3. Introduction to R&M Technologies
• Established in 1990 (19 years old) Specializing in
Reliability, Maintainability and Logistic Support Analysis
• Start to develop RamLog in 1992
(16 years old)
3
4. R&M Technologies Capabilities
• LSA Data Development and Management
• RamLog Software
• R&M Engineering
• Logistic Support Analysis
• Modeling (LCC, RAM, Spare Part, Logistic Support)
• FRACAS
4
5. Whole Life Management
System Baseline Information
RamLog Information Management
Edition
Decision Making Model
RamLog Simulation Edition Maintenance Management System
(Transactional Database)
RAMLOG.NET
Phase Out
Operational Phase
Production/Construction
Development
Early Design
5
7. Support Analysis Process
Phase A Phase B Phase C Phase D
System Failure Task Detail Task
Definition Analysis Identification Analysis
Develop a Identify the tasks
Perform Identify the
System requirements and
FMECA / RCM tasks and
Breakdown develop detail
analysis the task level
FBS / PBS task description
What tasks are
How can it fail ? required to correct/
What is
What is the prevent a failure ?
required to perform
failure criticality ? Who is going to
these tasks?
How can it do these tasks ?
What does (all support
be detected ? (at what level ?)
the system elements)
Can the failure What is the most
consist of ? How, in detail will
be prevented ? cost effective
the task been
Should it be support concept ?
performed ?
redesigned ? (last opportunity
(for TMs)
before detail
analysis)
7
8. PBS/FBS
Functional and/or Physical Breakdown Structure
Internal and External LCN Structure which provide
flexibility (i.e. floating nodes and reference nodes)
csv file Import/Export
Data Checking and Data Checker
Phase Out
Operational Phase
Production/Construction
Development
Early Design
8
9. FMECA
Functional and/or Physical FMECA can be
performed
Phase Out
Operational Phase
Production/Construction
Development
Early Design
9
10. RCM Analysis
MSG-3 logic but user have the ability to built
its own logic
Phase Out
Operational Phase
Production/Construction
Development
Early Design
10
11. Detail Task Analysis
Task Documentation Editor for
procedural tasks linked with
imbedded figures and photos
Phase Out
Operational Phase
Production/Construction
Development
Early Design
11
12. Task Network Model
Task Network Diagrams to define the
task sequence for simulation purposes
Phase Out
Operational Phase
Production/Construction
Development
Early Design
12
13. Illustrated Parts Breakdown (IPB) Editor
IPB Editor with “hot spots” and
imbedded figures linked to the PBS
Phase Out
Operational Phase
Production/Construction
Development
Early Design
13
14. Interactive Electronic Technical
Manual/Publication IETM/P
chm (windows help)
html (web based, publish to RAMLOG.NET or
intranet)
MS Word (2007) - RSA-MIL-STD-122 printable
copy format)
Information sets and data modules (based on
AECMA S1000D)
Phase Out
Operational Phase
Production/Construction
Development
Early Design
14
16. Simulation Planner
Event planner to schedule events for simulation
purposes (acquisitions, operations, etc)
Phase Out
Operational Phase
Production/Construction
Development
Early Design
16
17. Operational Model
Operational Model to simulation
the operation, life cycle of the
system/plant
System Groups into clusters
Operational phases, parameters
distribution based
Phase Out
Operational Phase
Production/Construction
Development
Early Design
17
18. Deploy & Support Model
Deploy & Support Model to
simulate the flow of Work
Orders, Job Cards, Item
Orders and Delivery Notes
Phase Out
Operational Phase
Production/Construction
Development
Early Design
18
19. RBD and FTA
RBDs and FTAs linked to the failure modes
to simulation Reliability and Availability
Reliability and Availability Culprit Identification
Phase Out
Operational Phase
Production/Construction
Development
Early Design
19
20. Animation Model
Animation Model to assist during
the model verification process
Phase Out
Operational Phase
Production/Construction
Development
Early Design
20
21. Simulation Results
Life Cycle Cost Results
Phase Out
Operational Phase
Production/Construction
Development
Early Design
21
22. Simulation Results Continue
Statistical results including Availability,
Reliability, Spare Parts Requirements, Delay
Times - Histograms and Distributions
Phase Out
Operational Phase
Production/Construction
Development
Early Design
22
24. Job Card
Work Orders
Item Orders
Delivery Notes
web based IETM/P Configuration Administrator
Administrator
System Manager
Supervisor
Maintainer
Stores Personnel
Data Capture
Phase Out
Operational Phase
Production/Construction
Development
Early Design
24
25. It provides System Managers, Supervisors, Maintainers and Store Personnel
thee ability to manage equipment assets, with respect to:
• stock and inventory control
• system utilisation and operational tracking
• as-maintained configuration control (i.e. configuration control during
maintenance and serial number tracking)
• collect system and equipment failure data
• collect maintenance and repair data
• collect supply and turn-around times/data
• implementation of a Failure Recording Analysis and Corrective Action
System (FRACAS)
25
26. Whole Life Management
Estimations Reality
Phase Out
Operational Phase
Production/Construction
Development
Early Design