown Start-up loss Defects and rework Benchmarking Start-up loss
  • 40. to steady state quickly after a change? Which of the following is the most reasonable time taken by an organization to implement TPM? Two days Three years Five days Fifty years Three years Quality is improved as a result , that the failures and malfunctions are reduced reduced Increased constant None of this reduced To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as Down time Break Down time Both (A) and (B) Idle time Both (A) and (B)
  • 41. The down time cost consists of Loss of production Wages paid to the workers Reduction in sales All of the above All of the above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance Belt of an electric motor is broken, it needs Corrective maintenance Scheduled maintenance Preventive maintenance Timely maintenance Corrective maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution The total cost of the replacement must be greater after failure than before. This may be caused by A greater loss of production because replacement A greater profit of production because replacement A avg profit of production because replacement None of this A greater loss of production because replacement The hazard rate of equipment must be increasing before preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile the optimal frequency of inspection and associated ……….. maintenance of complex equipment. Minor Major Primary None of this Minor To reduce the number of failures, preventive replacements can be scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals. A systematic approach for maintenance is Problem – Cause – Diagnosis – Problem– Diagnosis – Cause – Problem – Measure – Diagnosis – Problem– Diagnosis – Measure – Problem – Cause – Diagnosis –
  • 42. Rectification Rectification Rectification Rectification Rectification (Down time in hours / Available hours) = Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Maintenance effectiveness (Number of breakdowns / Available machine hours) Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Frequency of breakdown Total productive maintenance aims at Less idle time Increase in productivity Zero down time None of the above Zero down time To anticipate failures and prevent them from happening is the objective of FMEA. TRUE FALSE TRUE Find the odd one out related to the FMEA team. Assembly engineer Manufacturing engineer Quality engineer Process variability data Process variability data Find the odd one out related to the data inputs required to prepare FMEA. Product and process specifications Reliability data Customer priority data Quality engineer Quality engineer Which of the following is not a benefit of FMEA? Increase in customer satisfaction Prioritize product/process deficiencies Maximize late changes and associated cost Document and track actions taken to reduce risk Maximize late changes and associated cost Establishing the economic life of equipment that is essentially utilized steadily each year One year Six month Three month Nine month One year we can see that as the replacement age of an item increases, the operations and maintenance (O&M) costs per unit time will increase decrease constant none of this increase Reliability-centered maintenance (RCM) an asset- centered methodology non asset- centered methodology non asset- exteriority methodology an asset- exteriority methodology an asset- centered methodology
  • 43. The high resale value associated with a old vehicle 1-year 2-year 3-year 4-year 1-year Optimal replacement interval for capital Equipment: maximization of discounted benefits minimize of discounted benefits average of discounted benefits none of this maximization of discounted benefits Which of the following is not a function of SAP Plant Maintenance? Inspection and Notifications Corrective and Preventive Maintenance Breakdown Maintenance Material Requirement Planning (MRP) run Material Requirement Planning (MRP) run Which of the following is used to define the sequence of activities that are performed as part of Preventive Maintenance in an organization? Task Lists Notification Work Order Maintenance Order Task Lists In Plant Maintenance, after refurbishment is done and material is returned, which of the following is correct? Stock value of the repairable material in the warehouse is changed Charges to the cost center changes A credit memo is applied to the order All of the above All of the above Which of the following correctly defines a Maintenance Plant? Maintenance Department Plant at which maintenance activities are planned Plant at which Maintenance of material done A plant in which the technical objects of a company are installed A plant in which the technical objects of a company are installed Optimal Number Of Workshop Machines To Meet a Fluctuating Workload To Meet a remain, Workload To Meet a stay Workload To Meet a continue Workload To Meet a Fluctuating Workload Optimal size of a maintenance workforce to meet a fluctuating workload, taking Account of subcontracting opportunities Account of contracting opportunities Account of subcontracting threat None of this Account of subcontracting opportunities
