SlideShare a Scribd company logo
1 of 7
From: DEEPAK KUMAR
FLAT NO - 461/A3
THEMA
LOBATSE
BOTSWANA
With Respectfully, I may draw your kind attention for the following few lines in favors of your kind
consideration.
I am DEEPAK KUMAR Successfully Completed THREE YEAR DIPLOMA IN PLASTIC TECHNOLOGY.
Now at present I am working with FLOTEK PIPES & IRRIGATION LTD. of Company, a reputed one in
plastic PVC & HDPE Pipe Manufacture company in southern affrica, as a PRODUCTION MANAGER.
As a Technical Incumbent, I am seeking for a suitable Job relevant to my eligibility criteria in your
renowned organization, I am young, dynamic, enthusiastic and self confident as well.
Hopefully I expect you to grant my requisition and let me have an opportunity to show my caliber and
serve for your prestigious organization. I can assure if I will be absorbed I can prove to be best of your
satisfaction.
Anticipating for your early positive reply.
Thanking you,
Yours sincerely,
(DEEPAK KUMAR.)
RESUME
Name : DEEPAK KUMAR
Father’s Name : Sri KAILASH PRASAD
Date of Birth : 24 /08 /1987
Marital Status : UNMARRIED
CAREER OBJECTIVE
To involve myself in the field of plastics by enlarge testing and manufacturing in particular in
much dedicated way.
PERSONAL SKILLS
Comprehensive problem solving abilities, ability to work with team members, willingness to
learn and urge to lead as per assignment with punctuality.
QUALIFICATIONS
ACADEMIC
: 10th passed in the year 2002 From Haryana Board.
: 12th passed in the year 2004 From Haryana Board.
TECHNICAL : Diploma in plastics technology from chhotu ram polytechnic Rohtak
Haryana, INDIA. .
PROFESSIONAL : BASIC KNOWLEDGE OF COMPUTER
PROFESSIONAL PROFILE
1. A PLASTIC TECHNOLOGY ENGG with 8 year of good experience in production
Operation, quality assurance, cost saving in plastic extrusion machine.
2. An effective communicator with communicator with excellent customer relationship.
EXPERIENCE
1. Company : FLO-TEK PIPES & IRRIGATION LTD, LOBATSE, BOTSWANA
Company Profile : Manufacturer of PVC pipes of as per South African national standard
. UPVC pipes (20 mm to 500mm socketed pipes) as per SANS 966-1 ,MPVC pipes(75mm to
500mm socketed pipes)as per SANS 966-2,SWVpipes(20mm to110mm plane pipe )as per SANS
967 ,SEVERAGE pipes(110mm to 315mmsocketed or plane pipe)as per SANS 791,FOAM
CORE PIPES( 110mm to 200mm double layer pipe)as per SANS 1601.MPVC HIGH IMPECT
pipes(75 mm t500 mm socketed pipe)as per SANS 1283 & SCH 80 &SCH 40
as per American Standards(ASTM)&IS STANDARDS
ALSO MAKING HDPE PIPE 20 TO 630 MM DIAMETER.
Position : PRODUCTION MANAGER
Period : FEB 2012 TO Till DATE
Responsibilities : 1. looking all activities of production.
2. Making the production plan and achieve the target with quality
3 Installation of production machineries, setting process and continuing production.
.
4. Selecting appropriate manpower and train them for different operations in plant
5. Handling extrusion M/C like ROLEPAAL, ROLEPAAL DOUBLE LAYER,
KABRA, WINDSOR.
6. Identifying corrective and preventive maintenance and effecting continuous
7. Handling compounding department & changing as per requirement (according to
pipe size & machinery).
8. Handling SICA socketing machines & maintaining tool, mandrel.
9. In absence of Production Manager looked after whole production
For 6 months. In this period looking after all related activities like production
Planning, increasing capacity utilization, reducing rejection percentage,
Increasing yield , Purchasing ,Die designing ,etc.
2. Company : KISAN IRRIGATION LTD, TARAPUR (MAHARASTRA)
Company Profile : Manufacturer of PVC pipes of SCH 40& sch80 as per
Water system as per American Standards (ASTM) & IS STANDARDS
& SWR pipes of PVC as per IS -13592 & 4985 standards.
Position : Production executive.
Period : JUNE 2010 TO JAN 2012
Responsibilities : 1. looking all activities of production in charge.
2. Making the production plan and achieve the target with quality
3. Installation of production machineries, setting process and continuing production.
.
