Introduction
Under ISO55000, a company must demonstrate that it is managing its assets from the project phase to
end of life.
For the assets, e.g. spare parts, a company must:
• Demonstrate that it is managing its data (cataloguing, issue, returns, receipts, etc)
• Have procedures in place (cataloguing, initial spares purchasing, inventory man)
• Demonstrate risk-based decisions
• Demonstrate continuous improvement
In our experience the creation of MRO Spare Parts Master Data is typically done very badly at the
project phase and continues into the asset ownership phase. See attached flyer, listing several case
studies.
Poor cataloguing leads to duplicate stock, loss of time trying to find spare parts, emergency purchases,
excess stocking and hence excess costs.
Depending how bad you currently are, there is a potential for significant savings.
RAMsoft have been conducting workshops to help companies optimise and reduce their inventory for
several years.
RAMsoft have developed several tools to support reductions in inventory.
• MRO-Strip, a tool to identify duplicate line items, most companies have between 10-15%
duplicates
• MRO-OPT, a tool to optimise stock levels and to show % cost savings
• MRO-BOM, a tool to support BOM building
• MRO-Auditor, for conducting MRO Spare Parts Master Data Audits very effectively
• MRO-CleanIT, to cleanse the spare part master data with standardised part descriptions and part
numbers
RAMsoft have also developed an inventory reduction process based on the following 6 phases:
Audit
Define Process & Guides
Cleanse
Rationalise
Optimise
Measure Effectiveness
Is Your MRO Spare Parts Improvement
Programme ISO55000 Compliant?
Maintenance, Reliability & MRO Spare Parts Specialists
Phase 1 Auditing
The first step for any inventory improvement programme is an understanding of the company’s issues.
The scope of an inventory management audit can cover the following areas:
• MRO Best Practices (a structured questionnaire is used to evaluate best practices in managing
spare parts effectively)
• MRO Written Procedures and Guides (the documents required for each phase of an item’s life)
• Master Data Review (short description formats, nouns and modifiers, Mfg. & Vendor P/Ns,
Vendor and Mfg. names, review of duplicates)
• Inventory replenishment control parameters (an evaluation of current ROP, OQ, Min-Max, etc)
In this document, we will mainly discuss activities related to spare parts master data.
A company’s downloaded inventory data is mapped and imported to our MRO-Auditor tool. MRO-
Auditor contains over 200 saved filters and queries to facilitate the master data review by noun, etc.
A report is issued detailing the findings good and bad - remember poor cataloguing represents potential
savings.
Typical findings from our audits are:
• Short descriptions have inconsistent formatting
• Qualifiers or Modifiers are not identified
• Vendors’ names included in the short description
• Lack of attribute data in the short description, and inconsistent sequencing
• MPNs have inconsistent formatting
• MPNs fields are a mix of Vendors and MPNs
• 10-15% duplicate line items
• Inconsistent abbreviations used
• Abbreviations are not used when they should be
• Multiple suppliers for the similar material
Comments on poor cataloguing will be supported by screen shots from the MRO-Auditor tool, a typical
example is:
The above is an example of the poor cleansing delivered by a consultant.
RAMsoft do not guarantee to find all types of inconsistencies, but the most common. Only during
master data cleansing will all issues be identified.
Phase 2 Procedures and Guides
ISO55000 states that a high level strategic plan (known as a SAMP) needs to be developed. The structure
of the SAMP varies between consultants and the various maintenance associations, this is because the
ISO55000 is not prescriptive.
The SAMP developed by Ramsoft, includes two elements relative to MRO Spare Parts:
• Initial MRO Spare Parts Planning (Project phase)
• MRO Spare Parts Management (Ownership phase)
The main reason for poor cataloguing, is that the cataloguing process is not documented in the project
phase, which includes CMMS population.
Even when a so called consultant has carried out the cataloguing or the cleansing the final quality is
poor. Unless you document all the rules and build criteria the cataloguing will not achieve a high quality.
Remember under ISO55000 you must demonstrate the management of data and that means how the
data is populated in the CMMS consistently
During the data cleansing phase, RAMsoft can prepare documentation that supports consistent
cataloguing in the future.
Documentation can include:
• Guides and rules used during the cleansing
