A PROJECT
ON
REPLANTING (2010-11)
“SURVIVING THE DROUGHT”
(JANUARY ’11 TO MARCH ’11)
BY
EDWIN CHERIN ABRAHAM
ASSISTANT MANAGER
LOCKHART ESTATE
OBJECTIVES
BUSINESS OBJECTIVE (LONG TERM)
•SAVING THE CAPITAL INVESTMENT PUT IN FOR REPLANTING
•INCREASING THE LAND PRODUCTIVITY AND WORKER
PRODUCTIVITY THROUGH HIGHER BUSH POPULATION
•DEVELOP DEEP ROOT SYSTEM IN PLANTS (HYDROTROPISM)
SHORT TERM GOALS (3 MONTHS OF THE PROJECT)
• INCREASE IN THE SURVIVAL% AFTER DROUGHT MONTHS
•REDUCTION IN THE COST OF IRRIGATION
•INCREASING THE EFFICIENCY OF IRRIGATION
REPLANTING (2010-2011)
PROJECT SITE: LOCKHART ESTATE (LOCKHART HUB)
FIELD: 4A AREA: 8.3 h.a PLANTS: 1,08,000
PLANTING DISTANCE: 1.35M X 0.75M X 0.75M
CLONE: TRF-1 (UPASI 17 x UPASI 21)
CLONE CHARECTERSTICS:
BROAD LEAF
ROBUST GROWTH
PALE YELLOWISH GREEN COLOUR LEAVES
YIELD :10000KG/H.A
LONG INTERNODE
DIFFICULT TO ROOT
EXCELLENT BRANCHING
HISTORY : DATA ANALYSIS
THE PROBLEM IN FIGURES: INFILLING DATA APRIL ’2010
RAINFALL DATA
FIELD NO. OF PLANTS CASUALITY NO.(%)
TOTAL 54635 9027 (16.52%)
MONTH RAINFALL (2009-10) RAINFALL (2010-11)
JANUARY 0.25 CM 0.46 CM
FEBRUARY 0.0 CM 2.72 CM
MARCH 2.95 CM 0 CM
TOTAL 3.20 CM 3.18 CM
MEASURES TO RESIST DROUGHT
• MULCHING : COVERING THE SOIL SURFACE NEAR TO THE PLANTS WITH
COIR PITH TO REDUCE THE EVAPORATION FROM THE SOIL SURFACE.
• COVER CROPS: CROTOLARIA AND GLYRICIDIA USED AS COVER CROPS
TO THE PLANTS. THIS WASN’T MUCH USEFUL AS THESE COVER CROPS
DID NOT RESPOND WELL.
• TOP SHADING: REDUCTION IN THE TRANSPIRATION LOSS BY COVERING
THE PLANTS ALONG EAST-WEST DIRECTION USING COCONUT FRONDS
AND EUCALYPTUS BRANCHES.
• KAOLIN APPLICATION
• SUBSOIL IRRIGATION
SUBSOIL IRRIGATION
CONVENTIONAL METHOD
TASK:200 PLANTS/MANDAY
IN THIS METHOD A PAIR OF WORKERS , ONE FOR INJECTING AND THE OTHER FOR
HEAD LOADING WATER.
VERY LOW TASK ACHIEVABLE AND EFFICIENCY WAS VERY LESS.
SUBSOIL IRRIGATION
• NEW METHOD:
 TASK: 750-1000 PLANTS/MANDAY
 USING THE HIGH VOLUME MACHINES TO PUMP WATER TO THE INJECTORS CONNECTED TO
THE TWO OUTLETS USING HOSE PIPES AND INJECTING AT A HIGHER EFFICIENCY AND LESS
EXPENSE.
HIGH SAVING ON MANDAYS AND COST OF IRRIGATION.
PROGRESS
• LAST RAINFALL RECEIVED ON : 04/01/’11
• SUB-SOIL IRRIGATION STARTED ON: 28/01/’11
MONTH PLANTS DONE
JANUARY 12000
FEBRUARY 1,53,000
MARCH (TILL 18/03) 71,500
TOTAL (TILL 18/03) 2,24,500
NO. OF ROUNDS COMPLETED
(TILL 18/03)
2.07
FINANCIAL PERSPECTIVE
A COMPARITIVE STUDY OF THE TWO METHODS CONSIDERING THE COST
PARAMETERS WHEN REQUIRED TO DO 2,24,500 PLANTS.
COST SAVINGS/PLANT: RS.(2.34 -0.97) = RS.1.37
TOTAL SAVINGS: RS.1,47,960
METHOD-> CONVENTIONAL HIGH VOLUME INJECTION
PLANTS 2,24,500 2,24,500
PLANTS/MANDAY 200 596
MANDAYS REQ. 1122.5 377
COST (MANDAYS) 1122.5 x Rs.225 = Rs.2,52,562 377 x Rs.225 = Rs.84825
FUEL CONSUMED 0 332 L (PETROL)
COST (FUEL) 0 332 x Rs.60 = Rs.19,920
TOTAL COST Rs. 2,52,562 Rs. 1,04,745
COST/PLANT Rs. 2.34 Rs. 0.97

