Experience of 8+ years in Civil Construction project planning, project engineering, scheduling, mapping
requirements of equipment, manpower and materials inputs, defining technical specifications, driving
procurement initiatives to ensure availability of inputs on most competitive rates, reviews and final project
delivery.
I am currentlyspearheadingefforts withITD ITDCEM JV as Asst Manager having expertise in drawing, materials,
equipment,manpowerneedsandarrangingresource inputsonmostcompetitivetermsalong with structuring of
project budget and implementation of cost reduction techniques to contain expenditure within agreed limits.
I possess the qualities of tenacity, perseverance and determination, invaluable in an employee. I am positive,
highlymotivatedandgoal-oriented,withdetermination to give my best to any work I undertake and to succeed
in the face of any and all odds.
Darmendra Kumar Rai
Mob.08388919838
DHARMENDRA KUMAR RAI
Contact: +91-8388919838 / 9163364030
E-mail:dkrai01@gmail.com
CIVIL PROJECT & SITE MANAGEMENT PROFESSIONAL
Seeking challenging assignments with growth-oriented organization in the domain of Construction Projects
PROFILE
 Technically accomplished Civil Project Engineer with an experience on 8+ years in managing wide range of
Civil Construction projects and Supervision; currently spearheading efforts with ITD ITDCEM JV as Senior
Engineer.
 Proven capabilities in project execution, monitoring planning, drawing project estimates, quality control,
mobilizing& managing materials,machinesand manpowerresources to accelerate projectimplementation.
 Successful track record in the field of Construction, execution & Supervision of various type structural
Works (RCC); adept at executing challenging residential, commercial, industrial and infrastructure projects
within defined cost and time parameters.
 Proficientinstrikingperfect coordinationwithall involvedagenciese.g.Consultants,Architects,Clients,Site
Engineers etc, to ensure bottleneck-free work performance.
 Prolific team builder, trainer, and a motivator having ability to integrate team efforts to maximize overall
teamproductivity.Stronganalytical andproblemsolving skills. Excellent written and verbal communication
abilities.
Core Competencies:
Project Planning & Scheduling  Project Estimates / Technical Specification  Material Procurement 
Resource Deployment  Construction Management  Project Designing  Work Measurements  Quality
Assurance  Contractor Billing  Manpower Planning  Cross Functional Coordination
PROFESSIONAL EXPERIENCE
ITD ITDCEM JV May 2008 - Till date (Total - 6+yrs)
Asst Manager
 Responsible fordrawingupdetailedprojectplancoveringoverall projecttheme,requirementsof manpower,
machines,material resources,budgetaryoutlayandactivityscheduleswithin stipulated time of completion.
 Strategicallyplanning and assessing the basic requirements while setting up the technical infrastructure of
the project and reviewed all the project proposals.
 Accountable for initiation, planning , execution& billing of civil construction works of TG Building& TG
foundations, Transformer yard, Mill & bunker bays (excluding foundation), Air Compressor building/ DG
building/Condenser pump & Boiler fill pumps.
 Responsible for structural detailing (RCC), site execution; handling RCC work, external work and water
proofing of the site.
 Handlingpreparationof infrastructure plan&budget,preparingBOQ,manpowerplanning,appraisal toclient
and Principal Employer.
 Executing the plans and procedures while ensuring the project quality control on material and other
processing’s & optimum utilization of manpower.
 Conductingplanningandmonitoringfortime boundcompletionandmaintainingdaytoday projectactivities.
 Overall understanding of Contract agreement and accordingly managing quality and quantity of work, and
ensuring accurate rendition of drawn work in practical.
Project details:
Project Title (1) Construction of Kolkata Metro Project-UG-2 (Underground)by top down method
Station: Phool Bagan, Cross Over
Client KolkataMetro Rail Corporation
Duration 30th
Sept.2010 – Till date
ProjectCost Rs. 900 Crore
7
Project Title (2) Construction of Delhi Metro Rail Corporation BC-24
(Central Secretariat To Badarpur Corridor)
Station Under Ground,Top DownMethod Site:Khan market
Launching shaft CUT &COVERMETHOD Site: Udyog Bhavan
Client Delhi Metro Rail Corporation (DMRC)
Duration May 2008 – till date
ProjectCost Rs. 1000 Crore
M/s SIMPLEX INFRASTRUCTURES LTD. Kotputli, Rajasthan Jan. 2007 - April 2008 (1.5 yrs)
Engineer
 Managed manpower,machineries,material &subcontractorsbilling;supervised the work in progress on the
sites and resolved the issued faced.
 Meticulously prepared the statements for stock & inventories while reconciling the same on regular basis.
 Managed initiation, planning, execution & billing of civil construction works of a 5 Floors Apartment;
prepared infrastructure planning and budget.
 Entrusted with the task of managing resources (Manpower, materials & machinery) judiciously while
administering the site, labor, taking measurements, reconciling material etc for construction.
 Managed and lead a team of Estimators, Junior Engineers, Site Personnel, Surveyors and Draftsmen to
commissionthe projects as scheduled; ensured proper flow of material without any information/ payment
gap.
Projecthandled:
Project Title (3) Construction of GRASIM IDUSTRIES LIMITED – Cement Plant
Client Grasim IndustriesLimited
Duration Jan.2007 - April 2008
ProjectCost Rs. 2000 million
Capacity 10000 TPD
M/S SIMPLEX INFRASTRUCTURES LTD. July 2006 –Dec. 2006 (6 months)
Trainee Engineer
 Participatedinall safetyrelatedprogrammerslike National safetyDay;followedall safetyrules & regulations
as per norms and took precautions against all fire activities.
 Took measurementsof all hiddenactivitieswithproperjointrecord;made schedule foryearlypaintingworks.
 Handled record keeping of all vendor bills for yearly budgeting and checked all Vendor Bills with proper
supervision.
Project detail: (4) Construction of 1000 MW Power Plant
Client M/s Jindal PowerLtd.
Duration July 2006 – Dec. 2006
ProjectCost Rs. 5000 crore
Capacity 1000 MW
EDUCATIONAL & PROFESSIONAL CREDENTIALS
Diploma (Civil Engineering), 2006
I.E.R.T. Allahabad; 83.39%
Degree (AMICE (I)
The Institute of Civil Engineers
Computer Proficiency: Windows 98 / XP, AutoCAD, MS Office & Internet Applications
Personal Details
Name Dharmendra Kumar Rai
F’Name Sri Daya Dhankar Rai
Date of Birth: 28th
July1983
Languages Known: English&Hindi
Permanent Address: Village: Pathra Dasaudhi, P.O.: Sandwa, District: Mirzapur (U.P.), PIN - 231001

