SlideShare a Scribd company logo
1 of 3
Page 1 of 3
David Clayton
Contact Mobile: +44 (0) 7771933833 Email: dclayton49@hotmail.com
Location Newport Pagnell, Buckinghamshire
Professional profile
A highly-experienced and results-driven Senior Cost Manager with a very successful background in oil & gas,
pharmaceuticals, utilities, rail, international and FTSE-100 corporates. Project values ranging from £10million to over
£1 billion
Highly accomplished, able to design implement and execute effective cost management systems and performance
monitoring strategies.
Accounting and reporting experience in, SAP, Oracle, JDE, P6, Cobra and IDEA.
Experience of working in many different countries, environments and cultures,
Experience of driving change, cost saving, project strategies, project management, centralised processes, best
practice.
Fully experienced contractor, having worked on multiple projects with both governments, global companies and
consultancies and have fulfilled all contractual obligations.
Key skills & business capabilities
WBS and CBS Structure Design. Project Planning & Strategy Development
Budgetary Management (OPEX & CAPEX) Project Delivery Management & Support
NEC 3 Operational Policy and Procedure Documentation
Whole Life and Life Cycle Costing Training and Mentoring
Troubleshooting & Problem Solving Auditing
Change Management Project Budgets and Reporting
Project Financial Control Team Leadership & Management
Estimating 3rd Parties, Vendors and Suppliers
Stakeholder Engagement & Relationships Excellent Communication & Presentation Skills
Employment History
April 2016 to Present Private consultancy contract
 Devise a stock control system
 Stock usage monitoringsystem
 Calculateoperational costs
 Advise on possiblecostreductions
 Design cost reporting templates
October 2015 to March 2016. PDC Consultants Cost Manager/Estimator Temporary Assignment
To review project overspend
 Review previous estimates
 Review contractor applications
 Review equipment usageon site
 Create estimatingdata base
 Create estimatingtemplates
 Review cost control data collection systemand recommend changes
February 2015 to September 2015. TFL. Cost Manager Temporary Assignment
Review of Completed Track Renewal Projects
 Review estimates and costs on pastprojects
 Highlightissues with estimates
 Review project costs and verify
 Create records of historic costs for estimating
July2014 to February 2015.Enzen UK. Consultant Cost Manager
Review and enhancement of project reporting
 Design and manage new cost reporting function
 Create costestimating records
 Life cycleand whole lifecosting’s
 Design and generate management reports
 Devise costmanagement training programme
 Integrate costengineering into existingdisciplines
December 2013 to June 2014. CPL Ltd. Project Cost Controller
Create project control procedures
 Set up project control procedures
 Project budget control
 Cost evaluation and verification
 Post FEED project estimate
 Reporting structure
 Cost report compilation fromrelevant parties for submission to DECC
July 2013 –December 2013. Jacobs Engineering. Senior Cost Manager.
Assigned to sort out issues arising from multiple change orders
 Short term contractto sortout issues with the change control system
 Update change control register
 Closeout old changes
 Evaluate and verify costs
 Target costadjustments
 Assign new changes and followup
Jul. 2011 – June 2013.Shell Global Solutions. Rijswijk, Holland. Senior Cost Manager.
NORSOK Z014 Implementation Lead
 Mappingof Upstream and Downstream SAP Cost Elements for all OperatingUnits worldwide to NORSOK Z014 Code of
Resource.
 Onshore/offshoreproduction facility costmapping
 Continual involvement with operatingunits
 Dealingwith cultural differences in the use of the SAP accountingsystem.
 Subsea and land based well operations mapping
 Workingwith estimators to categorisecodes for a multilevel estimatingtool
 Mappingestimators CBS to NORSOK Z014 Code of Resource
 Updating costcontrol reporting system with mapping adjustments
 Verification and sensecheck of mapping
 Investigate postings to SAP cost elements to understand the usagewithin all operatingunits
 Investigate possibleISO accreditation for NORSOK
Jan. 2011 – Jun. 2011.Thames Water. Senior Cost Manager. ~
Forensic audit
 Service Contract auditand compliance(singlesource)
 Cost verification
 Procurement strategy analysisand modifications
 Cost recovery in excess of £1m+ overcharged over a 4 year period
 Disallowed costanalysisand negotiation.
Jan. 2009 – Dec.2010. CH2MHill. Senior Cost Manager.
Assigned to the Olympic Park Project – Stadium £500m (Jan 2009 to July 2010) and Site Security £900m(July 2010 to
December 2010)
 Cash flow, EV and AFC projections
 Change Control
 Contractor Audits
 Cost Verification
 Change order estimating
 Updating work breakdown and costbreakdown schedules
 Continual projectAFC updates
Page 3 of 3
 Disallowed costnegotiations
 Preparation of Project Status Report
Early career includes
Roles:
Cost Engineer
Cost Manager
Senior Cost Manager
Cost Consultant
Commercial Manager
Companies:
Mace
Railtrack
National Oil Company of Libya
Merck Sharp & Dohme
Cornerstone (Abbey National)
Further information available on request.