More Related Content

Similar to Innovation irrigation

Green infrastructure policy for stormwater infiltration
Green infrastructure policy for stormwater infiltrationGreen infrastructure policy for stormwater infiltration
Green infrastructure policy for stormwater infiltrationEvan Pratt
 
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...How Chevron saved an average of 18 days per well on three deepwater Gulf of M...
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...Jason Hardin
 
Article on environment friendly technology in water industry
Article on environment friendly technology in water industryArticle on environment friendly technology in water industry
Article on environment friendly technology in water industryTejas Mairal
 
SMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANTSMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANTvikaspanch
 
Hydropower project
Hydropower projectHydropower project
Hydropower projectsouravpaul00
 
Suzlon one earth
Suzlon one earthSuzlon one earth
Suzlon one earthVineet Rs
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Fu Michael Justin
 
Suez Victorian Desalination Project
Suez Victorian Desalination ProjectSuez Victorian Desalination Project
Suez Victorian Desalination ProjectRick Nabett
 
Hydrology of a cloudforest in La Tigra Honduras
Hydrology of a cloudforest in La Tigra HondurasHydrology of a cloudforest in La Tigra Honduras
Hydrology of a cloudforest in La Tigra HondurasLuis Caballero Bonilla
 
EIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptxEIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptxSandeep754657
 
Water harvesting structures
Water harvesting structures Water harvesting structures
Water harvesting structures Pawan Jeet
 
Onkar_Joshi - Hyperloop.pptx
Onkar_Joshi - Hyperloop.pptxOnkar_Joshi - Hyperloop.pptx
Onkar_Joshi - Hyperloop.pptxOnkarJoshi49
 
OR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green RoofOR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green RoofSotirakou964
 
Final Report_Edited by JC and KP
Final Report_Edited by JC and KPFinal Report_Edited by JC and KP
Final Report_Edited by JC and KPJared Cordes
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plantRick Nabett
 
Hydro-electrical Energy.ppt
Hydro-electrical Energy.pptHydro-electrical Energy.ppt
Hydro-electrical Energy.pptFrankKalili1
 
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE Akhil Prabhakar
 

Similar to Innovation irrigation (20)

Al bahar
Al baharAl bahar
Al bahar
 
Green infrastructure policy for stormwater infiltration
Green infrastructure policy for stormwater infiltrationGreen infrastructure policy for stormwater infiltration
Green infrastructure policy for stormwater infiltration
 
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...How Chevron saved an average of 18 days per well on three deepwater Gulf of M...
How Chevron saved an average of 18 days per well on three deepwater Gulf of M...
 
Article on environment friendly technology in water industry
Article on environment friendly technology in water industryArticle on environment friendly technology in water industry
Article on environment friendly technology in water industry
 
SMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANTSMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANT
 
Hydropower project
Hydropower projectHydropower project
Hydropower project
 
Suzlon one earth
Suzlon one earthSuzlon one earth
Suzlon one earth
 
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
Urban Planning Design Considerations for Better Water Quality, Bill Hunt NC S...
 
Suez Victorian Desalination Project
Suez Victorian Desalination ProjectSuez Victorian Desalination Project
Suez Victorian Desalination Project
 
Hydrology of a cloudforest in La Tigra Honduras
Hydrology of a cloudforest in La Tigra HondurasHydrology of a cloudforest in La Tigra Honduras
Hydrology of a cloudforest in La Tigra Honduras
 
EIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptxEIA-Thermal-Powerplant-1.pptx
EIA-Thermal-Powerplant-1.pptx
 
Water harvesting structures
Water harvesting structures Water harvesting structures
Water harvesting structures
 
Onkar_Joshi - Hyperloop.pptx
Onkar_Joshi - Hyperloop.pptxOnkar_Joshi - Hyperloop.pptx
Onkar_Joshi - Hyperloop.pptx
 
OR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green RoofOR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green Roof
 
Final Report_Edited by JC and KP
Final Report_Edited by JC and KPFinal Report_Edited by JC and KP
Final Report_Edited by JC and KP
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plant
 
Hydro-electrical Energy.ppt
Hydro-electrical Energy.pptHydro-electrical Energy.ppt
Hydro-electrical Energy.ppt
 
