Dinesh Kumar has over 14 years of experience in electrical projects. He is currently working as an Assistant Manager - Electrical at E-Pack Polymers Pvt. Limited in Greater Noida. Some of the key projects he has worked on include electrical installations at RIL Refinery in Jamnagar, Gujarat. He holds a 3-year diploma in electrical engineering and has experience managing projects in industries such as oil and gas, commercial buildings, and power plants. He is looking for a role as Assistant Manager or Manager with a salary negotiable based on role, responsibility, and location preferably in Western Uttar Pradesh, Uttarakhand, Punjab, Delhi, or nearby areas.
1. Curriculum Vitae
Dinesh Kumar
E - 292, Delta - I, Gr. Noida, U.P.
Contact. No.:- 9015496366
Alt. Contact No. – 9818666137
DINESH KUMAR E-mail:- dinesh_daabra@yahoo.co.in
___________________________________________________________________________________________________________________________________
Job Profile :- Project Manager – Electrical
Job Description :- Electrical Installation Such as HT & LT Panel, Bas Bar, Transformers, Overhead Line,
Cabling, Substations, Electrical Wiring, Lighting, DB, Earthing etc.
ELV System such as Fire alarm, Security System, Data & Voice System etc.
Professional Qualification:-
3 Year’s Diploma in “Electrical Engineering” specialization in “Industrial Control” Securing first class from “B. R.
Engineering Institute Bitchpuri Agra” under “Board of Technical Education” Lucknow.
Professional Experience:- 14 Years
Designation :- Assistant Manager - Electrical
Organization :- E - Pack Polymers Pvt. Limited, Gr. Noida
Period :- From 02 August 2013 to till now.
Nature of work :- Electrical – Project
Projects :- RIL Refinery, Jamnager, Gujrat and many more at all over india
Responsibility :-
• Understanding the specifications of tender documents, extraction of Comments
and deviations from the specifications.
• Providing Design input to design Team for designing of Electrical System and get
Approval of Drawings from Client.
• Helps in resource mobilization & resource sharing among various teams at site.
• Monitoring project status, reviewing during the course of periodic project review
Meetings and updates HO as frequently as required.
• Responsible for quality and timely completion of work.
• Responsible for completion of work within the Budget.
• Estimates quantities of material as per BOQ/Drawings, making requisition and
Follow up with supplier/Purchase Deptt. for delivery of material.
• Crisis Management.
• Manage the equipment / System handover process between vendor and Client with
all necessary documentation.
Designation :- Sr. Engineer - Project
Organization :- Sterling and Wilson Limited, Noida
Period :- From 10 September 2008 to 31 July 2013
Nature of work :- Electrical - Project
Projects :- 1. Nokia Siemens Network– Global office Noida (Internal Electrification work)
Since 10 September 2008 to 09 march 2009
2. Jawaharlal Nehru Stadium - Commonwealth Games 2010 (Internal
Electrification & Sports Lighting Work) Since 10 March 2009 to 20 November 2011.
3. HCL Technologies Ltd.– Corporate office Noida (Internal Electrification &
Landscape Area Lighting Work) Since 21 November 2011 to 30 March 2013.
4. TPDDL Model Town – 33/11 KV Grid Sub-station at Model Town New Delhi since
01 April 2013 to 31 July2013.
2. Designation :- Assistant Engineer – P&M
Organization :- JMC Projects India Limited
Period :- From 10 September 2007 to 09 September 2008.
Nature of work :- Operation & Maintenance of Construction Plant / Machinery & Electrical System.
Project :- ELECON Dadri Power Project (NTPC Dadri)
Designation :- Project Engineer - Panels
Organization :- Anand Power Limited
Period :- From 03 October 2006 to 09 September 2007.
