SlideShare a Scribd company logo
1 of 22
Download to read offline
Al Monaco 
President & CEO 
BUSINESS UNIT HEADER IMAGE GOES HERE 
2014 Third Quarter Financial & Strategic Update 
John Whelen 
Executive Vice President & CFO
Legal Notice 
2 
This presentation includes certain forward looking information (FLI) to provide Enbridge shareholders and potential investors with information about Enbridge and management’s assessment of its future plans and operations, which may not be appropriate for other purposes. FLI is typically identified by words such as “anticipate”, “expect”, “project”, “estimate”, “forecast”, “plan”, “intend”, “target”, “believe” and similar words suggesting future outcomes or statements regarding an outlook. Although we believe that our FLI is reasonable based on the information available today and processes used to prepare it, such statements are not guarantees of future performance and you are cautioned against placing undue reliance on FLI. By its nature, FLI involves a variety of assumptions, risks, uncertainties and other factors which may cause actual results, levels of activity and achievements to differ materially from those expressed or implied in our FLI. Material assumptions include assumptions about: the expected supply and demand for crude oil, natural gas and natural gas liquids; prices of crude oil, natural gas and natural gas liquids; expected exchange rates; inflation; interest rates; the availability and price of labour and pipeline construction materials; operational reliability; anticipated in-service dates and weather. 
Our FLI is subject to risks and uncertainties pertaining to operating performance, regulatory parameters, weather, economic conditions, exchange rates, interest rates and commodity prices, including but not limited to those discussed more extensively in our filings with Canadian and US securities regulators. The impact of any one risk, uncertainty or factor on any particular FLI is not determinable with certainty as these are interdependent and our future course of action depends on management’s assessment of all information available at the relevant time. Except to the extent required by law, we assume no obligation to publicly update or revise any FLI, whether as a result of new information, future events or otherwise. All FLI in this presentation is expressly qualified in its entirety by these cautionary statements. 
This presentation will make reference to non-GAAP measures including adjusted earnings together with respective per share amounts. These measures are not measures that have a standardized meaning prescribed by U.S. GAAP and may not be comparable with similar measures presented by other issuers. Additional information on the Company’s use of non-GAAP measures can be found in Management’s Discussion and Analysis available on the Company’s website.
Agenda 
• 
Third Quarter Highlights 
• 
Capital Investment Plan (2014 – 2018) 
• 
Major Projects Update 
• 
Q3 Financial Review & Funding Status 
• 
Outlook 
3
EPS Guidance 
Relative Monthly Price Performance 
• 
Reliable Low Risk Business Model 
- 
Conservative commercial structures 
- 
Major projects execution 
- 
Prudent financial management 
- 
Disciplined investment process 
• 
Superior long-term track record 
- 
Transparent EPS/DPS growth 
A Proven Model for Sustainable Value Creation 
4 
Adjusted EPS* 
*Adjusted earnings is a non-GAAP measure. For more information on non-GAAP measures please refer to disclosure in MD&A. 
Enbridge Inc. 
Peers 
S&P/TSX Index 
$0.60 
$0.80 
$1.00 
$1.20 
$1.40 
$1.60 
$1.80 
$2.00 
2008 
2009 
2010 
2011 
2012 
2013 
2014E 
DPS 
Growing Predictable EPS/DPS 
0% 
50% 
100% 
150% 
200% 
250% 
300%
Q3 and YTD 2014 – Adjusted Earnings ($ millions) 
5 
$488 
$492 
$306 
$328 
$278 
$345 
2013 
2014 
Q3 
Q3 
Q2 
Q1 
Q2 
Q1 
$1,072 
$1,165 
Year-To-Date Adjusted EPS: 
$1.33 
$1.41 
*Adjusted earnings is a non-GAAP measure. For more information on non-GAAP measures please refer to disclosure in MD&A. 
Full Year 2014 EPS Guidance: 
$1.84 
$2.04
Growth Capital Program* 
Enbridge Day 2012 
2012-2016 
Enbridge Day 2013 
2013 - 2017 
Enbridge Day 2014 
2014 - 2018 
Secured 
Unsecured 
$18 
$26 
$33 
$17 
$10 
$11 
$35 
$36 
$44 
• 
$44 billion capital program drives growth outlook 
- 
Increased opportunity set by $9 billion since 2012 
- 
$15 billion net increase in secured capital since 2012 
• 
Capital program drives 10-12% EPS CAGR through 2018 
* Enterprise wide program, includes EEP and ENF 
6 
$Billions 
5-Year Program 
75% Secured
Project Execution Update – Completed Projects 
Mainline Expansions 
Southern Access Phase 1 
Flanagan South 
Line 6B Replacement 
Lac Alfred & Massif-du-Sud 
7 
Seaway 
Projects 
Estimated Cost 
($ Billion) 
Liquids Pipelines (Alberta Regional Infrastructure): 
Norealis Pipeline 
$0.5 
Surmont Phase 2 Expansion (2014-2015 Phases) 
$0.3 
Liquids Pipelines (Market Access Initiatives): 
Eastern Access 
Line 6B Replacement 
Line 9 Reversal* 
$2.1 
$0.6 
Western USGC Access 
$4.6 
Light Oil Market Access (Line 9 Expansion*) 
$0.1 
Eddystone Rail Project 
$0.1 
Line 6B 75 Miles Replacement Program 
$0.4 
Gas Pipelines: 
Pipestone and Sexsmith Project (2012-2014 Phases) 
$0.3 
Gas Distribution: 
Other EGD Growth Capital 
$0.2 
Green Power: 
Blackspring Ridge Wind Project 
$0.3 
Lac Alfred/Massif du Sud 
$0.2 
$9.7 Billion in-service in 2014 
 
 
 
 
 
 
 
Norealis Pipeline 
Blackspring Ridge 
Eddystone Rail 
*Unable to estimate the length of the delay. 
 
