COVER/TITLE PAGE
Table of Contents
I. Integrated Project 1: Developing Your Project Plan
20 points
a. Background ( who, what, when and How) of your company
4
b. Current Process (what do they do overall and how)
4
c. Overview of the Project
i. Objectives
1a. provide construction blueprint to customer.
1b. decrease delivery time on all raw materials from 10 days
1c. reduce amount of rework from inspections.
1d. Decrease cost overruns
4
ii. General Approach (Technical and managerial)
4
iii. Constraints (what could prevent the project from been
completed: time, money, government tags etc)
4
II. Integrated Project 2: Developing the Work Breakdown
Structure
50 points
a. Work Breakdown Outline (do not include the scheduling
views)
30
b. Responsibility Matrix (explanation necessary!) & Personnel
20
III. Integrated Project 3: Project Risk Assessment
50 points
a. Risk Analysis*
20
b. Risk Matrices (available @ www.mhhe.com/graylarson4e)
30
*: All values selected must be explained; risks should be cited
to sources if possible—Internet sites acceptable for this
research)
IV. Integrated Project
100 points
a. Project Schedule (shows beginning and end dates)
30
b. Activity Precedence Diagram (Gantt)
20
c. Activity Duration Table
10
d. Milestones (you determine w/explanation)
15
e. Discussion of Critical Path w/ Visual Supporting
Documentation (Network and/or tracking Gantt)
25
V. Integrated Project
45 points
a. Resource Allocation
20
b. Resolved Resource Conflicts*
25
*: explanation required
VI Integrated Project: Developing the Cost Estimates & Budget
20 points
a. Budget Analysis
15
b. Time-Phased Budget
c. Earned value Analysis
5
VII Conclusion (states what you have determined; remember
that goal of any project is on-time and within budget; you might
want to go back to Section I to see whether your constraints
were met or exceeded
15 points
WORK BREAKDOWN STRUCTURE (WBS)
PART 1
Company Background
Tell the story (who, what, when, where, how) of the company or
organization for which this project is being done.
· Who founded this company? Who are its leaders?
· What does this company make or do? What is its target
market? What is its financial performance?
· When was the company founded? Where was/is it located?
· How does the company operate? How effective is the company
in its industry? How are its competitors placed in the market?
If using a company website, be sure to cite the source!
Current Process
What is the current process or existing scenario for
accomplishing the company’s goals? In other words, how does
the company conduct business? If, for example, it is a
construction business building new homes, what would be the
process that encompasses the company’s procedure from
advertising through getting customers, doing the project and
closing out the project deliverable. This current process might
be something like:
1) Receive customer specifications
2) Design preliminary floor plan and elevation
3) Send preliminary documents to customer
4) Receive and execute customer changes
5) Create bid for customer contract
6) Run bid through technical and legal departments
7) Ship bid to customer
8) Follow up with customer
9) Negotiate details of bid acceptance
10) Build the negotiated architectural design
11) Oversee construction budget
12) Deliver agreed upon product to customer
13) Receive payment
14) Close out project using lessons learned approach
Your project must fit within the framework of the company’s
business. In other words, if the company builds single family
residences, your project would not be for an office building. It
must be related to a specific type of single family
home/townhouse.
Project Overview
The project overview is a report on the project undertaking and
a discussion of the general situation management finds itself in.
This provides important context for the project management
team to use in determining methods, approaches, and
timeframes, as well as a scope.
For example, if building a new home, you should state whether
it will have one or two stories, three or four bedrooms, and any
other rooms that are to be included. There may be important
details regarding the lot, area of town, and other issues such as
landscaping. Be as detailed as possible, since this will assist the
instructor in understanding and ultimately approving your
project based on his/her belief that you have a viable project
topic for a team of 3-4 persons. Objectives
Objectives describe concrete outcomes that a project will meet
so as to be deemed a success. Goals need to be described as
specifically as necessary-but no more specifically than that. The
purpose is not to artificially constrain the project but to limit
the project to as wide a range of acceptable outcomes as
possible. Targets are measurements of how well the goals were
met. For example:
Goals
Targets
1) Provide construction blueprints to customer
Excellent = < 4 days
Good = < 1 week
Acceptable = < 2 weeks
2) Decrease delivery time on all raw materials from 10 days
Excellent = -40%
Good = -30%
Acceptable = -15%
3) Reduce amount of rework from inspections
Excellent = -80%
Good = -65%
Acceptable = -50%
5) Decrease cost overruns
Excellent = -40%
Good = -30%
Acceptable = -15%
General Approach
What will be the general project approach taken, in terms of
managerial and technical changes, to create these changes
through the project? For example:
Managerial approach – These items relate to how the managers
will plan, organize, direct and control the project resources
toward the targeted outcome.
Technical approach – These items relate to the procedural
aspects needed, including logistics of moving equipment to and
from the site, designing the blueprints to meet customer
expectations, utilizing computers, etc. Constraints
Describe the things that will limit the project. For example:
1) Budget constraints—This project will increase profitability
by perhaps 30%, but therefore should not cost in excess of three
times this savings to ensure that its payback period is relatively
short.
2) Time—This project must be completed in the time agreed
upon by builder and customer in the contract terms (proposed to
be 90 days’ time).
3) Customer contracts—The project must not impact operations
for current customers nor fail to meet the customer demands for
this project.
4) Regulatory standards—Rework and shutdowns caused by
inspections that are not up to code will delay and potentially
kill the project. Part 2 – Developing the Work Breakdown
Structure
