PROJECTS: PRINCIPAL PROCESS DESIGN ENGINEER
Lihir ASU design(2007 – 2008)
Objective: Deliverprocessdesignof a1,750T/day oxygenplant,intighttimescale andbudget.
Achieved: Deliveredprocessdesign,constructionsupport,andcommissioningsupportin
time,tomanhourbudget,andto personal praise fromthe projectmanager.
Identifiedanddesignedchanges toAirProducts’standardcolumninternals,to
reduce columnheightby2m while improvingperformance. Testfeedbackshows
efficiency0.5%betterthanspecification,capacity3% overspecification,andgood
operability.
Role: Lead process designengineer,responsibleforplantperformance,processdesign
manhoursand schedule,andleadingateamof four designers. Pointof contactfor
all otherdisciplinesduringdetaileddesign.
Consultancyservice,Al Jubail,Saudi Arabia (2007)
Objective: Deliveracomplex consultancybrief,withintightschedule,andmaintainor
enhance clientrelationship.
Achieved: Service deliveredtothe clients’expresseddelight. Follow-onworkawarded,on
the basisof the qualityof the service alreadygiven. Includedanon-site surveyand
designreview withthe client,asthe company’sprincipal representative.
Role: Processengineer,leadconsultant.
Deliveryof a 480T/day liquefierand2,400T/day nitrogenplant (2006 - 2007)
Objective: Design,buildandcommissionthe facilitiesforIsle of GrainPhase 2, to serve the
UK’s largestLNG receivingterminal.
Achieved: Leda designteaminthe deliveryof the full processdesignof the facility.
Successfullyintegratedthe effortsof three groupsontwocontinents,todeliverthe
facilityontime andwithinbudget. Specifyanddevelopacomplex pipeline
managementsystem, tomeetthe client’sstringentrequirementfor100%
reliability,deliveryof productwithin10secondsof demand,andminimisingpower
consumption. Commissionedandtestedthe entire system, demonstratingthe
performance of the whole facility,includingthe pipeline manager. Achieved7%
improvementonpowerconsumption,generating$40,000 per yearadditional
revenue. Successful deliveryof a120 bar.g LIN pumpingsystem, withpumpsat
nearlythree timesthe vendor’sprevious experience forsize,withoutsignificant
safetyor performance issuesandnoon-site re-workrequired.
Role: Lead processdesignengineer.
370T/day air separationand liquefactionfacility design,procurementandcommissioning (2005 –
2007)
Objective: Delivermachinery,processdesign,andcommissioningof the TongxiangASU,our
firstof this size inChinaandof the productline. Commissionandtestwithina
challengingtimescale.
Achieved: Plantbroughtonline exactlytoschedule. Overall spend8% lowerthaninitial
estimate,despite challengingcoordinationproblemsbetweendistantteamsand
vendorinexperience withChinese codesandregulatoryrequirements. Diagnose
problemswiththe argoncolumn,leadingtorestorationof the specifiedproduction
followingcolumnmodifications.
Role: Machineryengineerforthe whole durationof the project. Frominitial
specificationof compressors,cryogenicexpanders,liquidoxygenpumps,and
packagedequipment. LiaisonwithChinesedesignteamtoensure integrationand
compliance withlocal regulations. Processdesignparticipation. Leadmachinery
commissioningonsite,andtake overprocesscommissioningduringtestingand
handover.
Liquidnitrogen storage and deliverysystem(2005)
Objective: Designanddeliver1,000 tonne liquidnitrogenstorage andpumpingsystem.
Resolve client’scomplaintsoverperformance withinguarantee period.
Achieved: Designedsystem,withinbudgetandschedule. Multiple sitevisitstodiagnose the
causesof the shortfall,designa solution,andtesteffectiveness.
Role: Processdesignengineer.