More Related Content

What's hot

Earned Value Management Essentials
Earned Value Management EssentialsEarned Value Management Essentials
Earned Value Management EssentialsGlen Alleman
 
Ber in sa with oracle primavera delivered successfully
Ber in sa with oracle primavera  delivered successfullyBer in sa with oracle primavera  delivered successfully
Ber in sa with oracle primavera delivered successfullyInSync Conference
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne PearceSuzanne Pearce
 
CV Shray Jain
CV Shray Jain CV Shray Jain
CV Shray Jain Shray Jain
 
LuceyResume0515
LuceyResume0515LuceyResume0515
LuceyResume0515Dan Lucey
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cvjamli haythem
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity SurveyingLIJI A
 
Chazapis cx for better buildings
Chazapis cx for better buildingsChazapis cx for better buildings
Chazapis cx for better buildingsNicholas Chazapis
 
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016Tahir Khan
 
Productivity strategies for production engineer
Productivity strategies for production engineerProductivity strategies for production engineer
Productivity strategies for production engineerAhmad 'Uzair Sukor
 
2# types of estimate
2# types of estimate2# types of estimate
2# types of estimateLIJI A
 

What's hot (17)

Delivering nothing efficiently
Delivering nothing efficientlyDelivering nothing efficiently
Delivering nothing efficiently
 
Earned Value Management Essentials
Earned Value Management EssentialsEarned Value Management Essentials
Earned Value Management Essentials
 
Hossam CV-FEB2016
Hossam CV-FEB2016Hossam CV-FEB2016
Hossam CV-FEB2016
 
Ber in sa with oracle primavera delivered successfully
Ber in sa with oracle primavera  delivered successfullyBer in sa with oracle primavera  delivered successfully
Ber in sa with oracle primavera delivered successfully
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne Pearce
 
CV Shray Jain
CV Shray Jain CV Shray Jain
CV Shray Jain
 
DC Resume v2021
DC Resume v2021DC Resume v2021
DC Resume v2021
 
LuceyResume0515
LuceyResume0515LuceyResume0515
LuceyResume0515
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cv
 
Project control
Project controlProject control
Project control
 
For expressways
For expresswaysFor expressways
For expressways
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
 
Chazapis cx for better buildings
Chazapis cx for better buildingsChazapis cx for better buildings
Chazapis cx for better buildings
 
Resume +Tahir 2016
Resume +Tahir 2016Resume +Tahir 2016
Resume +Tahir 2016
 
JKnightResume16
JKnightResume16JKnightResume16
JKnightResume16
 
Productivity strategies for production engineer
Productivity strategies for production engineerProductivity strategies for production engineer
Productivity strategies for production engineer
 
2# types of estimate
2# types of estimate2# types of estimate
2# types of estimate
 

Similar to CV_Clayton_David_2016 new

Amanda Spence Resume_US Gulfcoast Analytics
Amanda Spence Resume_US Gulfcoast AnalyticsAmanda Spence Resume_US Gulfcoast Analytics
Amanda Spence Resume_US Gulfcoast AnalyticsAmanda Alexander Spence
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef samNermeen gerges
 
Greg Hastings 4-2015
Greg Hastings 4-2015Greg Hastings 4-2015
Greg Hastings 4-2015Greg Hastings
 
Leonard Smith Resume.docxGE only
Leonard Smith Resume.docxGE onlyLeonard Smith Resume.docxGE only
Leonard Smith Resume.docxGE onlyLeonard Smith
 
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...Dr Wei Liu
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Aew Sanmai
 
Manish garg resume
Manish garg resumeManish garg resume
Manish garg resumeManish Garg
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7Sam Ghosh
 
Gary Clancy CV - November 2016
Gary Clancy CV - November 2016Gary Clancy CV - November 2016
Gary Clancy CV - November 2016Gary Clancy
 

Similar to CV_Clayton_David_2016 new (20)

Amanda Spence Resume_US Gulfcoast Analytics
Amanda Spence Resume_US Gulfcoast AnalyticsAmanda Spence Resume_US Gulfcoast Analytics
Amanda Spence Resume_US Gulfcoast Analytics
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016
 
Umesh Resume
Umesh ResumeUmesh Resume
Umesh Resume
 
Greg Hastings 4-2015
Greg Hastings 4-2015Greg Hastings 4-2015
Greg Hastings 4-2015
 
SURESH MANICKAM
SURESH MANICKAMSURESH MANICKAM
SURESH MANICKAM
 
Leonard Smith Resume.docxGE only
Leonard Smith Resume.docxGE onlyLeonard Smith Resume.docxGE only
Leonard Smith Resume.docxGE only
 
CV (KET)-New
CV (KET)-NewCV (KET)-New
CV (KET)-New
 
CV 2016 LB (B)
CV 2016 LB (B)CV 2016 LB (B)
CV 2016 LB (B)
 
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...
Optimisation and Tradeoff Analysis Tool for Asset Management Planning and Pro...
 
