4. PAAS – an investment in silver
ü 2nd largest primary silver producer in the world
ü Portfolio of high-quality assets in the Americas
ü Large reserves: proven and probable of 286 Moz silver (1)
ü Growing, low-cost production profile
ü Significant exploration potential
ü Experienced mine builder and operator
ü Strong balance sheet
Our strategy is focused on extracting value from our portfolio of assets,
improving operating margins and deploying proven expertise to pursue
profitable growth.
4 April 3, 2017(1) Please refer to the Appendix for more detailed information on the Company’s reserves.
9. Progress on cost reductions
9 April 3, 2017
$12.03
$6.29
$22.26
$10.17
$0
$5
$10
$15
$20
$25
2012 2013 2014 2015 2016
Cash Costs AISCSOS
Consolidated Cash Costs per payable ounce of silver, net of by-products (“Cash Costs”)1
Consolidated All-in Sustaining Costs per Silver Ounce Sold (“AISCSOS”)1
(1) Cash Costs and AISCSOS are non-GAAP financial measures; see“Alternative Performance (non-GAAP) Measures” section of the Company’s news release
dated Feb. 14, 2017 for further information.
Main drivers of 2016 cost
reduction:
• Improved productivity ~45%
• FX gains ~30%
• Higher by-product prices ~15%
• Generally lower input costs and
export credits ~10%
10. Financial strength
10 April 3, 2017
At Dec. 31, 2016 USD Millions
Cash and cash equivalents and short-term investments 217.6
Working capital (1) 428.6
Total debt (2) 43.3
Total available liquidity (3) 481.4
(1) Working capital is a non-GAAP measure calculated as current assets less current liabilities. The Company and certain investors
use this information to evaluate whether the Company is able to meet its current obligations using its current assets.
(2) Inclusive of $7.1 million in capital leases.
(3) Includes cash and cash equivalents, short-term investments, and the undrawn portion of the Company’s secured line of credit.
Net income of $101.8 M in
2016 ($0.66 per share) from 2015
14. Capital allocation priorities
14 April 3, 2017
$361
$491
$542
$423
$330
$227 $218
$0
$100
$200
$300
$400
$500
$600
2010 2011 2012 2013 2014 2015 2016
Millions US$
Cash & STI
Financial debt
Cumulative return to shareholders
$387 M in total cumulative cash returned to
shareholders (dividends and share buy-backs)
since 2010 in addition to investing $410 M in
project and expansion capital.
Pan American’s approach to capital management prioritizes investment in projects that generate a
high-rate of return, maintaining a strong balance sheet and returning cash to shareholders.
18. La Colorada expansion (1)
18 April 3, 2017
Highlights
• 69% increase expected in average annual
silver production to 7.7 Moz by 2018
• 137% and 185% increase expected in zinc
and lead production, respectively, by 2018
Project Scope
• New 618-metre deep mine shaft – fully
commissioned in Q3 2016
• New sulphide processing plant – began
operating Q3 2016
• Underground development to open new
production areas – advancing on schedule for
completion in 2017
• New 115kV power line - targeted for
completion in 2017
(1) For additional information, please refer to the Company’s technical report entitled “Technical Report – Preliminary Economic Analysis for the Expansion of the La Colorada Mine, Zacatecas, Mexico”,
with an effective date of Dec. 31, 2013 available at www.SEDAR.com. The results of this preliminary economic assessment are preliminary in nature, in that it includes inferred mineral resources that are
considered too geologically speculative to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the assessment
will be realized. Mineral resources that are not mineral reserves have no demonstrated economic viability.
Original investment of $163.8M, including sustaining
capital. Project expected to be ~5% under budget
19. Organic growth – Dolores expansion
19 April 3, 2017
Underground
reserves
Tonnes
(Mt)
Ag g/t
Ag contained
(Moz)
Au g/t
Au contained
(koz)
Proven 1.1 81 2.8 1.28 44.3
Probable 3.0 58 5.6 1.73 167.2
Proven + Probable 4.1 64 8.4 1.61 211.5
Notes:
1 Mineral reserves were estimated using a price of $18.50 per ounce of silver and $1,300 per ounce of gold.
2 Mineral resource and reserve estimates for Dolores were prepared under the supervision of, or were reviewed by, Christopher Emerson, FAusIMM, and Martin G. Wafforn, P.Eng., as Qualified
Persons as that term is defined in NI 43-101.