• A list of all abbreviations
• Type guides to cover the type of spares stocked and the naming convention
The screen shot below, shows a typical Type Guide for Shaft Bushes.
Phase 3 Cleansing Master Data
The scope of cleansing will vary from company to company and will be CMMS dependant. For example,
Maximo users typically describe their spare parts using up to 75 characters, while SAP users are limited
to 40 characters. This means a SAP user must use many more abbreviations to describe a spare part.
RAMsoft using their MRO-CleanIT tool can clean up your master data. Using standardised descriptions,
a) located in a look up table when matched to a MPN and b) a table containing template descriptions,
when that MPN is not an exact match.
One of the reasons for duplicate stock is manufacturers & vendors use different naming conventions,
e.g. see for stainless steel A2, 304, SS, they could be all the same but used in MPN then you would not
be able to identify these. Therefore Phase 2 is essential, you must clearly identify your naming
conventions.
Benefits of cleansed master data are the identification of potential duplicates, ease of finding spares,
identification of standardisation and rationalisation opportunities and hence inventory reduction.
The following example shows the current part description and the cleansed description.
Phase 4 Rationalisation
Rationalisation is about reviewing your material and seeking inventory or cost reduction opportunities
Companies who have proceeded to the cleansing and rationalisation phases have achieved up to 60-70
% reduction in line items (for some material) by:
• Standardising part descriptions and MPNs
• Removing duplicates
• Standardising on the material specification
• Reducing the number of manufacturers
• Removing stock that is not fit for purpose (wrong specification)
The screen shot below shows that this company stocked 23 different manufacturers of bearings.
Rationalisation covers many of the 30 tactics, we cover in our 3 day workshop, including:
• Classifying the criticality of each spare
• Assigning classifications for ABC, HML, XYZ and demand classes
• Identifying OPMs and APMs
• Reducing stocking locations
• Conducting RCA for A items
• Conducting Spend Analysis
• Challenge stocking of slow movers
• Etc.
Further cost savings may be possible by proceeding to Phase 5 MRO Optimisation
Phase 5 Optimisation
Optimisation supports ISO55000 by making decisions based on risk, we set a Stock-out risk for each
spare part based on the item’s criticality. Opportunities for reducing inventory are identified by
determining the optimum ROP and OQ and then the most appropriate replenishment strategy.
Optimum ROPs are determined by:
• Assigning a service level to each spare part based on its criticality
• Identifying the true lead time (company plus supplier)
• Determining the average demand rate
RAMsoft propose three main replenishment strategies:
• ROP a fixed ROP and OQ
• Min-Max, a variable OQ to bring the stock level to a maximum
• Constant Vendor Delivery, based on JIT concepts
Costs savings are identified by looking for potential cost savings. Prioritisation is based on differential
financial value between the current average stock level and optimum average stock level.
The case study below is an example, where the optimum values are not appropriate, the options are
then to a) increase one or more control parameters, so that they are not the optimum values or b) move
to a different replenishment strategy. In this example a) was the best option.
The Author
David Thompson holds a B.Sc. (Hons) in Mechanical Engineering and has spent his entire career over 50
years in maintenance, reliability and spare parts management.
David has been a certified trainer in both Reliability and RCA for leading USA companies.
David has worked in many industries Steel, Mining, Utilities, General Manufacturing, Food & Beverage,
and Oil & Gas and worked in over 36 countries
David has conducted over 40 workshops on MRO Optimisation and Inventory Reduction including
CMMS data builds. He has conducted numerous audits of MRO Master Data and conducted optimum
inventory parameter evaluations.
David has developed procedures and guides to support effective CMMS inventory build and
management.
Workshops offered
• MRO Spare Parts Optimisation and Inventory Reduction
• MRO Spare Parts Master Data Auditing & Cleansing
Contact details:
David Thompson
MRO Spares Parts Consultant/Trainer
Ramsoft (UK)
Summerseat, Bury, BL0 5QW, Manchester.
dave@ramsoftuk.com
www.ramsoftuk.com
http://uk.linkedin.com/in/davidthompsonreliability
Ramsoft (UK). 23 Waterside Road, Summerseat. Bury, Lancs, UK. BL9 5QW