5. Selecting appropriate manpower and train them for different operations in plant
6. Handling extrusion M/C like KABRA .SAI TOOLS, WINDSOR,
7. Identifying corrective and preventive maintenance and effecting continuous
3. Company : M/s TIME TECHNOPLAST LTD SILVASA.
Company Profile : Manufacturer of HDPE Pipe AS PER IS 4984-1995
(SIZE-20 TO 1400MM)
Sprinkler irrigation system AS PER IS 14151-1995
HDPE pipes FOR SEVERAGE AS PER IS 14333-1995
PLB DUCT pipes FOR TELECOM DEPARTMENT
Position : Production Shift ENGINEER.
Period : APRIL 2009 TO JUNE 2010.
Responsibilities : 1. handling overall responsibility in production
Department.
2. Plan work scheduled & co-ordinate production for most efficient
Utilization of personal & equipment
3. Initiative to improve efficiency & saving.
4. Manage & insure the reduction in spoilage / or wastage where &
When possible.
5. Controlling quality of all vendor supplied materials.
6. Doing all formalities to getting new BIS license and maintaining the
existing license.
7. Attending quality complaints, analyzing the defect, taking decision for corrective action
and monitoring implementation.
.
4. Company : M/s AJAY INDUSTRIAL CORPORATION. , Dehradun.
Company Profile : A Group of companies engaged in various plastics and other manufacturing process.
Its one Division Newly started at Dehradun manufacturing C-PVC Pipes and Fittings
For hot and cold water system as per American Standards (ASTM) &IS STANDARDS.
This Process is having Technical collaboration with one of the overseas expert in this
Field (NOVEON,Belgium). Also Manufacturing CPVC and PVC and fittings
For Industrial piping system.
Position : QUALITY & PRODUCTION ENGG.
Period : MAY 2008 TO MAR 2009
Responsibilities : 1. Overall responsibility of quality & production.
2. Formulating Quality control procedure and implementing.
3. Selecting appropriate manpower and train them for different
operations in quality.
4. Identifying corrective and preventive measures and effecting continuous
improvement.
5. Analyzing quality complains.
6. Handling BIS formalities.
7. Handling third party inspection.
8. Maintaining ISO documents
PRODUTION PLANING & CONTROLE
1. PLANING day to day activities, production schedule implementing tools & allocating
work for achieving production targets of various extrusion machines.
2. Monitoring production entailing daily die / calibrator / bush , keeping control over
Activities and analyzing process for stabilization thereby ensuring smooth operation.
3. Carrying out R & D works, looking after new product designing and new die & socketing
tools development under the guidance of technical director.
CAPABILITIES IN QUALITY
1. Clear theoretical & Practical idea about properties & Characteristics of raw material to its
product.
2. Ability to handle all of the testing like as VST, TENSILE STRENGHT, ELONGATION,
REVERSION, HYDROSTATICS BURST PRESSURE, DENSITY, OPACITY, FITTING
BURST, ASH CONTAIN TEST ,CRUSH RESISTANCE, INTERNAL COFFICIENT OF
FRICTION , OXIDATION INDUTION TEST as per standard
DECLARATION
I hereby solemnly declare that all the statements made in the above application are true and
correct to the best of my knowledge and belief.
TOTAL EXPERIENCE – 8 YEARS in plastic pipe production & quality.
CORRESPONDENC:
PRESENT ADD : DEEPAK KUMAR
FLAT NO- 461/A3
THEMA
LOBATSE
BOTSWANA
Permanent address : DEEPAK KUMAR
FCA 123/A BHATIA COLONY
BALLABGARH
FARIDABAD (HARYANA)
Contact No. : 00-267-76683583
Mail ID : deepakji.kumar162@gmail.com
: deepakji.kumar162@yahoo.com
Skype ID :deepakji.kumar162
(DEEPAK KUMAR)
DECLARATION
I hereby solemnly declare that all the statements made in the above application are true and
correct to the best of my knowledge and belief.
TOTAL EXPERIENCE – 8 YEARS in plastic pipe production & quality.
CORRESPONDENC:
PRESENT ADD : DEEPAK KUMAR
FLAT NO- 461/A3
THEMA
LOBATSE
BOTSWANA
Permanent address : DEEPAK KUMAR
FCA 123/A BHATIA COLONY
BALLABGARH
FARIDABAD (HARYANA)
Contact No. : 00-267-76683583
Mail ID : deepakji.kumar162@gmail.com
: deepakji.kumar162@yahoo.com
Skype ID :deepakji.kumar162
(DEEPAK KUMAR)