20. Dolores expansion (1)
20 April 3, 2017
Highlights
• Increases average production for the first 5
years to:
5.3 Moz for silver (+39% vs 2016)
151 koz for gold (+47% vs 2016)
Project Scope
• New 5,600 tpd pulp agglomeration plant -
scheduled for start-up in mid 2017
• New underground mine - scheduled to
reach 1,500 tpd by end of 2017
• New 115 kV power line - energized in
September 2016
(1) For additional information, please refer to the Company’s technical report entitled “Technical Report for the Dolores Property, Chihuahua, Mexico”, with an effective date of Dec. 31, 2016
available at www.SEDAR.com.
Estimated capital investment ~$132.4 M (incl. power line)
Project on time and on budget
22. Exploration and production growth
22 April 3, 2017
• 2017 exploration budget of US$21M, up 45% from 2016
• Solid performance on replacing 2016 production with new silver reserves
• La Colorada continues to deliver both new reserves and extension to mine life
• High potential at Peru operations; near site and greenfield exploration
• La Negra (Kootenay Silver Inc.) and Joaquin bring advanced silver exploration
projects into the pipeline with excellent regional exploration potential
• 100% owner of Navidad, one of the largest undeveloped silver deposits in the
world:
Navidad Silver Resources (1) Contained Ag
(Moz)
Tonnes
(Mt)
Ag (g/t)
Measured (contained Moz) 67.8 15.4 137
Indicated (contained Moz) 564.5 139.8 126
Inferred (contained Moz) 119.4 45.9 81
(1) Estimated using a price of $12.52/oz of silver
24. Joaquin Project (Argentina)
24 April 3, 2017
• Pan American acquired 100% of
Coeur Mining’s Joaquin project:
• US$25M (US$15M cash and US$10M in
PAAS shares) plus a 2% NSR
• Synergies with Pan American’s
Manantial Espejo operation
• Processing capacity available at
Manantial Espejo plant
• Joaquin within trucking distance
• Potential for further exploration
success
Joaquin is located about 145 km from our
Manantial Espejo mine
Adding high-grade satellite deposits to realize further value at Manantial Espejo
For more information see the press release dated Jan. 17, 2017
25. Strategic initiatives to surface value
Maverix (1)
• Pan American realized value for assets hidden within its portfolio through sale to Maverix
Metals Inc. (royalties, precious metals streams)
• Provides additional leverage to gold and silver prices
• Maverix successful in attracting new growth prospects, such as recent acquisition of
additional royalties from Gold Fields Netherlands Services BV
• Maverix has a market cap of about CAD $187M and is up 100% since the acquisition of
Pan American assets closed (2)
• As at Dec. 31, 2016, Pan American held approximately 40% of Maverix (43% fully-diluted)
Milpo Shalipayco Joint Venture
• Pan American sold 75% of its shares in Compania Minera Shalipayco SAC to Votorantim
Metais – Cajamarquilla SA for US$15M cash and 1% Net Smelter Return (sold to Maverix)
• Pan American receives free carry of its remaining 25% interest to commercial production in
this large zinc development project located in Peru
25 April 3, 2017
(1) See press releases dated July 11, 2016 and Dec. 27, 2016, available at www.sedar.com
(2) Based on Maverix (MMX) opening price on TSX-V on July 12, 2016 of CAD $0.70/share compared to closing price on Feb. 17, 2017 of CAD $1.41/share
26. Why invest in PAAS now
26 April 3, 2017
1. Strong leverage to silver prices – a commodity with demand for
industrial uses and as a “safe-haven” investment
2. Low-cost silver producer with growing production over the next 3 years
3. Advanced exploration project pipeline – La Negra, Joaquin
4. Increasing free cash flow potential following completion of expansions at
La Colorada and Dolores
5. Optionality of Navidad, one of the world’s largest silver deposits
28. Company overview
• Listings: NASDAQ (PAAS) and TSX (PAAS)
• Market cap: US$2.7 B(1)
• Shares outstanding: approx. 152.3 M
• Average daily volume shares traded: 2.0 M(1)
• Dividends since 2010 - Current yield 0.6%(2)
28 April 3, 2017
52%
46%
2%
Ownership (3)
Reported Institutional Implied retail Insiders
All data as of close March 22, 2017
(1) Based on Nasdaq exchange
(2) Based on closing share price at March 22, 2017 and dividend declared Feb. 14, 2017, annualized
(3) Source: IPREO
32. Views on the silver market (1)
• Real interest rates in the U.S. likely to remain low in 2017, despite expected monetary tightening
• US GDP growth constrained by high government debt, limiting government’s scope for new round of
fiscal stimulus
• Europe’s banking sector remains vulnerable
• Inflationary pressures are starting to build
• Industrial demand represents just under half of the total demand for silver
• Growing demand through the use of technology, electronics and renewable sources of power
• Silver demand from the photovoltaics industry now represents 14% of silver’s industrial demand,
up from only 1% a decade ago.
