Large Energy Storage System Eduard Heindl Hochschule Furtwangen University, Germany
Renewable Energy needs storage wind 60% solar 40% supply change source: Lueder von Bremen, EWEC 2009 storage for up to seven days required!
Electicity: Daily Production Base load: coal, nuclear daily production: 1600GWh Problem: how to use this energy 70GW 280GW Hydro Storage capacity in Germany: 40GWh 0h midnight 24h  time „ priceless energie“ solar power, wind power Consumption in Germany 12h high noon
Energy demand:  Joe Public ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
1km
Think Big! 1km 500m 1700GWh
Basic Principle capacity power converter h ,[object Object],[object Object],[object Object],connec t power grid
Construction 1km mine shaft base tunnel, water intake 1. tunnel 1km blast   hole construction road deep well drilling plant
Construction work 1km 1. tunnel lower saw mill wire saw upper saw mill blast hole construction road
Diamond wire sawing Surface 1. Tunnel traction cut surface Diamondwire saw rock drilling holes r
Diamond wire sawing surface 1. tunnel traction Diamond wire saw rock drilling holes r cut surface
Baseplate seperation base-tunnel 2. tunnel traktion sawing string rock drilling holes r cutted rock remaining rock top view!
Rock Bottom Area Separation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],m a F m a r a 0 =a r +a s h ρ F s p s B s ;T s p s =304bar h=1000m:
Cutting completed 1km 1. tunnel 2. tunnel construction road the wall and the floor of the cylinder are  separated from the surrounding rock
 
Energy Storage Capacity h=r D=2r l=2r Generated surface: M = 2 * π * r * l = 4 * π * r²  (1) Real density ρ 2  = ρ 1  – ρ 3   (2) Potential energy in gravitation field E =  g * m * h  (3) Real mass of cylinder  m = π * r² * 2 h * ρ 2   (4) Eq. 4 and eq. 3 using h = r results in: E = g * π * r² * 2 * r * ρ 2  * r  (5) Eq. 5 condensed: E =  2 π g ρ 2  *   r 4 the power V=4πr³
500 1.700 Beispiel Daily electrical power  production in Germany Energy storage capacity depends on the Radius r Example Source: www.eia.doe.gov/cneaf/electricity/epm/table1_1.html Daily electrical power  production in USA 800
Sealing ,[object Object],[object Object],[object Object],[object Object]
Sealing the Walls rock mass piston 1. tunnel platform sealed wall support column sealing water under pressure Saw line
Closing the Cracks rock mass piston piston 1. tunnel water under pressure wall with sealant ad sealant seal crack
Complete the Sealing rock mass piston piston  1. tunnel water under pressure wall with sealant ad sealing seal crack
Sealing rock mass piston pin joint with sensor seal steel podest water pressure
Water Volume ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Speed of movement ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Piston position fine tuning ,[object Object],piston low pressure sealing about 1 bar Seal low pressure seal low pressure seal high pressure exchange pump x x
Thermal effects ,[object Object],[object Object],[object Object],[object Object],* Quelle: Regierungspräsidiums Freiburg www.lgrb.uni-freiburg.de
Price of the system ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
pump storage power station 0,39 500 100 1.000 example system Price per kWh storage volume (excluding the energy converter) price system radius [m]
0,39 500 100 1.000 day week month year 200€/kW pump storage power station example system system radius [m] price Price per kWh storage volume (using different converters, 200€/kW)
Calculation 157 € /m 1 000 Drilling 821 Total 3 € /m 1 000 Sealing 157 € /m² 100 Seal shield 39 € /m² 10 Sawing 464 € /m 50 000 Tunnel Mio € unit cost per Building
Calculation 2 861 Total 2 040 € /kWh (T=7d) 200 Pumps and Generators 821 Storage system Mio € Cost
Return on Investment DRAFT! Assumption:  there are 100 days (2,400h) where the power could be bought  with a mean price of 20€/MWh and there are 2400h where it could be sold  for 70€/MWh, the other times of the year, there is no activity. The conversion  efficiency is 70% (worst case ) 710 Total  (Q=70%) 1 200 € /MWh (T=100d) 70 Power sell Per year 490 € /MWh (T=100d) 20 Power buy per year Mio € Turnover
Return on Investment ,[object Object],[object Object]
Requirements: Storage Systems ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],source Dirk Uwe Sauer
Maintenance Steps ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Worst case scenario ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Research Topics ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Thank you for your interest! Questions? eduard-heindl.de/energy-storage