More Related Content

What's hot

Cheng da gre pipe
Cheng da gre pipe Cheng da gre pipe
Cheng da gre pipe Tim Yao
 
Projetos de solução de corrosão, resultados e opiniões dos clientes. Corrosio...
Projetos de solução de corrosão, resultados e opiniões dos clientes. Corrosio...Projetos de solução de corrosão, resultados e opiniões dos clientes. Corrosio...
Projetos de solução de corrosão, resultados e opiniões dos clientes. Corrosio...ScienceTec & CorrTec-Engineering
 
Presentation asiatech qc 2009
Presentation asiatech qc 2009Presentation asiatech qc 2009
Presentation asiatech qc 2009naoums
 
RUSTX-VCI_Catalogue
RUSTX-VCI_CatalogueRUSTX-VCI_Catalogue
RUSTX-VCI_CatalogueJohn Wilson
 
UF filtration material Cn and en 2016 08-15
UF filtration material Cn and en 2016 08-15UF filtration material Cn and en 2016 08-15
UF filtration material Cn and en 2016 08-15育泉 邵
 
RAJ UPDATED CV IN WORD
RAJ UPDATED CV IN WORDRAJ UPDATED CV IN WORD
RAJ UPDATED CV IN WORDsaravana raj
 
Mla group intro presentation
Mla group intro presentationMla group intro presentation
Mla group intro presentationVinay Johari
 
Fittings & Valves For Instrumentation, Hydraulic & Pneumatic Applications
Fittings & Valves For Instrumentation, Hydraulic & Pneumatic ApplicationsFittings & Valves For Instrumentation, Hydraulic & Pneumatic Applications
Fittings & Valves For Instrumentation, Hydraulic & Pneumatic ApplicationsVishakhaTalmale
 
Bole Presentation
Bole PresentationBole Presentation
Bole Presentationwenny Jiang
 
Bole Presentation
Bole PresentationBole Presentation
Bole PresentationAnna zheng
 
System Seals Inc Mining Brochure
System Seals Inc Mining BrochureSystem Seals Inc Mining Brochure
System Seals Inc Mining BrochureJulian Webster-Gigg
 
Grenville Castings New Brochure
Grenville Castings New BrochureGrenville Castings New Brochure
Grenville Castings New BrochureJoe Clements
 

What's hot (20)

Custom molds case study
Custom molds case studyCustom molds case study
Custom molds case study
 
Cheng da gre pipe
Cheng da gre pipe Cheng da gre pipe
Cheng da gre pipe
 
Projetos de solução de corrosão, resultados e opiniões dos clientes. Corrosio...
Projetos de solução de corrosão, resultados e opiniões dos clientes. Corrosio...Projetos de solução de corrosão, resultados e opiniões dos clientes. Corrosio...
Projetos de solução de corrosão, resultados e opiniões dos clientes. Corrosio...
 