More Related Content

What's hot (20)

Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressed
 
resume rkm
resume rkmresume rkm
resume rkm
 
Biodata - 14.06.15
Biodata - 14.06.15Biodata - 14.06.15
Biodata - 14.06.15
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
 
CV_Billing and QS_Rohit Kumar
CV_Billing and QS_Rohit KumarCV_Billing and QS_Rohit Kumar
CV_Billing and QS_Rohit Kumar
 
Vinod cv (1)
Vinod cv (1)Vinod cv (1)
Vinod cv (1)
 
Balbant Singh indolia Resume
Balbant Singh indolia ResumeBalbant Singh indolia Resume
Balbant Singh indolia Resume
 
manish resume Nov 2014
manish resume Nov 2014manish resume Nov 2014
manish resume Nov 2014
 
Joy Hazra Presentation
Joy Hazra PresentationJoy Hazra Presentation
Joy Hazra Presentation
 
MAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANEMAKARAND GOVIND DHAWANE
MAKARAND GOVIND DHAWANE
 
CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015
 
cv_rajesh_kachhawah
cv_rajesh_kachhawahcv_rajesh_kachhawah
cv_rajesh_kachhawah
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 
ALYUL CV
ALYUL CVALYUL CV
ALYUL CV
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
Experience
ExperienceExperience
Experience
 
M New
M NewM New
M New
 
update cv
update cvupdate cv
update cv
 
M New
M NewM New
M New
 
CV_1
CV_1CV_1
CV_1
 

Viewers also liked

Framtidens lärande webbstjärnan 2015
Framtidens lärande webbstjärnan 2015Framtidens lärande webbstjärnan 2015
Framtidens lärande webbstjärnan 2015cillan10
 
Programa electoral 2015. Compromis per Orba.
Programa electoral 2015. Compromis per Orba.Programa electoral 2015. Compromis per Orba.
Programa electoral 2015. Compromis per Orba.CompromisOrba
 
SharePoint Lesson #41: Connecting WebParts
SharePoint Lesson #41: Connecting WebPartsSharePoint Lesson #41: Connecting WebParts
SharePoint Lesson #41: Connecting WebPartsPeter Heffner
 
Transport coordinator performance appraisal
Transport coordinator performance appraisalTransport coordinator performance appraisal
Transport coordinator performance appraisalleejordan48
 
