Six Sigma
Green Belt
Certification Presentation
07/19/16
Six Sigma Tools
• Certification score card
• Project Charter
• SIPOC
• Definition of a defect and resulting Sigma Score
• Project Roadmap
• Fishbone
• C&E
• Control Plan
Certification Score Card
Phase Gate
Reviews:
Phase Score KEY
Team Name: Phase 1 Date: 91.67%1=Awareness (trained)
Core Team Members: Phase 2 Date: 83.33%2=Understands Basic Concepts
Phase 3 Date: #VALUE! 3=Understands Concepts & Mechanics
Phase 4 Date: #VALUE! 4=Above + Demonstrates Application
Coach: Final Review Date: 0.00%5=Above + Teaches/Tool Master
BB Mentor:
DMAIC
Skill Set Phase Six Sigma Tools Rec. level Current Score Comments
Define 1 Project Charter 4 4 Updates were made per new learning from
the C&E matrix
Define 1 Project Schedule 4 4
Define 1 SIPOC 4 3
Measure 2 Sigma Score 4 4 Using the ability to score correctly as this has
the most impact on customer retention. This
is a customer facing application.
Measure/I
mprove
2 Process Maps 4 3 Process map contained all necessary
information only needed to be more readable
2 Fishbone 4 4 Composed of all issues categories. Excellent
Analyze 3 C&E Matrix 4 Needs to be completed showing graph
Analyze/I
mprove
3 FMEA 4 4
Analyze 3 Basic Statistics 3 3 Sigma score/
Also added additional information per C&E
which inlcuded an additional sigma score for
scoring.
Analyze 3 VOP (Control Charts) 2
Analyze 3 MSE 1 N/A
Improve 4 DOE 1 N/A
Control Final Control Plan 4
Project Charter
Process Impacted Training Development Total Financial Impact $1M
Champion VP of Content Organization/Function
Sponsor CTO Organization/Function
Green Belt Consultant Nancy Northrup Telephone Number
Project Leader Elena Titova Telephone Number
Start Date December 2015 Target Completion
Date
April 1, 2016
Element Description Team Charter
1. Process: The process in which opportunity exists. Create Military Family online training for life skills, educational advancement, job training, and career
management as well as associated resources. The project utilizes Project Tracking software by CA (Rally)
Associates in AGILE methodology.
2. Project Description: Describe the Project’s Purpose and scope. Provide resource libraries for 5 military branches focused on the Military Family including eBooks, Articles, tests,
and tutorials including the SATs.
Create the IT project to support this effort including systems implementation, content loading, and reporting
statistics on scoring, usage, and within appropriate privacy guidelines and coordinating the communication
between the different workstreams involve including Marketing, Sales, and Customer Support.
Manage content loading, quarterly updates, website design, any special systems design required, testing on IT
and on content, testing on designated platforms, mobile devices, and browsers.
3. Problem Statement: What problem are we attempting to
resolve?
There is a new sector. The new customer is the US Military which has a specific need to provide Military Families
with training in life skills, educational advancement, and evaluation testing for career placement and
management.
4. Objective: What improvement is targeted and what
will be the impact on Sigma, Savings and
Cust. Sat?
BSL GOAL ACT UNITS
Sigma n/a
Baseline is being
established
RTU 50 100
Software support costs
5. Project Scope: Which part of the process will be
investigated?
Military Family centers for the 5 branches.
6. Business Results: What is the improvement in business
performance
(e.g. savings, cycle time) anticipated and
when?
All centers are prepared (7 steps are completed)
Loading template, center created, center tested, list of products, images, (ET to fill in)
7. Core Team members: Who are the key members and any expert
consultants?
Elena Titova: Program Manager
Director of Content Development
Lead Developer
Lead Designer
8. Definition of a Defect Process is not able to execute Center does not load or respond (cannot be opened).
Content is not correct or available to the user
9. Assumptions: What assumptions are being make?
Project Vision
• The new LearningExpress DoD MWR eLearning
platform will serve the needs of current military
members, military families, and military members