  • 44. A statistical characteristic of equipment frequently used in replacement studies is the hazard rate casualty risk random hazard rate A study of maintenance personnel concluded that those who ranked highest possessed characteristics as More experience Less experience Inexperience None of this More experience The failed system is repaired and preventive maintenance is performed Periodically One year Two year Six year Periodically Which of the following is not a type of loss examined by TPM? Down-time loss Speed loss Defect loss Forecasting loss Forecasting loss Which of the following loss refers to the gradual deterioration in equipment cycle times? Increased speed Reduced speed Maximum speed Optimum speed Reduced speed Which of the following is not a loss that TPM focuses on reducing? Equipment breakdown Defects and rework Idling and minor stoppages Optimized equipment cycle time Optimized equipment cycle time Which of the following is not a goal shared by TPM? Zero defects Maximum productivity Minimum productivity Zero breakdowns Minimum productivity Total Productive Maintenance is a systematic approach for understanding the equipment's function, the equipment's relationship to product quality and the likely cause and frequency of failure of the critical equipment components. failure of the safe equipment components. failure of the complimentary equipment components. None of this failure of the critical equipment components. Total Productive Maintenance (TPM) aimed at …………………equipment effectiveness through the Maximizing Minimizing Average None of this Maximizing
  • 45. optimization of equipment availability, performances, efficiency and product quality. Which maintenance the continuous checking and prevention of major maintenance. Preventive Maintenance Corrective Maintenance Condition- Based Maintenanc Predictive Maintenance Preventive Maintenance which maintenance Correction of problem when occur is very important to run the production process smoothly Preventive Maintenance Corrective Maintenance Condition- Based Maintenanc Predictive Maintenance Corrective Maintenance Quality is improved as a result , that the failures and malfunctions are reduced reduced Increased constant None of this Reduced To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above Which of the following is not the responsibility of maintenance department ? Breakdown maintenance Protection against fire hazards To keep machine in good condition None of the above None of the above
  • 46. Which of the following is types of Maintenance ? Condition- Based Maintenance Predictive maintenance Preventive maintenance All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as Down time Break Down time Both (A) and (B) Idle time Both (A) and (B) The down time cost consists of Loss of production Wages paid to the workers Reduction in sales All of the above All of the above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Scheduled maintenance is _______ between breakdown maintenance and the preventive maintenance. Joint Compromise Bridge In Compromise Equipment history cards are meant to record The way equipment behaves Total down time of the equipment The rate at which different components wear off All of the above Total down time of the equipment The ____ goes on increasing with the increase in degree of maintenance efforts. Cost of down time Cost of spares and maintenance Labour and Overhead Cost All of the above Labour and Overhead Cost With the increase in preventive maintenance cost, breakdown maintenance cost Increases Decreases Remain same Any of the above Decreases A systematic approach for maintenance is Problem – Cause – Problem– Diagnosis – Problem – Measure – Problem– Diagnosis – Problem – Cause –
  • 47. Diagnosis – Rectification Cause – Rectification Diagnosis – Rectification Measure – Rectification Diagnosis – Rectification (Down time in hours / Available hours) = Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Maintenance effectiveness (Number of breakdowns / Available machine hours) Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Frequency of breakdown Total productive maintenance aims at Less idle time Increase in productivity Zero down time None of the above Zero down time To anticipate failures and prevent them from happening is the objective of FMEA. TRUE FALSE TRUE Find the odd one out related to the FMEA team. Assembly engineer Manufacturing engineer Quality engineer Process variability data Process variability data Find the odd one out related to the data inputs required to prepare FMEA. Product and process specifications Reliability data Customer priority data Quality engineer Quality engineer Which of the following is not a benefit of FMEA? Increase in customer satisfaction Prioritize product/process deficiencies Maximize late changes and associated cost Document and track actions taken to reduce risk Maximize late changes and associated cost A particular product has been given the following rankings for calculating RPN while preparing FMEA chart, S=10, O=2, D=2. What is the value of RPN? 20 10 40 2 40 What is Maintainability? The ease with which the aircraft can be The ease with which the aircraft can Vulnerability RCS detection The ease with which the aircraft can be