More Related Content

What's hot

Wind Energy 1
Wind Energy 1Wind Energy 1
Wind Energy 1
falkor
 
Geothermal Development in Turkey
Geothermal Development in TurkeyGeothermal Development in Turkey
Geothermal Development in Turkey
Ali Osman Öncel
 
Caes gen presentation
Caes gen presentationCaes gen presentation
Caes gen presentation
LukeBatten
 
Caes projects worldwide
Caes projects worldwideCaes projects worldwide
Caes projects worldwide
LukeBatten
 

What's hot (20)

A012440104
A012440104A012440104
A012440104
 
Geothermal energy in Turkey Büşra Kevser KARAAĞAÇ
Geothermal energy in Turkey Büşra Kevser KARAAĞAÇGeothermal energy in Turkey Büşra Kevser KARAAĞAÇ
Geothermal energy in Turkey Büşra Kevser KARAAĞAÇ
 
Response to Emergencies in Wind Turbines
Response to Emergencies in Wind TurbinesResponse to Emergencies in Wind Turbines
Response to Emergencies in Wind Turbines
 
Wind Energy 1
Wind Energy 1Wind Energy 1
Wind Energy 1
 
Design and testing of a vertical axis turbine drivenby automotive drag as an ...
Design and testing of a vertical axis turbine drivenby automotive drag as an ...Design and testing of a vertical axis turbine drivenby automotive drag as an ...
Design and testing of a vertical axis turbine drivenby automotive drag as an ...
 
Geothermal Development in Turkey
Geothermal Development in TurkeyGeothermal Development in Turkey
Geothermal Development in Turkey
 
Geothermal power - cheaper than coal
Geothermal power - cheaper than coalGeothermal power - cheaper than coal
Geothermal power - cheaper than coal
 
Value engineered wind turbine
Value engineered wind turbineValue engineered wind turbine
Value engineered wind turbine
 
Caes gen presentation
Caes gen presentationCaes gen presentation
Caes gen presentation
 
Wind Mill Industry Analysis by Using Porter's Five Model
Wind Mill Industry Analysis by Using Porter's Five ModelWind Mill Industry Analysis by Using Porter's Five Model
Wind Mill Industry Analysis by Using Porter's Five Model
 
Individual
IndividualIndividual
Individual
 
Caes projects worldwide
Caes projects worldwideCaes projects worldwide
Caes projects worldwide
 
Wind Energy ppt
Wind Energy pptWind Energy ppt
Wind Energy ppt
 
G therm thermal _pr presentation_animated_r4 2 19 13 electricial
G therm thermal _pr presentation_animated_r4 2 19 13 electricialG therm thermal _pr presentation_animated_r4 2 19 13 electricial
G therm thermal _pr presentation_animated_r4 2 19 13 electricial
 
Conventional Power generation
Conventional Power generationConventional Power generation
Conventional Power generation
 
Wind energy
Wind energyWind energy
Wind energy
 
Wind energy
Wind energyWind energy
Wind energy
 
013_20160726_Wind energy
013_20160726_Wind energy013_20160726_Wind energy
013_20160726_Wind energy
 
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATIONC2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
 
Windmill
WindmillWindmill
Windmill
 

Similar to Ultra Large Energy Storage System

Vinith 6713 comprehension
Vinith   6713 comprehensionVinith   6713 comprehension
Vinith 6713 comprehension
Vinimec
 
Remaining Life Analysis of Boiler Tubes on Behalf of Hoop Stresses Produced D...
Remaining Life Analysis of Boiler Tubes on Behalf of Hoop Stresses Produced D...Remaining Life Analysis of Boiler Tubes on Behalf of Hoop Stresses Produced D...
Remaining Life Analysis of Boiler Tubes on Behalf of Hoop Stresses Produced D...
IJERA Editor
 