Dlaczego warto dodać swój blog do agregatu kulinarnego Targ Smaku?
Dlaczego warto dodać swój blog do agregatu kulinarnego Targ Smaku?Dlaczego warto dodać swój blog do agregatu kulinarnego Targ Smaku?
Dlaczego warto dodać swój blog do agregatu kulinarnego Targ Smaku?Blogpl
 
Trainee recruitment consultant performance appraisal
Trainee recruitment consultant performance appraisalTrainee recruitment consultant performance appraisal
Trainee recruitment consultant performance appraisalleejordan48
 
Advanced Cell Therapies - GMP Manufacturing
Advanced Cell Therapies - GMP Manufacturing Advanced Cell Therapies - GMP Manufacturing
Advanced Cell Therapies - GMP Manufacturing Comecer
 
Nội tiết tố sinh dục nam Testosterone có vai trò quan trọng
Nội tiết tố sinh dục nam Testosterone có vai trò quan trọngNội tiết tố sinh dục nam Testosterone có vai trò quan trọng
Nội tiết tố sinh dục nam Testosterone có vai trò quan trọngexie506
 
nhận làm dịch vụ giúp việc nhà giá tốt ở hcm
nhận làm dịch vụ giúp việc nhà giá tốt ở hcmnhận làm dịch vụ giúp việc nhà giá tốt ở hcm
nhận làm dịch vụ giúp việc nhà giá tốt ở hcmexie506
 

Viewers also liked (18)

Askep keluarga
Askep keluargaAskep keluarga
Askep keluarga
 
RESUME
RESUMERESUME
RESUME
 
Framtidens lärande webbstjärnan 2015
Framtidens lärande webbstjärnan 2015Framtidens lärande webbstjärnan 2015
Framtidens lärande webbstjärnan 2015
 
Programa electoral 2015. Compromis per Orba.
Programa electoral 2015. Compromis per Orba.Programa electoral 2015. Compromis per Orba.
Programa electoral 2015. Compromis per Orba.
 
SharePoint Lesson #41: Connecting WebParts
SharePoint Lesson #41: Connecting WebPartsSharePoint Lesson #41: Connecting WebParts
SharePoint Lesson #41: Connecting WebParts
 
Введение в SEO
Введение в SEOВведение в SEO
Введение в SEO
 
Transport coordinator performance appraisal
Transport coordinator performance appraisalTransport coordinator performance appraisal
Transport coordinator performance appraisal
 
Dlaczego warto dodać swój blog do agregatu kulinarnego Targ Smaku?
Dlaczego warto dodać swój blog do agregatu kulinarnego Targ Smaku?Dlaczego warto dodać swój blog do agregatu kulinarnego Targ Smaku?
Dlaczego warto dodać swój blog do agregatu kulinarnego Targ Smaku?
 
Trainee recruitment consultant performance appraisal
Trainee recruitment consultant performance appraisalTrainee recruitment consultant performance appraisal
Trainee recruitment consultant performance appraisal
 
Advanced Cell Therapies - GMP Manufacturing
Advanced Cell Therapies - GMP Manufacturing Advanced Cell Therapies - GMP Manufacturing
Advanced Cell Therapies - GMP Manufacturing
 
Dklatpim polabaru
Dklatpim polabaruDklatpim polabaru
Dklatpim polabaru
 
Layoutregler
LayoutreglerLayoutregler
Layoutregler
 
Layoutregler
LayoutreglerLayoutregler
Layoutregler
 
Bonbila
BonbilaBonbila
Bonbila
 
Nội tiết tố sinh dục nam Testosterone có vai trò quan trọng
Nội tiết tố sinh dục nam Testosterone có vai trò quan trọngNội tiết tố sinh dục nam Testosterone có vai trò quan trọng
Nội tiết tố sinh dục nam Testosterone có vai trò quan trọng
 
nhận làm dịch vụ giúp việc nhà giá tốt ở hcm
nhận làm dịch vụ giúp việc nhà giá tốt ở hcmnhận làm dịch vụ giúp việc nhà giá tốt ở hcm
nhận làm dịch vụ giúp việc nhà giá tốt ở hcm
 
IALS 21st Conference
IALS 21st ConferenceIALS 21st Conference
IALS 21st Conference
 
Lamaran n CV
Lamaran n CVLamaran n CV
Lamaran n CV
 

Similar to Civil Project Management Expert Seeks New Challenge

Similar to Civil Project Management Expert Seeks New Challenge (20)