Develop a work breakdown structure (WBS) for your project
based on the first project assignment. The process is as follows:
1) Create a detailed list of the components of the project,
through work packages, tasks, and subtasks. Use the intended
scope of the project to help you determine all the project
components.
2) Determine the resource needs for the project (i.e., personnel,
facilities, and equipment).
3) Determine the relationships between the project components
and the people. For example, for each component, at least one
person will be responsible for its completion, while others may
be involved as consultants or decision approvers.
Example Work Breakdown StructureAbbreviated Personnel
Table
Name
Department
Title
Joe Evans
Accounting
Bid Manager
Sim Elezar
Projects
Project Manager
Kim Astair
Engineering
Systems Architect
Leo Biel
Operations
Operations Manager
Tara Simmons
Operations
Logistics Manager
NOTE: If you do not have names, you can identify the personnel
by job such as Master Plumber, Journeyman Electrician #3,
etc.Abbreviated Sample Work Breakdown Structure
WBS
1
Improvement Project
Main Project
1.1
Deliverable 1: Bid response time
Deliverable 1
1.1.1
Map current bid process
Work Package
1.1.1.1
Interview bid team
Task
1.1.1.2
List bid steps and process relationships
Task
1.1.2
Conduct value-added process study
Work Package
1.1.2.1
Determine value added by each process step
Task
1.1.2.2
Separate process steps into necessary vs. unnecessary
Task
1.1.3
Reform process to eliminate unnecessary and non-value-
added steps
Work Package
1.1.3.1
Pare down to only necessary and value-added steps
Task
1.1.3.2
Identify ways to improve and shorten remaining steps
Task
1.1.3.3
Create new process map
Task
1.2
Deliverable 2: Increase customer response rate
Deliverable 2
1.2.1
Interview customers
Work Package
1.2.1.1
Create survey
Task
1.2.1.2
Find non-responsive and responsive customers
Task
1.2.1.3
Deliver survey
Task
1.2.2
Analyze removing response rate barriers
Work Package
1.2.2.1
List primary reasons for low response
Task
1.2.2.2
Order reasons for priority/feasibility
Task
1.2.3
Implement new measures
Work Package
1.3
Deliverable 3: Reduce bid complaints and calls
Deliverable 3
1.3.1
Interview customers
Work Package
1.3.1.1
Create survey
Task
1.3.1.2
Find unhappy customers
Task
1.3.1.3
Deliver survey
Task
1.3.2
Analyze resolving complaint root causes
Work Package
1.3.2.1
List primary reasons for bid complaints
Task
1.3.2.2
Order reasons for priority/feasibility
Task
1.3.3
Implement new measures
Work Package
1.4
Deliverable 4: Decrease bid package size and complexity
Deliverable 4
1.4.1
Interview customers
Work Package
1.4.1.1
Create survey
Task
1.4.1.2
Identify customers with bid size complaints
Task
1.4.1.3
Deliver survey
Task
1.4.2
Determine appropriate bid content
Work Package
1.4.3
Implement new bid construction process
Work Package
1.5
Deliverable 5: Increase customer contract sign rate
Deliverable 5
1.5.1
Identify existing market bids
Work Package
1.5.1.1
Benchmark market leaders
Task
1.5.1.2
Analyze price ranges
Task
1.5.1.3
Analyze bid features
Task
1.5.2
Normalize bid features and ranges to market expectations
Work Package
1.5.2.1
Identify target market
Task
1.5.2.2
Match bid creation process to intended market
Task
NOTE: Instead of the diagram above, you can simply copy and
paste your Microsoft project view obtained by inputting all
tasks, indenting as necessary, and inserting the column WBS for
the coding/numbering. The WBS does NOT include any dates,
predecessors or durations. These are aspects of scheduling while
the WBS is simply a breakdown of all aspects of the project
deliverables.
Example Responsibility Matrix
The example above can be modified using letters and/or
numbers instead of the symbols give. You must, however,
explain what it means to be responsible, to support, etc. Also,
given the extensive nature of your real-world project, your list
of work packages (WP) and the personnel involved will be much
more detailed. Instead of the names of people, you may use your
resource job description, such as master plumber, journeyman
electrician, etc. Again, you can copy from your Microsoft
Project’s Gantt chart/input view at the work package/tasks
level. Do not assign resources to the sub-deliverables (those in
bold lettering).Part 3 – Project Risk Assessment
You must analyze all risks that could prevent completion of
your project. To do this:
1) Generate a list of likely risk factors. Use sources to support
that these could be possible risks. Do not simply make up things
you believe to be risks without investigating reliable sources.
Internet websites are fine for your research. Be sure to copy
these and cite them in your analysis.
2) Discuss the risks in terms of likelihood and impact. Again, to
do this find sources for support. In other words, if doing a
construction project in Houston in August, and you indicate the
risk of a hurricane then what is the likelihood of a hurricane
hitting the Houston area in that month?
3) Develop strategies for handling (or accepting) these risks.
The above risk analyses will require the following two matrices
with explanations..
First: Risk Assessment matrix requires the research identified in
item 1) above. When you determine a number on the scale of 1
to 5 for likelihood, impact and detection difficulty, you should
refer to a designated scale that you determined . For example, 1
might mean 20% or less, 2 might be 21-40%; 3 might be 41-
60%, etc. or 1 might be defined qualitatively as Very Unlikely;
2 as Unlikely; 3 as Somewhat likely, etc. Whatever scale you
use should reflect the research that you conducted. You may
not be able to find as much on Impact and Detection Difficulty
in the literature but, again, define your scale to define your
terms and number scores.
Risk
Likelihood
Impact
Detection Difficulty
When
Major injury requiring immediate medical attention
3 (state here the % of major injuries in construction)
3 (may indicate a short work crew for duration)
1 (easily observed that worker is severely bleeding or in shock)
During the project
Hurricane hitting the Gulf Coast
1 (this will depend upon your project’s start and end dates, I’ve
assumed we are working in November)
5 (must shut down and evacuate the site including all equipment
and loose objects)
3 (weather reports can be followed but often off as to exact
location hit)
During the exterior deliverable
Second: Contingency Matrix clearly indicating the risk and
action taken. Be very clear in identifying your Trigger. The
