The City of Sandy Springs
Purchasing Office
7840 Roswell Road Suite 500
Sandy Springs, Georgia 30350
FYI Engineering’s Proposal for RFP No. 432 - 081324
Traffic Study, Bridge Analysis, and Intersection Improvements
Presented by: In partnership with:
1700 Parkway Plaza
Suite 4400
Marietta, GA 30067
Phone: 111.111.1111
E-mail: info@FYIengineering.com
123 Anywhere Road
Suite 200
Atlanta, GA 30000
Phone: 777.777.7777
E-mail: info@acmeco.com
ACMEH y d r o l o g i c a l C o .E N G I N E E R I N G
FYI
The City of Sandy Springs
FYI Engineering’s Proposal for RFP No. 432 - 081324
Traffic Study, Bridge Analysis, and Intersection Improvements E N G I N E E R I N G
FYI
Page 2
The City of Sandy Springs
FYI Engineering’s Proposal for RFP No. 432 - 081324
Traffic Study, Bridge Analysis, and Intersection Improvements
To: 		 Mr. J.J. Matthews, PE; Sandy Springs Municipal Engineer
From: 		 Mr. Derek Vitterman, PE; President of FYI Engineering
Subject:	 FYI Proposal for RFP No. 432 - 081324
Date:		 November 2nd, 2013
Mr. Matthews,
I would first like to extend our thanks on behalf of FYI Engineering (FYI) for this opportunity to be considered for providing
engineering services in the form of a Traffic Study, Bridge Analysis, and Intersection Improvements at the intersection
of Heatherwood Road and Windy Parkway. Upon studying this RFP, our Municipal Department gained a thorough
understanding of the scope of work for this project. This understanding includes:
•	 The Contractor is to complete a traffic study of the Heatherwood Road and Windy Parkway intersection. This traffic
study includes public hearings with community stakeholders to gather input.
•	 The Contractor will furnish recommendations and plans for signaling, expansion, improvements, and traffic alleviation
for the aforementioned intersection. FYI will furnish these deliverables in a timely manner to the City.
•	 Accompanying all aforementioned recommendations and plans, the Contractor will conduct a structural analysis of the
Windy Parkway Bridge, adjacent to the Heatherwood Road and Windy Parkway intersection.
•	 The Contractor will submit a report to the City with recommendations for structural improvements to Windy Parkway
Bridge. These recommendations will reflect improvements at the intersection of Heatherwood Road and Windy
Parkway.
•	 If and when the City approves these plans for construction, the Contractor will stand ready to provide construction
oversight from the beginning of the project to its completion.
FYI’s Municipal Department has already risen to this challenge by conducting preliminary site visitations, garnering a clear
visual of the unique challenges facing this busy intersection. Furthermore, the Municipal Department has already collected
site photos and past RFPs concerning this intersection, gathering data to formulate a project approach. Performing these
tasks in advance has lent us insight and certainty in presenting this proposal to the City of Sandy Springs.
FYI Engineering has also partnered with ACME Hydrological, Co., a hydrological engineering firm with whom we have
worked for over 15 years. FYI will manage this project from start to finish, and our Municipal Department Manager, Mr.
Alexander Hayes, PE, will serve as the Project Manager, Point of Contact, and liaison between FYI, ACME, and the City
of Sandy Springs throughout this project. All finished products will undergo my final analysis and personal approval.
Lastly, FYI is acting as the Project Administrator for this RFP and will report directly to the City. In so doing, our company
has already secured qualifying insurance under the regulations of this RFP. Please see the Appendices for details.
If I can be of any assistance, please do not hesitate to contact me personally. Again, thank you for your consideration.
Sincerely,
Mr. Derek Vitterman, PE
President of FYI Engineering
1700 Parkway Plaza, Suite 4400
Marietta, GA 30067
Phone: 111.111.1111
E-mail: Vitterman@FYIengineering.com
E N G I N E E R I N G
FYI
Letter of Introduction
The City of Sandy Springs
FYI Engineering’s Proposal for RFP No. 432 - 081324
Traffic Study, Bridge Analysis, and Intersection Improvements E N G I N E E R I N G
FYI
Page 3
Firm Introduction 						 Page	
											
	 Firm History												 4
	 Firm Qualifications											 4
	 GDOT Prequalifications										 5
	 Litigation History											 6
Project Approach
	 The Intersection and Bridge									 7
	 Traffic Study												 9
	 Bridge Study												 11
Project Team Management
	 Organizational Chart										 12
	 Key Personnel Resumes										 13
	 Project Timetables											 21
Table of Contents

More Related Content

Similar to RFP Intro

Universal Resume-updated_Ben Slater
Universal Resume-updated_Ben SlaterUniversal Resume-updated_Ben Slater
Universal Resume-updated_Ben SlaterBen Slater
 
Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020Fairfax County
 
Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020Fairfax County
 
Chichester Lane Sidewalk Improvements
Chichester Lane Sidewalk ImprovementsChichester Lane Sidewalk Improvements
Chichester Lane Sidewalk ImprovementsFairfax County
 
Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Fairfax County
 
Newington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree CourtNewington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree CourtFairfax County
 
Bus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsBus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsFairfax County
 
Vesper St. Shared Use Path
Vesper St. Shared Use PathVesper St. Shared Use Path
Vesper St. Shared Use PathFairfax County
 
Chichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane WalkwayChichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane WalkwayFairfax County
 
Tysons East Sidewalk - South Side of Route 123
Tysons East Sidewalk - South Side of Route 123Tysons East Sidewalk - South Side of Route 123
Tysons East Sidewalk - South Side of Route 123Fairfax County
 
Item # 1a January 24, 2022 City Council Meeting Minutes
Item # 1a   January 24, 2022 City Council Meeting MinutesItem # 1a   January 24, 2022 City Council Meeting Minutes
Item # 1a January 24, 2022 City Council Meeting Minutesahcitycouncil
 
Route 50 Sidewalk from Annandale Road to Cherry Street
Route 50 Sidewalk from Annandale Road to Cherry StreetRoute 50 Sidewalk from Annandale Road to Cherry Street
Route 50 Sidewalk from Annandale Road to Cherry StreetFairfax County
 
Spring Hill Metro Emergency Sewer Replacement
Spring Hill Metro Emergency Sewer ReplacementSpring Hill Metro Emergency Sewer Replacement
Spring Hill Metro Emergency Sewer ReplacementFairfax County
 
Councilmember BJ Williams Garland Texas obstructing hispanic development
Councilmember BJ Williams Garland Texas obstructing hispanic developmentCouncilmember BJ Williams Garland Texas obstructing hispanic development
Councilmember BJ Williams Garland Texas obstructing hispanic developmentAccion America
 
Lanier St. Bicycle and Pedestrian Connection
Lanier St. Bicycle and Pedestrian ConnectionLanier St. Bicycle and Pedestrian Connection
Lanier St. Bicycle and Pedestrian ConnectionFairfax County
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina
 
Route 50 Sidewalk from Cherry Street to Linden Lane
Route 50 Sidewalk from Cherry Street to Linden LaneRoute 50 Sidewalk from Cherry Street to Linden Lane
Route 50 Sidewalk from Cherry Street to Linden LaneFairfax County
 

Similar to RFP Intro (20)

Universal Resume-updated_Ben Slater
Universal Resume-updated_Ben SlaterUniversal Resume-updated_Ben Slater
Universal Resume-updated_Ben Slater
 
Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020
 
Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020Chesterbrook Road Walkway Improvement Project August 2020
Chesterbrook Road Walkway Improvement Project August 2020
 
Chichester Lane Sidewalk Improvements
Chichester Lane Sidewalk ImprovementsChichester Lane Sidewalk Improvements
Chichester Lane Sidewalk Improvements
 
Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation
 
Newington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree CourtNewington Forest Ave Walkway from Hooes Road to Treasure Tree Court
Newington Forest Ave Walkway from Hooes Road to Treasure Tree Court
 
Bus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsBus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility Improvements
 
Vesper St. Shared Use Path
Vesper St. Shared Use PathVesper St. Shared Use Path
Vesper St. Shared Use Path
 
Scott_Molstad 8
Scott_Molstad 8Scott_Molstad 8
Scott_Molstad 8
 
Chichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane WalkwayChichester Lane at Lismore Lane Walkway
Chichester Lane at Lismore Lane Walkway
 
Tysons East Sidewalk - South Side of Route 123
Tysons East Sidewalk - South Side of Route 123Tysons East Sidewalk - South Side of Route 123
Tysons East Sidewalk - South Side of Route 123
 
Item # 1a January 24, 2022 City Council Meeting Minutes
Item # 1a   January 24, 2022 City Council Meeting MinutesItem # 1a   January 24, 2022 City Council Meeting Minutes
Item # 1a January 24, 2022 City Council Meeting Minutes
 
Route 50 Sidewalk from Annandale Road to Cherry Street
Route 50 Sidewalk from Annandale Road to Cherry StreetRoute 50 Sidewalk from Annandale Road to Cherry Street
Route 50 Sidewalk from Annandale Road to Cherry Street
 
FINAL-OT Fall 2015
FINAL-OT Fall 2015FINAL-OT Fall 2015
FINAL-OT Fall 2015
 
Spring Hill Metro Emergency Sewer Replacement
Spring Hill Metro Emergency Sewer ReplacementSpring Hill Metro Emergency Sewer Replacement
Spring Hill Metro Emergency Sewer Replacement
 
Councilmember BJ Williams Garland Texas obstructing hispanic development
Councilmember BJ Williams Garland Texas obstructing hispanic developmentCouncilmember BJ Williams Garland Texas obstructing hispanic development
Councilmember BJ Williams Garland Texas obstructing hispanic development
 
Lanier St. Bicycle and Pedestrian Connection
Lanier St. Bicycle and Pedestrian ConnectionLanier St. Bicycle and Pedestrian Connection
Lanier St. Bicycle and Pedestrian Connection
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter Project
 
