Call Girls in Nagpur Bhavna Call 7001035870 Meet With Nagpur Escorts
Essential Maintenance Concepts
1. Ques I Ques II Ques III Ques IV Ques V (Ans)
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of Loss of Wages paid to Reduction in All of the All of the
2. production the workers sales above above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
maintenance cost
Increases Decreases Remain same
Any of the
above
Decreases
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Rectification
Problem–
Diagnosis –
Cause –
Rectification
Problem –
Measure –
Diagnosis –
Rectification
Problem–
Diagnosis –
Measure –
Rectification
Problem –
Cause –
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent TRUE FALSE TRUE
3. them from happening is the objective
of FMEA.
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
What is Maintainability?
The ease with
which the
aircraft can be
fixed
The ease with
which the
aircraft can
sustain damage
Vulnerability RCS detection
The ease with
which the
aircraft can be
fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
4. Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
5. Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
6. Which type of preventive
maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
Process
control
maintenance
Control
maintenance
Performance-
based
preventive
maintenance
Data-based
preventive
maintenance
Performance-
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
7. Which of the following loss refers
to the equipment’s inability to get
to steady state quickly after a
change?
Breakdown Start-up loss
Defects and
rework
Benchmarking Start-up loss
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
8. operating condition is known as
The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
9. A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Rectification
Problem–
Diagnosis –
Cause –
Rectification
Problem –
Measure –
Diagnosis –
Rectification
Problem–
Diagnosis –
Measure –
Rectification
Problem –
Cause –
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the
objective of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
Establishing the economic life of
equipment that is essentially
utilized steadily each year One year Six month Three month Nine month One year
we can see that as the replacement
age of an item increases, the
operations and maintenance
(O&M) costs per unit time will increase decrease constant none of this increase
10. Reliability-centered maintenance
(RCM)
an asset-
centered
methodology
non asset-
centered
methodology
non asset-
exteriority
methodology
an asset-
exteriority
methodology
an asset-
centered
methodology
The high resale value associated
with a old vehicle 1-year 2-year 3-year 4-year 1-year
Optimal replacement interval for
capital Equipment:
maximization
of discounted
benefits
minimize of
discounted
benefits
average of
discounted
benefits none of this
maximization
of discounted
benefits
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Optimal Number Of Workshop
Machines
To Meet a
Fluctuating
Workload
To Meet a
remain,
Workload
To Meet a stay
Workload
To Meet a
continue
Workload
To Meet a
Fluctuating
Workload
11. Optimal size of a maintenance
workforce to meet a fluctuating
workload, taking
Account of
subcontracting
opportunities
Account of
contracting
opportunities
Account of
subcontracting
threat
None of this
Account of
subcontracting
opportunities
A statistical characteristic of
equipment frequently used in
replacement studies is the
hazard rate casualty risk random hazard rate
A study of maintenance personnel
concluded that those who ranked
highest possessed characteristics
as
More
experience
Less experience Inexperience None of this
More
experience
The failed system is repaired and
preventive maintenance is
performed
Periodically One year Two year Six year Periodically
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Total Productive Maintenance is a
systematic approach for
understanding the equipment's
function, the equipment's
relationship to product quality
and the likely cause and
frequency of
failure of the
critical
equipment
components.
failure of the
safe equipment
components.
failure of the
complimentary
equipment
components.
None of this
failure of the
critical
equipment
components.
12. Total Productive Maintenance
(TPM) aimed at
…………………equipment
effectiveness through the
optimization of equipment
availability, performances,
efficiency and product quality.
Maximizing Minimizing Average None of this Maximizing
Which maintenance the
continuous checking and
prevention of major maintenance.