trigger is that which causes you to put an action into place. The
trigger for a hurricane would be different depending upon the
close proximity of the storm. If the hurricane is 2 days out, you
could mitigate damage by actions to secure the site. If the
hurricane suddenly changed course and you are now in danger
of a direct hit, you may have to accept the risk and get people
off site quickly. If it is possible, you could avoid the hurricane
damage by not building in the Gulf Coast area in August. So,
the trigger involves when you see this risk happening.
Risk
Response
Trigger (what is observed)
Contingency Plan
Who responsible
Major injury requiring immediate medical attention
Transfer
Worker has cut hand badly and is bleeding profusely from wrist
Contact ambulance service to take him to hospital
Site supervisor
Hurricane hitting the Gulf Coast
Mitigate
Weather report indicates your site is in direct path of storm due
in 48 hours
Batten down the site; move equipment and personnel to safe
location
Project manager
Overall, be very clear in your analysis throughout these two
matrices and graph. Be sure you research and explain with
Works Cited evident! Part 4 – Developing the Project
ScheduleBefore you start your input, you need to specify the
holidays/non-working days in your project. You must also
specify the working times for the project. Default is Monday-
Friday from 8-12 and 1-5. In construction, for example, this
may not make sense. You can set different working days for a
specific resource once that resource is entered in Part 5. You
can also, set different working times for any resource or group
of resources once they are entered. For this section, state your
working times and add predecessors and durations for each
activity (not sub-deliverables!) in your WBS from Part 2.
Everything is not “1 day”! And if something is one day, be sure
to remove the default “?” from that duration entry. You can
change your project start date using Project tab and you can
change the default from days. If something takes only a couple
of hours, then type in “2 hrs” and MS Project will convert this
into fractions of a day (if that “days” is your project default).
The scheduling output includes the Gantt Chart view clearly
showing durations, times and beginning/ending dates with the
Gantt chart, the network diagram (or Tracking Gantt), and a
statement of the critical path. Remember that if you group by
critical, you get a list of the critical activities but these may be
on multiple paths. You MUST check your network and/or
tracking Gantt to identify the critical path(s)! Also, a critical
path is a statement of the activities, not the line numbers or an
alphabetic identifier.Part 5 – Managing Your Project’s
Resources
Now, that you have a schedule and ideal project duration, you
must add your resources to each activity. (See Part 6 below for
Resource Sheet view). Overallocated resources will be
identified in the Gantt chart view as well as in other views;
again see Part 6 below. You must resolve any overallocations.
Your resource-leveling procedure should be consistent to
utilizing your resources identified. The key to this is
maximizing the use of project resources while minimally
disrupting your project schedule from Part 4. It may be
necessary to use several iterations. Thus, you must consider
first that the project is time constrained and level within slack.
Identify any resources now no longer overallocated.
If you cannot resolve all overallocations, then level outside of
slack, assuming that your project is resource constrained.
Identify changes made.
Lastly, if neither approach works, rethink your resource usage
by Maximum Units and/or allocations to activities.
Your project section should identify what you did and why. It
must show your revised schedule including your new Gantt
chart view, etc. In particular, there is a Report of Who Does
What When that will show your resources as not being
overallocated (Task and Resource Views do this as well).Part 6
– Developing the Cost Estimates and Budget
For your project we are concerned only with labor costs in
support of your project narrative and scope statement. Your
budget will roll up from the labor costs entered into the
Resource Sheet. If a person is salaried, you need to compute
the hourly cost for this resource. If you have a flat bid rate, you
can enter this as Cost/Use but it will be easier to level this
resource if again, you calculate the cost per worker.
A crew can be entered in more than one way. You can list as
your resource Architectural Designers (for example) and if there
are 2, your Maximum Units will be 200% (2 people working 40
hours per week). If they are paid at different rates, you can refe r
to each as Designer 1 with his/her rate and Designer 2 with
his/her rate.
Resource Name
Type
Material Label
Initials
Group
Max. Units
Std. Rate
Ovt. Rate
Cost/Use
Accrue At
Base Calendar
Joe
Work
S
100%
$25.00/hr
$40.00/hr
$0.00
Prorated
Standard
Sim
Work
P
100%
$45.00/hr
$60.00/hr
$0.00
Prorated
Standard
Client
Work
C
20%
$0.00/hr
$0.00/hr
$0.00
Prorated
Standard
Lim
Work
S
100%
$10.00/hr
$20.00/hr
$0.00
Prorated
Standard
Leo
Work
P
100%
$25.00/hr
$45.00/hr
$0.00
Prorated
Standard
Tara
Work
E
100%
$20.00/hr
$35.00/hr
$0.00
Prorated
Standard
Kim
Work
E
100%
$20.00/hr
$35.00/hr
$0.00
Prorated
Standard
Conference Room
Material
E
$0.00
$250.00
Start
You should Set Your Baseline (budgeted) cost, Save, and Insert
a Baseline column. Then conduct an earned value analysis using
a status date approximately one month from the schedule you
determined after leveling resources. You can insert Earned
Value columns into your Gantt View and/or use the Earned
Value Report for your analysis.
Actual costs can be entered if you turn off the Option (default)
for Microsoft to automatically calculate costs. Then you can
enter the Actual Costs. If you do not have actual costs, you can
use the % Completed assuming that at the status date, you are
on time. This needs to be explained in your report.Part 7 –
Conclusions
You need to relate your project results to your scope statement,
risk assessment, goals, objectives, etc. This is not a section for
what you learned doing the project in this class. It wraps up
your project by stating clearly what you observed. What
changed from the beginning schedule? If you believe that the
duration is now too long, what changes would you consider?
Overall, what statements regarding this project would you give
to management?