Presentation asiatech qc 2009
Presentation asiatech qc 2009Presentation asiatech qc 2009
Presentation asiatech qc 2009
 
RUSTX-VCI_Catalogue
RUSTX-VCI_CatalogueRUSTX-VCI_Catalogue
RUSTX-VCI_Catalogue
 
Guru Kirpa Metal,Mohali, Punjab
Guru Kirpa Metal,Mohali, PunjabGuru Kirpa Metal,Mohali, Punjab
Guru Kirpa Metal,Mohali, Punjab
 
Shantou Shenqi Plastic Products
Shantou Shenqi Plastic ProductsShantou Shenqi Plastic Products
Shantou Shenqi Plastic Products
 
UF filtration material Cn and en 2016 08-15
UF filtration material Cn and en 2016 08-15UF filtration material Cn and en 2016 08-15
UF filtration material Cn and en 2016 08-15
 
RAJ UPDATED CV IN WORD
RAJ UPDATED CV IN WORDRAJ UPDATED CV IN WORD
RAJ UPDATED CV IN WORD
 
Cipet
CipetCipet
Cipet
 
Mla group intro presentation
Mla group intro presentationMla group intro presentation
Mla group intro presentation
 
TOUFEEQomer32cv
TOUFEEQomer32cvTOUFEEQomer32cv
TOUFEEQomer32cv
 
Fittings & Valves For Instrumentation, Hydraulic & Pneumatic Applications
Fittings & Valves For Instrumentation, Hydraulic & Pneumatic ApplicationsFittings & Valves For Instrumentation, Hydraulic & Pneumatic Applications
Fittings & Valves For Instrumentation, Hydraulic & Pneumatic Applications
 
Bole Presentation
Bole PresentationBole Presentation
Bole Presentation
 
Bole Presentation
Bole PresentationBole Presentation
Bole Presentation
 
System Seals Inc Mining Brochure
System Seals Inc Mining BrochureSystem Seals Inc Mining Brochure
System Seals Inc Mining Brochure
 
System Seals Steel Brochure
System Seals Steel BrochureSystem Seals Steel Brochure
System Seals Steel Brochure
 
Grenville Castings New Brochure
Grenville Castings New BrochureGrenville Castings New Brochure
Grenville Castings New Brochure
 
SSI Forging Brochure
SSI Forging BrochureSSI Forging Brochure
SSI Forging Brochure
 
curriculum1
curriculum1curriculum1
curriculum1
 

Viewers also liked (14)

Zeeklas
ZeeklasZeeklas
Zeeklas
 
Quyết định số 1570/2000/QĐ-BYT
Quyết định số 1570/2000/QĐ-BYTQuyết định số 1570/2000/QĐ-BYT
Quyết định số 1570/2000/QĐ-BYT
 
pedagogía critica
pedagogía criticapedagogía critica
pedagogía critica
 
Dự thảo Nghị định quy định về điều kiện sản xuất Mỹ phẩm
Dự thảo Nghị định quy định về điều kiện sản xuất Mỹ phẩmDự thảo Nghị định quy định về điều kiện sản xuất Mỹ phẩm
Dự thảo Nghị định quy định về điều kiện sản xuất Mỹ phẩm
 
Michelle Leigh Butterfield MBA
Michelle Leigh Butterfield MBAMichelle Leigh Butterfield MBA
Michelle Leigh Butterfield MBA
 
Zeal Vanilla Protein Shake
Zeal Vanilla Protein ShakeZeal Vanilla Protein Shake
Zeal Vanilla Protein Shake
 
32 Via dei birrai: coerenza, cambiamento, crescita
32 Via dei birrai: coerenza, cambiamento, crescita32 Via dei birrai: coerenza, cambiamento, crescita
32 Via dei birrai: coerenza, cambiamento, crescita
 
Servicios PIPE
Servicios PIPEServicios PIPE
Servicios PIPE
 
Thông tư quy định thủ tục đăng ký, kiểm tra, chứng nhận cơ sở sản xuất thuốc ...
Thông tư quy định thủ tục đăng ký, kiểm tra, chứng nhận cơ sở sản xuất thuốc ...Thông tư quy định thủ tục đăng ký, kiểm tra, chứng nhận cơ sở sản xuất thuốc ...
Thông tư quy định thủ tục đăng ký, kiểm tra, chứng nhận cơ sở sản xuất thuốc ...
 