Nature of work :- Electrical - Project
Project :- Expansion Project at MATE Maneser, Gurgaon
Electrical Installation at Everady Industries India Limited, SIDCUL, Haridwar
Designation :- Project Engineer
Organization :- I Sat Network Engineers Pvt. Limited
Period :- From 02 December 2003 to 30 September 2006
Nature of work :- Electrical - Project
Projects :- Modernization of Sub-Stations at IIT Roorkee with ABB Limited
Security System Installation at Hindustan Lever Ltd. (SIDCUL Hardwar)
PLCC Panels Installation at Uttarkashi & Dharashu Hydro Power Plant,
Chamba & Rishikesh Grid Substation.
Retrofitting of ACB in 2x600 KW Power Plant at Taaleswar for Jal Vidut Nigam.
Achievements :-
Installation, Testing and commissioning of 11 KV H.T. Switchgear Panel (RMU),
Compact Sub-Station (CSS) & Distribution Transformers.
Installation, Testing and Commissioning of L.T. Panels.
Laying of H.T. and L.T. Cable as per Cable Schedule with necessary Test.
Installation, Testing & Commissioning of Overhead Distribution Lines.
Installation, Testing & Commissioning of CCTV.
Designation :- Site Engineer (Electrical & Mechanical)
Organization :- M/s B.S. Agarwal (Engineers & Contractors)
Period :- From 05 July 2001 to 31 November 2003
Nature of work :- Operation & Maintenance of Construction Plant / Machinery & Electrical System.
Projects :- Construction of 100 Bedded Moti nager Hospital at Moti nager New Delhi.
Achievements :- Operation and Maintenance of Batching Plant, Concrete Pump, Transit Mixer,
D.G. Set etc.
Electrification work at Site to operate Construction Machineries and Lighting
Arrangement.
Responsibilities :-
• Site Installation / Erection / Fabrication / Commissioning Supervision of Various
Capital Equipment and Distribution Systems.
• Troubleshooting, Routine Maintenance / Break down Maintenance of Plant and
Machines at site.
• Power Distribution for operation of Plant, Machines & Lighting arrangement at Site.
• Arrangement of Spare Parts & Consumable Electrical Item.
• Responsible for optimal utilization of resources.
• To allot work to workmen and check the work completed by workmen.
• Maintain all documentation as required by the Company including all Internal
Reporting.
3. Educational Qualification:-
Passed High School with Science group under B.H.I.E. Allahbad U.P. in Year 1995.
Passed Intermediate with Science group under B.H.I.E. Allahbad U.P. in Year 1997.
I.T. Skills:-
# Three Months Certificate Course in “Computer Software Application”.
# Ms Word, Ms Excel & AutoCAD)
Project Experience:-
Electrical :- Stadium (Jawahar Lal Nehru Stadium – New Delhi)
Commercial Building (Nokia Seimens & HCL Noida)
Industrial (MATE Maneser & EVERADY Haridwar)
Power Plant (Uttarkashi & Dharashu)
Substations (I.I.T. Roorkee)
Refinery (RIL, Jamnager)
Operation & Maintenance :- Hospital (Moti nager New Delhi) & Power Plant (NTPC Dadri)
Employment Information:-
Designation :- Assistant Manager - Electrical
Division :- PU - Project
Reporting to :- Director
Current Salary : - 8.0+ Lakhs Per Annum + Allowances
Notice Period :- One Month
Expectations:-
Designation :- Assistant Manager/Manager
Salary : - Negotiable, depend on Role, Responsibility & Location
Preferred Location :- West U.P. / Uttarakhand / Punjab / Delhi / NCR /Haryana / H.P.
Personal Particulars:-
Father’s name :- Shri KhemRaj Singh
Date of Birth :- 04 December 1980
Passport No. :- F 0058468
Driving License No :- D 8308 /SRE /04.
Permanent Address :-
Village - Isserpur (Leachhipur)
Post Office - Gunarsa (Deoband)
District - Saharanpur (U.P.)
Pin Code - 247554
Date:-
Place: - Greater Noida (Dinesh Kumar)