Pipestone & Sexsmith 

Project Execution – Line 9 
8 
Line 9 Reversal & Expansion 
• 
Program: Eastern Access 
• 
Cost: $0.7 billion 
• 
Scope: Reversal and Expansion to 300kbpd 
• 
Status: 
- 
NEB approval in March 2014 (subject to 30 conditions) 
- 
Mechanically complete Oct. 15 
- 
Responded to NEB request for additional information 
- 
In-service date TBD
Executing the Growth Capital Program 
Executed Projects 2008-Q3 2014 
completed at <5% under budget 
$20B 
<1% over budget 
$27B 
Projects in Execution Q4 2014 - 2017 
33 of 39 projects under or on schedule 
23 of 27 projects under or on schedule 
Project management is a core competency
Operational Reliability Report 
10 
Moving towards industry leadership
80% 
90% 
100% 
110% 
120% 
130% 
140% 
1/1/2013 
7/1/2013 
1/1/2014 
7/1/2014 
80% 
90% 
100% 
110% 
120% 
130% 
140% 
150% 
1/1/2013 
7/1/2013 
1/1/2014 
7/1/2014 
Sponsored Vehicles Strategy Update 
Positioned to provide low cost funding and enhance value ($24B Drop Down Inventory) 
ENF Relative Price Performance 
Enbridge Income Fund (ENF) 
• 
$1.8B drop down expands historical pace 
• 
Releases capital, accretive to ENB and ENF 
• 
Solid foundation for future drop downs Enbridge Energy Partners (EEP) 
• 
Reduced cost of funding 
• 
Proposed $900 mm drop down accelerated 
• 
No public equity requirement 
EEP Relative Price Performance 
11 
Date Yield 1/1/2013 5.2% 10/31/2014 4.6% 
Date Yield 
1/1/2013 7.7% 
10/31/2014 6.1% 
ENF; +23% 
S&P/TSX: +18% 
EEP: +30% MLP Alerian Index: +41%
Q3 Segmented Adjusted Earnings* Variance 
12 
0 
50 
100 
150 
200 
250 
300 
350 
400 
Q3 2013 
Q3 2014 
Adjusted Earnings* $ millions 
$278 
$345 
- $34 Gas Pipelines, Processing & Energy Services 
Sponsored Investments + $40 
+ $7 Corporate 
+ $34 
Liquids Pipelines 
*Adjusted earnings is a non-GAAP measure. For more information on non-GAAP measures please refer to disclosure in MD&A.. 
Gas Distribution + $20
2014 Guidance Range 
Full Year 2014 Adjusted EPS* Guidance Outlook 
13 
Headwinds 
Energy Services 
Equity prefunding 
Tailwinds Liquids Pipelines 
- 
Line 9B delay 
*Adjusted earnings is a non-GAAP measure. For more information on non-GAAP measures please refer to disclosure in MD&A.. 
$1.84 
$2.04
Market Price Risk Mitigation 
88% 
69% 
77% 
0% 
100% 
Term Debt 
Issuance 
Floating 
Rate Debt 
USD 
Exposure (2014 – 2018): % Hedged 
Average Hedged Rate 
1.06 CAD/USD 
1.47% CDOR/LIBOR 
3.56% GOC/UST 
Market price exposure continues to be substantially hedged 
14
0 
5 
10 
15 
20 
YTD 
Enterprise Wide Funding & Liquidity 
* Includes debt issued by Canadian self-funding subsidiaries, EGD and EPI. 
15 
$ Billions (nominal) 
0 
5 
10 
15 
20 
September 30, 2014 
$11 Billion Available 
$18 
Facility Usage1 
Unutilized Capacity 
Cash 
1 Includes credit facility draws and undrawn amounts backstopping outstanding commercial paper. 
Enterprise Wide Funding 
Available Liquidity 
Sponsored Vehicles 
ENB Equity & DRIP 
ENB Preferred Shares 
ENB Debt* & Credit Facilities 
$5.6 
$1.4 
$0.8 
$8.6 Billion Raised 
$0.8
Maintenance & Integrity Capital 
5.0 
Secured Growth Capital 
22.9 
Risked Growth Capital 
9.4 
37.3 
Cash Flow Net of Dividends 
(15.4) 
Net Funding Requirement* 
21.9 
Total Requirement 
15.7 
2014 – 2018 Maturities 
6.6 
Cash on Hand 
(0.5) 
Requirement, Net of Cash 
21.8 
Preferred Share Issuances 
(0.7) 
Debt Already Issued 
(5.5) 
Debt Requirement 
15.6 
Funding Plan (2014-2018) 
Debt 
Equity 
Total Requirement 
6.2 
DRIP/ESOP 
(2.8) 
Requirement, Net of DRIP 
3.4 
ENF Drop Down Equity 
(0.3) 
Common Share Issuances 
(0.5) 
Preferred Share Issuances 
(0.7) 
Equity Requirement 
1.9 
*Excludes funding requirements of sponsored vehicles 
$ Billions 
Financing requirements remain very manageable 
16
Cost of Equity Optimization and Flexibility 
Alternative Sources 
Preferred Shares 
$1.5B 
Asset Monetization/Sponsored Vehicle Drop Downs 
$3.0B 
Total 
$4.5B 
ENB Public Equity 
~ 
Alternative sources of equity exceed $1.9 billion of current common equity requirements 
17
18 
Projects 
Estimated Cost 
($ Billion) 
Liquids Pipelines (Alberta Regional Infrastructure): 
AOC Hangingstone 
$0.2 
Sunday Creek Terminal Expansion 
$0.2 
Woodland Pipeline Expansion 
$0.6 
Liquids Pipelines (Market Access Initiatives): 
Western USGC Access: 
Associated Mainline Expansions 
$0.7 
Light Oil Market Access: 
Southern Access Extension 
Chicago Connectivity 
Associated Mainline Expansions 
$0.6 
$0.5 
$1.9 
Edmonton to Hardisty Expansion 
$1.8 
Gas Pipelines: 
Beckville Cryogenic Processing Facility 
$0.1 
Walker Ridge Gas Gathering 
$0.4 
Big Foot Oil Pipeline 
$0.2 
Gas Distribution: 
Greater Toronto Area Project 
$0.7 
Other EGD Growth Capital 
$0.2 
Green Power: 
Keechi Creek Wind Project 
$0.2 
$8.3 Billion in-service in 2015 
Continued Earnings Growth
2013 
2018 
Adjusted Earnings* Growth 
• 
$20 billion of Tilted Return Projects 
• 
Natural Gas 
• 
New Growth Platforms 
• 
Sponsored Vehicle Drop Downs 
• 
Liquids Pipelines 
*Adjusted earnings are non-GAAP measures. For more information on non-GAAP measures please refer to disclosure in MD&A. 
•Liquids Pipelines 
•$44 B growth program 
• 
10-12% average annual EPS growth through 2018 
- 
Highly transparent growth outlook 
•Several sources of post 2018 growth 
19
Dividend Payout Considerations 
• 
Progress on equity prefunding 
20 
• 
High organic growth capital program 
• 
Robustness of equity funding options (sponsored vehicles) 
• 
Rising internal free cash flow
2013 
2018 
Substantial Dividend Growth 
• 
EPS Growth 
• 
Surplus Cash Flow 
21
Question & Answer Period 
BUSINESS UNIT HEADER IMAGE GOES HERE 
22