Interfaz
InterfazInterfaz
Interfaz
 
LEÇON 278 – Si je suis lié, mon Père n’est pas libre.
LEÇON 278 – Si je suis lié, mon Père n’est pas libre.LEÇON 278 – Si je suis lié, mon Père n’est pas libre.
LEÇON 278 – Si je suis lié, mon Père n’est pas libre.
 
Smart Cities
Smart CitiesSmart Cities
Smart Cities
 
Handout example.
Handout example. Handout example.
Handout example.
 
Conscioussness and Formatting (AIK 2016)
Conscioussness and Formatting (AIK 2016)Conscioussness and Formatting (AIK 2016)
Conscioussness and Formatting (AIK 2016)
 

Similar to DEEPAK[1]_(5)(1) (20)

s.muthu
s.muthus.muthu
s.muthu
 
Hareshwar dongare cv13.doc
Hareshwar dongare cv13.docHareshwar dongare cv13.doc
Hareshwar dongare cv13.doc
 
deep modified 22nd june 2015
deep modified 22nd june 2015deep modified 22nd june 2015
deep modified 22nd june 2015
 
din_CVM2[2]
din_CVM2[2]din_CVM2[2]
din_CVM2[2]
 
Hareshwar dongare cv13.doc
Hareshwar dongare cv13.docHareshwar dongare cv13.doc
Hareshwar dongare cv13.doc
 
prashat resume
prashat resumeprashat resume
prashat resume
 
venkat narayana resume
venkat narayana resumevenkat narayana resume
venkat narayana resume
 
Brc Resume
Brc ResumeBrc Resume
Brc Resume
 
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdfFAROOQ CV, PRODUCTION, QUALITY,  PLC AUTOMATION,.pdf
FAROOQ CV, PRODUCTION, QUALITY, PLC AUTOMATION,.pdf
 
Updated CV
Updated CVUpdated CV
Updated CV
 
MZS umc (4)
MZS umc (4)MZS umc (4)
MZS umc (4)
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
NEW RESUME AUG-16
NEW RESUME AUG-16NEW RESUME AUG-16
NEW RESUME AUG-16
 
MS Suresh -Jun-16
MS Suresh -Jun-16MS Suresh -Jun-16
MS Suresh -Jun-16
 
Mohamed hamdy .c.v
Mohamed hamdy .c.vMohamed hamdy .c.v
Mohamed hamdy .c.v
 
Mohamed hamdy .C.V
Mohamed hamdy .C.VMohamed hamdy .C.V
Mohamed hamdy .C.V
 
kk
kkkk
kk
 
pandit
panditpandit
pandit
 
Vrundavan Plastic Engg. Works, Ahmedabad, Plastic Machinery
Vrundavan Plastic Engg. Works, Ahmedabad, Plastic MachineryVrundavan Plastic Engg. Works, Ahmedabad, Plastic Machinery
Vrundavan Plastic Engg. Works, Ahmedabad, Plastic Machinery
 
ashwani (1)
ashwani (1)ashwani (1)
ashwani (1)
 

DEEPAK[1]_(5)(1)