Resume
ResumeResume
Resume
 
Resume for Senior Manager - projects
Resume for  Senior Manager -  projectsResume for  Senior Manager -  projects
Resume for Senior Manager - projects
 
Krishna Updated Resume
Krishna Updated ResumeKrishna Updated Resume
Krishna Updated Resume
 
PRAKASH UPDATED
PRAKASH UPDATEDPRAKASH UPDATED
PRAKASH UPDATED
 
CIVIL SITE ENGINEER
CIVIL SITE ENGINEERCIVIL SITE ENGINEER
CIVIL SITE ENGINEER
 
CV_09.09.2016
CV_09.09.2016CV_09.09.2016
CV_09.09.2016
 
Resume
ResumeResume
Resume
 
Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)
 
jeyakumar resume civil
jeyakumar   resume civiljeyakumar   resume civil
jeyakumar resume civil
 
Ravi resume
Ravi resumeRavi resume
Ravi resume
 
SK Khalifa Resume
SK Khalifa ResumeSK Khalifa Resume
SK Khalifa Resume
 
Madhankumar 1984..
Madhankumar 1984..Madhankumar 1984..
Madhankumar 1984..
 
Quantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs ExpQuantity Surveyor 5+ Yrs Exp
Quantity Surveyor 5+ Yrs Exp
 
Avdhesh _CV
Avdhesh _CVAvdhesh _CV
Avdhesh _CV
 
Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)Vinay Sinha Updated Resume (1)
Vinay Sinha Updated Resume (1)
 
Resume Mahendharan Palani.f
Resume  Mahendharan Palani.fResume  Mahendharan Palani.f
Resume Mahendharan Palani.f
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECH
 
Saddam Gogi - CV - MECH
Saddam Gogi - CV - MECHSaddam Gogi - CV - MECH
Saddam Gogi - CV - MECH
 