More Related Content

Similar to MRO Spare Parts Improvement Programme Conforms to ISO55000

Smu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignmentsSmu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignmentssolved_assignments
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015naveen kumar
 
3 Day Spares Optimisation Course (Multiple Venues)
3 Day Spares Optimisation Course (Multiple Venues)3 Day Spares Optimisation Course (Multiple Venues)
3 Day Spares Optimisation Course (Multiple Venues)David Thompson
 
Supply Chain Council
Supply Chain CouncilSupply Chain Council
Supply Chain CouncilSergio Grisa
 
Elcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAMElcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAMSergio Grisa
 
MRO spare part case studies master data
MRO spare part case studies   master dataMRO spare part case studies   master data
MRO spare part case studies master dataDavid Thompson
 
C3 3 day spares optimisation rationalisation 2017 01
C3 3 day spares optimisation  rationalisation 2017 01C3 3 day spares optimisation  rationalisation 2017 01
C3 3 day spares optimisation rationalisation 2017 01David Thompson
 
CIPS award Submission 2012 (Finalist) Version 1
CIPS award Submission 2012 (Finalist) Version 1CIPS award Submission 2012 (Finalist) Version 1
CIPS award Submission 2012 (Finalist) Version 1Vincent Edwards
 
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...Leslie Schulte
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations managementsmumbahelp
 
SIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentationSIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentationcheldulceconstan28
 
Smu mba sem 3 om winter 2014 assignments
Smu mba sem 3 om winter 2014 assignmentsSmu mba sem 3 om winter 2014 assignments
Smu mba sem 3 om winter 2014 assignmentssolved_assignments
 
Smu mba sem 2 spring 2016 assignments
Smu mba sem 2 spring 2016 assignmentsSmu mba sem 2 spring 2016 assignments
Smu mba sem 2 spring 2016 assignmentssolved_assignments
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)Prashant Rasekar
 
PDM System for Automobile Assembly
PDM System for Automobile AssemblyPDM System for Automobile Assembly
PDM System for Automobile AssemblyIRJET Journal
 
Smu mba sem 3 om fall 2015 assignments
Smu mba sem 3 om fall 2015 assignmentsSmu mba sem 3 om fall 2015 assignments
Smu mba sem 3 om fall 2015 assignmentssolved_assignments
 
A Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning PrototypingA Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning PrototypingGH_Wijnants
 
07 caelum-cmmi-multimodel-scamp iv2
07 caelum-cmmi-multimodel-scamp iv207 caelum-cmmi-multimodel-scamp iv2
07 caelum-cmmi-multimodel-scamp iv2CAELUM-CMMI
 

Similar to MRO Spare Parts Improvement Programme Conforms to ISO55000 (20)

Smu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignmentsSmu mba sem 4 om spring 2016 assignments
Smu mba sem 4 om spring 2016 assignments
 
Sample sem 2 winter 2015
Sample sem 2 winter 2015Sample sem 2 winter 2015
Sample sem 2 winter 2015
 
3 Day Spares Optimisation Course (Multiple Venues)
3 Day Spares Optimisation Course (Multiple Venues)3 Day Spares Optimisation Course (Multiple Venues)
3 Day Spares Optimisation Course (Multiple Venues)
 
Supply Chain Council
Supply Chain CouncilSupply Chain Council
Supply Chain Council
 
Elcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAMElcio Grassia Presidente do SCC LATAM
Elcio Grassia Presidente do SCC LATAM
 
MRO spare part case studies master data
MRO spare part case studies   master dataMRO spare part case studies   master data
MRO spare part case studies master data
 
C3 3 day spares optimisation rationalisation 2017 01
C3 3 day spares optimisation  rationalisation 2017 01C3 3 day spares optimisation  rationalisation 2017 01
C3 3 day spares optimisation rationalisation 2017 01
 