  • 1. From: DEEPAK KUMAR FLAT NO - 461/A3 THEMA LOBATSE BOTSWANA With Respectfully, I may draw your kind attention for the following few lines in favors of your kind consideration. I am DEEPAK KUMAR Successfully Completed THREE YEAR DIPLOMA IN PLASTIC TECHNOLOGY. Now at present I am working with FLOTEK PIPES & IRRIGATION LTD. of Company, a reputed one in plastic PVC & HDPE Pipe Manufacture company in southern affrica, as a PRODUCTION MANAGER. As a Technical Incumbent, I am seeking for a suitable Job relevant to my eligibility criteria in your renowned organization, I am young, dynamic, enthusiastic and self confident as well. Hopefully I expect you to grant my requisition and let me have an opportunity to show my caliber and serve for your prestigious organization. I can assure if I will be absorbed I can prove to be best of your satisfaction. Anticipating for your early positive reply. Thanking you, Yours sincerely, (DEEPAK KUMAR.) RESUME
  • 2. Name : DEEPAK KUMAR Father’s Name : Sri KAILASH PRASAD Date of Birth : 24 /08 /1987 Marital Status : UNMARRIED CAREER OBJECTIVE To involve myself in the field of plastics by enlarge testing and manufacturing in particular in much dedicated way. PERSONAL SKILLS Comprehensive problem solving abilities, ability to work with team members, willingness to learn and urge to lead as per assignment with punctuality. QUALIFICATIONS ACADEMIC : 10th passed in the year 2002 From Haryana Board. : 12th passed in the year 2004 From Haryana Board. TECHNICAL : Diploma in plastics technology from chhotu ram polytechnic Rohtak Haryana, INDIA. . PROFESSIONAL : BASIC KNOWLEDGE OF COMPUTER PROFESSIONAL PROFILE 1. A PLASTIC TECHNOLOGY ENGG with 8 year of good experience in production Operation, quality assurance, cost saving in plastic extrusion machine. 2. An effective communicator with communicator with excellent customer relationship. EXPERIENCE 1. Company : FLO-TEK PIPES & IRRIGATION LTD, LOBATSE, BOTSWANA Company Profile : Manufacturer of PVC pipes of as per South African national standard . UPVC pipes (20 mm to 500mm socketed pipes) as per SANS 966-1 ,MPVC pipes(75mm to 500mm socketed pipes)as per SANS 966-2,SWVpipes(20mm to110mm plane pipe )as per SANS 967 ,SEVERAGE pipes(110mm to 315mmsocketed or plane pipe)as per SANS 791,FOAM
  • 3. CORE PIPES( 110mm to 200mm double layer pipe)as per SANS 1601.MPVC HIGH IMPECT pipes(75 mm t500 mm socketed pipe)as per SANS 1283 & SCH 80 &SCH 40 as per American Standards(ASTM)&IS STANDARDS ALSO MAKING HDPE PIPE 20 TO 630 MM DIAMETER. Position : PRODUCTION MANAGER Period : FEB 2012 TO Till DATE Responsibilities : 1. looking all activities of production. 2. Making the production plan and achieve the target with quality 3 Installation of production machineries, setting process and continuing production. . 4. Selecting appropriate manpower and train them for different operations in plant 5. Handling extrusion M/C like ROLEPAAL, ROLEPAAL DOUBLE LAYER, KABRA, WINDSOR. 6. Identifying corrective and preventive maintenance and effecting continuous 7. Handling compounding department & changing as per requirement (according to pipe size & machinery). 8. Handling SICA socketing machines & maintaining tool, mandrel. 9. In absence of Production Manager looked after whole production For 6 months. In this period looking after all related activities like production Planning, increasing capacity utilization, reducing rejection percentage, Increasing yield , Purchasing ,Die designing ,etc. 2. Company : KISAN IRRIGATION LTD, TARAPUR (MAHARASTRA) Company Profile : Manufacturer of PVC pipes of SCH 40& sch80 as per Water system as per American Standards (ASTM) & IS STANDARDS & SWR pipes of PVC as per IS -13592 & 4985 standards. Position : Production executive.