Joe Bollig
Joe Bollig Joe Bollig
Joe Bollig
 
PW cv1602 03
PW cv1602 03PW cv1602 03
PW cv1602 03
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
Manish garg resume
Manish garg resumeManish garg resume
Manish garg resume
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7
 
Gary Clancy CV - November 2016
Gary Clancy CV - November 2016Gary Clancy CV - November 2016
Gary Clancy CV - November 2016
 
CV - SimonV7
CV - SimonV7CV - SimonV7
CV - SimonV7
 
CV - SimonV7
CV - SimonV7CV - SimonV7
CV - SimonV7
 

CV_Clayton_David_2016 new

  • 1. Page 1 of 3 David Clayton Contact Mobile: +44 (0) 7771933833 Email: dclayton49@hotmail.com Location Newport Pagnell, Buckinghamshire Professional profile A highly-experienced and results-driven Senior Cost Manager with a very successful background in oil & gas, pharmaceuticals, utilities, rail, international and FTSE-100 corporates. Project values ranging from £10million to over £1 billion Highly accomplished, able to design implement and execute effective cost management systems and performance monitoring strategies. Accounting and reporting experience in, SAP, Oracle, JDE, P6, Cobra and IDEA. Experience of working in many different countries, environments and cultures, Experience of driving change, cost saving, project strategies, project management, centralised processes, best practice. Fully experienced contractor, having worked on multiple projects with both governments, global companies and consultancies and have fulfilled all contractual obligations. Key skills & business capabilities WBS and CBS Structure Design. Project Planning & Strategy Development Budgetary Management (OPEX & CAPEX) Project Delivery Management & Support NEC 3 Operational Policy and Procedure Documentation Whole Life and Life Cycle Costing Training and Mentoring Troubleshooting & Problem Solving Auditing Change Management Project Budgets and Reporting Project Financial Control Team Leadership & Management Estimating 3rd Parties, Vendors and Suppliers Stakeholder Engagement & Relationships Excellent Communication & Presentation Skills Employment History April 2016 to Present Private consultancy contract  Devise a stock control system  Stock usage monitoringsystem  Calculateoperational costs  Advise on possiblecostreductions  Design cost reporting templates October 2015 to March 2016. PDC Consultants Cost Manager/Estimator Temporary Assignment To review project overspend  Review previous estimates  Review contractor applications  Review equipment usageon site  Create estimatingdata base  Create estimatingtemplates  Review cost control data collection systemand recommend changes February 2015 to September 2015. TFL. Cost Manager Temporary Assignment Review of Completed Track Renewal Projects  Review estimates and costs on pastprojects  Highlightissues with estimates  Review project costs and verify  Create records of historic costs for estimating
  • 2. July2014 to February 2015.Enzen UK. Consultant Cost Manager Review and enhancement of project reporting  Design and manage new cost reporting function  Create costestimating records  Life cycleand whole lifecosting’s  Design and generate management reports  Devise costmanagement training programme  Integrate costengineering into existingdisciplines December 2013 to June 2014. CPL Ltd. Project Cost Controller Create project control procedures  Set up project control procedures  Project budget control  Cost evaluation and verification  Post FEED project estimate  Reporting structure  Cost report compilation fromrelevant parties for submission to DECC July 2013 –December 2013. Jacobs Engineering. Senior Cost Manager. Assigned to sort out issues arising from multiple change orders  Short term contractto sortout issues with the change control system  Update change control register  Closeout old changes  Evaluate and verify costs  Target costadjustments  Assign new changes and followup Jul. 2011 – June 2013.Shell Global Solutions. Rijswijk, Holland. Senior Cost Manager. NORSOK Z014 Implementation Lead  Mappingof Upstream and Downstream SAP Cost Elements for all OperatingUnits worldwide to NORSOK Z014 Code of Resource.  Onshore/offshoreproduction facility costmapping  Continual involvement with operatingunits  Dealingwith cultural differences in the use of the SAP accountingsystem.  Subsea and land based well operations mapping  Workingwith estimators to categorisecodes for a multilevel estimatingtool  Mappingestimators CBS to NORSOK Z014 Code of Resource  Updating costcontrol reporting system with mapping adjustments  Verification and sensecheck of mapping  Investigate postings to SAP cost elements to understand the usagewithin all operatingunits  Investigate possibleISO accreditation for NORSOK Jan. 2011 – Jun. 2011.Thames Water. Senior Cost Manager. ~ Forensic audit  Service Contract auditand compliance(singlesource)  Cost verification  Procurement strategy analysisand modifications  Cost recovery in excess of £1m+ overcharged over a 4 year period  Disallowed costanalysisand negotiation. Jan. 2009 – Dec.2010. CH2MHill. Senior Cost Manager. Assigned to the Olympic Park Project – Stadium £500m (Jan 2009 to July 2010) and Site Security £900m(July 2010 to December 2010)  Cash flow, EV and AFC projections  Change Control  Contractor Audits  Cost Verification  Change order estimating  Updating work breakdown and costbreakdown schedules  Continual projectAFC updates
  • 3. Page 3 of 3  Disallowed costnegotiations  Preparation of Project Status Report Early career includes Roles: Cost Engineer Cost Manager Senior Cost Manager Cost Consultant Commercial Manager Companies: Mace Railtrack National Oil Company of Libya Merck Sharp & Dohme Cornerstone (Abbey National) Further information available on request.