Deep drilling - Risks and challenges with examples from the German Molasse Basin
Deep drilling - Risks and challenges with examples from the German Molasse BasinDeep drilling - Risks and challenges with examples from the German Molasse Basin
Deep drilling - Risks and challenges with examples from the German Molasse Basin
Gerd Tarand
 
diseño y conocimineto sobre los transformadores electricos
diseño y conocimineto sobre los transformadores electricosdiseño y conocimineto sobre los transformadores electricos
diseño y conocimineto sobre los transformadores electricos
dibujante32
 
Wind Energy Nguyen Hoang Viet Final
Wind Energy   Nguyen Hoang Viet FinalWind Energy   Nguyen Hoang Viet Final
Wind Energy Nguyen Hoang Viet Final
Viet NguyenHoang
 
MHD wind energy conversion
MHD wind energy conversionMHD wind energy conversion
MHD wind energy conversion
Hera Khwaja
 

Similar to Ultra Large Energy Storage System (20)

Probs5,11,17
Probs5,11,17Probs5,11,17
Probs5,11,17
 
Solar Calculation (44 slide)
 Solar Calculation (44 slide) Solar Calculation (44 slide)
Solar Calculation (44 slide)
 
Wind energy tech 2015
Wind energy tech  2015Wind energy tech  2015
Wind energy tech 2015
 
GEOTHERMAL POWER PLANT
GEOTHERMAL  POWER PLANT GEOTHERMAL  POWER PLANT
GEOTHERMAL POWER PLANT
 
Vinith 6713 comprehension
Vinith   6713 comprehensionVinith   6713 comprehension
Vinith 6713 comprehension
 
IRJET- Numerical Analysis of Twisted Tape Absorber Tube of Solar Parabolic Tr...
IRJET- Numerical Analysis of Twisted Tape Absorber Tube of Solar Parabolic Tr...IRJET- Numerical Analysis of Twisted Tape Absorber Tube of Solar Parabolic Tr...
IRJET- Numerical Analysis of Twisted Tape Absorber Tube of Solar Parabolic Tr...
 
Remaining Life Analysis of Boiler Tubes on Behalf of Hoop Stresses Produced D...
Remaining Life Analysis of Boiler Tubes on Behalf of Hoop Stresses Produced D...Remaining Life Analysis of Boiler Tubes on Behalf of Hoop Stresses Produced D...
Remaining Life Analysis of Boiler Tubes on Behalf of Hoop Stresses Produced D...
 
Deep drilling - Risks and challenges with examples from the German Molasse Basin
Deep drilling - Risks and challenges with examples from the German Molasse BasinDeep drilling - Risks and challenges with examples from the German Molasse Basin
Deep drilling - Risks and challenges with examples from the German Molasse Basin
 
Final ppt 26 slides
Final ppt 26 slidesFinal ppt 26 slides
Final ppt 26 slides
 
Gyromat in tunnelling practice
Gyromat in tunnelling practiceGyromat in tunnelling practice
Gyromat in tunnelling practice
 
diseño y conocimineto sobre los transformadores electricos
diseño y conocimineto sobre los transformadores electricosdiseño y conocimineto sobre los transformadores electricos
diseño y conocimineto sobre los transformadores electricos
 
Wind Energy Nguyen Hoang Viet Final
Wind Energy   Nguyen Hoang Viet FinalWind Energy   Nguyen Hoang Viet Final
Wind Energy Nguyen Hoang Viet Final
 
ISES 2013 - Day 1 - Prof. Koichi Kitazawa, Former Executive Director, Japan ...
ISES 2013  - Day 1 - Prof. Koichi Kitazawa, Former Executive Director, Japan ...ISES 2013  - Day 1 - Prof. Koichi Kitazawa, Former Executive Director, Japan ...
ISES 2013 - Day 1 - Prof. Koichi Kitazawa, Former Executive Director, Japan ...
 