  • 48. fixed sustain damage fixed There are four stages of FMEA. i) Specifyingthe possibilities ii) Quantifying risk iii) Correcting high risk causes iv) Re-evaluation of Risk Which is the correct order of proceeding with these stages of FMEA? i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv) According to common industry scale, what does severity ranking (S) 1 indicate? Very serious effect No effect Sometimes serious effect The value doesn’t exist No effect Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution Which of the following is not a function of SAP Plant Maintenance? Inspection and Notifications Corrective and Preventive Maintenance Breakdown Maintenance Material Requirement Planning (MRP) run Material Requirement Planning (MRP) run Which of the following is used to define the sequence of activities that are performed as part of Preventive Maintenance in an organization? Task Lists Notification Work Order Maintenance Order Task Lists In Plant Maintenance, after refurbishment is done and material is returned, which of the following is correct? Stock value of the repairable material in the warehouse is Charges to the cost center changes A credit memo is applied to the order All of the above All of the above
  • 49. changed Which of the following is correct? Maintenance Plan Type Maintenance Strategy 1) Single cycle plan, time-based - No 2) Single cycle plan, performance- based - No 3) Strategy plan, time-based - Yes 4) Strategy plan, performance- based - Yes 5) Multiple counter plan - No 1,2,3 are correct 1,2,3,4 are correct 2,3,4,5 are correct 1,2,3,4,5 are correct 1,2,3,4,5 are correct Which of the following correctly defines a Maintenance Plant? Maintenance Department Plant at which maintenance activities are planned Plant at which Maintenance of material done A plant in which the technical objects of a company are installed A plant in which the technical objects of a company are installed Assume a scenario where a system engineer accidentally entered a functional location with an incorrect label. Flow do you correct it without making a new entry? Alternative Labeling Changing the primary key Duplicate Labeling Flierarchical Labeling Alternative Labeling Which type of preventive Process Control Performance- Data-based Performance-
  • 50. maintenance enables you to plan maintenance based on counter reading that are managed for the technical objects to be maintained? control maintenance maintenance based preventive maintenance preventive maintenance based preventive maintenance Which types of task list are object- based and created for a specific, individual piece of equipment? Task lists for functional locations General maintenance task lists Equipment task list Preventive task list Equipment task list What happens if no scheduling period is defined in the maintenance plan when the current waiting call is converted into an order? Order will not be processed Order is blocked A new planned date is automatically added Previous scheduling date will be entered A new planned date is automatically added Which of the following is not a type of loss examined by TPM? Down-time loss Speed loss Defect loss Forecasting loss Forecasting loss Which of the following loss refers to the gradual deterioration in equipment cycle times? Increased speed Reduced speed Maximum speed Optimum speed Reduced speed Which of the following is not a loss that TPM focuses on reducing? Equipment breakdown Defects and rework Idling and minor stoppages Optimized equipment cycle time Optimized equipment cycle time Which of the following is not a goal shared by TPM? Zero defects Maximum productivity Minimum productivity Zero breakdowns Minimum productivity Which pillar of TPM focuses on routine maintenance? Training and Education Just-in-time 5S Autonomous maintenance Autonomous maintenance Which of the following is not an advantage of autonomous maintenance? Sense of ownership in operators Increases operator knowledge of equipment Ensures clean and lubricated equipment Demotes customer satisfaction Demotes customer satisfaction Which of the following loss refers to the equipment’s inability to get Breakdown Start-up loss Defects and rework Benchmarking Start-up loss
  • 51. to steady state quickly after a change? Which of the following is the most reasonable time taken by an organization to implement TPM? Two days Three years Five days Fifty years Three years Quality is improved as a result , that the failures and malfunctions are reduced reduced Increased constant None of this reduced To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as Down time Break Down time Both (A) and (B) Idle time Both (A) and (B)
  • 52. The down time cost consists of Loss of production Wages paid to the workers Reduction in sales All of the above All of the above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance Belt of an electric motor is broken, it needs Corrective maintenance Scheduled maintenance Preventive maintenance Timely maintenance Corrective maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution The total cost of the replacement must be greater after failure than before. This may be caused by A greater loss of production because replacement A greater profit of production because replacement A avg profit of production because replacement None of this A greater loss of production because replacement The hazard rate of equipment must be increasing before preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile the optimal frequency of inspection and associated ……….. maintenance of complex equipment. Minor Major Primary None of this Minor To reduce the number of failures, preventive replacements can be scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals. A systematic approach for maintenance is Problem – Cause – Diagnosis – Problem– Diagnosis – Cause – Problem – Measure – Diagnosis – Problem– Diagnosis – Measure – Problem – Cause – Diagnosis –