More Related Content

What's hot

Q1 fiscal 2016 slides final
Q1 fiscal 2016 slides finalQ1 fiscal 2016 slides final
Q1 fiscal 2016 slides finalRoyalGold
 
02 24-16 fourth quarter &amp; fy 2015 financial review final
02 24-16 fourth quarter &amp; fy 2015 financial review final02 24-16 fourth quarter &amp; fy 2015 financial review final
02 24-16 fourth quarter &amp; fy 2015 financial review finalAES_BigSky
 
Jp energy mlpa conference jun2016-final
Jp energy   mlpa conference jun2016-finalJp energy   mlpa conference jun2016-final
Jp energy mlpa conference jun2016-finalir_jpenergy
 
Chesapeake Energy Investor Presentation Feb 2015
Chesapeake Energy Investor Presentation Feb 2015Chesapeake Energy Investor Presentation Feb 2015
Chesapeake Energy Investor Presentation Feb 2015Marcellus Drilling News
 
AES 50th Annual EEI Financial Conference
AES 50th Annual EEI Financial ConferenceAES 50th Annual EEI Financial Conference
AES 50th Annual EEI Financial ConferenceAES_BigSky
 
Enlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnLinkMidstreamLLC
 
1 q16 earnings-presentation-final
1 q16 earnings-presentation-final1 q16 earnings-presentation-final
1 q16 earnings-presentation-finalinvestorswci
 
EGM Presentation to Foyson Shareholders
EGM Presentation to Foyson ShareholdersEGM Presentation to Foyson Shareholders
EGM Presentation to Foyson ShareholdersFOYSONRESOURCESLTD
 
1Q 2016 Earnings Presentation
1Q 2016 Earnings Presentation1Q 2016 Earnings Presentation
1Q 2016 Earnings Presentationirbgcpartners
 
Q2 2016 operations report final as published
Q2 2016   operations report final as publishedQ2 2016   operations report final as published
Q2 2016 operations report final as publishedEnLinkMidstreamLLC
 
Jp energy barclays mlp corporate access day
Jp energy   barclays mlp corporate access dayJp energy   barclays mlp corporate access day
Jp energy barclays mlp corporate access dayir_jpenergy
 
May Investor Presentation
May Investor PresentationMay Investor Presentation
May Investor PresentationAES_BigSky
 
Quarterly Slides October 2021
Quarterly Slides October 2021Quarterly Slides October 2021
Quarterly Slides October 2021gstubel
 
Q3 2014 AES Corporation Earnings Conference Call
Q3 2014 AES Corporation Earnings Conference CallQ3 2014 AES Corporation Earnings Conference Call
Q3 2014 AES Corporation Earnings Conference CallAES_BigSky
 
Eog and yates 0916 slideshow final
Eog and yates 0916 slideshow finalEog and yates 0916 slideshow final
Eog and yates 0916 slideshow finalResources1Smith
 
Pesentation Slides on Keppel Pegasus' Final Consideration for SPH ex-media
Pesentation Slides on Keppel Pegasus' Final Consideration for SPH ex-mediaPesentation Slides on Keppel Pegasus' Final Consideration for SPH ex-media
Pesentation Slides on Keppel Pegasus' Final Consideration for SPH ex-mediaKeppelCorporation
 
2017 12 capital one conference final
2017 12 capital one conference final2017 12 capital one conference final
2017 12 capital one conference finalDenbury
 

What's hot (20)

Q1 fiscal 2016 slides final
Q1 fiscal 2016 slides finalQ1 fiscal 2016 slides final
Q1 fiscal 2016 slides final
 
02 24-16 fourth quarter &amp; fy 2015 financial review final
02 24-16 fourth quarter &amp; fy 2015 financial review final02 24-16 fourth quarter &amp; fy 2015 financial review final
02 24-16 fourth quarter &amp; fy 2015 financial review final
 
Jp energy mlpa conference jun2016-final
Jp energy   mlpa conference jun2016-finalJp energy   mlpa conference jun2016-final
Jp energy mlpa conference jun2016-final
 