Route 50 Sidewalk from Cherry Street to Linden Lane
Route 50 Sidewalk from Cherry Street to Linden LaneRoute 50 Sidewalk from Cherry Street to Linden Lane
Route 50 Sidewalk from Cherry Street to Linden Lane
 
SNEAPA 2013 Thursday c2 1_45 meeting the growing demand
SNEAPA 2013 Thursday c2 1_45 meeting the growing demandSNEAPA 2013 Thursday c2 1_45 meeting the growing demand
SNEAPA 2013 Thursday c2 1_45 meeting the growing demand
 

RFP Intro

  • 1. The City of Sandy Springs Purchasing Office 7840 Roswell Road Suite 500 Sandy Springs, Georgia 30350 FYI Engineering’s Proposal for RFP No. 432 - 081324 Traffic Study, Bridge Analysis, and Intersection Improvements Presented by: In partnership with: 1700 Parkway Plaza Suite 4400 Marietta, GA 30067 Phone: 111.111.1111 E-mail: info@FYIengineering.com 123 Anywhere Road Suite 200 Atlanta, GA 30000 Phone: 777.777.7777 E-mail: info@acmeco.com ACMEH y d r o l o g i c a l C o .E N G I N E E R I N G FYI
  • 2. The City of Sandy Springs FYI Engineering’s Proposal for RFP No. 432 - 081324 Traffic Study, Bridge Analysis, and Intersection Improvements E N G I N E E R I N G FYI Page 2 The City of Sandy Springs FYI Engineering’s Proposal for RFP No. 432 - 081324 Traffic Study, Bridge Analysis, and Intersection Improvements To: Mr. J.J. Matthews, PE; Sandy Springs Municipal Engineer From: Mr. Derek Vitterman, PE; President of FYI Engineering Subject: FYI Proposal for RFP No. 432 - 081324 Date: November 2nd, 2013 Mr. Matthews, I would first like to extend our thanks on behalf of FYI Engineering (FYI) for this opportunity to be considered for providing engineering services in the form of a Traffic Study, Bridge Analysis, and Intersection Improvements at the intersection of Heatherwood Road and Windy Parkway. Upon studying this RFP, our Municipal Department gained a thorough understanding of the scope of work for this project. This understanding includes: • The Contractor is to complete a traffic study of the Heatherwood Road and Windy Parkway intersection. This traffic study includes public hearings with community stakeholders to gather input. • The Contractor will furnish recommendations and plans for signaling, expansion, improvements, and traffic alleviation for the aforementioned intersection. FYI will furnish these deliverables in a timely manner to the City. • Accompanying all aforementioned recommendations and plans, the Contractor will conduct a structural analysis of the Windy Parkway Bridge, adjacent to the Heatherwood Road and Windy Parkway intersection. • The Contractor will submit a report to the City with recommendations for structural improvements to Windy Parkway Bridge. These recommendations will reflect improvements at the intersection of Heatherwood Road and Windy Parkway. • If and when the City approves these plans for construction, the Contractor will stand ready to provide construction oversight from the beginning of the project to its completion. FYI’s Municipal Department has already risen to this challenge by conducting preliminary site visitations, garnering a clear visual of the unique challenges facing this busy intersection. Furthermore, the Municipal Department has already collected site photos and past RFPs concerning this intersection, gathering data to formulate a project approach. Performing these tasks in advance has lent us insight and certainty in presenting this proposal to the City of Sandy Springs. FYI Engineering has also partnered with ACME Hydrological, Co., a hydrological engineering firm with whom we have worked for over 15 years. FYI will manage this project from start to finish, and our Municipal Department Manager, Mr. Alexander Hayes, PE, will serve as the Project Manager, Point of Contact, and liaison between FYI, ACME, and the City of Sandy Springs throughout this project. All finished products will undergo my final analysis and personal approval. Lastly, FYI is acting as the Project Administrator for this RFP and will report directly to the City. In so doing, our company has already secured qualifying insurance under the regulations of this RFP. Please see the Appendices for details. If I can be of any assistance, please do not hesitate to contact me personally. Again, thank you for your consideration. Sincerely, Mr. Derek Vitterman, PE President of FYI Engineering 1700 Parkway Plaza, Suite 4400 Marietta, GA 30067 Phone: 111.111.1111 E-mail: Vitterman@FYIengineering.com E N G I N E E R I N G FYI Letter of Introduction
  • 3. The City of Sandy Springs FYI Engineering’s Proposal for RFP No. 432 - 081324 Traffic Study, Bridge Analysis, and Intersection Improvements E N G I N E E R I N G FYI Page 3 Firm Introduction Page Firm History 4 Firm Qualifications 4 GDOT Prequalifications 5 Litigation History 6 Project Approach The Intersection and Bridge 7 Traffic Study 9 Bridge Study 11 Project Team Management Organizational Chart 12 Key Personnel Resumes 13 Project Timetables 21 Table of Contents