transitioning out of the service.
• It is being built to directly compete with
Peterson’s DoD MWR eLearning platform.
Peterson’s currently has DoD contract.
• The library will leverage existing resources and
incorporate new resources to meet the demands
of the market.
Success Measures
• Land the Contract from the DoD
• The project will be complete once all first-
wave pieces of content have been developed,
loaded, tested and approved, within
scope/schedule.
Process: Process Owner:
Suppliers Inputs Process Outputs Customers
(Providers of the required resources) (Resources required by the process) (Top level description of activity) (Deliverables from the process) (Anyone who receives a deliverable from the process)
Noun Requirements (adj) Nouns Requirements (adjectives) Customer
Military
Initial assessment results: Miltary test to show which
branch of the military and which occupation within the
brach is most appropriate for the individual
Uniquely identifiable to the person
Ablle to be incorporated into the occupational
information within Learning Express module for that
branch of the military
Website
Fully Funtioning EBSCO Sales
Reference libraries EBSCO cataloges
Current and easily accessible
Available to the project when needed
New customer base
Subscription-based for each branch of the military Executive Management
Content Group
Tutorials
Practice tests
Come as a loading template
All links are plugged in
Available to the project when needed
Learning Express Library
Incorporated into the EBSCO systems EBSCO Management
IT Group
Algorithms including:
1. Scoring modlules
2. Navigation
3. Recommendation calculation
4. Global Algorithm across different modules and return
5. Ability to take tests in various modes such as : Answer
mode, assimilation mode, etc.
Well-tested and verified as working
Meets scoring requirements
Available to the project when needed
1. Instructions for completing the chosen certification
2. Courses / tutorials / reference libraries
3. Testing preparation / practice tool
4. Practice tests for final certification and recommendations for tutorials
to better the results
Comprehensive
Current
Complete
Meets minimum requirements for
Physically Accessible
ADA compliance
Repeatable and / or able to start where left off
Recorded results and progress
Progress monitored
Privacy on / off Active Military
Image Selection Group
Images and design of each page as required for each
Military Branch
Reusuable images where appropriate
Customize for each center (Active Military, Military family,
Transitioning Military)
Correct as defined
Ready to use as requested by the project
1. Instructions for completing the chosen certification as well as
occupational match for civilian careets
2. Courses / tutorials / reference libraries
3. Testing preparation / practice tool
4. Practice tests for final certification and recommendations for tutorials
to better the results
Comprehensive
Current
Complete
Meets minimum requirements for
Physically Accessible
ADA compliance
Repeatable and / or able to start where left off
Recorded results and progress
Progress monitored
Privacy on / off
Transitioning Military
1. Instructions for completing the chosen certification includes
preparation and tutorials for educational testing such as GED, SAT, etc.
2. Courses / tutorials / reference libraries
3. Testing preparation / practice tool
4. Practice tests for final certification and recommendations for tutorials
to better the results
Comprehensive
Current
Complete
Meets minimum requirements for
Physically Accessible
ADA compliance
Repeatable and / or able to start where left off
Recorded results and progress
Progress monitored
Privacy on / off
Military Families
Structure define
Images selected
Pages designed
Development by IT Group Content Development Testing DEMO / Project Complete
Process: Process Owner:
Suppliers Inputs Process Outputs Customers
(Providers of the required resources) (Resources required by the process) (Top level description of activity) (Deliverables from the process) (Anyone who receives a deliverable from the process)
Noun Requirements (adj) Nouns Requirements (adjectives) Customer
Military