CIPS award Submission 2012 (Finalist) Version 1
CIPS award Submission 2012 (Finalist) Version 1CIPS award Submission 2012 (Finalist) Version 1
CIPS award Submission 2012 (Finalist) Version 1
 
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations management
 
Lubrication Maturity Matrix
Lubrication Maturity MatrixLubrication Maturity Matrix
Lubrication Maturity Matrix
 
Om 4 th
Om 4 thOm 4 th
Om 4 th
 
SIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentationSIX-SIGMA-GROUP-5.powerpoint presentation
SIX-SIGMA-GROUP-5.powerpoint presentation
 
Smu mba sem 3 om winter 2014 assignments
Smu mba sem 3 om winter 2014 assignmentsSmu mba sem 3 om winter 2014 assignments
Smu mba sem 3 om winter 2014 assignments
 
Smu mba sem 2 spring 2016 assignments
Smu mba sem 2 spring 2016 assignmentsSmu mba sem 2 spring 2016 assignments
Smu mba sem 2 spring 2016 assignments
 
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
 
PDM System for Automobile Assembly
PDM System for Automobile AssemblyPDM System for Automobile Assembly
PDM System for Automobile Assembly
 
Smu mba sem 3 om fall 2015 assignments
Smu mba sem 3 om fall 2015 assignmentsSmu mba sem 3 om fall 2015 assignments
Smu mba sem 3 om fall 2015 assignments
 
A Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning PrototypingA Vision On Integrated Inspection Planning Prototyping
A Vision On Integrated Inspection Planning Prototyping
 
07 caelum-cmmi-multimodel-scamp iv2
07 caelum-cmmi-multimodel-scamp iv207 caelum-cmmi-multimodel-scamp iv2
07 caelum-cmmi-multimodel-scamp iv2
 

More from David Thompson

Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemDavid Thompson
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemDavid Thompson
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemDavid Thompson
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemDavid Thompson
 
Sap mrp hb and fx 2017 09
Sap mrp hb and fx 2017 09Sap mrp hb and fx 2017 09
Sap mrp hb and fx 2017 09David Thompson
 
Sap mrp hb ex 2017 09 rev 4
Sap mrp hb ex 2017 09  rev 4Sap mrp hb ex 2017 09  rev 4
Sap mrp hb ex 2017 09 rev 4David Thompson
 
Ramsoft - Case 4 Spiral Wound Gaskets
Ramsoft - Case 4 Spiral Wound GasketsRamsoft - Case 4 Spiral Wound Gaskets
Ramsoft - Case 4 Spiral Wound GasketsDavid Thompson
 
Reducing Costs of Spares and Inventory Levels
Reducing Costs of Spares and Inventory LevelsReducing Costs of Spares and Inventory Levels
Reducing Costs of Spares and Inventory LevelsDavid Thompson
 

More from David Thompson (13)

Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
 
Using UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory SystemUsing UNSPSC codes in the MRO Inventory System
Using UNSPSC codes in the MRO Inventory System
 
Sap mrp hb and fx 2017 09
Sap mrp hb and fx 2017 09Sap mrp hb and fx 2017 09
Sap mrp hb and fx 2017 09
 
Sap mrp hb ex 2017 09 rev 4
Sap mrp hb ex 2017 09  rev 4Sap mrp hb ex 2017 09  rev 4
Sap mrp hb ex 2017 09 rev 4
 
All books
All booksAll books
All books
 
Reliability books
Reliability booksReliability books
Reliability books
 
Other books
Other booksOther books
Other books
 
Am books
Am booksAm books
Am books
 
Equip mgmt books
Equip mgmt booksEquip mgmt books
Equip mgmt books
 
Ramsoft - Case 4 Spiral Wound Gaskets
Ramsoft - Case 4 Spiral Wound GasketsRamsoft - Case 4 Spiral Wound Gaskets
Ramsoft - Case 4 Spiral Wound Gaskets
 
Reducing Costs of Spares and Inventory Levels
Reducing Costs of Spares and Inventory LevelsReducing Costs of Spares and Inventory Levels
Reducing Costs of Spares and Inventory Levels
 