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Preventive
Maintenance
which maintenance Correction of
problem when occur is very
important to run the production
process smoothly
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Corrective
Maintenance
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this Reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
13. Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid to
the workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
Increases Decreases Remain same
Any of the
above
Decreases
14. maintenance cost
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Rectification
Problem–
Diagnosis –
Cause –
Rectification
Problem –
Measure –
Diagnosis –
Rectification
Problem–
Diagnosis –
Measure –
Rectification
Problem –
Cause –
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the objective
of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
15. What is Maintainability?
The ease with
which the
aircraft can be
fixed
The ease with
which the
aircraft can
sustain damage
Vulnerability RCS detection
The ease with
which the
aircraft can be
fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
Stock value of
the repairable
material in
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
16. following is correct? the
warehouse is
changed
Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
17. Which type of preventive
maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
Process
control
maintenance
Control
maintenance
Performance-
based
preventive
maintenance
Data-based
preventive
maintenance
Performance-
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
Which of the following loss refers Breakdown Start-up loss Defects and Benchmarking Start-up loss
18. to the equipment’s inability to get
to steady state quickly after a
change?
rework
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
operating condition is known as
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
19. The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Problem–
Diagnosis –
Cause –
Problem –
Measure –
Diagnosis –
Problem–
Diagnosis –
Measure –
Problem –
Cause –
Diagnosis –
20. Rectification Rectification Rectification Rectification Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the
objective of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
Establishing the economic life of
equipment that is essentially
utilized steadily each year One year Six month Three month Nine month One year
we can see that as the replacement
age of an item increases, the
operations and maintenance
(O&M) costs per unit time will increase decrease constant none of this increase
Reliability-centered maintenance
(RCM)
an asset-
centered
methodology
non asset-
centered
methodology
non asset-
exteriority
methodology
an asset-
exteriority
methodology
an asset-
centered
methodology
21. The high resale value associated
with a old vehicle 1-year 2-year 3-year 4-year 1-year
Optimal replacement interval for
capital Equipment:
maximization
of discounted
benefits
minimize of
discounted
benefits
average of
discounted
benefits none of this
maximization
of discounted
benefits
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Optimal Number Of Workshop
Machines
To Meet a
Fluctuating
Workload
To Meet a
remain,
Workload
To Meet a stay
Workload
To Meet a
continue
Workload
To Meet a
Fluctuating
Workload
Optimal size of a maintenance
workforce to meet a fluctuating
workload, taking
Account of
subcontracting
opportunities
Account of
contracting
opportunities
Account of
subcontracting
threat
None of this
Account of
subcontracting
opportunities
22. A statistical characteristic of
equipment frequently used in
replacement studies is the
hazard rate casualty risk random hazard rate
A study of maintenance personnel
concluded that those who ranked
highest possessed characteristics
as
More
experience
Less experience Inexperience None of this
More
experience
The failed system is repaired and
preventive maintenance is
performed
Periodically One year Two year Six year Periodically
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Total Productive Maintenance is a
systematic approach for
understanding the equipment's
function, the equipment's
relationship to product quality
and the likely cause and
frequency of
failure of the
critical
equipment
components.
failure of the
safe equipment
components.
failure of the
complimentary
equipment
components.
None of this
failure of the
critical
equipment
components.
Total Productive Maintenance
(TPM) aimed at
…………………equipment
effectiveness through the
Maximizing Minimizing Average None of this Maximizing
23. optimization of equipment
availability, performances,
efficiency and product quality.
Which maintenance the
continuous checking and
prevention of major maintenance.
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Preventive
Maintenance
which maintenance Correction of
problem when occur is very
important to run the production
process smoothly
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Corrective
Maintenance
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this Reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
24. Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid to
the workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
maintenance cost
Increases Decreases Remain same
Any of the
above
Decreases
A systematic approach for
maintenance is
Problem –
Cause –
Problem–
Diagnosis –
Problem –
Measure –
Problem–
Diagnosis –
Problem –
Cause –
25. Diagnosis –
Rectification
Cause –
Rectification
Diagnosis –
Rectification
Measure –
Rectification
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the objective
of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
What is Maintainability?