More Related Content

What's hot

ERP Solution For an Indian Spice Maker - ROLLINGDICE
ERP Solution For an Indian Spice Maker - ROLLINGDICEERP Solution For an Indian Spice Maker - ROLLINGDICE
ERP Solution For an Indian Spice Maker - ROLLINGDICEBrand Captain
 
Jayaprakash Resume 2015
Jayaprakash Resume 2015Jayaprakash Resume 2015
Jayaprakash Resume 2015Jayaprakash P
 
Paresh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade
 
KCDC2015 - Enterprise Architecture In A Heterogeneous Environment
KCDC2015 - Enterprise Architecture In A Heterogeneous EnvironmentKCDC2015 - Enterprise Architecture In A Heterogeneous Environment
KCDC2015 - Enterprise Architecture In A Heterogeneous EnvironmentDustin Hudson
 
160730_Resume_Swaroop
160730_Resume_Swaroop160730_Resume_Swaroop
160730_Resume_Swaroopswaroop patil
 

What's hot (10)

General dqi for web
General dqi for webGeneral dqi for web
General dqi for web
 
Rajnish kumar
Rajnish kumarRajnish kumar
Rajnish kumar
 
ERP Solution For an Indian Spice Maker - ROLLINGDICE
ERP Solution For an Indian Spice Maker - ROLLINGDICEERP Solution For an Indian Spice Maker - ROLLINGDICE
ERP Solution For an Indian Spice Maker - ROLLINGDICE
 
Stapleton_Redevelopment
Stapleton_RedevelopmentStapleton_Redevelopment
Stapleton_Redevelopment
 
Jayaprakash Resume 2015
Jayaprakash Resume 2015Jayaprakash Resume 2015
Jayaprakash Resume 2015
 
CV_DP
CV_DPCV_DP
CV_DP
 
RESUME RICH TEXT 10-1-15
RESUME RICH TEXT 10-1-15RESUME RICH TEXT 10-1-15
RESUME RICH TEXT 10-1-15
 
Paresh Gawade-Manufacturing
Paresh Gawade-ManufacturingParesh Gawade-Manufacturing
Paresh Gawade-Manufacturing
 
KCDC2015 - Enterprise Architecture In A Heterogeneous Environment
KCDC2015 - Enterprise Architecture In A Heterogeneous EnvironmentKCDC2015 - Enterprise Architecture In A Heterogeneous Environment
KCDC2015 - Enterprise Architecture In A Heterogeneous Environment
 
160730_Resume_Swaroop
160730_Resume_Swaroop160730_Resume_Swaroop
160730_Resume_Swaroop
 

Similar to Projects - Principal process design engineer

Agile and UX Design_2015
Agile and UX Design_2015Agile and UX Design_2015
Agile and UX Design_2015drewert
 
Suresh Babu G P Resume
Suresh Babu G P ResumeSuresh Babu G P Resume
Suresh Babu G P Resumesuresh babu
 
ROI of Evolutionary Design to Rapidly Create Innovatively New Products & Serv...
ROI of Evolutionary Design to Rapidly Create Innovatively New Products & Serv...ROI of Evolutionary Design to Rapidly Create Innovatively New Products & Serv...
ROI of Evolutionary Design to Rapidly Create Innovatively New Products & Serv...David Rico
 
09 Ace 2010 Aras Implementation Best Practices
09 Ace 2010 Aras Implementation Best Practices09 Ace 2010 Aras Implementation Best Practices
09 Ace 2010 Aras Implementation Best PracticesProdeos
 
Fundamentals of Software Engineering
Fundamentals of Software Engineering Fundamentals of Software Engineering
Fundamentals of Software Engineering Madhar Khan Pathan
 
Proposal to revise documentation
Proposal to revise documentationProposal to revise documentation
Proposal to revise documentationrgroup99
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016Rich Bellino
 
Introduction to Agile Software Development
Introduction to Agile Software DevelopmentIntroduction to Agile Software Development
Introduction to Agile Software DevelopmentLife Cycle Engineering
 
