7_Boardwalk_SJ
- 1. CECV
PUERTA DE TIERRA’S
BOARDWALK PHASE II (2014)
PUERTA DE TIERRA’S BOARDWALK MASTER PLAN - SCF ARCHITECTS
Scope of Work
1. Modify Conceptual Master Plan done by SCFArchitects.
2. Develop Schematic Design.
3. Develop Preliminary Design.
4. Produce Construction Plans Set.
Challenges
1. Integrate the Transportation Study
recommendations into the Master Plan.
2. Strengthen Cyclist and Pedestrian Safety.
3. Develop an Economically Feasible Project.
4. Modify Existing Public Infrastructure.
Actions
1. Reduce Vehicle Lanes and Redirect Traffic.
2. Establish Safe Access to Existing
Recreational Parks and Buildings.
3. Add Bicycle Lanes Separated from Vehicles
and Pedestrians.
4. Refurbish Existing Pedestrian Walkways.
EXTERIOR IMAGES OF FINISHED PROJECT
DESIGN DETAIL - BHA ENGINEERSCONCEPTUAL DRAWING - SCF ARCHITECTS
CLIENT: PR INFRASTRUCTURE FINANCING AUTHORITY
DESIGNERS: SCF ARCHITECTS, BHA CONSULTING ENGINEERS
TRANSPORTATION CONSULTANTS: VAGTEC PSC