The ease with
which the
aircraft can be
The ease with
which the
aircraft can
Vulnerability RCS detection
The ease with
which the
aircraft can be
26. fixed sustain damage fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
27. changed
Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
Which type of preventive Process Control Performance- Data-based Performance-
28. maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
control
maintenance
maintenance based
preventive
maintenance
preventive
maintenance
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
Which of the following loss refers
to the equipment’s inability to get
Breakdown Start-up loss
Defects and
rework
Benchmarking Start-up loss
29. to steady state quickly after a
change?
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
operating condition is known as
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
30. The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Problem–
Diagnosis –
Cause –
Problem –
Measure –
Diagnosis –
Problem–
Diagnosis –
Measure –
Problem –
Cause –
Diagnosis –
31. Rectification Rectification Rectification Rectification Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the
objective of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
Establishing the economic life of
equipment that is essentially
utilized steadily each year One year Six month Three month Nine month One year
we can see that as the replacement
age of an item increases, the
operations and maintenance
(O&M) costs per unit time will increase decrease constant none of this increase
Reliability-centered maintenance
(RCM)
an asset-
centered
methodology
non asset-
centered
methodology
non asset-
exteriority
methodology
an asset-
exteriority
methodology
an asset-
centered
methodology
32. The high resale value associated
with a old vehicle 1-year 2-year 3-year 4-year 1-year
Optimal replacement interval for
capital Equipment:
maximization
of discounted
benefits
minimize of
discounted
benefits
average of
discounted
benefits none of this
maximization
of discounted
benefits
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Optimal Number Of Workshop
Machines
To Meet a
Fluctuating
Workload
To Meet a
remain,
Workload
To Meet a stay
Workload
To Meet a
continue
Workload
To Meet a
Fluctuating
Workload
Optimal size of a maintenance
workforce to meet a fluctuating
workload, taking
Account of
subcontracting
opportunities
Account of
contracting
opportunities
Account of
subcontracting
threat
None of this
Account of
subcontracting
opportunities
33. A statistical characteristic of
equipment frequently used in
replacement studies is the
hazard rate casualty risk random hazard rate
A study of maintenance personnel
concluded that those who ranked
highest possessed characteristics
as
More
experience
Less experience Inexperience None of this
More
experience
The failed system is repaired and
preventive maintenance is
performed
Periodically One year Two year Six year Periodically
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Total Productive Maintenance is a
systematic approach for
understanding the equipment's
function, the equipment's
relationship to product quality
and the likely cause and
frequency of
failure of the
critical
equipment
components.
failure of the
safe equipment
components.
failure of the
complimentary
equipment
components.
None of this
failure of the
critical
equipment
components.
Total Productive Maintenance
(TPM) aimed at
…………………equipment
effectiveness through the
Maximizing Minimizing Average None of this Maximizing
34. optimization of equipment
availability, performances,
efficiency and product quality.
Which maintenance the
continuous checking and
prevention of major maintenance.
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Preventive
Maintenance
which maintenance Correction of
problem when occur is very
important to run the production
process smoothly
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Corrective
Maintenance
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this Reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
35. Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid to
the workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
maintenance cost
Increases Decreases Remain same
Any of the
above
Decreases
A systematic approach for
maintenance is
Problem –
Cause –
Problem–
Diagnosis –
Problem –
Measure –
Problem–
Diagnosis –
Problem –
Cause –
36. Diagnosis –
Rectification
Cause –
Rectification
Diagnosis –
Rectification
Measure –
Rectification
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the objective
of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
What is Maintainability?
The ease with
which the
aircraft can be
The ease with
which the
aircraft can
Vulnerability RCS detection
The ease with
which the
aircraft can be
37. fixed sustain damage fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
38. changed
Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
Which type of preventive Process Control Performance- Data-based Performance-
39. maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
control
maintenance
maintenance based
preventive
maintenance
preventive
maintenance
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
Which of the following loss refers
to the equipment’s inability to get
Breakdown Start-up loss
Defects and
rework
Benchmarking Start-up loss
40. to steady state quickly after a
change?