Chesapeake Energy Investor Presentation Feb 2015
Chesapeake Energy Investor Presentation Feb 2015Chesapeake Energy Investor Presentation Feb 2015
Chesapeake Energy Investor Presentation Feb 2015
 
AES 50th Annual EEI Financial Conference
AES 50th Annual EEI Financial ConferenceAES 50th Annual EEI Financial Conference
AES 50th Annual EEI Financial Conference
 
Enlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations report
 
1 q16 earnings-presentation-final
1 q16 earnings-presentation-final1 q16 earnings-presentation-final
1 q16 earnings-presentation-final
 
CHK 2016 Analyst Day
CHK 2016 Analyst DayCHK 2016 Analyst Day
CHK 2016 Analyst Day
 
EGM Presentation to Foyson Shareholders
EGM Presentation to Foyson ShareholdersEGM Presentation to Foyson Shareholders
EGM Presentation to Foyson Shareholders
 
1Q 2016 Earnings Presentation
1Q 2016 Earnings Presentation1Q 2016 Earnings Presentation
1Q 2016 Earnings Presentation
 
Q2 2016 operations report final as published
Q2 2016   operations report final as publishedQ2 2016   operations report final as published
Q2 2016 operations report final as published
 
Jp energy barclays mlp corporate access day
Jp energy   barclays mlp corporate access dayJp energy   barclays mlp corporate access day
Jp energy barclays mlp corporate access day
 
May Investor Presentation
May Investor PresentationMay Investor Presentation
May Investor Presentation
 
Quarterly Slides October 2021
Quarterly Slides October 2021Quarterly Slides October 2021
Quarterly Slides October 2021
 
Q3 2014 AES Corporation Earnings Conference Call
Q3 2014 AES Corporation Earnings Conference CallQ3 2014 AES Corporation Earnings Conference Call
Q3 2014 AES Corporation Earnings Conference Call
 
Eog and yates 0916 slideshow final
Eog and yates 0916 slideshow finalEog and yates 0916 slideshow final
Eog and yates 0916 slideshow final
 
February 9 2021 Investor Presentation
February 9 2021 Investor PresentationFebruary 9 2021 Investor Presentation
February 9 2021 Investor Presentation
 
Pesentation Slides on Keppel Pegasus' Final Consideration for SPH ex-media
Pesentation Slides on Keppel Pegasus' Final Consideration for SPH ex-mediaPesentation Slides on Keppel Pegasus' Final Consideration for SPH ex-media
Pesentation Slides on Keppel Pegasus' Final Consideration for SPH ex-media
 
2017 12 capital one conference final
2017 12 capital one conference final2017 12 capital one conference final
2017 12 capital one conference final
 
Johnson Rice Energy Conference
Johnson Rice Energy ConferenceJohnson Rice Energy Conference
Johnson Rice Energy Conference
 

Viewers also liked

2014 C.D. Howe Institute Roundtable
2014 C.D. Howe Institute Roundtable 2014 C.D. Howe Institute Roundtable
2014 C.D. Howe Institute Roundtable Enbridge Inc.
 
2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids PipelinesEnbridge Inc.
 
TD Securities Calgary Energy Conference 2014
TD Securities Calgary Energy Conference 2014TD Securities Calgary Energy Conference 2014
TD Securities Calgary Energy Conference 2014Enbridge Inc.
 
Enbridge Inc. First Quarter 2014 Financial Results
Enbridge Inc. First Quarter 2014 Financial ResultsEnbridge Inc. First Quarter 2014 Financial Results
Enbridge Inc. First Quarter 2014 Financial ResultsEnbridge Inc.
 
Governor-in-Council 2014 Northern Gateway Decision
Governor-in-Council 2014 Northern Gateway DecisionGovernor-in-Council 2014 Northern Gateway Decision
Governor-in-Council 2014 Northern Gateway DecisionEnbridge Inc.
 
Duluth Chamber of Commerce 2014 Annual Dinner
Duluth Chamber of Commerce 2014 Annual DinnerDuluth Chamber of Commerce 2014 Annual Dinner
Duluth Chamber of Commerce 2014 Annual DinnerEnbridge Inc.
 
Caesar II (Pipe Stress Analysis) - Bahasa Melayu
Caesar II (Pipe Stress Analysis) -  Bahasa MelayuCaesar II (Pipe Stress Analysis) -  Bahasa Melayu
Caesar II (Pipe Stress Analysis) - Bahasa MelayuGem Gem
 
2014 Enbridge Day - Enbridge Gas Distribution
2014 Enbridge Day - Enbridge Gas Distribution2014 Enbridge Day - Enbridge Gas Distribution
2014 Enbridge Day - Enbridge Gas DistributionEnbridge Inc.
 
Fatigue analysis using caesar ii
Fatigue analysis using caesar iiFatigue analysis using caesar ii
Fatigue analysis using caesar iiRem Elems
 

Viewers also liked (11)

2014 C.D. Howe Institute Roundtable
2014 C.D. Howe Institute Roundtable 2014 C.D. Howe Institute Roundtable
2014 C.D. Howe Institute Roundtable
 
2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines2014 Enbridge Day - Liquids Pipelines
2014 Enbridge Day - Liquids Pipelines
 
Add revit
Add   revitAdd   revit
Add revit
 
TD Securities Calgary Energy Conference 2014
TD Securities Calgary Energy Conference 2014TD Securities Calgary Energy Conference 2014
TD Securities Calgary Energy Conference 2014
 
Enbridge Inc. First Quarter 2014 Financial Results
Enbridge Inc. First Quarter 2014 Financial ResultsEnbridge Inc. First Quarter 2014 Financial Results
Enbridge Inc. First Quarter 2014 Financial Results
 