  • 53. Rectification Rectification Rectification Rectification Rectification (Down time in hours / Available hours) = Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Maintenance effectiveness (Number of breakdowns / Available machine hours) Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Frequency of breakdown Total productive maintenance aims at Less idle time Increase in productivity Zero down time None of the above Zero down time To anticipate failures and prevent them from happening is the objective of FMEA. TRUE FALSE TRUE Find the odd one out related to the FMEA team. Assembly engineer Manufacturing engineer Quality engineer Process variability data Process variability data Find the odd one out related to the data inputs required to prepare FMEA. Product and process specifications Reliability data Customer priority data Quality engineer Quality engineer Which of the following is not a benefit of FMEA? Increase in customer satisfaction Prioritize product/process deficiencies Maximize late changes and associated cost Document and track actions taken to reduce risk Maximize late changes and associated cost Establishing the economic life of equipment that is essentially utilized steadily each year One year Six month Three month Nine month One year we can see that as the replacement age of an item increases, the operations and maintenance (O&M) costs per unit time will increase decrease constant none of this increase Reliability-centered maintenance (RCM) an asset- centered methodology non asset- centered methodology non asset- exteriority methodology an asset- exteriority methodology an asset- centered methodology
  • 54. The high resale value associated with a old vehicle 1-year 2-year 3-year 4-year 1-year Optimal replacement interval for capital Equipment: maximization of discounted benefits minimize of discounted benefits average of discounted benefits none of this maximization of discounted benefits Which of the following is not a function of SAP Plant Maintenance? Inspection and Notifications Corrective and Preventive Maintenance Breakdown Maintenance Material Requirement Planning (MRP) run Material Requirement Planning (MRP) run Which of the following is used to define the sequence of activities that are performed as part of Preventive Maintenance in an organization? Task Lists Notification Work Order Maintenance Order Task Lists In Plant Maintenance, after refurbishment is done and material is returned, which of the following is correct? Stock value of the repairable material in the warehouse is changed Charges to the cost center changes A credit memo is applied to the order All of the above All of the above Which of the following correctly defines a Maintenance Plant? Maintenance Department Plant at which maintenance activities are planned Plant at which Maintenance of material done A plant in which the technical objects of a company are installed A plant in which the technical objects of a company are installed Optimal Number Of Workshop Machines To Meet a Fluctuating Workload To Meet a remain, Workload To Meet a stay Workload To Meet a continue Workload To Meet a Fluctuating Workload Optimal size of a maintenance workforce to meet a fluctuating workload, taking Account of subcontracting opportunities Account of contracting opportunities Account of subcontracting threat None of this Account of subcontracting opportunities
  • 55. A statistical characteristic of equipment frequently used in replacement studies is the hazard rate casualty risk random hazard rate A study of maintenance personnel concluded that those who ranked highest possessed characteristics as More experience Less experience Inexperience None of this More experience The failed system is repaired and preventive maintenance is performed Periodically One year Two year Six year Periodically Which of the following is not a type of loss examined by TPM? Down-time loss Speed loss Defect loss Forecasting loss Forecasting loss Which of the following loss refers to the gradual deterioration in equipment cycle times? Increased speed Reduced speed Maximum speed Optimum speed Reduced speed Which of the following is not a loss that TPM focuses on reducing? Equipment breakdown Defects and rework Idling and minor stoppages Optimized equipment cycle time Optimized equipment cycle time Which of the following is not a goal shared by TPM? Zero defects Maximum productivity Minimum productivity Zero breakdowns Minimum productivity Total Productive Maintenance is a systematic approach for understanding the equipment's function, the equipment's relationship to product quality and the likely cause and frequency of failure of the critical equipment components. failure of the safe equipment components. failure of the complimentary equipment components. None of this failure of the critical equipment components. Total Productive Maintenance (TPM) aimed at …………………equipment effectiveness through the Maximizing Minimizing Average None of this Maximizing
