The information provided herein is for informational and illustrative purposes
only and is not, and does not seek to be, a source of legal or financial advice
on any subject. This information does not constitute an offer of any sort and is
subject to change without notice.
EEB expressly disclaims any responsibility for actions taken or not taken based
on this information. EEB does not accept any responsibility for losses that
might result from the execution of the proposals or recommendations
presented. EEB is not responsible for any content that may originate with third
parties. EEB may have provided, or might provide in the future, information that
is inconsistent with the information herein presented.
EEB Overview
Wide energy Portfolio: Network and Services
Focus on natural
monopolies
Growth in controlled
subsidiaries
Sound regulatory
framework
Ample access to
capital markets
3
100%*
100%*
Leaders in every market
Electricity transmission
Market share (%)
(Km of 220-138 kV lines )
Electricity transmission
Market share (%)
(Km of lines)
Electricity distribution
Market share (%)
(Kwh)
Electricity generation
Installed Capacity (%)
(Generation)
# 1 Peru
# 2 Colombia
# 1 Colombia
# 2 Colombia
Gas distribution
Market share (%)
(No. clients)
59.0%
Gas transportation
Market share (%)
(Average volume transported)
88.0%
Gas distribution
Market share (%)
(No. clients)
100.0%
# 1 Colombia
# 1 Colombia
# 1 Perú
57.6%
8.22%
26.6%
20.72%
Electricity transmission
Project ongoing
(850 Km L/T and 24 S/E)
# 1 Guatemala
4
*Estimated market share once in operation.
Focus on natural monopolies and attractive
energy markets
Strong Presence in Relevant Countries
Natural Gas
Source: ANH, MEM, UPME, Concentra
333
417
484
528
950
2009 2010 2011 2012 2015E
Natural Gas Demand - Perú - MMCFD
8.46
7.06
6.63
7.01
6.41
2009 2010 2011 2012 2013
Natural Gas Reserves - Colombia - Tcf
12.00 12.50 12.46
15.38
2009 2010 2011 2012
Natural Gas Reserves - Perú - Tcf
810 860 892 905
1,047 1,083
2009 2010 2011 2012 2013 2016E
Natural Gas Demand - Colombia - GBTUD
6
Strong Presence in Relevant Countries
Electricity
Source: ANH, MEM, UPME
54,679
56,148
57,157
59,367
60,885
65,125
2009 2010 2011 2012 2013 2016E
Electricity Demand - Colombia - GWh
7,926 8,134 8,473 8,730 8,945
10,064
2009 2010 2011 2012 2013 2016E
Electricity Demand - Guatemala - GWh
27,003
32,314
36,779 37,321
39,669
48,411
2009 2010 2011 2012 2013 2016E
Electricity Demand - Perú - GWh
7
Stable and Growing Income*
8* Total of Operating Revenues per company – aggregated figures for comparable purposes.
Predictability and stability in regulated revenues. 81% of revenues comes from regulated business.
422.4
495.7
605.9
871.6
1,076.2
1,114.4
982.7
2008 2009 2010 2011 2012 2013 2014 3Q
Natural Gas Distribution - USD mm
GAS NATURAL CÁLIDDA TOTAL
1,317.7
1,584.2
1,730.3 1,808.7
2,092.1 1,972.1
1,499.1
2008 2009 2010 2011 2012 2013 2014 3Q
Electricity Distribution - USD mm
CODENSA DECSA EMSA TOTAL
279.6
365.2
401.9
439.1
536.4
578.1
486.9
2008 2009 2010 2011 2012 2013 2014 3Q
Natural GasTransportation - USD mm
TGI PROMIGAS TOTAL
136.2
152.4 162.1 181.5
207.3
288.9
220.4
2008 2009 2010 2011 2012 2013 2014 3Q
Electricity Transmission - USD mm
REP CTM EEB Transmisión TOTAL
Growth through controlled subsidiaries and
Brownfield opportunities
Consolidated Financial Results
Evolution EBITDA
10
81%
67%
56% 55%
61% 44% 45%
48% 47%19%
33%
44%
45%
39%
56%
55%
52% 53%
2006 2007 2008 2009 2010 2011* 2012** 2013 2014 IIIQ LTM
Consolidated Adjusted EBITDA & Normalized Dividends
(USD Million)
Operational EBITDA Dividends
240.9
471.3
416.4
515.6
586.4
818.5
921.7
705.0
974.6
EEB Transm, Trecsa
& EEBIS Gt
2.0%
TGI
39.8%
Decsa/EEC
3.9%
Cálidda, Contugás &
EEBIS Pe
7.5%
Emgesa
21.8%
Codensa
13.5%
Gas Natural
3.3%
Promigás
4.5%
ISA, REP & CTM
3.1%
Otros;
0.59%
Consolidated Adjusted EBITDA 3Q 2014 LTM by Subsidiary
Normalized Dividends: *2010 excludes dividends declared based on an