Initial assessment results: Miltary test to show which
branch of the military and which occupation within the
brach is most appropriate for the individual
Uniquely identifiable to the person
Ablle to be incorporated into the occupational
information within Learning Express module for that
branch of the military
Website
Fully Funtioning EBSCO Sales
Reference libraries EBSCO cataloges
Current and easily accessible
Available to the project when needed
New customer base
Subscription-based for each branch of the military Executive Management
Content Group
Tutorials
Practice tests
Come as a loading template
All links are plugged in
Available to the project when needed
Learning Express Library
Incorporated into the EBSCO systems EBSCO Management
IT Group
Algorithms including:
1. Scoring modlules
2. Navigation
3. Recommendation calculation
4. Global Algorithm across different modules and return
5. Ability to take tests in various modes such as : Answer
mode, assimilation mode, etc.
Well-tested and verified as working
Meets scoring requirements
Available to the project when needed
1. Instructions for completing the chosen certification
2. Courses / tutorials / reference libraries
3. Testing preparation / practice tool
4. Practice tests for final certification and recommendations for tutorials
to better the results
Comprehensive
Current
Complete
Meets minimum requirements for
Physically Accessible
ADA compliance
Repeatable and / or able to start where left off
Recorded results and progress
Progress monitored
Privacy on / off Active Military
Image Selection Group
Images and design of each page as required for each
Military Branch
Reusuable images where appropriate
Customize for each center (Active Military, Military family,
Transitioning Military)
Correct as defined
Ready to use as requested by the project
1. Instructions for completing the chosen certification as well as
occupational match for civilian careets
2. Courses / tutorials / reference libraries
3. Testing preparation / practice tool
4. Practice tests for final certification and recommendations for tutorials
to better the results
Comprehensive
Current
Complete
Meets minimum requirements for
Physically Accessible
ADA compliance
Repeatable and / or able to start where left off
Recorded results and progress
Progress monitored
Privacy on / off
Transitioning Military
1. Instructions for completing the chosen certification includes
preparation and tutorials for educational testing such as GED, SAT, etc.
2. Courses / tutorials / reference libraries
3. Testing preparation / practice tool
4. Practice tests for final certification and recommendations for tutorials
to better the results
Comprehensive
Current
Complete
Meets minimum requirements for
Physically Accessible
ADA compliance
Repeatable and / or able to start where left off
Recorded results and progress
Progress monitored
Privacy on / off
Military Families
Structure define
Images selected
Pages designed
Development by IT Group Content Development Testing DEMO / Project Complete
SIPOC
Reques
t
receive
d to
create a
DEMO
Creating
training
for
Military
use
DEMO
created
and
ready to
use
(RTU)
SIPOC
Run the
Sales
Demo for
the
Military
Understand
the structure
of each center
Prepare to
load the
template for
IAPPS
Validate
functional
and content
Start
End
Process Map
1.Login to Open
the Library
4. Open myCenter
Active tutorials, tests
3. First login process
First
logi
n
SOP Software package
SOP Internet connection
SOP Access configuration
N Student
Access to the
library
Successfu
l Login
2. Contact
Customer service
Y
N
6. Get Recommendations
for studying based upon
scores
SOP Request email,
Procedures
N Customer service rep
SOP Select Study direction
N Student
Start
Resolution
N
Y
Create myCenter
SOP Select Study direction
N Student
Pass
test
N
Y
End
5. Work with tutorials
and tests
SOP Software package
N Student
Get Scores
SOP Software package
X Scores
Update myCenter
List of tutorials and tests
Fishbone Diagram
C&E
C&E Score
0
50
100
150
200
250
300
350
400
450
Score
C&E Totals
0 200 400 600 800 1000 1200 1400
1. Library Setup
2. Contact Cutomer Service
3. First login Process
4. Open myCenter
5.Work with tutorials
6.Get Recommendations
Totals
Control Plan