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
operating condition is known as
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
41. The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Problem–
Diagnosis –
Cause –
Problem –
Measure –
Diagnosis –
Problem–
Diagnosis –
Measure –
Problem –
Cause –
Diagnosis –
42. Rectification Rectification Rectification Rectification Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the
objective of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
Establishing the economic life of
equipment that is essentially
utilized steadily each year One year Six month Three month Nine month One year
we can see that as the replacement
age of an item increases, the
operations and maintenance
(O&M) costs per unit time will increase decrease constant none of this increase
Reliability-centered maintenance
(RCM)
an asset-
centered
methodology
non asset-
centered
methodology
non asset-
exteriority
methodology
an asset-
exteriority
methodology
an asset-
centered
methodology
43. The high resale value associated
with a old vehicle 1-year 2-year 3-year 4-year 1-year
Optimal replacement interval for
capital Equipment:
maximization
of discounted
benefits
minimize of
discounted
benefits
average of
discounted
benefits none of this
maximization
of discounted
benefits
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Optimal Number Of Workshop
Machines
To Meet a
Fluctuating
Workload
To Meet a
remain,
Workload
To Meet a stay
Workload
To Meet a
continue
Workload
To Meet a
Fluctuating
Workload
Optimal size of a maintenance
workforce to meet a fluctuating
workload, taking
Account of
subcontracting
opportunities
Account of
contracting
opportunities
Account of
subcontracting
threat
None of this
Account of
subcontracting
opportunities
44. A statistical characteristic of
equipment frequently used in
replacement studies is the
hazard rate casualty risk random hazard rate
A study of maintenance personnel
concluded that those who ranked
highest possessed characteristics
as
More
experience
Less experience Inexperience None of this
More
experience
The failed system is repaired and
preventive maintenance is
performed
Periodically One year Two year Six year Periodically
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Total Productive Maintenance is a
systematic approach for
understanding the equipment's
function, the equipment's
relationship to product quality
and the likely cause and
frequency of
failure of the
critical
equipment
components.
failure of the
safe equipment
components.
failure of the
complimentary
equipment
components.
None of this
failure of the
critical
equipment
components.
Total Productive Maintenance
(TPM) aimed at
…………………equipment
effectiveness through the
Maximizing Minimizing Average None of this Maximizing
45. optimization of equipment
availability, performances,
efficiency and product quality.
Which maintenance the
continuous checking and
prevention of major maintenance.
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Preventive
Maintenance
which maintenance Correction of
problem when occur is very
important to run the production
process smoothly
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Corrective
Maintenance
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this Reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
46. Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid to
the workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
maintenance cost
Increases Decreases Remain same
Any of the
above
Decreases
A systematic approach for
maintenance is
Problem –
Cause –
Problem–
Diagnosis –
Problem –
Measure –
Problem–
Diagnosis –
Problem –
Cause –
47. Diagnosis –
Rectification
Cause –
Rectification
Diagnosis –
Rectification
Measure –
Rectification
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the objective
of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
What is Maintainability?
The ease with
which the
aircraft can be
The ease with
which the
aircraft can
Vulnerability RCS detection
The ease with
which the
aircraft can be
48. fixed sustain damage fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
49. changed
Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
Which type of preventive Process Control Performance- Data-based Performance-
50. maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
control
maintenance
maintenance based
preventive
maintenance
preventive
maintenance
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
Which of the following loss refers
to the equipment’s inability to get
Breakdown Start-up loss
Defects and
rework
Benchmarking Start-up loss
51. to steady state quickly after a
change?