More Related Content

Similar to COVERTITLE PAGE Table of ContentsI. Integrated Projec

Project Proposal (final paperpresentation) last week of class. On.docx
Project Proposal (final paperpresentation) last week of class. On.docxProject Proposal (final paperpresentation) last week of class. On.docx
Project Proposal (final paperpresentation) last week of class. On.docxbfingarjcmc
 
Cmgt 410 ver.13 entire class
Cmgt 410 ver.13 entire classCmgt 410 ver.13 entire class
Cmgt 410 ver.13 entire classLaynevine
 
Assignment Help Moodle Monkey
Assignment Help Moodle Monkey Assignment Help Moodle Monkey
Assignment Help Moodle Monkey ZomakSoluion
 
Lecture 3 Project Management.ppt
Lecture 3 Project Management.pptLecture 3 Project Management.ppt
Lecture 3 Project Management.pptMehediHasan636262
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptxFawadAfridi6
 
PROJECT MANAGEMENT intro - Lecture 01.pptx
PROJECT MANAGEMENT intro - Lecture 01.pptxPROJECT MANAGEMENT intro - Lecture 01.pptx
PROJECT MANAGEMENT intro - Lecture 01.pptxBimsaraRotaract
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project managementprakashnachnani
 
ERP/SAP Project Charter
ERP/SAP Project CharterERP/SAP Project Charter
ERP/SAP Project CharterBogdan Gorka
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUPKeshav Seewraz
 
4 defining scope, quality, responsibility, and activity sequence
4 defining scope, quality, responsibility, and activity sequence4 defining scope, quality, responsibility, and activity sequence
4 defining scope, quality, responsibility, and activity sequenceDaw Juguilon
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectSharad Srivastava
 
Project charter sample
Project charter sampleProject charter sample
Project charter sampleGregory Weiss
 
Project management processes ch3 (1)
Project management processes ch3 (1)Project management processes ch3 (1)
Project management processes ch3 (1)hinasardar2
 

Similar to COVERTITLE PAGE Table of ContentsI. Integrated Projec (20)

Project Proposal (final paperpresentation) last week of class. On.docx
Project Proposal (final paperpresentation) last week of class. On.docxProject Proposal (final paperpresentation) last week of class. On.docx
Project Proposal (final paperpresentation) last week of class. On.docx
 
4 integration
4 integration4 integration
4 integration
 
Intro to PM.ppt
Intro to PM.pptIntro to PM.ppt
Intro to PM.ppt
 
Cmgt 410 ver.13 entire class
Cmgt 410 ver.13 entire classCmgt 410 ver.13 entire class
Cmgt 410 ver.13 entire class
 
Assignment Help Moodle Monkey
Assignment Help Moodle Monkey Assignment Help Moodle Monkey
Assignment Help Moodle Monkey
 
Lecture 3 Project Management.ppt
Lecture 3 Project Management.pptLecture 3 Project Management.ppt
Lecture 3 Project Management.ppt
 
Lec#1
Lec#1Lec#1
Lec#1
 
Project management – standard for today´s modern company
Project management – standard for today´s modern companyProject management – standard for today´s modern company
Project management – standard for today´s modern company
 
PME UNIT-3.pptx
PME UNIT-3.pptxPME UNIT-3.pptx
PME UNIT-3.pptx
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
PROJECT MANAGEMENT intro - Lecture 01.pptx
PROJECT MANAGEMENT intro - Lecture 01.pptxPROJECT MANAGEMENT intro - Lecture 01.pptx
PROJECT MANAGEMENT intro - Lecture 01.pptx
 
Introduction to international project management
Introduction to international project managementIntroduction to international project management
Introduction to international project management
 
ERP/SAP Project Charter
ERP/SAP Project CharterERP/SAP Project Charter
ERP/SAP Project Charter
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUP
 
4 defining scope, quality, responsibility, and activity sequence
4 defining scope, quality, responsibility, and activity sequence4 defining scope, quality, responsibility, and activity sequence
4 defining scope, quality, responsibility, and activity sequence
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics Project
 
Project charter sample
Project charter sampleProject charter sample
Project charter sample
 
Project management processes ch3 (1)
Project management processes ch3 (1)Project management processes ch3 (1)
Project management processes ch3 (1)
 

More from CruzIbarra161

Business and Government Relations  Please respond to the following.docx
Business and Government Relations  Please respond to the following.docxBusiness and Government Relations  Please respond to the following.docx
Business and Government Relations  Please respond to the following.docxCruzIbarra161
 
Business Continuity Planning Explain how components of the busine.docx
Business Continuity Planning Explain how components of the busine.docxBusiness Continuity Planning Explain how components of the busine.docx
Business Continuity Planning Explain how components of the busine.docxCruzIbarra161
 
business and its environment Discuss the genesis, contributing fac.docx
business and its environment Discuss the genesis, contributing fac.docxbusiness and its environment Discuss the genesis, contributing fac.docx
business and its environment Discuss the genesis, contributing fac.docxCruzIbarra161
 
business and its environment Discuss the genesis, contributing facto.docx
business and its environment Discuss the genesis, contributing facto.docxbusiness and its environment Discuss the genesis, contributing facto.docx
business and its environment Discuss the genesis, contributing facto.docxCruzIbarra161
 
Business BUS 210 research outline1.Cover page 2.Table .docx
Business BUS 210 research outline1.Cover page 2.Table .docxBusiness BUS 210 research outline1.Cover page 2.Table .docx
Business BUS 210 research outline1.Cover page 2.Table .docxCruzIbarra161
 
BUS 439 International Human Resource ManagementInstructor Steven .docx
BUS 439 International Human Resource ManagementInstructor Steven .docxBUS 439 International Human Resource ManagementInstructor Steven .docx
BUS 439 International Human Resource ManagementInstructor Steven .docxCruzIbarra161
 
BUS 439 International Human Resource ManagementEmployee Value Pr.docx
BUS 439 International Human Resource ManagementEmployee Value Pr.docxBUS 439 International Human Resource ManagementEmployee Value Pr.docx
BUS 439 International Human Resource ManagementEmployee Value Pr.docxCruzIbarra161
 
Bullzeye is a discount retailer offering a wide range of products,.docx
Bullzeye is a discount retailer offering a wide range of products,.docxBullzeye is a discount retailer offering a wide range of products,.docx
Bullzeye is a discount retailer offering a wide range of products,.docxCruzIbarra161
 
Building on the work that you prepared for Milestones One through Th.docx
Building on the work that you prepared for Milestones One through Th.docxBuilding on the work that you prepared for Milestones One through Th.docx
Building on the work that you prepared for Milestones One through Th.docxCruzIbarra161
 
Budget Legislation Once the budget has been prepared by the vari.docx
Budget Legislation Once the budget has been prepared by the vari.docxBudget Legislation Once the budget has been prepared by the vari.docx
Budget Legislation Once the budget has been prepared by the vari.docxCruzIbarra161
 
Browsing the podcasts on iTunes or YouTube, listen to a few of Gramm.docx
Browsing the podcasts on iTunes or YouTube, listen to a few of Gramm.docxBrowsing the podcasts on iTunes or YouTube, listen to a few of Gramm.docx
Browsing the podcasts on iTunes or YouTube, listen to a few of Gramm.docxCruzIbarra161
 