More Related Content

What's hot

RMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 FinalRMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 FinalMichael Camp
 
SIX SIGMA Green Belt Training
SIX SIGMA Green Belt TrainingSIX SIGMA Green Belt Training
SIX SIGMA Green Belt Trainingchaudhryshailja
 
Presentation on six sigma roles
Presentation on six sigma rolesPresentation on six sigma roles
Presentation on six sigma rolessatya pal
 
Six Sigma
Six SigmaSix Sigma
Six Sigmauzukhan
 
Webinar - Using six sigma tools to analyze ehs performance metrics
Webinar - Using six sigma tools to analyze ehs performance metricsWebinar - Using six sigma tools to analyze ehs performance metrics
Webinar - Using six sigma tools to analyze ehs performance metricsProcessMAP Corporation
 
Six Sigma - Benefits to Individuals
Six Sigma - Benefits to IndividualsSix Sigma - Benefits to Individuals
Six Sigma - Benefits to IndividualsBenchmark Six Sigma
 
Six sigma an overview | Online Mini MBA (Free)
Six sigma  an overview | Online Mini MBA (Free)Six sigma  an overview | Online Mini MBA (Free)
Six sigma an overview | Online Mini MBA (Free)mybskool-online-courses
 
Six Sigma_DMAIC_Bharath Seminar
Six Sigma_DMAIC_Bharath SeminarSix Sigma_DMAIC_Bharath Seminar
Six Sigma_DMAIC_Bharath SeminarBharath M
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handoutsguest0981f4
 
Six sigma presentation
Six sigma presentationSix sigma presentation
Six sigma presentationUsamaboss
 
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT Firdaus Albarqoni
 
Six Sigma presentation
Six Sigma  presentationSix Sigma  presentation
Six Sigma presentationShikha Singh
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltRajiv Tiwari
 

What's hot (20)

Six Sigma Presentation
Six Sigma  PresentationSix Sigma  Presentation
Six Sigma Presentation
 
RMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 FinalRMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 Final
 
SIX SIGMA Green Belt Training
SIX SIGMA Green Belt TrainingSIX SIGMA Green Belt Training
SIX SIGMA Green Belt Training
 
Presentation on six sigma roles
Presentation on six sigma rolesPresentation on six sigma roles
Presentation on six sigma roles
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Webinar - Using six sigma tools to analyze ehs performance metrics
Webinar - Using six sigma tools to analyze ehs performance metricsWebinar - Using six sigma tools to analyze ehs performance metrics
Webinar - Using six sigma tools to analyze ehs performance metrics
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six Sigma - Benefits to Individuals
Six Sigma - Benefits to IndividualsSix Sigma - Benefits to Individuals
Six Sigma - Benefits to Individuals
 
Six sigma presentation
Six sigma presentationSix sigma presentation
Six sigma presentation
 
Six sigma seminar
Six sigma seminarSix sigma seminar
Six sigma seminar
 
Six sigma an overview | Online Mini MBA (Free)
Six sigma  an overview | Online Mini MBA (Free)Six sigma  an overview | Online Mini MBA (Free)
Six sigma an overview | Online Mini MBA (Free)
 
Six Sigma_DMAIC_Bharath Seminar
Six Sigma_DMAIC_Bharath SeminarSix Sigma_DMAIC_Bharath Seminar
Six Sigma_DMAIC_Bharath Seminar
 
Six sigma
Six sigma Six sigma
Six sigma
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
 
Six sigma presentation
Six sigma presentationSix sigma presentation
Six sigma presentation
 
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
 
Six Sigma presentation
Six Sigma  presentationSix Sigma  presentation
Six Sigma presentation
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green Belt
 

Viewers also liked

Six Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandSix Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandAkshay Anand
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best pptRabia Sgh S
 
Noções básicas de seis sigma
Noções básicas de seis sigmaNoções básicas de seis sigma
Noções básicas de seis sigmaGerisval Pessoa
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentationvivekissar
 
Six sigma and mumbai dabbawala
Six sigma and mumbai dabbawalaSix sigma and mumbai dabbawala
Six sigma and mumbai dabbawalaSandeep Mane
 
Whirlpool Case Study
Whirlpool Case StudyWhirlpool Case Study
Whirlpool Case Studyleylaniazmond
 
Case whirlpool
Case whirlpoolCase whirlpool
Case whirlpooljohnhulten
 
présentation six sigma uptraining français
présentation six sigma uptraining françaisprésentation six sigma uptraining français
présentation six sigma uptraining françaissimon leclercq
 
• Caterpillar Production System
 • Caterpillar Production System • Caterpillar Production System
• Caterpillar Production Systemfinance5
 
Using Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer lossesUsing Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer lossesNeelesh Bhagwat
 
Average Handle Time: How to reduce yours and improve customer satisfaction!
Average Handle Time: How to reduce yours and improve customer satisfaction!Average Handle Time: How to reduce yours and improve customer satisfaction!
Average Handle Time: How to reduce yours and improve customer satisfaction!eakoehler
 
Improving On Time Delivery
Improving On Time DeliveryImproving On Time Delivery
Improving On Time DeliveryThomas Cantin
 
Improve On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt ProjectImprove On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt ProjectMahit Ohri
 

Viewers also liked (19)

Six Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandSix Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay Anand
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
Noções básicas de seis sigma
Noções básicas de seis sigmaNoções básicas de seis sigma
Noções básicas de seis sigma
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
What is Six Sigma?
What is Six Sigma?What is Six Sigma?
What is Six Sigma?
 