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
operating condition is known as
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
52. The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Problem–
Diagnosis –
Cause –
Problem –
Measure –
Diagnosis –
Problem–
Diagnosis –
Measure –
Problem –
Cause –
Diagnosis –
53. Rectification Rectification Rectification Rectification Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the
objective of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
Establishing the economic life of
equipment that is essentially
utilized steadily each year One year Six month Three month Nine month One year
we can see that as the replacement
age of an item increases, the
operations and maintenance
(O&M) costs per unit time will increase decrease constant none of this increase
Reliability-centered maintenance
(RCM)
an asset-
centered
methodology
non asset-
centered
methodology
non asset-
exteriority
methodology
an asset-
exteriority
methodology
an asset-
centered
methodology
54. The high resale value associated
with a old vehicle 1-year 2-year 3-year 4-year 1-year
Optimal replacement interval for
capital Equipment:
maximization
of discounted
benefits
minimize of
discounted
benefits
average of
discounted
benefits none of this
maximization
of discounted
benefits
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
changed
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Optimal Number Of Workshop
Machines
To Meet a
Fluctuating
Workload
To Meet a
remain,
Workload
To Meet a stay
Workload
To Meet a
continue
Workload
To Meet a
Fluctuating
Workload
Optimal size of a maintenance
workforce to meet a fluctuating
workload, taking
Account of
subcontracting
opportunities
Account of
contracting
opportunities
Account of
subcontracting
threat
None of this
Account of
subcontracting
opportunities
55. A statistical characteristic of
equipment frequently used in
replacement studies is the
hazard rate casualty risk random hazard rate
A study of maintenance personnel
concluded that those who ranked
highest possessed characteristics
as
More
experience
Less experience Inexperience None of this
More
experience
The failed system is repaired and
preventive maintenance is
performed
Periodically One year Two year Six year Periodically
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Total Productive Maintenance is a
systematic approach for
understanding the equipment's
function, the equipment's
relationship to product quality
and the likely cause and
frequency of
failure of the
critical
equipment
components.
failure of the
safe equipment
components.
failure of the
complimentary
equipment
components.
None of this
failure of the
critical
equipment
components.
Total Productive Maintenance
(TPM) aimed at
…………………equipment
effectiveness through the
Maximizing Minimizing Average None of this Maximizing
56. optimization of equipment
availability, performances,
efficiency and product quality.
Which maintenance the
continuous checking and
prevention of major maintenance.
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Preventive
Maintenance
which maintenance Correction of
problem when occur is very
important to run the production
process smoothly
Preventive
Maintenance
Corrective
Maintenance
Condition-
Based
Maintenanc
Predictive
Maintenance
Corrective
Maintenance
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this Reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Which of the following is not the
responsibility of maintenance
department ?
Breakdown
maintenance
Protection
against fire
hazards
To keep
machine in
good condition
None of the
above
None of the
above
57. Which of the following is types of
Maintenance ?
Condition-
Based
Maintenance
Predictive
maintenance
Preventive
maintenance
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is repaired
and brought into operating
condition is known as
Down time
Break Down
time
Both (A) and (B) Idle time
Both (A) and
(B)
The down time cost consists of
Loss of
production
Wages paid to
the workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Scheduled maintenance is _______
between breakdown maintenance
and the preventive maintenance.
Joint Compromise Bridge In Compromise
Equipment history cards are
meant to record
The way
equipment
behaves
Total down
time of the
equipment
The rate at
which different
components
wear off
All of the
above
Total down
time of the
equipment
The ____ goes on increasing with
the increase in degree of
maintenance efforts.
Cost of down
time
Cost of spares
and
maintenance
Labour and
Overhead Cost
All of the
above
Labour and
Overhead
Cost
With the increase in preventive
maintenance cost, breakdown
maintenance cost
Increases Decreases Remain same
Any of the
above
Decreases
A systematic approach for
maintenance is
Problem –
Cause –
Problem–
Diagnosis –
Problem –
Measure –
Problem–
Diagnosis –
Problem –
Cause –
58. Diagnosis –
Rectification
Cause –
Rectification
Diagnosis –
Rectification
Measure –
Rectification
Diagnosis –
Rectification
(Down time in hours / Available
hours) =
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Maintenance
effectiveness
(Number of breakdowns /
Available machine hours)
Maintenance
effectiveness
Frequency of
breakdown
Effectiveness of
maintenance
planning
None of the
above
Frequency of
breakdown
Total productive maintenance
aims at
Less idle time
Increase in
productivity
Zero down time
None of the
above
Zero down
time
To anticipate failures and prevent
them from happening is the objective
of FMEA.