• Emerging market economies, especially in China, are stabilizing, lifting industrial commodity
demand
• Little to no growth in silver supply because many exploration companies have not been investing in
exploration and new projects
• Silver supply deficit expected in 2017
32 April 3, 2017
(1) Sources include: Bloomberg Metals Focus December, 2016 and GFMS, Thomson Reuters / The Silver Institute 2016
Factors support continued demand for silver for both industrial applications and
as a safe-haven asset.
33. Q4 and FY 2016 Operating Results
Consolidated Q4 2016 FY 2016
Silver production (million ounces) 6.3 25.4
Gold production (thousand ounces) 43.9 183.9
Zinc production (thousand tonnes) 13.2 51.9
Lead production (thousand tonnes) 5.5 20.2
Copper production (thousand tonnes) 3.1 14.4
Cash Costs(1) ($/ounce) 6.66 6.29
All-in Sustaining Costs per Silver
Ounce Sold (AISCSOS) (1) 10.38 10.17
33 April 3, 2017
(1) Cash Costs and AISCSOS are non-GAAP measures; please refer to the “Alternative Performance (non-GAAP) Measures" section of Pan American’s
press release dated Feb. 14, 2017 for more information.
Average by-product metal prices for Q4 2016 were: Au $1,222/oz, Zn $2,517/tonne, Pb $2,149/tonne, and Cu $5,277/tonne. Average by-product
metal prices for 2016 were: Au $1,251/oz, Zn $2,095/tonne, Pb $1,872/tonne, and Cu $4,860/tonne. Cash Costs is a non-GAAP measure; please refer
to the “Alternative Performance (non-GAAP) Measures" section of Pan American’s press release dated Feb. 14, 2017 for more information.
34. 2016 operating results by mine
Mine
Silver Production
(million ounces)
Gold Production
(thousand ounces)
Cash Costs
($/ounce)(1)
La Colorada 5.80 2.93 6.15
Dolores 3.84 102.76 -1.08
Alamo Dorado 1.86 8.38 16.02
Huaron 3.81 0.81 5.79
Morococha (92.3%)(2) 2.54 2.14 4.21
San Vicente (95%)(2) 4.43 n/a 11.95
Manantial Espejo 3.14 66.89 4.28
Total(3) 25.42 183.92 6.29
34 April 3, 2017
(1) Cash Costs is a non-GAAP measure; please refer to the “Alternative Performance (non-GAAP) Measures" section of Pan American’s press release dated
Feb. 14, 2017 for more information.
(2) Represents the Company’s partial ownership interest.
(3) Totals may not add up due to rounding.
35. 2017 Guidance by mine
Mine
Silver Production
(million ounces)
Gold Production
(thousand ounces)
Cash Costs
($/ounce)(1)
La Colorada 6.4 - 6.9 3.3 - 3.5 3.35 - 3.95
Dolores 4.0 - 4.5 109.1 - 115.0 1.25 - 2.25
Alamo Dorado 0.3 1.4 - 1.5 18.00 - 20.00
Huaron 3.7 - 3.8 0.3 - 0.4 5.95 - 6.95
Morococha (92.3%)(2) 2.5 - 2.6 2.9 - 3.1 3.15 - 4.15
San Vicente (95%)(2) 4.4 - 4.5 0.5 - 0.6 10.90 - 11.90
Manantial Espejo 3.3 - 3.4 37.5 - 41.0 15.35 - 16.25
Total(3) 24.5 - 26.0 155.0 - 165.0 6.45 - 7.45
35 April 3, 2017
(1) Cash Costs is a non-GAAP measure; please refer to the “Alternative Performance (non-GAAP) Measures" section of Pan American’s press
release dated Feb. 14, 2017 for more information.