Recently uploaded

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

MRO Spare Parts Improvement Programme Conforms to ISO55000

  • 1. Introduction Under ISO55000, a company must demonstrate that it is managing its assets from the project phase to end of life. For the assets, e.g. spare parts, a company must: • Demonstrate that it is managing its data (cataloguing, issue, returns, receipts, etc) • Have procedures in place (cataloguing, initial spares purchasing, inventory man) • Demonstrate risk-based decisions • Demonstrate continuous improvement In our experience the creation of MRO Spare Parts Master Data is typically done very badly at the project phase and continues into the asset ownership phase. See attached flyer, listing several case studies. Poor cataloguing leads to duplicate stock, loss of time trying to find spare parts, emergency purchases, excess stocking and hence excess costs. Depending how bad you currently are, there is a potential for significant savings. RAMsoft have been conducting workshops to help companies optimise and reduce their inventory for several years. RAMsoft have developed several tools to support reductions in inventory. • MRO-Strip, a tool to identify duplicate line items, most companies have between 10-15% duplicates • MRO-OPT, a tool to optimise stock levels and to show % cost savings • MRO-BOM, a tool to support BOM building • MRO-Auditor, for conducting MRO Spare Parts Master Data Audits very effectively • MRO-CleanIT, to cleanse the spare part master data with standardised part descriptions and part numbers RAMsoft have also developed an inventory reduction process based on the following 6 phases: Audit Define Process & Guides Cleanse Rationalise Optimise Measure Effectiveness Is Your MRO Spare Parts Improvement Programme ISO55000 Compliant? Maintenance, Reliability & MRO Spare Parts Specialists
  • 2. Phase 1 Auditing The first step for any inventory improvement programme is an understanding of the company’s issues. The scope of an inventory management audit can cover the following areas: • MRO Best Practices (a structured questionnaire is used to evaluate best practices in managing spare parts effectively) • MRO Written Procedures and Guides (the documents required for each phase of an item’s life) • Master Data Review (short description formats, nouns and modifiers, Mfg. & Vendor P/Ns, Vendor and Mfg. names, review of duplicates) • Inventory replenishment control parameters (an evaluation of current ROP, OQ, Min-Max, etc) In this document, we will mainly discuss activities related to spare parts master data. A company’s downloaded inventory data is mapped and imported to our MRO-Auditor tool. MRO- Auditor contains over 200 saved filters and queries to facilitate the master data review by noun, etc. A report is issued detailing the findings good and bad - remember poor cataloguing represents potential savings. Typical findings from our audits are: • Short descriptions have inconsistent formatting • Qualifiers or Modifiers are not identified • Vendors’ names included in the short description • Lack of attribute data in the short description, and inconsistent sequencing • MPNs have inconsistent formatting • MPNs fields are a mix of Vendors and MPNs • 10-15% duplicate line items • Inconsistent abbreviations used • Abbreviations are not used when they should be • Multiple suppliers for the similar material Comments on poor cataloguing will be supported by screen shots from the MRO-Auditor tool, a typical example is: The above is an example of the poor cleansing delivered by a consultant. RAMsoft do not guarantee to find all types of inconsistencies, but the most common. Only during master data cleansing will all issues be identified. Phase 2 Procedures and Guides ISO55000 states that a high level strategic plan (known as a SAMP) needs to be developed. The structure of the SAMP varies between consultants and the various maintenance associations, this is because the ISO55000 is not prescriptive. The SAMP developed by Ramsoft, includes two elements relative to MRO Spare Parts: • Initial MRO Spare Parts Planning (Project phase) • MRO Spare Parts Management (Ownership phase)