Six sigma and mumbai dabbawala
Six sigma and mumbai dabbawalaSix sigma and mumbai dabbawala
Six sigma and mumbai dabbawala
 
Six sigma ppt
Six sigma pptSix sigma ppt
Six sigma ppt
 
Relação entre Seis Sigma e Pmbok
Relação entre Seis Sigma e PmbokRelação entre Seis Sigma e Pmbok
Relação entre Seis Sigma e Pmbok
 
Whirlpool Case Study
Whirlpool Case StudyWhirlpool Case Study
Whirlpool Case Study
 
Case whirlpool
Case whirlpoolCase whirlpool
Case whirlpool
 
présentation six sigma uptraining français
présentation six sigma uptraining françaisprésentation six sigma uptraining français
présentation six sigma uptraining français
 
Ui Mockup
Ui MockupUi Mockup
Ui Mockup
 
• Caterpillar Production System
 • Caterpillar Production System • Caterpillar Production System
• Caterpillar Production System
 
Using Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer lossesUsing Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer losses
 
Average Handle Time: How to reduce yours and improve customer satisfaction!
Average Handle Time: How to reduce yours and improve customer satisfaction!Average Handle Time: How to reduce yours and improve customer satisfaction!
Average Handle Time: How to reduce yours and improve customer satisfaction!
 
Improving On Time Delivery
Improving On Time DeliveryImproving On Time Delivery
Improving On Time Delivery
 
AHT action plan
AHT action planAHT action plan
AHT action plan
 
Final ppt
Final pptFinal ppt
Final ppt
 
Improve On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt ProjectImprove On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt Project
 

Similar to Six Sigma Green Belt Certification Project Presentation

What Is the Software Testing Life Cycle.pdf
What Is the Software Testing Life Cycle.pdfWhat Is the Software Testing Life Cycle.pdf
What Is the Software Testing Life Cycle.pdfAnanthReddy38
 
Online course registration system development software engineering project pr...
Online course registration system development software engineering project pr...Online course registration system development software engineering project pr...
Online course registration system development software engineering project pr...MD.HABIBUR Rahman
 
STLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxSTLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxssusere4c6aa
 
Testing documents
Testing documentsTesting documents
Testing documentssuhasreddy1
 
Critical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionCritical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionDevOps.com
 
Testing documents
Testing documentsTesting documents
Testing documentsHari Tiru
 
Discovering the New SuccessFactors LMS Admin Features
Discovering the New SuccessFactors LMS Admin FeaturesDiscovering the New SuccessFactors LMS Admin Features
Discovering the New SuccessFactors LMS Admin FeaturesAshton Plusquellec
 
Value Stream Mapping – Stories From the Trenches
Value Stream Mapping – Stories From the TrenchesValue Stream Mapping – Stories From the Trenches
Value Stream Mapping – Stories From the TrenchesDevOps.com
 
Ooad lab manual(original)
Ooad lab manual(original)Ooad lab manual(original)
Ooad lab manual(original)dipenpatelpatel
 
SQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSuman Ghosh
 
Some of the Material in this paper has been repurposed from C.docx
Some of the Material in this paper has been repurposed from C.docxSome of the Material in this paper has been repurposed from C.docx
Some of the Material in this paper has been repurposed from C.docxwhitneyleman54422
 
Risk Driven Testing
Risk Driven TestingRisk Driven Testing
Risk Driven TestingJorge Boria
 
1. object oriented concepts & principles
1. object oriented concepts & principles 1. object oriented concepts & principles
1. object oriented concepts & principles poonam bora
 

Similar to Six Sigma Green Belt Certification Project Presentation (20)

What Is the Software Testing Life Cycle.pdf
What Is the Software Testing Life Cycle.pdfWhat Is the Software Testing Life Cycle.pdf
What Is the Software Testing Life Cycle.pdf
 
Online course registration system development software engineering project pr...
Online course registration system development software engineering project pr...Online course registration system development software engineering project pr...
Online course registration system development software engineering project pr...
 