early close of Gas Natural’s, Emgesa’s and Codensa’s financial statements.
These figures are included in 2011, when such dividends would normally
have been declared.** Anticipated dividends declared by Codensa on first
half 2011, were included in 2012.
Ambitious projects under execution
Consolidating the Strategy
Controlled Subsidiaries
12
Projects Update
EEB Transmission
• Armenia – 64%,
• Tesalia – 77%
• Chivor II Norte – 37%
• SVC Tunal – 83%.
• Bolívar-TermoCartagena – 2.1%
• Sogamoso-Norte-Nueva Esperanza: 5%
• UPME awarded projects: Rio Cordoba
TGI
• La Sabana Compression Station – 91%
TRECSA
• Guatemala’s interconnection System – 76%
13
Consolidating the Strategy
Non-Controlled Subsidiaries
Projects Update
EMGESA
• Quimbo Project (400 MW)
• Total investment: USD 1,093 mm
• Execution 3Q-14: 80%
• Full operation: 1H 15
CODENSA
• On-going projects: Nueva Esperanza, Norte, Bacatá Substations
• New and existing demand
• Quality service and continuity
• Control operational risk
Financial Plan
2013-2018 Investments & Funding Sources
Composition of Investments
Brownfields: 70%
Greenfields: 30%
14OM: Offering Memorandum of USD.749,000,000 EEB 6.125% Senior Notes due 2021
As of September 2014 is already executed and compromised
USD 2,200 Mm (29%)
2013-2018 Funding Sources USD Millons
Cash Generation 1,700
Financial Debt 3,320
Third Parties (Contributions of Capital) 2,480
TOTAL 7,500
Compromised Resources (29%) 2,200
Resources that will be compromised
2014-2018
5,300
1.60 1.48 1.39 1.25
2.33
4.5
3Q - 13 4Q -13 1Q - 14 2Q -14 3Q -14
Net Debt / Consolidated Adjusted EBITDA
9.10
11.06 10.96
11.44
10.22
2.25
3Q - 13 4Q -13 1Q - 14 2Q -14 3Q -14
Consolidated Adjusted EBITDA/Interest
Access to Capital Markets
Access to Capital Markets
GEB Transactions
USD Million
16
EEB
Baa3
BBB-
BBB
TGI
Baa3
BBB-
BBB
CÁLIDDA
Baa3
BBB-
BBB-
EEB Share Performance
Ticker EEB:CB
As of September 30th, 2014 EEB’ market capitalization was USD 7.3 Billion
Trading volume tripled after the Equity Offering Nov 2011.
The stock is part of COLCAP, COLEQTY and COLIR
Average Target Price As of 3Q 2014: USD 0.96 COP 1,943
EEB Share Performance 3Q 2013 – 3Q 2014
17
Creating Value to shareholders
18
0.017 0.016 0.017
0.043
0.018
0.025
0.033
1Q 08 1Q 09 1Q 10 1Q 10 1Q 11* 1Q 11 1Q 13 1Q 14
Dividends per Share - USD
0.58
0.91
0.60
0.72
0.80
0.72
6.9%
0.0%
3.0%
3.5%
4.2%
3.5%
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
2010 2011 2012 2013 2014 Avg 2008-
2013
Dividend Yield Evolution
Closing Share price at the end of the year USD Dividend Yield
97.7
353.8
571.0
157.1
390.6
437.8
334.7
91.8 142.6 368.0 109.0 228.3 306.5 207.7
94%
40%
64%
69%
58%
70%
62%
141%
40%
64%
105%
58%
70% 68%
0.0
100.0
200.0
300.0
400.0
500.0
600.0
0%
20%
40%
60%
80%
100%
120%
140%
160%
2008 2009 2010 2011 2012 2013 Avg 2008-2013
Evolution Dividend Payout Ratio
(USD Mllion)
Net Profit Dividends Dividend payout on last year profit Dividend payout + Including realeased reserves
Financial Highlights
353.8
571.0
157.1
390.6
437.8
461.8
2009 2010 2011 2012 2013 3Q 2014
Net Income
(USD Millions)
203.6
140.2
283.5
315.9 315.5
301.0
2009 2010 2011 2012 2013 3Q 2014
Operating Profit
(USD Millions)
455.3 487.2
731.8
896.4
1,016.4
842.0
2009 2010 2011 2012 2013 3Q 2014
Operating Revenues
(USD Millions)
515.6
944.0
557.0
723.5
921.7
974.6
2009 2010 2011 2012 2013 3Q 2014
LTM Consolidated EBITDA
(USD Millions)
Consolidated Financial Results
20
Investor Relations
For more information about Grupo Energía de Bogotá contact our Investor Relations team:
http://www.eeb.com.co
http://www.grupoenergiadebogota.com/en/investors
Fabian Sánchez Aldana
Investor Relations Advisor GEB
+57 (1) 3268000 – Ext 1827
fsanchez@eeb.com.co
Nicolas Mancini Suarez
Financing and Investor Relations Manager GEB
+57 (1) 3268000 - Ext 1536
nmancini@eeb.com.co
Rafael Andres Salamanca
Investor Relations Advisor GEB
+57 (1) 3268000 – Ext 1675
rsalamanca@eeb.com.co
Felipe Castilla Canales
Chief Financial Officer - GEB
21