Ocean energy ppt azhar
Ocean energy ppt azharOcean energy ppt azhar
Ocean energy ppt azhar
 
Energy, power and climate change
Energy, power and climate changeEnergy, power and climate change
Energy, power and climate change
 
Mid semester qp
Mid semester qpMid semester qp
Mid semester qp
 
PSE-18.pdf
PSE-18.pdfPSE-18.pdf
PSE-18.pdf
 
International Journal of Computational Engineering Research(IJCER)
 International Journal of Computational Engineering Research(IJCER)  International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER)
 
274 iitb 274 corrected
274 iitb 274 corrected274 iitb 274 corrected
274 iitb 274 corrected
 
MHD wind energy conversion
MHD wind energy conversionMHD wind energy conversion
MHD wind energy conversion
 

Recently uploaded

Recently uploaded (20)

Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 

Ultra Large Energy Storage System

  • 1. Large Energy Storage System Eduard Heindl Hochschule Furtwangen University, Germany
  • 2. Renewable Energy needs storage wind 60% solar 40% supply change source: Lueder von Bremen, EWEC 2009 storage for up to seven days required!
  • 3. Electicity: Daily Production Base load: coal, nuclear daily production: 1600GWh Problem: how to use this energy 70GW 280GW Hydro Storage capacity in Germany: 40GWh 0h midnight 24h time „ priceless energie“ solar power, wind power Consumption in Germany 12h high noon
  • 4.
  • 5. 1km
  • 6. Think Big! 1km 500m 1700GWh
  • 7.
  • 8. Construction 1km mine shaft base tunnel, water intake 1. tunnel 1km blast hole construction road deep well drilling plant
  • 9. Construction work 1km 1. tunnel lower saw mill wire saw upper saw mill blast hole construction road
  • 10. Diamond wire sawing Surface 1. Tunnel traction cut surface Diamondwire saw rock drilling holes r
  • 11. Diamond wire sawing surface 1. tunnel traction Diamond wire saw rock drilling holes r cut surface
  • 12. Baseplate seperation base-tunnel 2. tunnel traktion sawing string rock drilling holes r cutted rock remaining rock top view!
  • 13.
  • 14. Cutting completed 1km 1. tunnel 2. tunnel construction road the wall and the floor of the cylinder are separated from the surrounding rock
  • 15.  
  • 16. Energy Storage Capacity h=r D=2r l=2r Generated surface: M = 2 * π * r * l = 4 * π * r² (1) Real density ρ 2 = ρ 1 – ρ 3 (2) Potential energy in gravitation field E = g * m * h (3) Real mass of cylinder m = π * r² * 2 h * ρ 2 (4) Eq. 4 and eq. 3 using h = r results in: E = g * π * r² * 2 * r * ρ 2 * r (5) Eq. 5 condensed: E = 2 π g ρ 2 * r 4 the power V=4πr³
  • 17. 500 1.700 Beispiel Daily electrical power production in Germany Energy storage capacity depends on the Radius r Example Source: www.eia.doe.gov/cneaf/electricity/epm/table1_1.html Daily electrical power production in USA 800
  • 18.
  • 19. Sealing the Walls rock mass piston 1. tunnel platform sealed wall support column sealing water under pressure Saw line
  • 20. Closing the Cracks rock mass piston piston 1. tunnel water under pressure wall with sealant ad sealant seal crack
  • 21. Complete the Sealing rock mass piston piston 1. tunnel water under pressure wall with sealant ad sealing seal crack
  • 22. Sealing rock mass piston pin joint with sensor seal steel podest water pressure
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28. pump storage power station 0,39 500 100 1.000 example system Price per kWh storage volume (excluding the energy converter) price system radius [m]
  • 29. 0,39 500 100 1.000 day week month year 200€/kW pump storage power station example system system radius [m] price Price per kWh storage volume (using different converters, 200€/kW)
  • 30. Calculation 157 € /m 1 000 Drilling 821 Total 3 € /m 1 000 Sealing 157 € /m² 100 Seal shield 39 € /m² 10 Sawing 464 € /m 50 000 Tunnel Mio € unit cost per Building
  • 31. Calculation 2 861 Total 2 040 € /kWh (T=7d) 200 Pumps and Generators 821 Storage system Mio € Cost
  • 32. Return on Investment DRAFT! Assumption: there are 100 days (2,400h) where the power could be bought with a mean price of 20€/MWh and there are 2400h where it could be sold for 70€/MWh, the other times of the year, there is no activity. The conversion efficiency is 70% (worst case ) 710 Total (Q=70%) 1 200 € /MWh (T=100d) 70 Power sell Per year 490 € /MWh (T=100d) 20 Power buy per year Mio € Turnover
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38. Thank you for your interest! Questions? eduard-heindl.de/energy-storage