  • 56. optimization of equipment availability, performances, efficiency and product quality. Which maintenance the continuous checking and prevention of major maintenance. Preventive Maintenance Corrective Maintenance Condition- Based Maintenanc Predictive Maintenance Preventive Maintenance which maintenance Correction of problem when occur is very important to run the production process smoothly Preventive Maintenance Corrective Maintenance Condition- Based Maintenanc Predictive Maintenance Corrective Maintenance Quality is improved as a result , that the failures and malfunctions are reduced reduced Increased constant None of this Reduced To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above Which of the following is not the responsibility of maintenance department ? Breakdown maintenance Protection against fire hazards To keep machine in good condition None of the above None of the above
  • 57. Which of the following is types of Maintenance ? Condition- Based Maintenance Predictive maintenance Preventive maintenance All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as Down time Break Down time Both (A) and (B) Idle time Both (A) and (B) The down time cost consists of Loss of production Wages paid to the workers Reduction in sales All of the above All of the above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Scheduled maintenance is _______ between breakdown maintenance and the preventive maintenance. Joint Compromise Bridge In Compromise Equipment history cards are meant to record The way equipment behaves Total down time of the equipment The rate at which different components wear off All of the above Total down time of the equipment The ____ goes on increasing with the increase in degree of maintenance efforts. Cost of down time Cost of spares and maintenance Labour and Overhead Cost All of the above Labour and Overhead Cost With the increase in preventive maintenance cost, breakdown maintenance cost Increases Decreases Remain same Any of the above Decreases A systematic approach for maintenance is Problem – Cause – Problem– Diagnosis – Problem – Measure – Problem– Diagnosis – Problem – Cause –
  • 58. Diagnosis – Rectification Cause – Rectification Diagnosis – Rectification Measure – Rectification Diagnosis – Rectification (Down time in hours / Available hours) = Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Maintenance effectiveness (Number of breakdowns / Available machine hours) Maintenance effectiveness Frequency of breakdown Effectiveness of maintenance planning None of the above Frequency of breakdown Total productive maintenance aims at Less idle time Increase in productivity Zero down time None of the above Zero down time To anticipate failures and prevent them from happening is the objective of FMEA. TRUE FALSE TRUE Find the odd one out related to the FMEA team. Assembly engineer Manufacturing engineer Quality engineer Process variability data Process variability data Find the odd one out related to the data inputs required to prepare FMEA. Product and process specifications Reliability data Customer priority data Quality engineer Quality engineer Which of the following is not a benefit of FMEA? Increase in customer satisfaction Prioritize product/process deficiencies Maximize late changes and associated cost Document and track actions taken to reduce risk Maximize late changes and associated cost A particular product has been given the following rankings for calculating RPN while preparing FMEA chart, S=10, O=2, D=2. What is the value of RPN? 20 10 40 2 40 What is Maintainability? The ease with which the aircraft can be The ease with which the aircraft can Vulnerability RCS detection The ease with which the aircraft can be
  • 59. fixed sustain damage fixed There are four stages of FMEA. i) Specifyingthe possibilities ii) Quantifying risk iii) Correcting high risk causes iv) Re-evaluation of Risk Which is the correct order of proceeding with these stages of FMEA? i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv) According to common industry scale, what does severity ranking (S) 1 indicate? Very serious effect No effect Sometimes serious effect The value doesn’t exist No effect Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution Which of the following is not a function of SAP Plant Maintenance? Inspection and Notifications Corrective and Preventive Maintenance Breakdown Maintenance Material Requirement Planning (MRP) run Material Requirement Planning (MRP) run Which of the following is used to define the sequence of activities that are performed as part of Preventive Maintenance in an organization? Task Lists Notification Work Order Maintenance Order Task Lists In Plant Maintenance, after refurbishment is done and material is returned, which of the following is correct? Stock value of the repairable material in the warehouse is Charges to the cost center changes A credit memo is applied to the order All of the above All of the above
  • 60. changed Which of the following is correct? Maintenance Plan Type Maintenance Strategy 1) Single cycle plan, time-based - No 2) Single cycle plan, performance- based - No 3) Strategy plan, time-based - Yes 4) Strategy plan, performance- based - Yes 5) Multiple counter plan - No 1,2,3 are correct 1,2,3,4 are correct 2,3,4,5 are correct 1,2,3,4,5 are correct 1,2,3,4,5 are correct Which of the following correctly defines a Maintenance Plant? Maintenance Department Plant at which maintenance activities are planned Plant at which Maintenance of material done A plant in which the technical objects of a company are installed A plant in which the technical objects of a company are installed Assume a scenario where a system engineer accidentally entered a functional location with an incorrect label. Flow do you correct it without making a new entry? Alternative Labeling Changing the primary key Duplicate Labeling Flierarchical Labeling Alternative Labeling Which type of preventive Process Control Performance- Data-based Performance-