PMI Portugal.VIII Conf.AplicarPraticasAgeisGPTradicionais-20141128
PMI Portugal.VIII Conf.AplicarPraticasAgeisGPTradicionais-20141128PMI Portugal.VIII Conf.AplicarPraticasAgeisGPTradicionais-20141128
PMI Portugal.VIII Conf.AplicarPraticasAgeisGPTradicionais-20141128Luis Sequeira
 
Utility Coordination 2015 - for show
Utility Coordination 2015 - for showUtility Coordination 2015 - for show
Utility Coordination 2015 - for showLynee Russell
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsRaja Bavani
 
Why agile is best for managing projects in principle but not always in practice
Why agile is best for managing projects in principle but not always in practiceWhy agile is best for managing projects in principle but not always in practice
Why agile is best for managing projects in principle but not always in practiceGlen Alleman
 
CV Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
CV  Ashfaq Sept. 2015 -BLDGS, INFRA STRS.CV  Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
CV Ashfaq Sept. 2015 -BLDGS, INFRA STRS.Mohammad Ashfaq
 
PSR_Success_Story
PSR_Success_StoryPSR_Success_Story
PSR_Success_StoryMark Dalton
 

Similar to Projects - Principal process design engineer (20)

Agile and UX Design_2015
Agile and UX Design_2015Agile and UX Design_2015
Agile and UX Design_2015
 
Suresh Babu G P Resume
Suresh Babu G P ResumeSuresh Babu G P Resume
Suresh Babu G P Resume
 
ROI of Evolutionary Design to Rapidly Create Innovatively New Products & Serv...
ROI of Evolutionary Design to Rapidly Create Innovatively New Products & Serv...ROI of Evolutionary Design to Rapidly Create Innovatively New Products & Serv...
ROI of Evolutionary Design to Rapidly Create Innovatively New Products & Serv...
 
09 Ace 2010 Aras Implementation Best Practices
09 Ace 2010 Aras Implementation Best Practices09 Ace 2010 Aras Implementation Best Practices
09 Ace 2010 Aras Implementation Best Practices
 
JD_CV_15
JD_CV_15JD_CV_15
JD_CV_15
 
Fundamentals of Software Engineering
Fundamentals of Software Engineering Fundamentals of Software Engineering
Fundamentals of Software Engineering
 
Proposal to revise documentation
Proposal to revise documentationProposal to revise documentation
Proposal to revise documentation
 
Design and Space Efficiency for Workspaces
Design and Space Efficiency for WorkspacesDesign and Space Efficiency for Workspaces
Design and Space Efficiency for Workspaces
 
Agile project management PMI-ACP
Agile project management PMI-ACPAgile project management PMI-ACP
Agile project management PMI-ACP
 
RAB resume 09 01 2016
RAB resume    09 01 2016RAB resume    09 01 2016
RAB resume 09 01 2016
 
Introduction to Agile Software Development
Introduction to Agile Software DevelopmentIntroduction to Agile Software Development
Introduction to Agile Software Development
 
PMI Portugal.VIII Conf.AplicarPraticasAgeisGPTradicionais-20141128
PMI Portugal.VIII Conf.AplicarPraticasAgeisGPTradicionais-20141128PMI Portugal.VIII Conf.AplicarPraticasAgeisGPTradicionais-20141128
PMI Portugal.VIII Conf.AplicarPraticasAgeisGPTradicionais-20141128
 
Utility Coordination 2015 - for show
Utility Coordination 2015 - for showUtility Coordination 2015 - for show
Utility Coordination 2015 - for show
 
Debahis CV
Debahis CVDebahis CV
Debahis CV
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile Projects
 
Why agile is best for managing projects in principle but not always in practice
Why agile is best for managing projects in principle but not always in practiceWhy agile is best for managing projects in principle but not always in practice
Why agile is best for managing projects in principle but not always in practice
 
CV Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
CV  Ashfaq Sept. 2015 -BLDGS, INFRA STRS.CV  Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
CV Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
 
