We are one professional plastic injection mold factory in Shenzhen city, Guangdong.
If you need more detailed information, pls let us know. thanks.
Mobile: 86-136 5149 7173
skype: cannamould
email:cannamould@gmail.com
Regards,
Canna
2. Company history
公司历程
Mr. HwaWong start business focus on transport good quality tool to
oversea market.
2005
Knowing well indeed customer demand after 3 years’ business
handling , start building a factory to do all manufacturing in house
base on original reliable clients support
2008
Setting up an agent plant in Italy, expanding our business and after
service in Europe. Getting supplier code of Europe FIAT. 150~200
tools was sold into Europea
2011
Talent is in concentration Sales turnover is double than last year.
Except guarantee the tools on time, Quality stable is focus of all job
2014
Quality is on the rise, become more and more stable. Main target is use quality to
attract the market . The European tool service is planning setting up in italy and
Sweden.
2015
Realize the tool after sale service in italy and Sweden. Return extra
valve to our customer on tool quality & service. Enlarge the capacity
of inner plant by increase large-scale, precise machine.
Set up a branch tool shop in italy turin.
2016
3. Company profile
公司规模
• Year of Founded : 2006
• Property Size: 3500 Sq. two floors
• Number of Employee: 100 staffs
• Working time : 1 shift/10 hours. Busy season Tool shop staff 2 shift/10 hours.
• Engineering Software : Pro/E, UG, Catia, Solidwork, Moldflow, AutoCad
• Expertise: Reverse engineering, tool design, tool making from Medium-Big size part
for automotive/LED-TV/ Air-condition.Home Appliances/Industrial Pipe
• CNC Capacity: Up to 4000*3000*1500 mm
• Maxi.Mould Ability : 2500*2500*1800 mm (Up to 3500Ton Clamp Force)
• Quality Certificate: ISO 9001:2008
• Annual Turnover: 5 Million euro ( 2014), 200 sets of tools each year.
• Percentage of Export : Over 95%
4. What we sell except tool
making?
Reversed engineering. Physical sample---part 3D---tool 3D----new tool----part production.
3D scanning device Patch processing Solid
modeling
Part 3D analysis----Tool 3D creating --- tool 2D machining drawing & BOM creating----tool
manufacturing in Europea
5. Trouble on the lead time?
Fast & flexible procedure + experienced team exercise
Timing is money, fulfill your idea into product:
Tool size under 300~400mm: normal in 25 ~30 days, historical limit in 12 days
Tool size 400~800mm: normal in 30 ~45 days, historical limit in 15 days
Tool size 800 ~1200mm: normal in 45~60 days, historical limit in 22 days
Tool size 1200 ~ 2100mm: normal in 60~80 days, historical limit in 45 days
Product launchProduct launch
on the marketon the market
to Grab chanceto Grab chance
is making moreis making more
profit for ourprofit for our
TopTop
considerconsider
for ourfor our
customercustomer Production inProduction in
the right ,fastthe right ,fast
and efficientand efficient
way is makingway is making
more profit formore profit for
our customerour customer
6. Trouble on the lead time?
Tool design
15.05.2015
T1 for serious
tools on
20.06.2015
Finish first
part assembly
& testing in
Russia before
10.7.2015
Part
modification
and T2 before
10.8 2015
Tool shipping
on 20.08 2015
Victory
meeting
25.09.2015
Advantage: 30Advantage: 30
days includedays include
tool design andtool design and
manufacturingmanufacturing
for a big projectfor a big project
7. We were trained and experienced by high standard tool doorsill for over 9 years.
Worry the tool quality?
– successful case with Ferrari
8. Audi opening roof. The tools was built 2010 by JCM, we spent 2 months to stay with
customer , got big technical support and guidance
Successful case
with Audi
9. Plastic Parts- Kinds of automotive part for HONDA since 2006 by JCM. We transport always stable high quality to Honda and
keeping a stable business so far.
Successful case
with HONDA
10. Kinds of automotive part for IVECO since 2009 by JCM, we accumulated lots of experience on complex structure tool.
Successful case
with IVECO
11. This vent pipe were produced in 2011 by JCM, we overcame the difficult on high fiber
part’s filling on the tool, and complex tunnel pipe tool.
Successful case
with Nissan
12. Huge tool (weight 37 ton) , injection machine 3500ton. A big success on tool structure design and tool implement. We got highest
praise from T0 from end customer.
Successful case with
Coca-cola
13. Tool weight 22 ton, more than 100 critical dimensions on part, we realized 95% ok dimension at T0, and tool
movement 100% approve each trial.
Successful case with
whirlpool
14. Successful case with
Ferraris over-mold
Over-mold tool required very high requirement on precision and skillful tool structure, in order to guarantee
without problem during overmolding. Plus this part has lots of big difference level ,which increase the tool
complexity, but we overcome all difficulty to get success on this kind of tool too.
15. Successful case on
Precise multi cavity tools
Part dimension tolerance 0.01mm, we control the tool precision by using mirror EDM machine
17. A special project team seamless follow project from order—design—purchase—manufacturing—tool trial---tool
improvement--- tool shipment
Project management
19. Vacuum packing in house for each tool.
Progressive anti-rust
technology, Anti-rust film
without corrosiveness and
greasy feeling,
Tool shipping packing protection
20. Quality Control(QC)
Quality control
All machining
process to be
inspected
during
manufacturing
Seriuos
tool
design
All material
come back
insepction
Samples, tool
insert both verify
on 3 CMM again
倾听客户要求,做出客户期望。
全流程人员 100% 执行作业标准。
一对一项目团队服务,作业严格遵守客户标准。
公司全流程进行质量控制,从各个环节确保优良的品质
。