Pravin sawant
Pravin sawantPravin sawant
Pravin sawant
 
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
 
Seminar aparna
Seminar aparnaSeminar aparna
Seminar aparna
 

Innovation irrigation

  • 1. A PROJECT ON REPLANTING (2010-11) “SURVIVING THE DROUGHT” (JANUARY ’11 TO MARCH ’11) BY EDWIN CHERIN ABRAHAM ASSISTANT MANAGER LOCKHART ESTATE
  • 2. OBJECTIVES BUSINESS OBJECTIVE (LONG TERM) •SAVING THE CAPITAL INVESTMENT PUT IN FOR REPLANTING •INCREASING THE LAND PRODUCTIVITY AND WORKER PRODUCTIVITY THROUGH HIGHER BUSH POPULATION •DEVELOP DEEP ROOT SYSTEM IN PLANTS (HYDROTROPISM) SHORT TERM GOALS (3 MONTHS OF THE PROJECT) • INCREASE IN THE SURVIVAL% AFTER DROUGHT MONTHS •REDUCTION IN THE COST OF IRRIGATION •INCREASING THE EFFICIENCY OF IRRIGATION
  • 3. REPLANTING (2010-2011) PROJECT SITE: LOCKHART ESTATE (LOCKHART HUB) FIELD: 4A AREA: 8.3 h.a PLANTS: 1,08,000 PLANTING DISTANCE: 1.35M X 0.75M X 0.75M CLONE: TRF-1 (UPASI 17 x UPASI 21) CLONE CHARECTERSTICS: BROAD LEAF ROBUST GROWTH PALE YELLOWISH GREEN COLOUR LEAVES YIELD :10000KG/H.A LONG INTERNODE DIFFICULT TO ROOT EXCELLENT BRANCHING
  • 4. HISTORY : DATA ANALYSIS THE PROBLEM IN FIGURES: INFILLING DATA APRIL ’2010 RAINFALL DATA FIELD NO. OF PLANTS CASUALITY NO.(%) TOTAL 54635 9027 (16.52%) MONTH RAINFALL (2009-10) RAINFALL (2010-11) JANUARY 0.25 CM 0.46 CM FEBRUARY 0.0 CM 2.72 CM MARCH 2.95 CM 0 CM TOTAL 3.20 CM 3.18 CM
  • 5. MEASURES TO RESIST DROUGHT • MULCHING : COVERING THE SOIL SURFACE NEAR TO THE PLANTS WITH COIR PITH TO REDUCE THE EVAPORATION FROM THE SOIL SURFACE. • COVER CROPS: CROTOLARIA AND GLYRICIDIA USED AS COVER CROPS TO THE PLANTS. THIS WASN’T MUCH USEFUL AS THESE COVER CROPS DID NOT RESPOND WELL. • TOP SHADING: REDUCTION IN THE TRANSPIRATION LOSS BY COVERING THE PLANTS ALONG EAST-WEST DIRECTION USING COCONUT FRONDS AND EUCALYPTUS BRANCHES. • KAOLIN APPLICATION • SUBSOIL IRRIGATION
  • 6. SUBSOIL IRRIGATION CONVENTIONAL METHOD TASK:200 PLANTS/MANDAY IN THIS METHOD A PAIR OF WORKERS , ONE FOR INJECTING AND THE OTHER FOR HEAD LOADING WATER. VERY LOW TASK ACHIEVABLE AND EFFICIENCY WAS VERY LESS.
  • 7. SUBSOIL IRRIGATION • NEW METHOD:  TASK: 750-1000 PLANTS/MANDAY  USING THE HIGH VOLUME MACHINES TO PUMP WATER TO THE INJECTORS CONNECTED TO THE TWO OUTLETS USING HOSE PIPES AND INJECTING AT A HIGHER EFFICIENCY AND LESS EXPENSE. HIGH SAVING ON MANDAYS AND COST OF IRRIGATION.
  • 8. PROGRESS • LAST RAINFALL RECEIVED ON : 04/01/’11 • SUB-SOIL IRRIGATION STARTED ON: 28/01/’11 MONTH PLANTS DONE JANUARY 12000 FEBRUARY 1,53,000 MARCH (TILL 18/03) 71,500 TOTAL (TILL 18/03) 2,24,500 NO. OF ROUNDS COMPLETED (TILL 18/03) 2.07
  • 9. FINANCIAL PERSPECTIVE A COMPARITIVE STUDY OF THE TWO METHODS CONSIDERING THE COST PARAMETERS WHEN REQUIRED TO DO 2,24,500 PLANTS. COST SAVINGS/PLANT: RS.(2.34 -0.97) = RS.1.37 TOTAL SAVINGS: RS.1,47,960 METHOD-> CONVENTIONAL HIGH VOLUME INJECTION PLANTS 2,24,500 2,24,500 PLANTS/MANDAY 200 596 MANDAYS REQ. 1122.5 377 COST (MANDAYS) 1122.5 x Rs.225 = Rs.2,52,562 377 x Rs.225 = Rs.84825 FUEL CONSUMED 0 332 L (PETROL) COST (FUEL) 0 332 x Rs.60 = Rs.19,920 TOTAL COST Rs. 2,52,562 Rs. 1,04,745 COST/PLANT Rs. 2.34 Rs. 0.97