Governor-in-Council 2014 Northern Gateway Decision
Governor-in-Council 2014 Northern Gateway DecisionGovernor-in-Council 2014 Northern Gateway Decision
Governor-in-Council 2014 Northern Gateway Decision
 
Duluth Chamber of Commerce 2014 Annual Dinner
Duluth Chamber of Commerce 2014 Annual DinnerDuluth Chamber of Commerce 2014 Annual Dinner
Duluth Chamber of Commerce 2014 Annual Dinner
 
Piping questions
Piping questionsPiping questions
Piping questions
 
Caesar II (Pipe Stress Analysis) - Bahasa Melayu
Caesar II (Pipe Stress Analysis) -  Bahasa MelayuCaesar II (Pipe Stress Analysis) -  Bahasa Melayu
Caesar II (Pipe Stress Analysis) - Bahasa Melayu
 
2014 Enbridge Day - Enbridge Gas Distribution
2014 Enbridge Day - Enbridge Gas Distribution2014 Enbridge Day - Enbridge Gas Distribution
2014 Enbridge Day - Enbridge Gas Distribution
 
Fatigue analysis using caesar ii
Fatigue analysis using caesar iiFatigue analysis using caesar ii
Fatigue analysis using caesar ii
 

Similar to Enbridge Inc. Third Quarter 2014 Financial Results

En link midstream jp morgan presentation
En link midstream jp morgan presentationEn link midstream jp morgan presentation
En link midstream jp morgan presentationEnLinkMidstreamLLC
 
Q3 2014 jnpr financial results slides final - 2014-10-27
Q3 2014 jnpr financial results slides   final - 2014-10-27Q3 2014 jnpr financial results slides   final - 2014-10-27
Q3 2014 jnpr financial results slides final - 2014-10-27IRJuniperNetworks
 
Juniper networks q4 2014 financial results slides
Juniper networks q4 2014 financial results slidesJuniper networks q4 2014 financial results slides
Juniper networks q4 2014 financial results slidesIRJuniperNetworks
 
Juniper networks q4 2014 financial results slides final 2015-02-23
Juniper networks q4 2014 financial results slides  final 2015-02-23Juniper networks q4 2014 financial results slides  final 2015-02-23
Juniper networks q4 2014 financial results slides final 2015-02-23IRJuniperNetworks
 
12 15-14 december investor presentation final
12 15-14 december investor presentation final12 15-14 december investor presentation final
12 15-14 december investor presentation finalAES_BigSky
 
Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation EnLinkMidstreamLLC
 
Trc q1 2015 earnings slides final
Trc q1 2015 earnings slides finalTrc q1 2015 earnings slides final
Trc q1 2015 earnings slides finaltrcsolutions
 
Investor Presentation August 2015
Investor Presentation August 2015Investor Presentation August 2015
Investor Presentation August 2015EnLinkMidstreamLLC
 
Trc q1 2014 earnings slides final
Trc q1 2014 earnings slides finalTrc q1 2014 earnings slides final
Trc q1 2014 earnings slides finaltrcsolutions
 
Citi MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure ConferenceCiti MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure ConferenceEnLinkMidstreamLLC
 
Credit suisse mlp conference presentation
Credit suisse mlp conference presentationCredit suisse mlp conference presentation
Credit suisse mlp conference presentationEnLinkMidstreamLLC
 
Q3 2014 jnpr financial results slides final
Q3 2014 jnpr financial results slides   finalQ3 2014 jnpr financial results slides   final
Q3 2014 jnpr financial results slides finalIRJuniperNetworks
 
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline ConferenceGoldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline ConferenceEnLinkMidstreamLLC
 
Trc q1-2015-earnings-slides-final v001-g61n61
Trc q1-2015-earnings-slides-final v001-g61n61Trc q1-2015-earnings-slides-final v001-g61n61
Trc q1-2015-earnings-slides-final v001-g61n61trcsolutions
 
1 q2017 earnings_ppt_final
1 q2017 earnings_ppt_final1 q2017 earnings_ppt_final
1 q2017 earnings_ppt_finalInfraREIT
 
Zep Inc. Company Overview - October 2013
Zep Inc. Company Overview - October 2013Zep Inc. Company Overview - October 2013
Zep Inc. Company Overview - October 2013Zep Inc.
 
Barclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - finalBarclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - finalEnLinkMidstreamLLC
 

Similar to Enbridge Inc. Third Quarter 2014 Financial Results (20)

Eep may13 pres
Eep may13 presEep may13 pres
Eep may13 pres
 
En link midstream jp morgan presentation
En link midstream jp morgan presentationEn link midstream jp morgan presentation
En link midstream jp morgan presentation
 
Q3 2014 jnpr financial results slides final - 2014-10-27
Q3 2014 jnpr financial results slides   final - 2014-10-27Q3 2014 jnpr financial results slides   final - 2014-10-27
Q3 2014 jnpr financial results slides final - 2014-10-27
 
Juniper networks q4 2014 financial results slides
Juniper networks q4 2014 financial results slidesJuniper networks q4 2014 financial results slides
Juniper networks q4 2014 financial results slides
 
Juniper networks q4 2014 financial results slides final 2015-02-23
Juniper networks q4 2014 financial results slides  final 2015-02-23Juniper networks q4 2014 financial results slides  final 2015-02-23
Juniper networks q4 2014 financial results slides final 2015-02-23
 
12 15-14 december investor presentation final
12 15-14 december investor presentation final12 15-14 december investor presentation final
12 15-14 december investor presentation final
 
Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation Enlink Midstream NAPTP Presentation
Enlink Midstream NAPTP Presentation
 
Trc q1 2015 earnings slides final
Trc q1 2015 earnings slides finalTrc q1 2015 earnings slides final
Trc q1 2015 earnings slides final
 