More Related Content

What's hot

Institucional 1 q14 novo padrão eng-final
Institucional 1 q14 novo padrão   eng-finalInstitucional 1 q14 novo padrão   eng-final
Institucional 1 q14 novo padrão eng-finalEquatorialRI
 
Apimec 2014 ing
Apimec 2014 ingApimec 2014 ing
Apimec 2014 ingCteep
 
4Q12 Institutional Presentation
4Q12 Institutional Presentation4Q12 Institutional Presentation
4Q12 Institutional PresentationCelpaRI
 
Institucional 4 q13 novo padrão eng-final
Institucional 4 q13 novo padrão   eng-finalInstitucional 4 q13 novo padrão   eng-final
Institucional 4 q13 novo padrão eng-finalEquatorialRI
 
1Q13 Institutional Presentation
1Q13 Institutional Presentation1Q13 Institutional Presentation
1Q13 Institutional PresentationCelpaRI
 
Institutional Presentation 1Q12
Institutional Presentation 1Q12Institutional Presentation 1Q12
Institutional Presentation 1Q12CelpaRI
 
AES Tietê Conference Call 2010 Presentation
AES Tietê Conference Call 2010 PresentationAES Tietê Conference Call 2010 Presentation
AES Tietê Conference Call 2010 PresentationAES Tietê
 
2Q17 Results Presentation - CPFL Energia
2Q17 Results Presentation - CPFL Energia2Q17 Results Presentation - CPFL Energia
2Q17 Results Presentation - CPFL EnergiaCPFL RI
 
Corporate Presentation - CPFL Energia - Outubro/2014
Corporate Presentation - CPFL Energia - Outubro/2014Corporate Presentation - CPFL Energia - Outubro/2014
Corporate Presentation - CPFL Energia - Outubro/2014CPFL RI
 
Infrastructure and new energies from planning to realization_Value Partners
Infrastructure and new energies from planning to realization_Value PartnersInfrastructure and new energies from planning to realization_Value Partners
Infrastructure and new energies from planning to realization_Value PartnersValue Partners
 

What's hot (18)

Eeb ppt corporate en vf
Eeb ppt corporate  en vfEeb ppt corporate  en vf
Eeb ppt corporate en vf
 
3Q earnings presentation geb vf1
3Q earnings presentation geb vf13Q earnings presentation geb vf1
3Q earnings presentation geb vf1
 
Corporate presentation 1 q 15 s.a vf
Corporate presentation 1 q 15 s.a vfCorporate presentation 1 q 15 s.a vf
Corporate presentation 1 q 15 s.a vf
 
EEB corporate presentation
EEB corporate presentationEEB corporate presentation
EEB corporate presentation
 
Institucional 1 q14 novo padrão eng-final
Institucional 1 q14 novo padrão   eng-finalInstitucional 1 q14 novo padrão   eng-final
Institucional 1 q14 novo padrão eng-final
 
Apimec 2014 ing
Apimec 2014 ingApimec 2014 ing
Apimec 2014 ing
 
4Q12 Institutional Presentation
4Q12 Institutional Presentation4Q12 Institutional Presentation
4Q12 Institutional Presentation
 
Tgi earnings call 3 q presentation
Tgi earnings call 3 q presentationTgi earnings call 3 q presentation
Tgi earnings call 3 q presentation
 
TGIi & Cálidda conference call Q3 14
TGIi & Cálidda conference call Q3 14TGIi & Cálidda conference call Q3 14
TGIi & Cálidda conference call Q3 14
 
TGI earnings call 2Q 14 vf
TGI earnings call 2Q  14 vfTGI earnings call 2Q  14 vf
TGI earnings call 2Q 14 vf
 
Institucional 4 q13 novo padrão eng-final
Institucional 4 q13 novo padrão   eng-finalInstitucional 4 q13 novo padrão   eng-final
Institucional 4 q13 novo padrão eng-final
 