TRUE FALSE TRUE
Find the odd one out related to the
FMEA team.
Assembly
engineer
Manufacturing
engineer
Quality
engineer
Process
variability
data
Process
variability
data
Find the odd one out related to the
data inputs required to prepare
FMEA.
Product and
process
specifications
Reliability data
Customer
priority data
Quality
engineer
Quality
engineer
Which of the following is not a
benefit of FMEA?
Increase in
customer
satisfaction
Prioritize
product/process
deficiencies
Maximize late
changes and
associated cost
Document
and track
actions taken
to reduce risk
Maximize late
changes and
associated
cost
A particular product has been given
the following rankings for calculating
RPN while preparing FMEA chart,
S=10, O=2, D=2. What is the value of
RPN?
20 10 40 2 40
What is Maintainability?
The ease with
which the
aircraft can be
The ease with
which the
aircraft can
Vulnerability RCS detection
The ease with
which the
aircraft can be
59. fixed sustain damage fixed
There are four stages of FMEA.
i) Specifyingthe possibilities
ii) Quantifying risk
iii) Correcting high risk causes
iv) Re-evaluation of Risk
Which is the correct order of
proceeding with these stages of
FMEA?
i),ii),iii),iv) i),ii),iv),iii) iv),iii),i),ii) iv),iii),ii),i) i),ii),iii),iv)
According to common industry scale,
what does severity ranking (S) 1
indicate?
Very serious
effect
No effect
Sometimes
serious effect
The value
doesn’t exist
No effect
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
Which of the following is not a
function of SAP Plant
Maintenance?
Inspection
and
Notifications
Corrective and
Preventive
Maintenance
Breakdown
Maintenance
Material
Requirement
Planning
(MRP) run
Material
Requirement
Planning
(MRP) run
Which of the following is used to
define the sequence of activities
that are performed as part of
Preventive Maintenance in an
organization?
Task Lists Notification Work Order
Maintenance
Order
Task Lists
In Plant Maintenance, after
refurbishment is done and
material is returned, which of the
following is correct?
Stock value of
the repairable
material in
the
warehouse is
Charges to the
cost center
changes
A credit memo
is applied to the
order
All of the
above
All of the
above
60. changed
Which of the following is correct?
Maintenance Plan Type
Maintenance Strategy
1) Single cycle plan, time-based -
No
2) Single cycle plan, performance-
based - No
3) Strategy plan, time-based - Yes
4) Strategy plan, performance-
based - Yes
5) Multiple counter plan - No
1,2,3 are
correct
1,2,3,4 are
correct
2,3,4,5 are
correct
1,2,3,4,5 are
correct
1,2,3,4,5 are
correct
Which of the following correctly
defines a Maintenance Plant?
Maintenance
Department
Plant at which
maintenance
activities are
planned
Plant at which
Maintenance of
material done
A plant in
which the
technical
objects of a
company are
installed
A plant in
which the
technical
objects of a
company are
installed
Assume a scenario where a system
engineer accidentally entered a
functional location with an
incorrect label. Flow do you
correct it without making a new
entry?
Alternative
Labeling
Changing the
primary key
Duplicate
Labeling
Flierarchical
Labeling
Alternative
Labeling
Which type of preventive Process Control Performance- Data-based Performance-
61. maintenance enables you to plan
maintenance based on counter
reading that are managed for the
technical objects to be
maintained?
control
maintenance
maintenance based
preventive
maintenance
preventive
maintenance
based
preventive
maintenance
Which types of task list are object-
based and created for a specific,
individual piece of equipment?
Task lists for
functional
locations
General
maintenance
task lists
Equipment task
list
Preventive
task list
Equipment
task list
What happens if no scheduling
period is defined in the
maintenance plan when the
current waiting call is converted
into an order?