  • 61. maintenance enables you to plan maintenance based on counter reading that are managed for the technical objects to be maintained? control maintenance maintenance based preventive maintenance preventive maintenance based preventive maintenance Which types of task list are object- based and created for a specific, individual piece of equipment? Task lists for functional locations General maintenance task lists Equipment task list Preventive task list Equipment task list What happens if no scheduling period is defined in the maintenance plan when the current waiting call is converted into an order? Order will not be processed Order is blocked A new planned date is automatically added Previous scheduling date will be entered A new planned date is automatically added Which of the following is not a type of loss examined by TPM? Down-time loss Speed loss Defect loss Forecasting loss Forecasting loss Which of the following loss refers to the gradual deterioration in equipment cycle times? Increased speed Reduced speed Maximum speed Optimum speed Reduced speed Which of the following is not a loss that TPM focuses on reducing? Equipment breakdown Defects and rework Idling and minor stoppages Optimized equipment cycle time Optimized equipment cycle time Which of the following is not a goal shared by TPM? Zero defects Maximum productivity Minimum productivity Zero breakdowns Minimum productivity Which pillar of TPM focuses on routine maintenance? Training and Education Just-in-time 5S Autonomous maintenance Autonomous maintenance Which of the following is not an advantage of autonomous maintenance? Sense of ownership in operators Increases operator knowledge of equipment Ensures clean and lubricated equipment Demotes customer satisfaction Demotes customer satisfaction Which of the following loss refers to the equipment’s inability to get Breakdown Start-up loss Defects and rework Benchmarking Start-up loss
  • 62. to steady state quickly after a change? Which of the following is the most reasonable time taken by an organization to implement TPM? Two days Three years Five days Fifty years Three years Quality is improved as a result , that the failures and malfunctions are reduced reduced Increased constant None of this reduced To keep the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Maintenance Wear Corrosion None of the above Maintenance To gives us knowledge for keeping the machine plants & process equipment in there efficient condition, the maintenance activities are planned & carried out is known as _____ . Industrial engineering Automobile engineering Production engineering Maintenance engineering Maintenance engineering Which of the following is primary functions of maintenance department? Maintenance of existing plant and equipments. Inspection and lubrication of equipments. Proper distribution of utility service All of above All of above Maintenance consist of the following action(s) Replace of component Repair of component Service of component All of the above All of the above The time elapsed from the point the machine fails to perform its function to the point it is repaired and brought into operating condition is known as Down time Break Down time Both (A) and (B) Idle time Both (A) and (B)
  • 63. The down time cost consists of Loss of production Wages paid to the workers Reduction in sales All of the above All of the above The following is not a classification of maintenance Corrective maintenance Timely maintenance Scheduled maintenance Preventive maintenance Timely maintenance Belt of an electric motor is broken, it needs Corrective maintenance Scheduled maintenance Preventive maintenance Timely maintenance Corrective maintenance The following is (are) scheduled maintenance Overhauling of machine Cleaning of tank Whitewashing of building All of the above All of the above Most important of all, maintenance excellence is concerned with balancing performance, risks, and the resource inputs to achieve an Optimal solution Direct solution Indirect solution None of this Optimal solution The total cost of the replacement must be greater after failure than before. This may be caused by A greater loss of production because replacement A greater profit of production because replacement A avg profit of production because replacement None of this A greater loss of production because replacement The hazard rate of equipment must be increasing before preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile the optimal frequency of inspection and associated ……….. maintenance of complex equipment. Minor Major Primary None of this Minor To reduce the number of failures, preventive replacements can be scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals. A systematic approach for maintenance is Problem – Cause – Diagnosis – Problem– Diagnosis – Cause – Problem – Measure – Diagnosis – Problem– Diagnosis – Measure – Problem – Cause – Diagnosis –