Big Data Pilot Template
Big Data Pilot Template Big Data Pilot Template
Big Data Pilot Template
 
CV_Dhanya
CV_DhanyaCV_Dhanya
CV_Dhanya
 
Prasanth_Pendam_QA_9.5 Years
Prasanth_Pendam_QA_9.5 YearsPrasanth_Pendam_QA_9.5 Years
Prasanth_Pendam_QA_9.5 Years
 
STLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxSTLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptx
 
Gcs day1
Gcs day1Gcs day1
Gcs day1
 
Testing documents
Testing documentsTesting documents
Testing documents
 
Critical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionCritical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management Solution
 
Testing documents
Testing documentsTesting documents
Testing documents
 
Discovering the New SuccessFactors LMS Admin Features
Discovering the New SuccessFactors LMS Admin FeaturesDiscovering the New SuccessFactors LMS Admin Features
Discovering the New SuccessFactors LMS Admin Features
 
Value Stream Mapping – Stories From the Trenches
Value Stream Mapping – Stories From the TrenchesValue Stream Mapping – Stories From the Trenches
Value Stream Mapping – Stories From the Trenches
 
VishalSrivastava_NewV1.0
VishalSrivastava_NewV1.0VishalSrivastava_NewV1.0
VishalSrivastava_NewV1.0
 
Aim crisp handout
Aim crisp handoutAim crisp handout
Aim crisp handout
 
Ooad lab manual(original)
Ooad lab manual(original)Ooad lab manual(original)
Ooad lab manual(original)
 
SQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar Ghosh
 
SDLC
SDLC SDLC
SDLC
 
Some of the Material in this paper has been repurposed from C.docx
Some of the Material in this paper has been repurposed from C.docxSome of the Material in this paper has been repurposed from C.docx
Some of the Material in this paper has been repurposed from C.docx
 
Risk Driven Testing
Risk Driven TestingRisk Driven Testing
Risk Driven Testing
 
1. object oriented concepts & principles
1. object oriented concepts & principles 1. object oriented concepts & principles
1. object oriented concepts & principles
 