Order will not
be processed
Order is
blocked
A new planned
date is
automatically
added
Previous
scheduling
date will be
entered
A new
planned date
is
automatically
added
Which of the following is not a
type of loss examined by TPM?
Down-time
loss
Speed loss Defect loss
Forecasting
loss
Forecasting
loss
Which of the following loss refers
to the gradual deterioration in
equipment cycle times?
Increased
speed
Reduced speed
Maximum
speed
Optimum
speed
Reduced
speed
Which of the following is not a
loss that TPM focuses on
reducing?
Equipment
breakdown
Defects and
rework
Idling and
minor
stoppages
Optimized
equipment
cycle time
Optimized
equipment
cycle time
Which of the following is not a
goal shared by TPM?
Zero defects
Maximum
productivity
Minimum
productivity
Zero
breakdowns
Minimum
productivity
Which pillar of TPM focuses on
routine maintenance?
Training and
Education
Just-in-time 5S
Autonomous
maintenance
Autonomous
maintenance
Which of the following is not an
advantage of autonomous
maintenance?
Sense of
ownership in
operators
Increases
operator
knowledge of
equipment
Ensures clean
and lubricated
equipment
Demotes
customer
satisfaction
Demotes
customer
satisfaction
Which of the following loss refers
to the equipment’s inability to get
Breakdown Start-up loss
Defects and
rework
Benchmarking Start-up loss
62. to steady state quickly after a
change?
Which of the following is the most
reasonable time taken by an
organization to implement TPM?
Two days Three years Five days Fifty years Three years
Quality is improved as a result ,
that the failures and malfunctions
are reduced
reduced Increased constant None of this reduced
To keep the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Maintenance Wear Corrosion
None of the
above
Maintenance
To gives us knowledge for
keeping the machine plants &
process equipment in there
efficient condition, the
maintenance activities are planned
& carried out is known as _____ .
Industrial
engineering
Automobile
engineering
Production
engineering
Maintenance
engineering
Maintenance
engineering
Which of the following is primary
functions of maintenance
department?
Maintenance
of existing
plant and
equipments.
Inspection and
lubrication of
equipments.
Proper
distribution of
utility service
All of above All of above
Maintenance consist of the
following action(s)
Replace of
component
Repair of
component
Service of
component
All of the
above
All of the
above
The time elapsed from the point
the machine fails to perform its
function to the point it is
repaired and brought into
operating condition is known as
Down time
Break Down
time
Both (A) and
(B)
Idle time
Both (A) and
(B)
63. The down time cost consists of
Loss of
production
Wages paid
to the
workers
Reduction in
sales
All of the
above
All of the
above
The following is not a
classification of maintenance
Corrective
maintenance
Timely
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Belt of an electric motor is broken,
it needs
Corrective
maintenance
Scheduled
maintenance
Preventive
maintenance
Timely
maintenance
Corrective
maintenance
The following is (are) scheduled
maintenance
Overhauling
of machine
Cleaning of
tank
Whitewashing
of building
All of the
above
All of the
above
Most important of all,
maintenance excellence is
concerned with balancing
performance, risks, and the
resource inputs to achieve an
Optimal
solution Direct solution Indirect solution None of this
Optimal
solution
The total cost of the replacement
must be greater after failure than
before. This may be caused by
A greater loss
of production
because
replacement
A greater profit
of production
because
replacement
A avg profit of
production
because
replacement None of this
A greater loss
of production
because
replacement
The hazard rate of equipment
must be increasing before
preventive replacement is Worthwhile Not worthwhile Unavailable None of this Worthwhile
the optimal frequency of
inspection and associated ………..
maintenance of complex
equipment. Minor Major Primary None of this Minor
To reduce the number of failures,
preventive replacements can be
scheduled to occur at specified Intervals. Rest. Layoff. Progression, Intervals.
A systematic approach for
maintenance is
Problem –
Cause –
Diagnosis –
Problem–
Diagnosis –
Cause –
Problem –
Measure –
Diagnosis –
Problem–
Diagnosis –
Measure –
Problem –
Cause –
Diagnosis –