1Q13 Institutional Presentation
1Q13 Institutional Presentation1Q13 Institutional Presentation
1Q13 Institutional Presentation
 
Institutional Presentation 1Q12
Institutional Presentation 1Q12Institutional Presentation 1Q12
Institutional Presentation 1Q12
 
Tgi & cálidda earnings call 2014
Tgi & cálidda earnings call 2014Tgi & cálidda earnings call 2014
Tgi & cálidda earnings call 2014
 
AES Tietê Conference Call 2010 Presentation
AES Tietê Conference Call 2010 PresentationAES Tietê Conference Call 2010 Presentation
AES Tietê Conference Call 2010 Presentation
 
2Q17 Results Presentation - CPFL Energia
2Q17 Results Presentation - CPFL Energia2Q17 Results Presentation - CPFL Energia
2Q17 Results Presentation - CPFL Energia
 
Corporate Presentation - CPFL Energia - Outubro/2014
Corporate Presentation - CPFL Energia - Outubro/2014Corporate Presentation - CPFL Energia - Outubro/2014
Corporate Presentation - CPFL Energia - Outubro/2014
 
Infrastructure and new energies from planning to realization_Value Partners
Infrastructure and new energies from planning to realization_Value PartnersInfrastructure and new energies from planning to realization_Value Partners
Infrastructure and new energies from planning to realization_Value Partners
 

Viewers also liked

Viewers also liked (9)

Frontier Sales Demo
Frontier Sales DemoFrontier Sales Demo
Frontier Sales Demo
 
Colombia moderna
Colombia modernaColombia moderna
Colombia moderna
 
Measuring Social Media to track Conversions
Measuring Social Media to track ConversionsMeasuring Social Media to track Conversions
Measuring Social Media to track Conversions
 
Calidda conference call 3T 13
Calidda conference call 3T 13Calidda conference call 3T 13
Calidda conference call 3T 13
 
Credit Suisse Hires Veteran Tech Banker From Merrill - NYTimes.com
Credit Suisse Hires Veteran Tech Banker From Merrill - NYTimes.comCredit Suisse Hires Veteran Tech Banker From Merrill - NYTimes.com
Credit Suisse Hires Veteran Tech Banker From Merrill - NYTimes.com
 
Tgi & cálidda earnings call 1 q 2015
Tgi & cálidda earnings call 1 q 2015Tgi & cálidda earnings call 1 q 2015
Tgi & cálidda earnings call 1 q 2015
 
Libro aves y mamíferos. corpochivor
Libro aves y mamíferos. corpochivorLibro aves y mamíferos. corpochivor
Libro aves y mamíferos. corpochivor
 
Tgi conference call 3T13
Tgi conference call  3T13Tgi conference call  3T13
Tgi conference call 3T13
 
Cardioversión c
Cardioversión cCardioversión c
Cardioversión c
 

Similar to Corporate presentation 3 q 14 vf wa

Apresentação Institucional - Inglês
Apresentação Institucional - InglêsApresentação Institucional - Inglês
Apresentação Institucional - InglêsAES Tietê
 
Apimec presentation 03-31-2009
Apimec presentation   03-31-2009Apimec presentation   03-31-2009
Apimec presentation 03-31-2009AES Tietê
 
Apresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engApresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engAES Tietê
 
Apresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engApresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engAES Eletropaulo
 
Apresentação institucional 3T10 - EN - Asia
Apresentação institucional 3T10 - EN  - AsiaApresentação institucional 3T10 - EN  - Asia
Apresentação institucional 3T10 - EN - AsiaAES Tietê
 
Apresentação institucional 4_q12_en_v5
Apresentação institucional 4_q12_en_v5Apresentação institucional 4_q12_en_v5
Apresentação institucional 4_q12_en_v5AES Tietê
 
Apresentação institucional 4_q12_en_v5
Apresentação institucional 4_q12_en_v5Apresentação institucional 4_q12_en_v5
Apresentação institucional 4_q12_en_v5AES Tietê
 
Apresentação institucional 3T10_EN
Apresentação institucional 3T10_ENApresentação institucional 3T10_EN
Apresentação institucional 3T10_ENAES Tietê
 
Corporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCorporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCPFL RI
 
Apresentação expomoney en_v1 - impressão
Apresentação expomoney en_v1 - impressãoApresentação expomoney en_v1 - impressão
Apresentação expomoney en_v1 - impressãoAES Eletropaulo
 
Corporate Presentation - Agosto/14 - CPFL Energia
Corporate Presentation - Agosto/14 - CPFL EnergiaCorporate Presentation - Agosto/14 - CPFL Energia
Corporate Presentation - Agosto/14 - CPFL EnergiaCPFL RI
 