  • 3. The main reason for poor cataloguing, is that the cataloguing process is not documented in the project phase, which includes CMMS population. Even when a so called consultant has carried out the cataloguing or the cleansing the final quality is poor. Unless you document all the rules and build criteria the cataloguing will not achieve a high quality. Remember under ISO55000 you must demonstrate the management of data and that means how the data is populated in the CMMS consistently During the data cleansing phase, RAMsoft can prepare documentation that supports consistent cataloguing in the future. Documentation can include: • Guides and rules used during the cleansing • A list of all abbreviations • Type guides to cover the type of spares stocked and the naming convention The screen shot below, shows a typical Type Guide for Shaft Bushes. Phase 3 Cleansing Master Data The scope of cleansing will vary from company to company and will be CMMS dependant. For example, Maximo users typically describe their spare parts using up to 75 characters, while SAP users are limited to 40 characters. This means a SAP user must use many more abbreviations to describe a spare part. RAMsoft using their MRO-CleanIT tool can clean up your master data. Using standardised descriptions, a) located in a look up table when matched to a MPN and b) a table containing template descriptions, when that MPN is not an exact match. One of the reasons for duplicate stock is manufacturers & vendors use different naming conventions, e.g. see for stainless steel A2, 304, SS, they could be all the same but used in MPN then you would not be able to identify these. Therefore Phase 2 is essential, you must clearly identify your naming conventions. Benefits of cleansed master data are the identification of potential duplicates, ease of finding spares, identification of standardisation and rationalisation opportunities and hence inventory reduction. The following example shows the current part description and the cleansed description.
  • 4. Phase 4 Rationalisation Rationalisation is about reviewing your material and seeking inventory or cost reduction opportunities Companies who have proceeded to the cleansing and rationalisation phases have achieved up to 60-70 % reduction in line items (for some material) by: • Standardising part descriptions and MPNs • Removing duplicates • Standardising on the material specification • Reducing the number of manufacturers • Removing stock that is not fit for purpose (wrong specification) The screen shot below shows that this company stocked 23 different manufacturers of bearings. Rationalisation covers many of the 30 tactics, we cover in our 3 day workshop, including: • Classifying the criticality of each spare • Assigning classifications for ABC, HML, XYZ and demand classes • Identifying OPMs and APMs • Reducing stocking locations • Conducting RCA for A items • Conducting Spend Analysis • Challenge stocking of slow movers • Etc. Further cost savings may be possible by proceeding to Phase 5 MRO Optimisation Phase 5 Optimisation Optimisation supports ISO55000 by making decisions based on risk, we set a Stock-out risk for each spare part based on the item’s criticality. Opportunities for reducing inventory are identified by determining the optimum ROP and OQ and then the most appropriate replenishment strategy. Optimum ROPs are determined by: • Assigning a service level to each spare part based on its criticality • Identifying the true lead time (company plus supplier)
  • 5. • Determining the average demand rate RAMsoft propose three main replenishment strategies: • ROP a fixed ROP and OQ • Min-Max, a variable OQ to bring the stock level to a maximum • Constant Vendor Delivery, based on JIT concepts Costs savings are identified by looking for potential cost savings. Prioritisation is based on differential financial value between the current average stock level and optimum average stock level. The case study below is an example, where the optimum values are not appropriate, the options are then to a) increase one or more control parameters, so that they are not the optimum values or b) move to a different replenishment strategy. In this example a) was the best option. The Author David Thompson holds a B.Sc. (Hons) in Mechanical Engineering and has spent his entire career over 50 years in maintenance, reliability and spare parts management. David has been a certified trainer in both Reliability and RCA for leading USA companies. David has worked in many industries Steel, Mining, Utilities, General Manufacturing, Food & Beverage, and Oil & Gas and worked in over 36 countries David has conducted over 40 workshops on MRO Optimisation and Inventory Reduction including CMMS data builds. He has conducted numerous audits of MRO Master Data and conducted optimum inventory parameter evaluations. David has developed procedures and guides to support effective CMMS inventory build and management. Workshops offered • MRO Spare Parts Optimisation and Inventory Reduction • MRO Spare Parts Master Data Auditing & Cleansing Contact details: David Thompson MRO Spares Parts Consultant/Trainer Ramsoft (UK) Summerseat, Bury, BL0 5QW, Manchester. dave@ramsoftuk.com www.ramsoftuk.com http://uk.linkedin.com/in/davidthompsonreliability Ramsoft (UK). 23 Waterside Road, Summerseat. Bury, Lancs, UK. BL9 5QW