(2) Reflects Pan American’s ownership in the operation.
(3) Totals may not add up due to rounding.
36. Three-year outlook
Consolidated 2017 Guidance 2018 Outlook 2019 Outlook
Silver production (million ounces) 24.5 – 26.0 26.0 - 28.0 26.5 – 29.5
Gold production (thousand ounces) 155 - 165 170 - 185 175 - 200
Zinc production (thousand tonnes) 56.5 - 58.5 59.0 - 63.0 55.0 - 65.0
Lead production (thousand tonnes) 19.0 - 20.0 23.0 - 26.0 23.0 - 27.0
Copper production (thousand tonnes) 8.75 - 9.25 6.00 - 8.00 4.00 - 4.20
Cash Costs(1)($/ounce) 6.45 - 7.45 5.60 - 7.10 5.20 – 6.80
Sustaining capital ($ millions) 82 - 88 75 - 85 75 - 90
Project Capital ($ millions) (2) 58 - 62 - -
AISCSOS(1) ($/ounce) 11.50 - 12.90 10.00 - 12.20 9.30 - 11.60
36 April 3, 2017
(1) Cash Costs and AISCSOS are non-GAAP measures; please refer to the “Alternative Performance (non-GAAP) Measures" section of Pan American’s
press release dated Feb. 14, 2017 for more information.
(2) Project capital relates to the current mine expansions at La Colorada and Dolores; 2017 is expected to be the final year of project capital related to
these expansions.
37. Pan American Silver Proven and Probable
Reserves at December 31, 2016 (1) (2)
Property Location Category Tonnes
(Mt)
Ag
g/t
Contained
Ag (Moz)
Au
g/t
Contained
Au (000’s oz)
Cu
%
Pb
%
Zn
%
Huaron Peru Proven 5.7 169 30.8 N/A 0.37 1.46 3.02
Probable 3.8 167 20.6 N/A 0.38 1.62 3.10
Morococha (92.3%) (3) Peru Proven 2.6 173 14.6 N/A 0.58 1.18 3.78
Probable 2.2 181 12.8 N/A 0.44 1.64 4.21
La Colorada Mexico Proven 3.7 432 51.3 0.33 39.1 1.72 3.08
Probable 4.0 362 46.8 0.32 41.2 1.24 2.06
Dolores Mexico Proven 41.6 27 36.1 0.77 1,034.9
Probable 22.5 25 17.9 0.65 472.4
La Bolsa Mexico Proven 9.5 10 3.1 0.67 203.0
Probable 6.2 7 1.4 0.57 113.1
Manantial Espejo Argentina Proven 2.2 111 8.0 1.17 84.4
Probable 0.5 244 3.8 3.32 52.2
San Vicente (95%) (3) Bolivia Proven 2.0 464 29.4 N/A 0.46 0.39 3.00
Probable 0.5 531 9.2 N/A 0.56 0.45 2.52
Total (4) Proven +
Probable
107.0 83 285.8 0.70 2,040.3 0.43 1.36 3.06
37 April 3, 2017
(1) Prices used to estimate mineral reserves for 2016 were $18.50 per ounce of silver, $1,300 per ounce of gold, $2,200 per tonne of zinc, $2,000 per tonne of
lead, and $5,000 per tonne of copper, except at Manantial Espejo where $17.00 per ounce of silver and $1,200 per ounce of gold were used for planned
2017 production, reverting to $18.50 per ounce of silver and $1,300 per ounce of gold thereafter. Metal prices used for La Bolsa were $14.00 per ounce of
silver and $825 per ounce of gold.
(2) Mineral reserve estimates were prepared under the supervision of, or were reviewed by, Christopher Emerson, FAusIMM, Vice President Business
Development and Geology and Martin G. Wafforn, P.Eng., Senior Vice President Technical Services and Process Optimization, each of whom are Qualified
Persons as that term is defined in National Instrument 43-101 (“NI 43-101).
(3) This information represents the portion of mineral reserves attributable to Pan American based on its ownership interest in the operating entity as indicated.
(4) Totals may not add up due to rounding.