Six Sigma Green Belt Certification Project Presentation

  • 1. Six Sigma Green Belt Certification Presentation 07/19/16
  • 2. Six Sigma Tools • Certification score card • Project Charter • SIPOC • Definition of a defect and resulting Sigma Score • Project Roadmap • Fishbone • C&E • Control Plan
  • 3. Certification Score Card Phase Gate Reviews: Phase Score KEY Team Name: Phase 1 Date: 91.67%1=Awareness (trained) Core Team Members: Phase 2 Date: 83.33%2=Understands Basic Concepts Phase 3 Date: #VALUE! 3=Understands Concepts & Mechanics Phase 4 Date: #VALUE! 4=Above + Demonstrates Application Coach: Final Review Date: 0.00%5=Above + Teaches/Tool Master BB Mentor: DMAIC Skill Set Phase Six Sigma Tools Rec. level Current Score Comments Define 1 Project Charter 4 4 Updates were made per new learning from the C&E matrix Define 1 Project Schedule 4 4 Define 1 SIPOC 4 3 Measure 2 Sigma Score 4 4 Using the ability to score correctly as this has the most impact on customer retention. This is a customer facing application. Measure/I mprove 2 Process Maps 4 3 Process map contained all necessary information only needed to be more readable 2 Fishbone 4 4 Composed of all issues categories. Excellent Analyze 3 C&E Matrix 4 Needs to be completed showing graph Analyze/I mprove 3 FMEA 4 4 Analyze 3 Basic Statistics 3 3 Sigma score/ Also added additional information per C&E which inlcuded an additional sigma score for scoring. Analyze 3 VOP (Control Charts) 2 Analyze 3 MSE 1 N/A Improve 4 DOE 1 N/A Control Final Control Plan 4
  • 4. Project Charter Process Impacted Training Development Total Financial Impact $1M Champion VP of Content Organization/Function Sponsor CTO Organization/Function Green Belt Consultant Nancy Northrup Telephone Number Project Leader Elena Titova Telephone Number Start Date December 2015 Target Completion Date April 1, 2016 Element Description Team Charter 1. Process: The process in which opportunity exists. Create Military Family online training for life skills, educational advancement, job training, and career management as well as associated resources. The project utilizes Project Tracking software by CA (Rally) Associates in AGILE methodology. 2. Project Description: Describe the Project’s Purpose and scope. Provide resource libraries for 5 military branches focused on the Military Family including eBooks, Articles, tests, and tutorials including the SATs. Create the IT project to support this effort including systems implementation, content loading, and reporting statistics on scoring, usage, and within appropriate privacy guidelines and coordinating the communication between the different workstreams involve including Marketing, Sales, and Customer Support. Manage content loading, quarterly updates, website design, any special systems design required, testing on IT and on content, testing on designated platforms, mobile devices, and browsers. 3. Problem Statement: What problem are we attempting to resolve? There is a new sector. The new customer is the US Military which has a specific need to provide Military Families with training in life skills, educational advancement, and evaluation testing for career placement and management. 4. Objective: What improvement is targeted and what will be the impact on Sigma, Savings and Cust. Sat? BSL GOAL ACT UNITS Sigma n/a Baseline is being established RTU 50 100 Software support costs 5. Project Scope: Which part of the process will be investigated? Military Family centers for the 5 branches. 6. Business Results: What is the improvement in business performance (e.g. savings, cycle time) anticipated and when? All centers are prepared (7 steps are completed) Loading template, center created, center tested, list of products, images, (ET to fill in) 7. Core Team members: Who are the key members and any expert consultants? Elena Titova: Program Manager Director of Content Development Lead Developer Lead Designer 8. Definition of a Defect Process is not able to execute Center does not load or respond (cannot be opened). Content is not correct or available to the user 9. Assumptions: What assumptions are being make?
  • 5. Project Vision • The new LearningExpress DoD MWR eLearning platform will serve the needs of current military members, military families, and military members transitioning out of the service. • It is being built to directly compete with Peterson’s DoD MWR eLearning platform. Peterson’s currently has DoD contract. • The library will leverage existing resources and incorporate new resources to meet the demands of the market.
  • 6. Success Measures • Land the Contract from the DoD • The project will be complete once all first- wave pieces of content have been developed, loaded, tested and approved, within scope/schedule.
  • 7. Process: Process Owner: Suppliers Inputs Process Outputs Customers (Providers of the required resources) (Resources required by the process) (Top level description of activity) (Deliverables from the process) (Anyone who receives a deliverable from the process) Noun Requirements (adj) Nouns Requirements (adjectives) Customer Military Initial assessment results: Miltary test to show which branch of the military and which occupation within the brach is most appropriate for the individual Uniquely identifiable to the person Ablle to be incorporated into the occupational information within Learning Express module for that branch of the military Website Fully Funtioning EBSCO Sales Reference libraries EBSCO cataloges Current and easily accessible Available to the project when needed New customer base Subscription-based for each branch of the military Executive Management Content Group Tutorials Practice tests Come as a loading template All links are plugged in Available to the project when needed Learning Express Library Incorporated into the EBSCO systems EBSCO Management IT Group Algorithms including: 1. Scoring modlules 2. Navigation 3. Recommendation calculation 4. Global Algorithm across different modules and return 5. Ability to take tests in various modes such as : Answer mode, assimilation mode, etc. Well-tested and verified as working Meets scoring requirements Available to the project when needed 1. Instructions for completing the chosen certification 2. Courses / tutorials / reference libraries 3. Testing preparation / practice tool 4. Practice tests for final certification and recommendations for tutorials to better the results Comprehensive Current Complete Meets minimum requirements for Physically Accessible ADA compliance Repeatable and / or able to start where left off Recorded results and progress Progress monitored Privacy on / off Active Military Image Selection Group Images and design of each page as required for each Military Branch Reusuable images where appropriate Customize for each center (Active Military, Military family, Transitioning Military) Correct as defined Ready to use as requested by the project 1. Instructions for completing the chosen certification as well as occupational match for civilian careets 2. Courses / tutorials / reference libraries 3. Testing preparation / practice tool 4. Practice tests for final certification and recommendations for tutorials to better the results Comprehensive Current Complete Meets minimum requirements for Physically Accessible ADA compliance Repeatable and / or able to start where left off Recorded results and progress Progress monitored Privacy on / off Transitioning Military 1. Instructions for completing the chosen certification includes preparation and tutorials for educational testing such as GED, SAT, etc. 2. Courses / tutorials / reference libraries 3. Testing preparation / practice tool 4. Practice tests for final certification and recommendations for tutorials to better the results Comprehensive Current Complete Meets minimum requirements for Physically Accessible ADA compliance Repeatable and / or able to start where left off Recorded results and progress Progress monitored Privacy on / off Military Families Structure define Images selected Pages designed Development by IT Group Content Development Testing DEMO / Project Complete Process: Process Owner: Suppliers Inputs Process Outputs Customers (Providers of the required resources) (Resources required by the process) (Top level description of activity) (Deliverables from the process) (Anyone who receives a deliverable from the process) Noun Requirements (adj) Nouns Requirements (adjectives) Customer Military Initial assessment results: Miltary test to show which branch of the military and which occupation within the brach is most appropriate for the individual Uniquely identifiable to the person Ablle to be incorporated into the occupational information within Learning Express module for that branch of the military Website Fully Funtioning EBSCO Sales Reference libraries EBSCO cataloges Current and easily accessible Available to the project when needed New customer base Subscription-based for each branch of the military Executive Management Content Group Tutorials Practice tests Come as a loading template All links are plugged in Available to the project when needed Learning Express Library Incorporated into the EBSCO systems EBSCO Management IT Group Algorithms including: 1. Scoring modlules 2. Navigation 3. Recommendation calculation 4. Global Algorithm across different modules and return 5. Ability to take tests in various modes such as : Answer mode, assimilation mode, etc. Well-tested and verified as working Meets scoring requirements Available to the project when needed 1. Instructions for completing the chosen certification 2. Courses / tutorials / reference libraries 3. Testing preparation / practice tool 4. Practice tests for final certification and recommendations for tutorials to better the results Comprehensive Current Complete Meets minimum requirements for Physically Accessible ADA compliance Repeatable and / or able to start where left off Recorded results and progress Progress monitored Privacy on / off Active Military Image Selection Group Images and design of each page as required for each Military Branch Reusuable images where appropriate Customize for each center (Active Military, Military family, Transitioning Military) Correct as defined Ready to use as requested by the project 1. Instructions for completing the chosen certification as well as occupational match for civilian careets 2. Courses / tutorials / reference libraries 3. Testing preparation / practice tool 4. Practice tests for final certification and recommendations for tutorials to better the results Comprehensive Current Complete Meets minimum requirements for Physically Accessible ADA compliance Repeatable and / or able to start where left off Recorded results and progress Progress monitored Privacy on / off Transitioning Military 1. Instructions for completing the chosen certification includes preparation and tutorials for educational testing such as GED, SAT, etc. 2. Courses / tutorials / reference libraries 3. Testing preparation / practice tool 4. Practice tests for final certification and recommendations for tutorials to better the results Comprehensive Current Complete Meets minimum requirements for Physically Accessible ADA compliance Repeatable and / or able to start where left off Recorded results and progress Progress monitored Privacy on / off Military Families Structure define Images selected Pages designed Development by IT Group Content Development Testing DEMO / Project Complete SIPOC Reques t receive d to create a DEMO Creating training for Military use DEMO created and ready to use (RTU)
  • 8. SIPOC Run the Sales Demo for the Military Understand the structure of each center Prepare to load the template for IAPPS Validate functional and content Start End
  • 9. Process Map 1.Login to Open the Library 4. Open myCenter Active tutorials, tests 3. First login process First logi n SOP Software package SOP Internet connection SOP Access configuration N Student Access to the library Successfu l Login 2. Contact Customer service Y N 6. Get Recommendations for studying based upon scores SOP Request email, Procedures N Customer service rep SOP Select Study direction N Student Start Resolution N Y Create myCenter SOP Select Study direction N Student Pass test N Y End 5. Work with tutorials and tests SOP Software package N Student Get Scores SOP Software package X Scores Update myCenter List of tutorials and tests
  • 11. C&E
  • 13. C&E Totals 0 200 400 600 800 1000 1200 1400 1. Library Setup 2. Contact Cutomer Service 3. First login Process 4. Open myCenter 5.Work with tutorials 6.Get Recommendations Totals