Apimec 2014 ing
Apimec 2014 ingApimec 2014 ing
Apimec 2014 ingCteep_ri
 
Institucional 2 q14 padrão 2014 eng
Institucional 2 q14 padrão 2014   engInstitucional 2 q14 padrão 2014   eng
Institucional 2 q14 padrão 2014 engEquatorialRI
 
Webinar - Photovoltaic Grid Parity Monitor for residential consumers
Webinar - Photovoltaic Grid Parity Monitor for residential consumersWebinar - Photovoltaic Grid Parity Monitor for residential consumers
Webinar - Photovoltaic Grid Parity Monitor for residential consumersLeonardo ENERGY
 

Similar to Corporate presentation 3 q 14 vf wa (20)

Geb corporate presentation
Geb corporate presentationGeb corporate presentation
Geb corporate presentation
 
EEB ppt corporate en vf
EEB ppt corporate  en vfEEB ppt corporate  en vf
EEB ppt corporate en vf
 
EEB Corporate
EEB Corporate EEB Corporate
EEB Corporate
 
Eeb ppt corporate en vf
Eeb ppt corporate en vfEeb ppt corporate en vf
Eeb ppt corporate en vf
 
Corporate presentation EEB
Corporate presentation EEBCorporate presentation EEB
Corporate presentation EEB
 
Apresentação Institucional - Inglês
Apresentação Institucional - InglêsApresentação Institucional - Inglês
Apresentação Institucional - Inglês
 
Apimec presentation 03-31-2009
Apimec presentation   03-31-2009Apimec presentation   03-31-2009
Apimec presentation 03-31-2009
 
Apresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engApresentação institucional 4_t10_eng
Apresentação institucional 4_t10_eng
 
Apresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engApresentação institucional 4_t10_eng
Apresentação institucional 4_t10_eng
 
Apresentação institucional 3T10 - EN - Asia
Apresentação institucional 3T10 - EN  - AsiaApresentação institucional 3T10 - EN  - Asia
Apresentação institucional 3T10 - EN - Asia
 
Apresentação institucional 4_q12_en_v5
Apresentação institucional 4_q12_en_v5Apresentação institucional 4_q12_en_v5
Apresentação institucional 4_q12_en_v5
 
Apresentação institucional 4_q12_en_v5
Apresentação institucional 4_q12_en_v5Apresentação institucional 4_q12_en_v5
Apresentação institucional 4_q12_en_v5
 
TGI presentation conference call 1Q 2014 vf
TGI presentation conference call 1Q 2014 vfTGI presentation conference call 1Q 2014 vf
TGI presentation conference call 1Q 2014 vf
 
Apresentação institucional 3T10_EN
Apresentação institucional 3T10_ENApresentação institucional 3T10_EN
Apresentação institucional 3T10_EN
 
Corporate Presentation CPFL Energia
Corporate Presentation CPFL EnergiaCorporate Presentation CPFL Energia
Corporate Presentation CPFL Energia
 
Apresentação expomoney en_v1 - impressão
Apresentação expomoney en_v1 - impressãoApresentação expomoney en_v1 - impressão
Apresentação expomoney en_v1 - impressão
 
Corporate Presentation - Agosto/14 - CPFL Energia
Corporate Presentation - Agosto/14 - CPFL EnergiaCorporate Presentation - Agosto/14 - CPFL Energia
Corporate Presentation - Agosto/14 - CPFL Energia
 
Apimec 2014 ing
Apimec 2014 ingApimec 2014 ing
Apimec 2014 ing
 
Institucional 2 q14 padrão 2014 eng
Institucional 2 q14 padrão 2014   engInstitucional 2 q14 padrão 2014   eng
Institucional 2 q14 padrão 2014 eng
 
Webinar - Photovoltaic Grid Parity Monitor for residential consumers
Webinar - Photovoltaic Grid Parity Monitor for residential consumersWebinar - Photovoltaic Grid Parity Monitor for residential consumers
Webinar - Photovoltaic Grid Parity Monitor for residential consumers
 

More from Empresa de Energía de Bogotá

More from Empresa de Energía de Bogotá (17)

Boletín Suroccidental
Boletín SuroccidentalBoletín Suroccidental
Boletín Suroccidental
 
Boletín Río Córdoba
Boletín Río CórdobaBoletín Río Córdoba
Boletín Río Córdoba
 
Boletín Tesalia - Alférez
Boletín Tesalia - AlférezBoletín Tesalia - Alférez
Boletín Tesalia - Alférez
 
1 q 2015 earnings presentation geb vf
1 q 2015 earnings presentation geb vf1 q 2015 earnings presentation geb vf
1 q 2015 earnings presentation geb vf
 
4 q earnings presentation geb vf1
4 q earnings presentation geb vf14 q earnings presentation geb vf1
4 q earnings presentation geb vf1
 