38. 38
All Pan American Silver Measured and Indicated Resources (1)(2)
Property Location Category Tonnes (Mt) Ag g/t Au g/t Zn% Pb% Cu%
Huaron Peru Measured 2.2 165 2.93 1.57 0.27
Indicated 1.7 164 2.99 1.56 0.33
Morococha (92.3%)(3) Peru Measured 0.4 161 3.31 1.09 0.25
Indicated 1.1 127 3.26 0.93 0.56
La Colorada Mexico Measured 0.5 206 0.31 0.85 0.45
Indicated 2.0 200 0.18 0.63 0.39
Dolores Mexico Measured 1.9 13 0.22
Indicated 3.2 24 0.43
La Bolsa Mexico Measured 1.4 11 0.90
Indicated 4.5 9 0.50
Manantial Espejo Argentina Measured 0.1 125 1.65
Indicated 0.4 207 2.04
San Vicente (95%)(3) Bolivia Measured 0.8 202 2.45 0.14 0.30
Indicated 0.1 194 2.30 0.17 0.33
Navidad Argentina Measured 15.4 137 1.44 0.10
Indicated 139.8 126 0.79 0.04
Pico Machay Argentina Measured 4.7 0.91
Indicated 5.9 0.67
Calcatreu Argentina Measured
Indicated 8.0 26 2.63
Total (4) Measured +
Indicated
194.0 118 1.11 2.32 0.86 0.06
Notes:
(1) Prices used to estimate mineral resources for 2016 were $18.50 per ounce of silver, $1,300 per ounce of gold, $2,200 per tonne of zinc, $2,000 per tonne of lead, and
$5,000 per tonne of copper, except at Dolores and Manantial Espejo, where $25.00 per ounce of silver and $1,400 per ounce of gold were used. Metal prices used for La
Bolsa were $14.00 per ounce of silver and $825 per ounce of gold. Metal prices for Navidad were $12.52 per ounce of silver and $1,100 per tonne of lead. Metal prices
used for Calcatreu were $12.50 per ounce of silver and $650 per ounce of gold.
(2) Mineral resource estimates were prepared under the supervision of, or were reviewed by, Christopher Emerson, FAusIMM, Vice President Business Development and
Geology and Martin G. Wafforn, P.Eng., Senior Vice President Technical Services and Process Optimization, each of whom are Qualified Persons as that term is defined in
National Instrument 43-101 (“NI 43-101).
(3) This information represents the portion of mineral resources attributable to Pan American based on its ownership interest in the operating entity as indicated.
(4) Totals may not add up due to rounding.
39. All Pan American Silver Inferred Resources(1)(2)
39
Property Location Category Tonnes (Mt) Ag g/t Au g/t Zn% Pb% Cu%
Huaron Peru Inferred 6.2 164 2.81 1.56 0.34
Morococha (92.3%)(3) Peru Inferred 3.9 214 3.58 1.30 0.29
La Colorada Mexico Inferred 1.8 313 0.35 4.58 2.65
Dolores Mexico Inferred 1.7 37 1.01
La Bolsa Mexico Inferred 13.7 8 0.51
Manantial Espejo Argentina Inferred 0.5 211 2.60
San Vicente (95%)(3) Bolivia Inferred 2.8 330 2.42 0.33 0.28
Navidad Argentina Inferred 45.9 81 0.57 0.02
Pico Machay Argentina Inferred 23.9 0.58
Calcatreu Argentina Inferred 3.4 17 2.06
Total (4) Inferred 103.7 92 0.70 2.83 0.77 0.08
Notes:
(1) Prices used to estimate mineral resources for 2016 were $18.50 per ounce of silver, $1,300 per ounce of gold, $2,000 per tonne of lead, $2,200 per tonne of zinc, and
$5,000 per tonne of copper, except at Dolores and Manantial Espejo, where $25.00 per ounce of silver and $1,400 per ounce of gold were used. Metal prices used for La
Bolsa were $14.00 per ounce of silver and $825 per ounce of gold. Metal prices for Navidad were $12.52 per ounce of silver and $1,100 per tonne of lead. Metal prices
used for Calcatreu were $12.50 per ounce of silver and $650 per ounce of gold.
(2) Mineral resource estimates were prepared under the supervision of, or were reviewed by, Christopher Emerson, FAusIMM, Vice President Business Development and
Geology and Martin G. Wafforn, P.Eng., Senior Vice President Technical Services and Process Optimization, each of whom are Qualified Persons as that term is defined in
National Instrument 43-101 (“NI 43-101).
(3) This information represents the portion of mineral resources attributable to Pan American based on its ownership interest in the operating entity as indicated.
(4) Totals may not add up due to rounding.