  • 4. Period : JUNE 2010 TO JAN 2012 Responsibilities : 1. looking all activities of production in charge. 2. Making the production plan and achieve the target with quality 3. Installation of production machineries, setting process and continuing production. . 5. Selecting appropriate manpower and train them for different operations in plant 6. Handling extrusion M/C like KABRA .SAI TOOLS, WINDSOR, 7. Identifying corrective and preventive maintenance and effecting continuous 3. Company : M/s TIME TECHNOPLAST LTD SILVASA. Company Profile : Manufacturer of HDPE Pipe AS PER IS 4984-1995 (SIZE-20 TO 1400MM) Sprinkler irrigation system AS PER IS 14151-1995 HDPE pipes FOR SEVERAGE AS PER IS 14333-1995 PLB DUCT pipes FOR TELECOM DEPARTMENT Position : Production Shift ENGINEER. Period : APRIL 2009 TO JUNE 2010. Responsibilities : 1. handling overall responsibility in production Department. 2. Plan work scheduled & co-ordinate production for most efficient Utilization of personal & equipment 3. Initiative to improve efficiency & saving. 4. Manage & insure the reduction in spoilage / or wastage where & When possible. 5. Controlling quality of all vendor supplied materials. 6. Doing all formalities to getting new BIS license and maintaining the existing license. 7. Attending quality complaints, analyzing the defect, taking decision for corrective action and monitoring implementation. .
  • 5. 4. Company : M/s AJAY INDUSTRIAL CORPORATION. , Dehradun. Company Profile : A Group of companies engaged in various plastics and other manufacturing process. Its one Division Newly started at Dehradun manufacturing C-PVC Pipes and Fittings For hot and cold water system as per American Standards (ASTM) &IS STANDARDS. This Process is having Technical collaboration with one of the overseas expert in this Field (NOVEON,Belgium). Also Manufacturing CPVC and PVC and fittings For Industrial piping system. Position : QUALITY & PRODUCTION ENGG. Period : MAY 2008 TO MAR 2009 Responsibilities : 1. Overall responsibility of quality & production. 2. Formulating Quality control procedure and implementing. 3. Selecting appropriate manpower and train them for different operations in quality. 4. Identifying corrective and preventive measures and effecting continuous improvement. 5. Analyzing quality complains. 6. Handling BIS formalities. 7. Handling third party inspection. 8. Maintaining ISO documents PRODUTION PLANING & CONTROLE 1. PLANING day to day activities, production schedule implementing tools & allocating work for achieving production targets of various extrusion machines. 2. Monitoring production entailing daily die / calibrator / bush , keeping control over Activities and analyzing process for stabilization thereby ensuring smooth operation. 3. Carrying out R & D works, looking after new product designing and new die & socketing tools development under the guidance of technical director. CAPABILITIES IN QUALITY 1. Clear theoretical & Practical idea about properties & Characteristics of raw material to its product. 2. Ability to handle all of the testing like as VST, TENSILE STRENGHT, ELONGATION, REVERSION, HYDROSTATICS BURST PRESSURE, DENSITY, OPACITY, FITTING BURST, ASH CONTAIN TEST ,CRUSH RESISTANCE, INTERNAL COFFICIENT OF FRICTION , OXIDATION INDUTION TEST as per standard
  • 6. DECLARATION I hereby solemnly declare that all the statements made in the above application are true and correct to the best of my knowledge and belief. TOTAL EXPERIENCE – 8 YEARS in plastic pipe production & quality. CORRESPONDENC: PRESENT ADD : DEEPAK KUMAR FLAT NO- 461/A3 THEMA LOBATSE BOTSWANA Permanent address : DEEPAK KUMAR FCA 123/A BHATIA COLONY BALLABGARH FARIDABAD (HARYANA) Contact No. : 00-267-76683583 Mail ID : deepakji.kumar162@gmail.com : deepakji.kumar162@yahoo.com Skype ID :deepakji.kumar162 (DEEPAK KUMAR)
  • 7. DECLARATION I hereby solemnly declare that all the statements made in the above application are true and correct to the best of my knowledge and belief. TOTAL EXPERIENCE – 8 YEARS in plastic pipe production & quality. CORRESPONDENC: PRESENT ADD : DEEPAK KUMAR FLAT NO- 461/A3 THEMA LOBATSE BOTSWANA Permanent address : DEEPAK KUMAR FCA 123/A BHATIA COLONY BALLABGARH FARIDABAD (HARYANA) Contact No. : 00-267-76683583 Mail ID : deepakji.kumar162@gmail.com : deepakji.kumar162@yahoo.com Skype ID :deepakji.kumar162 (DEEPAK KUMAR)