Tgi & cálidda earnings call 2014
Tgi & cálidda earnings call 2014Tgi & cálidda earnings call 2014
Tgi & cálidda earnings call 2014
 
Presentacion corporativa 4 q 14 sa
Presentacion corporativa 4 q 14 saPresentacion corporativa 4 q 14 sa
Presentacion corporativa 4 q 14 sa
 
Tgi conference call 4Q 2013 vf
Tgi conference call 4Q 2013 vfTgi conference call 4Q 2013 vf
Tgi conference call 4Q 2013 vf
 
Cálidda earnings 4Q 13
Cálidda earnings   4Q 13Cálidda earnings   4Q 13
Cálidda earnings 4Q 13
 
Calidda presentation Q1 2014 vf
Calidda presentation Q1 2014 vfCalidda presentation Q1 2014 vf
Calidda presentation Q1 2014 vf
 
Calidda investor's presentation Q2 2014
Calidda  investor's presentation Q2 2014Calidda  investor's presentation Q2 2014
Calidda investor's presentation Q2 2014
 
Calidda investor's presentation Q3 2014
Calidda investor's presentation Q3 2014Calidda investor's presentation Q3 2014
Calidda investor's presentation Q3 2014
 
Geb presentacion corporativa 3 t 14 vf sa
Geb presentacion corporativa 3 t 14  vf sa Geb presentacion corporativa 3 t 14  vf sa
Geb presentacion corporativa 3 t 14 vf sa
 
Geb presentacion corporativa 3 t 14 vf sa
Geb presentacion corporativa 3 t 14  vf sa Geb presentacion corporativa 3 t 14  vf sa
Geb presentacion corporativa 3 t 14 vf sa
 
Geb presentacion corporativa 3 t 14 vf sa
Geb presentacion corporativa 3 t 14  vf sa Geb presentacion corporativa 3 t 14  vf sa
Geb presentacion corporativa 3 t 14 vf sa
 
Geb presentacion corporativa 3 t 14 vf sa
Geb presentacion corporativa 3 t 14  vf sa Geb presentacion corporativa 3 t 14  vf sa
Geb presentacion corporativa 3 t 14 vf sa
 
Geb presentacion corporativa 2 t 14 v ff sa
Geb presentacion corporativa 2 t 14 v ff saGeb presentacion corporativa 2 t 14 v ff sa
Geb presentacion corporativa 2 t 14 v ff sa
 

Recently uploaded

Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Ltd
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna SpA
 
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call GirlsPremium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girlsmeghakumariji156
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfProbe Gold
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCAMILRI
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationPaul West-Sells
 
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024Osisko Gold Royalties Ltd
 
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样sovco
 
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubai
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In DubaiDubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubai
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubaikojalkojal131
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024Kweku Zurek
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Philip Rabenok
 
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Klinik kandungan
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCAMILRI
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024gstubel
 
Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024KDDI
 
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证xzxvi5zp
 
Gorakhpur Call Girls 8250092165 Low Price Escorts Service in Your Area
Gorakhpur Call Girls 8250092165 Low Price Escorts Service in Your AreaGorakhpur Call Girls 8250092165 Low Price Escorts Service in Your Area
Gorakhpur Call Girls 8250092165 Low Price Escorts Service in Your Areameghakumariji156
 

Recently uploaded (20)

Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings Presentation
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
 
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call GirlsPremium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
 
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
 
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubai
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In DubaiDubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubai
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubai
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024
 
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdfITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024
 
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
 
Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 Results
 
Gorakhpur Call Girls 8250092165 Low Price Escorts Service in Your Area
Gorakhpur Call Girls 8250092165 Low Price Escorts Service in Your AreaGorakhpur Call Girls 8250092165 Low Price Escorts Service in Your Area
Gorakhpur Call Girls 8250092165 Low Price Escorts Service in Your Area
 
SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024
 

Corporate presentation 3 q 14 vf wa

  • 1. Empresa de Energía de Bogotá - EEB A Regional Leader in the Energy Sector
  • 2. Disclaimer The information provided herein is for informational and illustrative purposes only and is not, and does not seek to be, a source of legal or financial advice on any subject. This information does not constitute an offer of any sort and is subject to change without notice. EEB expressly disclaims any responsibility for actions taken or not taken based on this information. EEB does not accept any responsibility for losses that might result from the execution of the proposals or recommendations presented. EEB is not responsible for any content that may originate with third parties. EEB may have provided, or might provide in the future, information that is inconsistent with the information herein presented.
  • 3. EEB Overview Wide energy Portfolio: Network and Services Focus on natural monopolies Growth in controlled subsidiaries Sound regulatory framework Ample access to capital markets 3 100%* 100%*
  • 4. Leaders in every market Electricity transmission Market share (%) (Km of 220-138 kV lines ) Electricity transmission Market share (%) (Km of lines) Electricity distribution Market share (%) (Kwh) Electricity generation Installed Capacity (%) (Generation) # 1 Peru # 2 Colombia # 1 Colombia # 2 Colombia Gas distribution Market share (%) (No. clients) 59.0% Gas transportation Market share (%) (Average volume transported) 88.0% Gas distribution Market share (%) (No. clients) 100.0% # 1 Colombia # 1 Colombia # 1 Perú 57.6% 8.22% 26.6% 20.72% Electricity transmission Project ongoing (850 Km L/T and 24 S/E) # 1 Guatemala 4 *Estimated market share once in operation.
  • 5. Focus on natural monopolies and attractive energy markets
  • 6. Strong Presence in Relevant Countries Natural Gas Source: ANH, MEM, UPME, Concentra 333 417 484 528 950 2009 2010 2011 2012 2015E Natural Gas Demand - Perú - MMCFD 8.46 7.06 6.63 7.01 6.41 2009 2010 2011 2012 2013 Natural Gas Reserves - Colombia - Tcf 12.00 12.50 12.46 15.38 2009 2010 2011 2012 Natural Gas Reserves - Perú - Tcf 810 860 892 905 1,047 1,083 2009 2010 2011 2012 2013 2016E Natural Gas Demand - Colombia - GBTUD 6
  • 7. Strong Presence in Relevant Countries Electricity Source: ANH, MEM, UPME 54,679 56,148 57,157 59,367 60,885 65,125 2009 2010 2011 2012 2013 2016E Electricity Demand - Colombia - GWh 7,926 8,134 8,473 8,730 8,945 10,064 2009 2010 2011 2012 2013 2016E Electricity Demand - Guatemala - GWh 27,003 32,314 36,779 37,321 39,669 48,411 2009 2010 2011 2012 2013 2016E Electricity Demand - Perú - GWh 7
  • 8. Stable and Growing Income* 8* Total of Operating Revenues per company – aggregated figures for comparable purposes. Predictability and stability in regulated revenues. 81% of revenues comes from regulated business. 422.4 495.7 605.9 871.6 1,076.2 1,114.4 982.7 2008 2009 2010 2011 2012 2013 2014 3Q Natural Gas Distribution - USD mm GAS NATURAL CÁLIDDA TOTAL 1,317.7 1,584.2 1,730.3 1,808.7 2,092.1 1,972.1 1,499.1 2008 2009 2010 2011 2012 2013 2014 3Q Electricity Distribution - USD mm CODENSA DECSA EMSA TOTAL 279.6 365.2 401.9 439.1 536.4 578.1 486.9 2008 2009 2010 2011 2012 2013 2014 3Q Natural GasTransportation - USD mm TGI PROMIGAS TOTAL 136.2 152.4 162.1 181.5 207.3 288.9 220.4 2008 2009 2010 2011 2012 2013 2014 3Q Electricity Transmission - USD mm REP CTM EEB Transmisión TOTAL
  • 9. Growth through controlled subsidiaries and Brownfield opportunities
  • 10. Consolidated Financial Results Evolution EBITDA 10 81% 67% 56% 55% 61% 44% 45% 48% 47%19% 33% 44% 45% 39% 56% 55% 52% 53% 2006 2007 2008 2009 2010 2011* 2012** 2013 2014 IIIQ LTM Consolidated Adjusted EBITDA & Normalized Dividends (USD Million) Operational EBITDA Dividends 240.9 471.3 416.4 515.6 586.4 818.5 921.7 705.0 974.6 EEB Transm, Trecsa & EEBIS Gt 2.0% TGI 39.8% Decsa/EEC 3.9% Cálidda, Contugás & EEBIS Pe 7.5% Emgesa 21.8% Codensa 13.5% Gas Natural 3.3% Promigás 4.5% ISA, REP & CTM 3.1% Otros; 0.59% Consolidated Adjusted EBITDA 3Q 2014 LTM by Subsidiary Normalized Dividends: *2010 excludes dividends declared based on an early close of Gas Natural’s, Emgesa’s and Codensa’s financial statements. These figures are included in 2011, when such dividends would normally have been declared.** Anticipated dividends declared by Codensa on first half 2011, were included in 2012.