Investor Presentation August 2015
Investor Presentation August 2015Investor Presentation August 2015
Investor Presentation August 2015
 
Trc q1 2014 earnings slides final
Trc q1 2014 earnings slides finalTrc q1 2014 earnings slides final
Trc q1 2014 earnings slides final
 
Citi MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure ConferenceCiti MLP / Midstream Infrastructure Conference
Citi MLP / Midstream Infrastructure Conference
 
Credit suisse mlp conference presentation
Credit suisse mlp conference presentationCredit suisse mlp conference presentation
Credit suisse mlp conference presentation
 
Q3 2014 jnpr financial results slides final
Q3 2014 jnpr financial results slides   finalQ3 2014 jnpr financial results slides   final
Q3 2014 jnpr financial results slides final
 
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline ConferenceGoldman Sachs Power, Utilities, MLP & Pipeline Conference
Goldman Sachs Power, Utilities, MLP & Pipeline Conference
 
Trc q1-2015-earnings-slides-final v001-g61n61
Trc q1-2015-earnings-slides-final v001-g61n61Trc q1-2015-earnings-slides-final v001-g61n61
Trc q1-2015-earnings-slides-final v001-g61n61
 
1 q2017 earnings_ppt_final
1 q2017 earnings_ppt_final1 q2017 earnings_ppt_final
1 q2017 earnings_ppt_final
 
Zep Inc. Company Overview - October 2013
Zep Inc. Company Overview - October 2013Zep Inc. Company Overview - October 2013
Zep Inc. Company Overview - October 2013
 
Barclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - finalBarclays ceo energy power conference - sept 9 - final
Barclays ceo energy power conference - sept 9 - final
 
JP Morgan Energy Presentation
JP Morgan Energy PresentationJP Morgan Energy Presentation
JP Morgan Energy Presentation
 
August Investor Presentation
August Investor PresentationAugust Investor Presentation
August Investor Presentation
 

More from Enbridge Inc.

2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and ProcessingEnbridge Inc.
 
2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major ProjectsEnbridge Inc.
 
2014 Enbridge Day - Power, International and Energy Services
2014 Enbridge Day - Power, International and Energy Services2014 Enbridge Day - Power, International and Energy Services
2014 Enbridge Day - Power, International and Energy ServicesEnbridge Inc.
 
2014 Enbridge Day - Strategic Overview
2014 Enbridge Day - Strategic Overview2014 Enbridge Day - Strategic Overview
2014 Enbridge Day - Strategic OverviewEnbridge Inc.
 
Market Access the Strategic Imperative Continues 2014
Market Access the Strategic Imperative Continues 2014Market Access the Strategic Imperative Continues 2014
Market Access the Strategic Imperative Continues 2014Enbridge Inc.
 
2014 Petroleum Intelligence Weekly Q&A
2014 Petroleum Intelligence Weekly Q&A2014 Petroleum Intelligence Weekly Q&A
2014 Petroleum Intelligence Weekly Q&AEnbridge Inc.
 
Enbridge Inc. 2014 AGM
Enbridge Inc. 2014 AGMEnbridge Inc. 2014 AGM
Enbridge Inc. 2014 AGMEnbridge Inc.
 
2013 Bennett Jones Lake Louise World Cup Business Forum
2013 Bennett Jones Lake Louise World Cup Business Forum2013 Bennett Jones Lake Louise World Cup Business Forum
2013 Bennett Jones Lake Louise World Cup Business ForumEnbridge Inc.
 
2012 Canada Europe Energy Roundtable
2012 Canada Europe Energy Roundtable2012 Canada Europe Energy Roundtable
2012 Canada Europe Energy RoundtableEnbridge Inc.
 

More from Enbridge Inc. (9)

2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing2014 Enbridge Day - Gas Pipelines and Processing
2014 Enbridge Day - Gas Pipelines and Processing
 
2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects
 
2014 Enbridge Day - Power, International and Energy Services
2014 Enbridge Day - Power, International and Energy Services2014 Enbridge Day - Power, International and Energy Services
2014 Enbridge Day - Power, International and Energy Services
 
2014 Enbridge Day - Strategic Overview
2014 Enbridge Day - Strategic Overview2014 Enbridge Day - Strategic Overview
2014 Enbridge Day - Strategic Overview
 
Market Access the Strategic Imperative Continues 2014
Market Access the Strategic Imperative Continues 2014Market Access the Strategic Imperative Continues 2014
Market Access the Strategic Imperative Continues 2014
 
2014 Petroleum Intelligence Weekly Q&A
2014 Petroleum Intelligence Weekly Q&A2014 Petroleum Intelligence Weekly Q&A
2014 Petroleum Intelligence Weekly Q&A
 
Enbridge Inc. 2014 AGM
Enbridge Inc. 2014 AGMEnbridge Inc. 2014 AGM
Enbridge Inc. 2014 AGM
 
2013 Bennett Jones Lake Louise World Cup Business Forum
2013 Bennett Jones Lake Louise World Cup Business Forum2013 Bennett Jones Lake Louise World Cup Business Forum
2013 Bennett Jones Lake Louise World Cup Business Forum
 
2012 Canada Europe Energy Roundtable
2012 Canada Europe Energy Roundtable2012 Canada Europe Energy Roundtable
2012 Canada Europe Energy Roundtable
 

Recently uploaded

Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 

Recently uploaded (20)

Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 

Enbridge Inc. Third Quarter 2014 Financial Results

  • 1. Al Monaco President & CEO BUSINESS UNIT HEADER IMAGE GOES HERE 2014 Third Quarter Financial & Strategic Update John Whelen Executive Vice President & CFO
  • 2. Legal Notice 2 This presentation includes certain forward looking information (FLI) to provide Enbridge shareholders and potential investors with information about Enbridge and management’s assessment of its future plans and operations, which may not be appropriate for other purposes. FLI is typically identified by words such as “anticipate”, “expect”, “project”, “estimate”, “forecast”, “plan”, “intend”, “target”, “believe” and similar words suggesting future outcomes or statements regarding an outlook. Although we believe that our FLI is reasonable based on the information available today and processes used to prepare it, such statements are not guarantees of future performance and you are cautioned against placing undue reliance on FLI. By its nature, FLI involves a variety of assumptions, risks, uncertainties and other factors which may cause actual results, levels of activity and achievements to differ materially from those expressed or implied in our FLI. Material assumptions include assumptions about: the expected supply and demand for crude oil, natural gas and natural gas liquids; prices of crude oil, natural gas and natural gas liquids; expected exchange rates; inflation; interest rates; the availability and price of labour and pipeline construction materials; operational reliability; anticipated in-service dates and weather. Our FLI is subject to risks and uncertainties pertaining to operating performance, regulatory parameters, weather, economic conditions, exchange rates, interest rates and commodity prices, including but not limited to those discussed more extensively in our filings with Canadian and US securities regulators. The impact of any one risk, uncertainty or factor on any particular FLI is not determinable with certainty as these are interdependent and our future course of action depends on management’s assessment of all information available at the relevant time. Except to the extent required by law, we assume no obligation to publicly update or revise any FLI, whether as a result of new information, future events or otherwise. All FLI in this presentation is expressly qualified in its entirety by these cautionary statements. This presentation will make reference to non-GAAP measures including adjusted earnings together with respective per share amounts. These measures are not measures that have a standardized meaning prescribed by U.S. GAAP and may not be comparable with similar measures presented by other issuers. Additional information on the Company’s use of non-GAAP measures can be found in Management’s Discussion and Analysis available on the Company’s website.
  • 3. Agenda • Third Quarter Highlights • Capital Investment Plan (2014 – 2018) • Major Projects Update • Q3 Financial Review & Funding Status • Outlook 3
  • 4. EPS Guidance Relative Monthly Price Performance • Reliable Low Risk Business Model - Conservative commercial structures - Major projects execution - Prudent financial management - Disciplined investment process • Superior long-term track record - Transparent EPS/DPS growth A Proven Model for Sustainable Value Creation 4 Adjusted EPS* *Adjusted earnings is a non-GAAP measure. For more information on non-GAAP measures please refer to disclosure in MD&A. Enbridge Inc. Peers S&P/TSX Index $0.60 $0.80 $1.00 $1.20 $1.40 $1.60 $1.80 $2.00 2008 2009 2010 2011 2012 2013 2014E DPS Growing Predictable EPS/DPS 0% 50% 100% 150% 200% 250% 300%
  • 5. Q3 and YTD 2014 – Adjusted Earnings ($ millions) 5 $488 $492 $306 $328 $278 $345 2013 2014 Q3 Q3 Q2 Q1 Q2 Q1 $1,072 $1,165 Year-To-Date Adjusted EPS: $1.33 $1.41 *Adjusted earnings is a non-GAAP measure. For more information on non-GAAP measures please refer to disclosure in MD&A. Full Year 2014 EPS Guidance: $1.84 $2.04
  • 6. Growth Capital Program* Enbridge Day 2012 2012-2016 Enbridge Day 2013 2013 - 2017 Enbridge Day 2014 2014 - 2018 Secured Unsecured $18 $26 $33 $17 $10 $11 $35 $36 $44 • $44 billion capital program drives growth outlook - Increased opportunity set by $9 billion since 2012 - $15 billion net increase in secured capital since 2012 • Capital program drives 10-12% EPS CAGR through 2018 * Enterprise wide program, includes EEP and ENF 6 $Billions 5-Year Program 75% Secured
  • 7. Project Execution Update – Completed Projects Mainline Expansions Southern Access Phase 1 Flanagan South Line 6B Replacement Lac Alfred & Massif-du-Sud 7 Seaway Projects Estimated Cost ($ Billion) Liquids Pipelines (Alberta Regional Infrastructure): Norealis Pipeline $0.5 Surmont Phase 2 Expansion (2014-2015 Phases) $0.3 Liquids Pipelines (Market Access Initiatives): Eastern Access Line 6B Replacement Line 9 Reversal* $2.1 $0.6 Western USGC Access $4.6 Light Oil Market Access (Line 9 Expansion*) $0.1 Eddystone Rail Project $0.1 Line 6B 75 Miles Replacement Program $0.4 Gas Pipelines: Pipestone and Sexsmith Project (2012-2014 Phases) $0.3 Gas Distribution: Other EGD Growth Capital $0.2 Green Power: Blackspring Ridge Wind Project $0.3 Lac Alfred/Massif du Sud $0.2 $9.7 Billion in-service in 2014        Norealis Pipeline Blackspring Ridge Eddystone Rail *Unable to estimate the length of the delay.  Pipestone & Sexsmith 