Brown Primary Care Dental clinics Oral Health Initiative p.docx
Brown Primary Care Dental clinics Oral Health Initiative p.docxBrown Primary Care Dental clinics Oral Health Initiative p.docx
Brown Primary Care Dental clinics Oral Health Initiative p.docxCruzIbarra161
 
BUDDHISMWEEK 3Cosmogony - Origin of the UniverseNature of .docx
BUDDHISMWEEK 3Cosmogony - Origin of the UniverseNature of .docxBUDDHISMWEEK 3Cosmogony - Origin of the UniverseNature of .docx
BUDDHISMWEEK 3Cosmogony - Origin of the UniverseNature of .docxCruzIbarra161
 
Build a binary search tree that holds first names.Create a menu .docx
Build a binary search tree that holds first names.Create a menu .docxBuild a binary search tree that holds first names.Create a menu .docx
Build a binary search tree that holds first names.Create a menu .docxCruzIbarra161
 
Briefly describe the development of the string quartet. How would yo.docx
Briefly describe the development of the string quartet. How would yo.docxBriefly describe the development of the string quartet. How would yo.docx
Briefly describe the development of the string quartet. How would yo.docxCruzIbarra161
 
Briefly describe a time when you were misled by everyday observation.docx
Briefly describe a time when you were misled by everyday observation.docxBriefly describe a time when you were misled by everyday observation.docx
Briefly describe a time when you were misled by everyday observation.docxCruzIbarra161
 
Broadening Your Perspective 8-1The financial statements of Toots.docx
Broadening Your Perspective 8-1The financial statements of Toots.docxBroadening Your Perspective 8-1The financial statements of Toots.docx
Broadening Your Perspective 8-1The financial statements of Toots.docxCruzIbarra161
 
Briefly discuss the differences in the old Minimum Foundation Prog.docx
Briefly discuss the differences in the old Minimum Foundation Prog.docxBriefly discuss the differences in the old Minimum Foundation Prog.docx
Briefly discuss the differences in the old Minimum Foundation Prog.docxCruzIbarra161
 
Briefly compare and contrast EHRs, EMRs, and PHRs. Include the typic.docx
Briefly compare and contrast EHRs, EMRs, and PHRs. Include the typic.docxBriefly compare and contrast EHRs, EMRs, and PHRs. Include the typic.docx
Briefly compare and contrast EHRs, EMRs, and PHRs. Include the typic.docxCruzIbarra161
 
Brief Exercise 9-11Suppose Nike, Inc. reported the followin.docx
Brief Exercise 9-11Suppose Nike, Inc. reported the followin.docxBrief Exercise 9-11Suppose Nike, Inc. reported the followin.docx
Brief Exercise 9-11Suppose Nike, Inc. reported the followin.docxCruzIbarra161
 

More from CruzIbarra161 (20)

Business and Government Relations  Please respond to the following.docx
Business and Government Relations  Please respond to the following.docxBusiness and Government Relations  Please respond to the following.docx
Business and Government Relations  Please respond to the following.docx
 
Business Continuity Planning Explain how components of the busine.docx
Business Continuity Planning Explain how components of the busine.docxBusiness Continuity Planning Explain how components of the busine.docx
Business Continuity Planning Explain how components of the busine.docx
 
business and its environment Discuss the genesis, contributing fac.docx
business and its environment Discuss the genesis, contributing fac.docxbusiness and its environment Discuss the genesis, contributing fac.docx
business and its environment Discuss the genesis, contributing fac.docx
 
business and its environment Discuss the genesis, contributing facto.docx
business and its environment Discuss the genesis, contributing facto.docxbusiness and its environment Discuss the genesis, contributing facto.docx
business and its environment Discuss the genesis, contributing facto.docx
 
Business BUS 210 research outline1.Cover page 2.Table .docx
Business BUS 210 research outline1.Cover page 2.Table .docxBusiness BUS 210 research outline1.Cover page 2.Table .docx
Business BUS 210 research outline1.Cover page 2.Table .docx
 
BUS 439 International Human Resource ManagementInstructor Steven .docx
BUS 439 International Human Resource ManagementInstructor Steven .docxBUS 439 International Human Resource ManagementInstructor Steven .docx
BUS 439 International Human Resource ManagementInstructor Steven .docx
 
BUS 439 International Human Resource ManagementEmployee Value Pr.docx
BUS 439 International Human Resource ManagementEmployee Value Pr.docxBUS 439 International Human Resource ManagementEmployee Value Pr.docx
BUS 439 International Human Resource ManagementEmployee Value Pr.docx
 
Bullzeye is a discount retailer offering a wide range of products,.docx
Bullzeye is a discount retailer offering a wide range of products,.docxBullzeye is a discount retailer offering a wide range of products,.docx
Bullzeye is a discount retailer offering a wide range of products,.docx
 
Building on the work that you prepared for Milestones One through Th.docx
Building on the work that you prepared for Milestones One through Th.docxBuilding on the work that you prepared for Milestones One through Th.docx
Building on the work that you prepared for Milestones One through Th.docx
 
Budget Legislation Once the budget has been prepared by the vari.docx
Budget Legislation Once the budget has been prepared by the vari.docxBudget Legislation Once the budget has been prepared by the vari.docx
Budget Legislation Once the budget has been prepared by the vari.docx
 
Browsing the podcasts on iTunes or YouTube, listen to a few of Gramm.docx
Browsing the podcasts on iTunes or YouTube, listen to a few of Gramm.docxBrowsing the podcasts on iTunes or YouTube, listen to a few of Gramm.docx
Browsing the podcasts on iTunes or YouTube, listen to a few of Gramm.docx
 
Brown Primary Care Dental clinics Oral Health Initiative p.docx
Brown Primary Care Dental clinics Oral Health Initiative p.docxBrown Primary Care Dental clinics Oral Health Initiative p.docx
Brown Primary Care Dental clinics Oral Health Initiative p.docx
 
BUDDHISMWEEK 3Cosmogony - Origin of the UniverseNature of .docx
BUDDHISMWEEK 3Cosmogony - Origin of the UniverseNature of .docxBUDDHISMWEEK 3Cosmogony - Origin of the UniverseNature of .docx
BUDDHISMWEEK 3Cosmogony - Origin of the UniverseNature of .docx
 