  • 12. Consolidating the Strategy Controlled Subsidiaries 12 Projects Update EEB Transmission • Armenia – 64%, • Tesalia – 77% • Chivor II Norte – 37% • SVC Tunal – 83%. • Bolívar-TermoCartagena – 2.1% • Sogamoso-Norte-Nueva Esperanza: 5% • UPME awarded projects: Rio Cordoba TGI • La Sabana Compression Station – 91% TRECSA • Guatemala’s interconnection System – 76%
  • 13. 13 Consolidating the Strategy Non-Controlled Subsidiaries Projects Update EMGESA • Quimbo Project (400 MW) • Total investment: USD 1,093 mm • Execution 3Q-14: 80% • Full operation: 1H 15 CODENSA • On-going projects: Nueva Esperanza, Norte, Bacatá Substations • New and existing demand • Quality service and continuity • Control operational risk
  • 14. Financial Plan 2013-2018 Investments & Funding Sources Composition of Investments Brownfields: 70% Greenfields: 30% 14OM: Offering Memorandum of USD.749,000,000 EEB 6.125% Senior Notes due 2021 As of September 2014 is already executed and compromised USD 2,200 Mm (29%) 2013-2018 Funding Sources USD Millons Cash Generation 1,700 Financial Debt 3,320 Third Parties (Contributions of Capital) 2,480 TOTAL 7,500 Compromised Resources (29%) 2,200 Resources that will be compromised 2014-2018 5,300 1.60 1.48 1.39 1.25 2.33 4.5 3Q - 13 4Q -13 1Q - 14 2Q -14 3Q -14 Net Debt / Consolidated Adjusted EBITDA 9.10 11.06 10.96 11.44 10.22 2.25 3Q - 13 4Q -13 1Q - 14 2Q -14 3Q -14 Consolidated Adjusted EBITDA/Interest
  • 15. Access to Capital Markets
  • 16. Access to Capital Markets GEB Transactions USD Million 16 EEB Baa3 BBB- BBB TGI Baa3 BBB- BBB CÁLIDDA Baa3 BBB- BBB-
  • 17. EEB Share Performance Ticker EEB:CB As of September 30th, 2014 EEB’ market capitalization was USD 7.3 Billion Trading volume tripled after the Equity Offering Nov 2011. The stock is part of COLCAP, COLEQTY and COLIR Average Target Price As of 3Q 2014: USD 0.96 COP 1,943 EEB Share Performance 3Q 2013 – 3Q 2014 17
  • 18. Creating Value to shareholders 18 0.017 0.016 0.017 0.043 0.018 0.025 0.033 1Q 08 1Q 09 1Q 10 1Q 10 1Q 11* 1Q 11 1Q 13 1Q 14 Dividends per Share - USD 0.58 0.91 0.60 0.72 0.80 0.72 6.9% 0.0% 3.0% 3.5% 4.2% 3.5% 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 0.0% 1.0% 2.0% 3.0% 4.0% 5.0% 6.0% 7.0% 8.0% 2010 2011 2012 2013 2014 Avg 2008- 2013 Dividend Yield Evolution Closing Share price at the end of the year USD Dividend Yield 97.7 353.8 571.0 157.1 390.6 437.8 334.7 91.8 142.6 368.0 109.0 228.3 306.5 207.7 94% 40% 64% 69% 58% 70% 62% 141% 40% 64% 105% 58% 70% 68% 0.0 100.0 200.0 300.0 400.0 500.0 600.0 0% 20% 40% 60% 80% 100% 120% 140% 160% 2008 2009 2010 2011 2012 2013 Avg 2008-2013 Evolution Dividend Payout Ratio (USD Mllion) Net Profit Dividends Dividend payout on last year profit Dividend payout + Including realeased reserves
  • 20. 353.8 571.0 157.1 390.6 437.8 461.8 2009 2010 2011 2012 2013 3Q 2014 Net Income (USD Millions) 203.6 140.2 283.5 315.9 315.5 301.0 2009 2010 2011 2012 2013 3Q 2014 Operating Profit (USD Millions) 455.3 487.2 731.8 896.4 1,016.4 842.0 2009 2010 2011 2012 2013 3Q 2014 Operating Revenues (USD Millions) 515.6 944.0 557.0 723.5 921.7 974.6 2009 2010 2011 2012 2013 3Q 2014 LTM Consolidated EBITDA (USD Millions) Consolidated Financial Results 20
  • 21. Investor Relations For more information about Grupo Energía de Bogotá contact our Investor Relations team: http://www.eeb.com.co http://www.grupoenergiadebogota.com/en/investors Fabian Sánchez Aldana Investor Relations Advisor GEB +57 (1) 3268000 – Ext 1827 fsanchez@eeb.com.co Nicolas Mancini Suarez Financing and Investor Relations Manager GEB +57 (1) 3268000 - Ext 1536 nmancini@eeb.com.co Rafael Andres Salamanca Investor Relations Advisor GEB +57 (1) 3268000 – Ext 1675 rsalamanca@eeb.com.co Felipe Castilla Canales Chief Financial Officer - GEB 21