  • 8. Project Execution – Line 9 8 Line 9 Reversal & Expansion • Program: Eastern Access • Cost: $0.7 billion • Scope: Reversal and Expansion to 300kbpd • Status: - NEB approval in March 2014 (subject to 30 conditions) - Mechanically complete Oct. 15 - Responded to NEB request for additional information - In-service date TBD
  • 9. Executing the Growth Capital Program Executed Projects 2008-Q3 2014 completed at <5% under budget $20B <1% over budget $27B Projects in Execution Q4 2014 - 2017 33 of 39 projects under or on schedule 23 of 27 projects under or on schedule Project management is a core competency
  • 10. Operational Reliability Report 10 Moving towards industry leadership
  • 11. 80% 90% 100% 110% 120% 130% 140% 1/1/2013 7/1/2013 1/1/2014 7/1/2014 80% 90% 100% 110% 120% 130% 140% 150% 1/1/2013 7/1/2013 1/1/2014 7/1/2014 Sponsored Vehicles Strategy Update Positioned to provide low cost funding and enhance value ($24B Drop Down Inventory) ENF Relative Price Performance Enbridge Income Fund (ENF) • $1.8B drop down expands historical pace • Releases capital, accretive to ENB and ENF • Solid foundation for future drop downs Enbridge Energy Partners (EEP) • Reduced cost of funding • Proposed $900 mm drop down accelerated • No public equity requirement EEP Relative Price Performance 11 Date Yield 1/1/2013 5.2% 10/31/2014 4.6% Date Yield 1/1/2013 7.7% 10/31/2014 6.1% ENF; +23% S&P/TSX: +18% EEP: +30% MLP Alerian Index: +41%
  • 12. Q3 Segmented Adjusted Earnings* Variance 12 0 50 100 150 200 250 300 350 400 Q3 2013 Q3 2014 Adjusted Earnings* $ millions $278 $345 - $34 Gas Pipelines, Processing & Energy Services Sponsored Investments + $40 + $7 Corporate + $34 Liquids Pipelines *Adjusted earnings is a non-GAAP measure. For more information on non-GAAP measures please refer to disclosure in MD&A.. Gas Distribution + $20
  • 13. 2014 Guidance Range Full Year 2014 Adjusted EPS* Guidance Outlook 13 Headwinds Energy Services Equity prefunding Tailwinds Liquids Pipelines - Line 9B delay *Adjusted earnings is a non-GAAP measure. For more information on non-GAAP measures please refer to disclosure in MD&A.. $1.84 $2.04
  • 14. Market Price Risk Mitigation 88% 69% 77% 0% 100% Term Debt Issuance Floating Rate Debt USD Exposure (2014 – 2018): % Hedged Average Hedged Rate 1.06 CAD/USD 1.47% CDOR/LIBOR 3.56% GOC/UST Market price exposure continues to be substantially hedged 14
  • 15. 0 5 10 15 20 YTD Enterprise Wide Funding & Liquidity * Includes debt issued by Canadian self-funding subsidiaries, EGD and EPI. 15 $ Billions (nominal) 0 5 10 15 20 September 30, 2014 $11 Billion Available $18 Facility Usage1 Unutilized Capacity Cash 1 Includes credit facility draws and undrawn amounts backstopping outstanding commercial paper. Enterprise Wide Funding Available Liquidity Sponsored Vehicles ENB Equity & DRIP ENB Preferred Shares ENB Debt* & Credit Facilities $5.6 $1.4 $0.8 $8.6 Billion Raised $0.8
  • 16. Maintenance & Integrity Capital 5.0 Secured Growth Capital 22.9 Risked Growth Capital 9.4 37.3 Cash Flow Net of Dividends (15.4) Net Funding Requirement* 21.9 Total Requirement 15.7 2014 – 2018 Maturities 6.6 Cash on Hand (0.5) Requirement, Net of Cash 21.8 Preferred Share Issuances (0.7) Debt Already Issued (5.5) Debt Requirement 15.6 Funding Plan (2014-2018) Debt Equity Total Requirement 6.2 DRIP/ESOP (2.8) Requirement, Net of DRIP 3.4 ENF Drop Down Equity (0.3) Common Share Issuances (0.5) Preferred Share Issuances (0.7) Equity Requirement 1.9 *Excludes funding requirements of sponsored vehicles $ Billions Financing requirements remain very manageable 16
  • 17. Cost of Equity Optimization and Flexibility Alternative Sources Preferred Shares $1.5B Asset Monetization/Sponsored Vehicle Drop Downs $3.0B Total $4.5B ENB Public Equity ~ Alternative sources of equity exceed $1.9 billion of current common equity requirements 17
  • 18. 18 Projects Estimated Cost ($ Billion) Liquids Pipelines (Alberta Regional Infrastructure): AOC Hangingstone $0.2 Sunday Creek Terminal Expansion $0.2 Woodland Pipeline Expansion $0.6 Liquids Pipelines (Market Access Initiatives): Western USGC Access: Associated Mainline Expansions $0.7 Light Oil Market Access: Southern Access Extension Chicago Connectivity Associated Mainline Expansions $0.6 $0.5 $1.9 Edmonton to Hardisty Expansion $1.8 Gas Pipelines: Beckville Cryogenic Processing Facility $0.1 Walker Ridge Gas Gathering $0.4 Big Foot Oil Pipeline $0.2 Gas Distribution: Greater Toronto Area Project $0.7 Other EGD Growth Capital $0.2 Green Power: Keechi Creek Wind Project $0.2 $8.3 Billion in-service in 2015 Continued Earnings Growth
  • 19. 2013 2018 Adjusted Earnings* Growth • $20 billion of Tilted Return Projects • Natural Gas • New Growth Platforms • Sponsored Vehicle Drop Downs • Liquids Pipelines *Adjusted earnings are non-GAAP measures. For more information on non-GAAP measures please refer to disclosure in MD&A. •Liquids Pipelines •$44 B growth program • 10-12% average annual EPS growth through 2018 - Highly transparent growth outlook •Several sources of post 2018 growth 19
  • 20. Dividend Payout Considerations • Progress on equity prefunding 20 • High organic growth capital program • Robustness of equity funding options (sponsored vehicles) • Rising internal free cash flow
  • 21. 2013 2018 Substantial Dividend Growth • EPS Growth • Surplus Cash Flow 21
  • 22. Question & Answer Period BUSINESS UNIT HEADER IMAGE GOES HERE 22