Build a binary search tree that holds first names.Create a menu .docx
Build a binary search tree that holds first names.Create a menu .docxBuild a binary search tree that holds first names.Create a menu .docx
Build a binary search tree that holds first names.Create a menu .docx
 
Briefly describe the development of the string quartet. How would yo.docx
Briefly describe the development of the string quartet. How would yo.docxBriefly describe the development of the string quartet. How would yo.docx
Briefly describe the development of the string quartet. How would yo.docx
 
Briefly describe a time when you were misled by everyday observation.docx
Briefly describe a time when you were misled by everyday observation.docxBriefly describe a time when you were misled by everyday observation.docx
Briefly describe a time when you were misled by everyday observation.docx
 
Broadening Your Perspective 8-1The financial statements of Toots.docx
Broadening Your Perspective 8-1The financial statements of Toots.docxBroadening Your Perspective 8-1The financial statements of Toots.docx
Broadening Your Perspective 8-1The financial statements of Toots.docx
 
Briefly discuss the differences in the old Minimum Foundation Prog.docx
Briefly discuss the differences in the old Minimum Foundation Prog.docxBriefly discuss the differences in the old Minimum Foundation Prog.docx
Briefly discuss the differences in the old Minimum Foundation Prog.docx
 
Briefly compare and contrast EHRs, EMRs, and PHRs. Include the typic.docx
Briefly compare and contrast EHRs, EMRs, and PHRs. Include the typic.docxBriefly compare and contrast EHRs, EMRs, and PHRs. Include the typic.docx
Briefly compare and contrast EHRs, EMRs, and PHRs. Include the typic.docx
 
Brief Exercise 9-11Suppose Nike, Inc. reported the followin.docx
Brief Exercise 9-11Suppose Nike, Inc. reported the followin.docxBrief Exercise 9-11Suppose Nike, Inc. reported the followin.docx
Brief Exercise 9-11Suppose Nike, Inc. reported the followin.docx
 

Recently uploaded

Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 

Recently uploaded (20)

Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 

COVERTITLE PAGE Table of ContentsI. Integrated Projec

  • 1. COVER/TITLE PAGE Table of Contents I. Integrated Project 1: Developing Your Project Plan 20 points a. Background ( who, what, when and How) of your company 4 b. Current Process (what do they do overall and how) 4 c. Overview of the Project i. Objectives 1a. provide construction blueprint to customer. 1b. decrease delivery time on all raw materials from 10 days 1c. reduce amount of rework from inspections. 1d. Decrease cost overruns 4 ii. General Approach (Technical and managerial) 4 iii. Constraints (what could prevent the project from been completed: time, money, government tags etc) 4 II. Integrated Project 2: Developing the Work Breakdown Structure 50 points a. Work Breakdown Outline (do not include the scheduling views) 30 b. Responsibility Matrix (explanation necessary!) & Personnel
  • 2. 20 III. Integrated Project 3: Project Risk Assessment 50 points a. Risk Analysis* 20 b. Risk Matrices (available @ www.mhhe.com/graylarson4e) 30 *: All values selected must be explained; risks should be cited to sources if possible—Internet sites acceptable for this research) IV. Integrated Project 100 points a. Project Schedule (shows beginning and end dates) 30 b. Activity Precedence Diagram (Gantt) 20 c. Activity Duration Table 10 d. Milestones (you determine w/explanation) 15 e. Discussion of Critical Path w/ Visual Supporting Documentation (Network and/or tracking Gantt) 25 V. Integrated Project 45 points a. Resource Allocation 20 b. Resolved Resource Conflicts* 25 *: explanation required VI Integrated Project: Developing the Cost Estimates & Budget 20 points
  • 3. a. Budget Analysis 15 b. Time-Phased Budget c. Earned value Analysis 5 VII Conclusion (states what you have determined; remember that goal of any project is on-time and within budget; you might want to go back to Section I to see whether your constraints were met or exceeded 15 points WORK BREAKDOWN STRUCTURE (WBS) PART 1 Company Background Tell the story (who, what, when, where, how) of the company or organization for which this project is being done. · Who founded this company? Who are its leaders? · What does this company make or do? What is its target market? What is its financial performance? · When was the company founded? Where was/is it located? · How does the company operate? How effective is the company in its industry? How are its competitors placed in the market? If using a company website, be sure to cite the source! Current Process What is the current process or existing scenario for accomplishing the company’s goals? In other words, how does the company conduct business? If, for example, it is a
  • 4. construction business building new homes, what would be the process that encompasses the company’s procedure from advertising through getting customers, doing the project and closing out the project deliverable. This current process might be something like: 1) Receive customer specifications 2) Design preliminary floor plan and elevation 3) Send preliminary documents to customer 4) Receive and execute customer changes 5) Create bid for customer contract 6) Run bid through technical and legal departments 7) Ship bid to customer 8) Follow up with customer 9) Negotiate details of bid acceptance 10) Build the negotiated architectural design 11) Oversee construction budget 12) Deliver agreed upon product to customer 13) Receive payment 14) Close out project using lessons learned approach Your project must fit within the framework of the company’s business. In other words, if the company builds single family residences, your project would not be for an office building. It must be related to a specific type of single family home/townhouse. Project Overview The project overview is a report on the project undertaking and a discussion of the general situation management finds itself in. This provides important context for the project management team to use in determining methods, approaches, and timeframes, as well as a scope. For example, if building a new home, you should state whether it will have one or two stories, three or four bedrooms, and any other rooms that are to be included. There may be important details regarding the lot, area of town, and other issues such as landscaping. Be as detailed as possible, since this will assist the
  • 5. instructor in understanding and ultimately approving your project based on his/her belief that you have a viable project topic for a team of 3-4 persons. Objectives Objectives describe concrete outcomes that a project will meet so as to be deemed a success. Goals need to be described as specifically as necessary-but no more specifically than that. The purpose is not to artificially constrain the project but to limit the project to as wide a range of acceptable outcomes as possible. Targets are measurements of how well the goals were met. For example: Goals Targets 1) Provide construction blueprints to customer Excellent = < 4 days Good = < 1 week Acceptable = < 2 weeks 2) Decrease delivery time on all raw materials from 10 days Excellent = -40% Good = -30% Acceptable = -15% 3) Reduce amount of rework from inspections Excellent = -80% Good = -65% Acceptable = -50% 5) Decrease cost overruns Excellent = -40% Good = -30% Acceptable = -15% General Approach What will be the general project approach taken, in terms of managerial and technical changes, to create these changes through the project? For example: Managerial approach – These items relate to how the managers will plan, organize, direct and control the project resources toward the targeted outcome. Technical approach – These items relate to the procedural
  • 6. aspects needed, including logistics of moving equipment to and from the site, designing the blueprints to meet customer expectations, utilizing computers, etc. Constraints Describe the things that will limit the project. For example: 1) Budget constraints—This project will increase profitability by perhaps 30%, but therefore should not cost in excess of three times this savings to ensure that its payback period is relatively short. 2) Time—This project must be completed in the time agreed upon by builder and customer in the contract terms (proposed to be 90 days’ time). 3) Customer contracts—The project must not impact operations for current customers nor fail to meet the customer demands for this project. 4) Regulatory standards—Rework and shutdowns caused by inspections that are not up to code will delay and potentially kill the project. Part 2 – Developing the Work Breakdown Structure Develop a work breakdown structure (WBS) for your project based on the first project assignment. The process is as follows: 1) Create a detailed list of the components of the project, through work packages, tasks, and subtasks. Use the intended scope of the project to help you determine all the project components. 2) Determine the resource needs for the project (i.e., personnel, facilities, and equipment). 3) Determine the relationships between the project components and the people. For example, for each component, at least one person will be responsible for its completion, while others may be involved as consultants or decision approvers. Example Work Breakdown StructureAbbreviated Personnel Table Name Department Title
  • 7. Joe Evans Accounting Bid Manager Sim Elezar Projects Project Manager Kim Astair Engineering Systems Architect Leo Biel Operations Operations Manager Tara Simmons Operations Logistics Manager NOTE: If you do not have names, you can identify the personnel by job such as Master Plumber, Journeyman Electrician #3, etc.Abbreviated Sample Work Breakdown Structure WBS 1 Improvement Project Main Project 1.1 Deliverable 1: Bid response time Deliverable 1 1.1.1 Map current bid process Work Package 1.1.1.1 Interview bid team Task 1.1.1.2 List bid steps and process relationships
  • 8. Task 1.1.2 Conduct value-added process study Work Package 1.1.2.1 Determine value added by each process step Task 1.1.2.2 Separate process steps into necessary vs. unnecessary Task 1.1.3 Reform process to eliminate unnecessary and non-value- added steps Work Package 1.1.3.1 Pare down to only necessary and value-added steps Task 1.1.3.2 Identify ways to improve and shorten remaining steps Task 1.1.3.3 Create new process map Task 1.2 Deliverable 2: Increase customer response rate Deliverable 2 1.2.1 Interview customers Work Package 1.2.1.1 Create survey Task 1.2.1.2 Find non-responsive and responsive customers Task 1.2.1.3
  • 9. Deliver survey Task 1.2.2 Analyze removing response rate barriers Work Package 1.2.2.1 List primary reasons for low response Task 1.2.2.2 Order reasons for priority/feasibility Task 1.2.3 Implement new measures Work Package 1.3 Deliverable 3: Reduce bid complaints and calls Deliverable 3 1.3.1 Interview customers Work Package 1.3.1.1 Create survey Task 1.3.1.2 Find unhappy customers Task 1.3.1.3 Deliver survey Task 1.3.2 Analyze resolving complaint root causes Work Package 1.3.2.1 List primary reasons for bid complaints Task 1.3.2.2
  • 10. Order reasons for priority/feasibility Task 1.3.3 Implement new measures Work Package 1.4 Deliverable 4: Decrease bid package size and complexity Deliverable 4 1.4.1 Interview customers Work Package 1.4.1.1 Create survey Task 1.4.1.2 Identify customers with bid size complaints Task 1.4.1.3 Deliver survey Task 1.4.2 Determine appropriate bid content Work Package 1.4.3 Implement new bid construction process Work Package 1.5 Deliverable 5: Increase customer contract sign rate Deliverable 5 1.5.1 Identify existing market bids Work Package 1.5.1.1 Benchmark market leaders Task 1.5.1.2
