This document outlines various time-related preventative actions that were considered for a construction project. It lists actions such as conducting inspections of equipment and the work area, evaluating safety equipment like seat belts and stabilizers, planning the logistics of moving building panels, assigning competent personnel, and ensuring communication among all parties. The goal was to thoroughly plan the work, identify risks, and take steps to conduct the task safely given factors like equipment limitations, language barriers, and split responsibilities across teams.
Abortion pills in Doha Qatar (+966572737505 ! Get Cytotec
Time related preventative action possibilities
1. Time Related Preventative Action Possibilities
Remained
in cab
Monitored
Inclinometer
Safety seat
belt
Deployed
Stabilizers Go/No Go
decision
Evaluated
Environment
Conducted
“All Clear – Safe To Work”
Go/No Go
Tool Box
Talk
Conducted
Task-Plant-Personal
selection
Vehicle
overturned
Slighting
raised to
maneuver
Adjust for
Inclination Freely
entered
slope area
Slope
Restricted
Area to
maneuver
Position &
Direction
of Panels
Machine
Suitability
Slings
required
Rigger
required
Checked
Tire
Pressures
Daily Pre-startup
Plant Check
Assessed
Plant-Task
Selection
Coordinated &
Planned moving of
panels from
building
Communicated
Friday working
Rolling 3
month risk
Operator
Competency
Vehicle
Inspections &
Maintenance
Plant-Task
Selection
Matrix
Lifting
Plan(s)
Logistics
Plan
Method Statement
& Risk Assessment
Assignment of
Competent person
(Plant, Logistics,
Riggers)
“T” Lock fitted
Tire conditionFork lift with sling hooks
Small mobile crane
Direct loading from tower crane
to flatback truck
Required Action
Plant Operator
Logistics Chargehand
Others Responsible
Contributing Factors
Task
Talk
Different
Languages
spoken
Control
Incoming
Plant
Split
responsibility
form Logistics
Unclear responsibilities
for production of key
documents
Project
Safety
Plan
Corporate Policy & Documents
“All Clear – Safe to Work”
HSE Manager trainings