M.A.Iqbal C.V
M.A.Iqbal C.VM.A.Iqbal C.V
M.A.Iqbal C.V
 
Shabd saran sahu
Shabd saran sahuShabd saran sahu
Shabd saran sahu
 

Civil Project Management Expert Seeks New Challenge

  • 1. DHARMENDRA KUMAR RAI Contact: +91-8388919838 / 9163364030 E-mail:dkrai01@gmail.com <Date> <Name> Dharmendra Kumar Rai <Designation> Asst Manager <Company Name> ITD Cementation India ltd <Address> <City, State> KOLKATA Sub: <Position applied for Experience of 8+ years in Civil Construction project planning, project engineering, scheduling, mapping requirements of equipment, manpower and materials inputs, defining technical specifications, driving procurement initiatives to ensure availability of inputs on most competitive rates, reviews and final project delivery. I am currentlyspearheadingefforts withITD ITDCEM JV as Asst Manager having expertise in drawing, materials, equipment,manpowerneedsandarrangingresource inputsonmostcompetitivetermsalong with structuring of project budget and implementation of cost reduction techniques to contain expenditure within agreed limits. I possess the qualities of tenacity, perseverance and determination, invaluable in an employee. I am positive, highlymotivatedandgoal-oriented,withdetermination to give my best to any work I undertake and to succeed in the face of any and all odds. Darmendra Kumar Rai Mob.08388919838
  • 2. DHARMENDRA KUMAR RAI Contact: +91-8388919838 / 9163364030 E-mail:dkrai01@gmail.com CIVIL PROJECT & SITE MANAGEMENT PROFESSIONAL Seeking challenging assignments with growth-oriented organization in the domain of Construction Projects PROFILE  Technically accomplished Civil Project Engineer with an experience on 8+ years in managing wide range of Civil Construction projects and Supervision; currently spearheading efforts with ITD ITDCEM JV as Senior Engineer.  Proven capabilities in project execution, monitoring planning, drawing project estimates, quality control, mobilizing& managing materials,machinesand manpowerresources to accelerate projectimplementation.  Successful track record in the field of Construction, execution & Supervision of various type structural Works (RCC); adept at executing challenging residential, commercial, industrial and infrastructure projects within defined cost and time parameters.  Proficientinstrikingperfect coordinationwithall involvedagenciese.g.Consultants,Architects,Clients,Site Engineers etc, to ensure bottleneck-free work performance.  Prolific team builder, trainer, and a motivator having ability to integrate team efforts to maximize overall teamproductivity.Stronganalytical andproblemsolving skills. Excellent written and verbal communication abilities. Core Competencies: Project Planning & Scheduling  Project Estimates / Technical Specification  Material Procurement  Resource Deployment  Construction Management  Project Designing  Work Measurements  Quality Assurance  Contractor Billing  Manpower Planning  Cross Functional Coordination PROFESSIONAL EXPERIENCE ITD ITDCEM JV May 2008 - Till date (Total - 6+yrs) Asst Manager  Responsible fordrawingupdetailedprojectplancoveringoverall projecttheme,requirementsof manpower, machines,material resources,budgetaryoutlayandactivityscheduleswithin stipulated time of completion.  Strategicallyplanning and assessing the basic requirements while setting up the technical infrastructure of the project and reviewed all the project proposals.  Accountable for initiation, planning , execution& billing of civil construction works of TG Building& TG foundations, Transformer yard, Mill & bunker bays (excluding foundation), Air Compressor building/ DG building/Condenser pump & Boiler fill pumps.  Responsible for structural detailing (RCC), site execution; handling RCC work, external work and water proofing of the site.  Handlingpreparationof infrastructure plan&budget,preparingBOQ,manpowerplanning,appraisal toclient and Principal Employer.  Executing the plans and procedures while ensuring the project quality control on material and other processing’s & optimum utilization of manpower.  Conductingplanningandmonitoringfortime boundcompletionandmaintainingdaytoday projectactivities.  Overall understanding of Contract agreement and accordingly managing quality and quantity of work, and ensuring accurate rendition of drawn work in practical. Project details: Project Title (1) Construction of Kolkata Metro Project-UG-2 (Underground)by top down method Station: Phool Bagan, Cross Over Client KolkataMetro Rail Corporation Duration 30th Sept.2010 – Till date ProjectCost Rs. 900 Crore
  • 3. 7 Project Title (2) Construction of Delhi Metro Rail Corporation BC-24 (Central Secretariat To Badarpur Corridor) Station Under Ground,Top DownMethod Site:Khan market Launching shaft CUT &COVERMETHOD Site: Udyog Bhavan Client Delhi Metro Rail Corporation (DMRC) Duration May 2008 – till date ProjectCost Rs. 1000 Crore M/s SIMPLEX INFRASTRUCTURES LTD. Kotputli, Rajasthan Jan. 2007 - April 2008 (1.5 yrs) Engineer  Managed manpower,machineries,material &subcontractorsbilling;supervised the work in progress on the sites and resolved the issued faced.  Meticulously prepared the statements for stock & inventories while reconciling the same on regular basis.  Managed initiation, planning, execution & billing of civil construction works of a 5 Floors Apartment; prepared infrastructure planning and budget.  Entrusted with the task of managing resources (Manpower, materials & machinery) judiciously while administering the site, labor, taking measurements, reconciling material etc for construction.  Managed and lead a team of Estimators, Junior Engineers, Site Personnel, Surveyors and Draftsmen to commissionthe projects as scheduled; ensured proper flow of material without any information/ payment gap. Projecthandled: Project Title (3) Construction of GRASIM IDUSTRIES LIMITED – Cement Plant Client Grasim IndustriesLimited Duration Jan.2007 - April 2008 ProjectCost Rs. 2000 million Capacity 10000 TPD M/S SIMPLEX INFRASTRUCTURES LTD. July 2006 –Dec. 2006 (6 months) Trainee Engineer  Participatedinall safetyrelatedprogrammerslike National safetyDay;followedall safetyrules & regulations as per norms and took precautions against all fire activities.  Took measurementsof all hiddenactivitieswithproperjointrecord;made schedule foryearlypaintingworks.  Handled record keeping of all vendor bills for yearly budgeting and checked all Vendor Bills with proper supervision. Project detail: (4) Construction of 1000 MW Power Plant Client M/s Jindal PowerLtd. Duration July 2006 – Dec. 2006 ProjectCost Rs. 5000 crore Capacity 1000 MW EDUCATIONAL & PROFESSIONAL CREDENTIALS Diploma (Civil Engineering), 2006 I.E.R.T. Allahabad; 83.39% Degree (AMICE (I) The Institute of Civil Engineers
  • 4. Computer Proficiency: Windows 98 / XP, AutoCAD, MS Office & Internet Applications Personal Details Name Dharmendra Kumar Rai F’Name Sri Daya Dhankar Rai Date of Birth: 28th July1983 Languages Known: English&Hindi Permanent Address: Village: Pathra Dasaudhi, P.O.: Sandwa, District: Mirzapur (U.P.), PIN - 231001