  • 11. Analyze price ranges Task 1.5.1.3 Analyze bid features Task 1.5.2 Normalize bid features and ranges to market expectations Work Package 1.5.2.1 Identify target market Task 1.5.2.2 Match bid creation process to intended market Task NOTE: Instead of the diagram above, you can simply copy and paste your Microsoft project view obtained by inputting all tasks, indenting as necessary, and inserting the column WBS for the coding/numbering. The WBS does NOT include any dates, predecessors or durations. These are aspects of scheduling while the WBS is simply a breakdown of all aspects of the project deliverables. Example Responsibility Matrix The example above can be modified using letters and/or numbers instead of the symbols give. You must, however, explain what it means to be responsible, to support, etc. Also, given the extensive nature of your real-world project, your list of work packages (WP) and the personnel involved will be much more detailed. Instead of the names of people, you may use your resource job description, such as master plumber, journeyman electrician, etc. Again, you can copy from your Microsoft Project’s Gantt chart/input view at the work package/tasks level. Do not assign resources to the sub-deliverables (those in
  • 12. bold lettering).Part 3 – Project Risk Assessment You must analyze all risks that could prevent completion of your project. To do this: 1) Generate a list of likely risk factors. Use sources to support that these could be possible risks. Do not simply make up things you believe to be risks without investigating reliable sources. Internet websites are fine for your research. Be sure to copy these and cite them in your analysis. 2) Discuss the risks in terms of likelihood and impact. Again, to do this find sources for support. In other words, if doing a construction project in Houston in August, and you indicate the risk of a hurricane then what is the likelihood of a hurricane hitting the Houston area in that month? 3) Develop strategies for handling (or accepting) these risks. The above risk analyses will require the following two matrices with explanations.. First: Risk Assessment matrix requires the research identified in item 1) above. When you determine a number on the scale of 1 to 5 for likelihood, impact and detection difficulty, you should refer to a designated scale that you determined . For example, 1 might mean 20% or less, 2 might be 21-40%; 3 might be 41- 60%, etc. or 1 might be defined qualitatively as Very Unlikely; 2 as Unlikely; 3 as Somewhat likely, etc. Whatever scale you use should reflect the research that you conducted. You may not be able to find as much on Impact and Detection Difficulty in the literature but, again, define your scale to define your terms and number scores. Risk Likelihood Impact Detection Difficulty When Major injury requiring immediate medical attention 3 (state here the % of major injuries in construction) 3 (may indicate a short work crew for duration) 1 (easily observed that worker is severely bleeding or in shock)
  • 13. During the project Hurricane hitting the Gulf Coast 1 (this will depend upon your project’s start and end dates, I’ve assumed we are working in November) 5 (must shut down and evacuate the site including all equipment and loose objects) 3 (weather reports can be followed but often off as to exact location hit) During the exterior deliverable Second: Contingency Matrix clearly indicating the risk and action taken. Be very clear in identifying your Trigger. The trigger is that which causes you to put an action into place. The trigger for a hurricane would be different depending upon the close proximity of the storm. If the hurricane is 2 days out, you could mitigate damage by actions to secure the site. If the hurricane suddenly changed course and you are now in danger of a direct hit, you may have to accept the risk and get people off site quickly. If it is possible, you could avoid the hurricane damage by not building in the Gulf Coast area in August. So, the trigger involves when you see this risk happening. Risk Response Trigger (what is observed) Contingency Plan Who responsible Major injury requiring immediate medical attention Transfer Worker has cut hand badly and is bleeding profusely from wrist Contact ambulance service to take him to hospital Site supervisor Hurricane hitting the Gulf Coast Mitigate Weather report indicates your site is in direct path of storm due in 48 hours Batten down the site; move equipment and personnel to safe
  • 14. location Project manager Overall, be very clear in your analysis throughout these two matrices and graph. Be sure you research and explain with Works Cited evident! Part 4 – Developing the Project ScheduleBefore you start your input, you need to specify the holidays/non-working days in your project. You must also specify the working times for the project. Default is Monday- Friday from 8-12 and 1-5. In construction, for example, this may not make sense. You can set different working days for a specific resource once that resource is entered in Part 5. You can also, set different working times for any resource or group of resources once they are entered. For this section, state your working times and add predecessors and durations for each activity (not sub-deliverables!) in your WBS from Part 2. Everything is not “1 day”! And if something is one day, be sure to remove the default “?” from that duration entry. You can change your project start date using Project tab and you can change the default from days. If something takes only a couple of hours, then type in “2 hrs” and MS Project will convert this into fractions of a day (if that “days” is your project default). The scheduling output includes the Gantt Chart view clearly showing durations, times and beginning/ending dates with the Gantt chart, the network diagram (or Tracking Gantt), and a statement of the critical path. Remember that if you group by critical, you get a list of the critical activities but these may be on multiple paths. You MUST check your network and/or tracking Gantt to identify the critical path(s)! Also, a critical path is a statement of the activities, not the line numbers or an alphabetic identifier.Part 5 – Managing Your Project’s Resources Now, that you have a schedule and ideal project duration, you must add your resources to each activity. (See Part 6 below for Resource Sheet view). Overallocated resources will be
  • 15. identified in the Gantt chart view as well as in other views; again see Part 6 below. You must resolve any overallocations. Your resource-leveling procedure should be consistent to utilizing your resources identified. The key to this is maximizing the use of project resources while minimally disrupting your project schedule from Part 4. It may be necessary to use several iterations. Thus, you must consider first that the project is time constrained and level within slack. Identify any resources now no longer overallocated. If you cannot resolve all overallocations, then level outside of slack, assuming that your project is resource constrained. Identify changes made. Lastly, if neither approach works, rethink your resource usage by Maximum Units and/or allocations to activities. Your project section should identify what you did and why. It must show your revised schedule including your new Gantt chart view, etc. In particular, there is a Report of Who Does What When that will show your resources as not being overallocated (Task and Resource Views do this as well).Part 6 – Developing the Cost Estimates and Budget For your project we are concerned only with labor costs in support of your project narrative and scope statement. Your budget will roll up from the labor costs entered into the Resource Sheet. If a person is salaried, you need to compute the hourly cost for this resource. If you have a flat bid rate, you can enter this as Cost/Use but it will be easier to level this resource if again, you calculate the cost per worker. A crew can be entered in more than one way. You can list as your resource Architectural Designers (for example) and if there are 2, your Maximum Units will be 200% (2 people working 40 hours per week). If they are paid at different rates, you can refe r to each as Designer 1 with his/her rate and Designer 2 with his/her rate. Resource Name Type Material Label
  • 16. Initials Group Max. Units Std. Rate Ovt. Rate Cost/Use Accrue At Base Calendar Joe Work S 100% $25.00/hr $40.00/hr $0.00 Prorated Standard Sim Work P 100% $45.00/hr $60.00/hr $0.00 Prorated Standard Client Work C 20%
  • 18. Prorated Standard Kim Work E 100% $20.00/hr $35.00/hr $0.00 Prorated Standard Conference Room Material E $0.00 $250.00 Start You should Set Your Baseline (budgeted) cost, Save, and Insert a Baseline column. Then conduct an earned value analysis using a status date approximately one month from the schedule you determined after leveling resources. You can insert Earned Value columns into your Gantt View and/or use the Earned Value Report for your analysis. Actual costs can be entered if you turn off the Option (default) for Microsoft to automatically calculate costs. Then you can enter the Actual Costs. If you do not have actual costs, you can use the % Completed assuming that at the status date, you are on time. This needs to be explained in your report.Part 7 – Conclusions You need to relate your project results to your scope statement,
  • 19. risk assessment, goals, objectives, etc. This is not a section for what you learned doing the project in this class. It wraps up your project by stating clearly what you observed. What changed from the beginning schedule? If you believe that the duration is now too long, what changes would you consider? Overall, what statements regarding this project would you give to management?