PSR_Success_Story
PSR_Success_StoryPSR_Success_Story
PSR_Success_Story
 
David Green_21-06-16
David Green_21-06-16David Green_21-06-16
David Green_21-06-16
 
Resume - Debashree Panigrahi
Resume - Debashree PanigrahiResume - Debashree Panigrahi
Resume - Debashree Panigrahi
 

Projects - Principal process design engineer

  • 1. PROJECTS: PRINCIPAL PROCESS DESIGN ENGINEER Lihir ASU design(2007 – 2008) Objective: Deliverprocessdesignof a1,750T/day oxygenplant,intighttimescale andbudget. Achieved: Deliveredprocessdesign,constructionsupport,andcommissioningsupportin time,tomanhourbudget,andto personal praise fromthe projectmanager. Identifiedanddesignedchanges toAirProducts’standardcolumninternals,to reduce columnheightby2m while improvingperformance. Testfeedbackshows efficiency0.5%betterthanspecification,capacity3% overspecification,andgood operability. Role: Lead process designengineer,responsibleforplantperformance,processdesign manhoursand schedule,andleadingateamof four designers. Pointof contactfor all otherdisciplinesduringdetaileddesign. Consultancyservice,Al Jubail,Saudi Arabia (2007) Objective: Deliveracomplex consultancybrief,withintightschedule,andmaintainor enhance clientrelationship. Achieved: Service deliveredtothe clients’expresseddelight. Follow-onworkawarded,on the basisof the qualityof the service alreadygiven. Includedanon-site surveyand designreview withthe client,asthe company’sprincipal representative. Role: Processengineer,leadconsultant. Deliveryof a 480T/day liquefierand2,400T/day nitrogenplant (2006 - 2007) Objective: Design,buildandcommissionthe facilitiesforIsle of GrainPhase 2, to serve the UK’s largestLNG receivingterminal. Achieved: Leda designteaminthe deliveryof the full processdesignof the facility. Successfullyintegratedthe effortsof three groupsontwocontinents,todeliverthe facilityontime andwithinbudget. Specifyanddevelopacomplex pipeline managementsystem, tomeetthe client’sstringentrequirementfor100% reliability,deliveryof productwithin10secondsof demand,andminimisingpower consumption. Commissionedandtestedthe entire system, demonstratingthe performance of the whole facility,includingthe pipeline manager. Achieved7% improvementonpowerconsumption,generating$40,000 per yearadditional revenue. Successful deliveryof a120 bar.g LIN pumpingsystem, withpumpsat nearlythree timesthe vendor’sprevious experience forsize,withoutsignificant safetyor performance issuesandnoon-site re-workrequired. Role: Lead processdesignengineer.
  • 2. 370T/day air separationand liquefactionfacility design,procurementandcommissioning (2005 – 2007) Objective: Delivermachinery,processdesign,andcommissioningof the TongxiangASU,our firstof this size inChinaandof the productline. Commissionandtestwithina challengingtimescale. Achieved: Plantbroughtonline exactlytoschedule. Overall spend8% lowerthaninitial estimate,despite challengingcoordinationproblemsbetweendistantteamsand vendorinexperience withChinese codesandregulatoryrequirements. Diagnose problemswiththe argoncolumn,leadingtorestorationof the specifiedproduction followingcolumnmodifications. Role: Machineryengineerforthe whole durationof the project. Frominitial specificationof compressors,cryogenicexpanders,liquidoxygenpumps,and packagedequipment. LiaisonwithChinesedesignteamtoensure integrationand compliance withlocal regulations. Processdesignparticipation. Leadmachinery commissioningonsite,andtake overprocesscommissioningduringtestingand handover. Liquidnitrogen storage and deliverysystem(2005) Objective: Designanddeliver1,000 tonne liquidnitrogenstorage andpumpingsystem. Resolve client’scomplaintsoverperformance withinguarantee period. Achieved: Designedsystem,withinbudgetandschedule. Multiple sitevisitstodiagnose the causesof the shortfall,designa solution,andtesteffectiveness. Role: Processdesignengineer.