CIVIL COMPONENT
1.DAM
The dam of kulekhani II (KL2) is rock fill type located in
makwanpur district of narayani zone,nepal.
The dam is located at the
Gross head of 860m from KL2
Substation and headrace of
KL2 is located at gross head
0f 310m. The distance of head
Race canal from KL2 sub
Station is 12km.
2.CATCHMENT AREA
The catchment area is 126 km^2.
3.RESERVOIR
The live storage volume of the reservoir is 2400 m^3.
4.SURGE TANK
The surge tank of kulekhani II is restricted orifice type.
5.PENSTOCK
 The penstock is made up of steel. The overall length of penstock is
841.279m. The maximum design head for penstock 409.375m.the
weight of penstock is 7,01,393.17kg.Its installation is completed in
august 1986.
INLET AND BY PASS VALVE
INLET VALVE
Allows water flow from
penstock to turbine
Spherical
BY PASS VALVE
Balance pressure on
either side of valve
Turbine
Vertical shaft francis type
turbine
Speed 750 rpm
Runway speed is 1280 rpm
Rated output 16500 kw
Net head 303.6/284.1 m
Rated flow 6.45 m3 /s
Francis turbine with spiral casing and runner
water is enter radially and Exit axially
GOVERNOR
• Used for controlling the guide vanes by
detecting turbine speed and its guide vane
opening in order to keep turbine speed
stable or to regulate its output.
• The performance of the governor dominates
the controllability of the power plant and
quality of electrical power produced.
GOVERNOR (speed or frequency
control)
• The hydraulic turbine governor is equipment for
controlling the guide vanes by detecting turbine
speed and its guide vane opening in order to keep
the turbine speed stable or to regulate it's output.
• Governors are provided with the following
features:
 Quick responses and stable control.
 Guide vanes opening detection with high accuracy.
 Speed detection with high accuracy.
 High reliability and easy maintenances.
SERVOMOTOR USED FOR GUIDE
VANES
• The opening of guide
vanes is controlled.
• The small opening of
guide vanes reduces
the RPM and hence
the frequency.
• The maximum
opening of guide
vanes increases RPM
of turbine and Hence
frequency is
increased.
• Reacts to sudden change
of generator load by
giving corresponding
excitation voltage, under
the new load condition.
• Two units of AVR are in
use.
• Here it helps in
stabilizing the output
voltage from the
generator remain
constant to 6.6 KV.
GOVERNOR (AUTOMATIC
VOLTAGE REGULATOR )
EXCITATION SYSTEM
• Brushless (ac) excitation system
• With rotating rectifiers ,the need for slips rings and
brushes is eliminated.
EXCITER
STATOR
WINDING
• Here, the exciter
has stationary
field winding
• The rectifier
output of pilot
exciter stator
energises the
stationary field of
the ac exciter
EXCITER ROTOR
WINDING
• Here, the exciter has
rotating armature
winding
• The voltage regulator
controls the ac exciter
field
CONTROL
PANNEL FOR
BATTERY
BACKUP
• The voltage of
battery backup is
110V
• The cooling system
and several lighting
system is supplied
with battery backup
at emergency
conditions.
Figure: Generator and excitor
• GENERATOR
 Two, salient pole rotor
type synchronous
generator
 Output : 3 phase, 6.6K
V ; 18.8 MVA
 Power factor: 0.85
 No. of poles and speed:
8 pole, 750 rpm
 Excitation voltage: 130
V
 Excitation system:
brushless
•
LA
Generato
r bus
Power
transformer
6.6/132 KV
SF6
Circuit
breaker
SF6
Circuit
breaker
Circuit
breaker
CT
CT
CT
isolator
isolator
isolator isolator
isolator isolator
Three units of
Capacitive voltage transformer
H
E
T
A
U
D
A
S
U
I
T
A
C
H
A
R
Mainbusbar
132 kv
Feeder busbar
132 KV
SINGLE LINE DIAGRAM OF
SWITCHYARD
.
SWITCHYARD
RESERVOIR
SURGE TANK
FRANCIS-1 FRANCIS -2
GENERATOR -1
6.6KV,18.8 MVA
SWICHTAR,LDC HEUTADA
GENERATOR -2
6.6KV,18.8 MVA
POWER TRANSFORMER
6.6KV/132KV, 37.8 MVA
BURSHLES
S EXCITOR
BRUSHLES
S EXCITOR
Rapti river Mandu
river
Out flow of KL-1
MAIN
BUSBAR
132 KV
ENERGY FLOW DIAGRAM
PROTECTION SCHEME
CURRENT TRANSFORMER
Three CT’s of rating 500-250/5A
are used for over current
protection of 132KV line.
 for the protection of transformer
,CT’s of rating 200/5A.
For the protection of generator
,CT’s of 2000/5A are used.
POTENTIAL TRANSFORMER
Three PT’s of rating 132KV/110V are used for
132KV bus bar protection(1 per phase).
 PT’s of rating 6.6KV/110V are used for over
voltage and under voltage protection of both
unit of generators.
CIRCUIT BREAKERS
For the protection of 132KV line in switchyard, SF6 circuit
breaker is used.
For the protection of 6.6KV line, vacuum circuit breaker
is used.
Air circuit breaker are used in low tension system.
SF6 CIRCUIT BREAKER
RELAY
TYPE USES
DIFFERENTIAL RELAY For the protection of generators, transformers
and bus bar of kulekhani-2.
OVER CURRENT RELAY In case of external faults of KL-2.like phase to
ground fault, phase to phase fault, double
phase to ground fault.
OVER VOLTAGE AND UNDER
VOLTAGE RELAY
Protects the system from abnormal high and
low voltage.
RELAY CONTROL PANAL
ISOLATOR
EARTHING
 To solve black out in whole Nepal power
system network, firstly Khulekhani I is
operated which supplies power to the grid and
to Khulekhani II as well. Thereafter Khulekhani
II is operated and adds its power to the grid.
 Then the remaining hydropower plants is
operated by taking excitation from the grid.
KHULEKHANI I and II:
INITIALIZER TO SOLVE BLACK
OUT
 On Jestha 2075, damper winding of rotor
of unit 2 generator was damaged. Then,
repairing process was done. Now the unit
is operating smoothly.
 Recently, automatic remote controller for
cranes to lift the turbines, generators,
exciter etc. is being set up.
Maintenance and Upgrade
Activities

More Related Content

What's hot

Power loss due to Corona on High Voltage Transmission Lines
Power loss due to Corona on High Voltage Transmission LinesPower loss due to Corona on High Voltage Transmission Lines
Power loss due to Corona on High Voltage Transmission LinesIOSR Journals
 
Hydro Electric Power plant
Hydro Electric Power plantHydro Electric Power plant
Hydro Electric Power plantRatan Debnath
 
TYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSTYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSRAJ BAIRWA
 
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)Ameh Messiah Edache
 
Piezometer by milan kumar rai
Piezometer by milan kumar raiPiezometer by milan kumar rai
Piezometer by milan kumar raiMilan Kumar Rai
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantsnelkoli
 
Desin of penstock pipe ppt
Desin of penstock pipe pptDesin of penstock pipe ppt
Desin of penstock pipe pptzafaralam7868
 
Kulekhani-1 hydropower project, Nepal
Kulekhani-1 hydropower project, NepalKulekhani-1 hydropower project, Nepal
Kulekhani-1 hydropower project, NepalHari Bhusal
 
1.7 transmission and distribution system of electrical energy
1.7 transmission and distribution system of electrical energy1.7 transmission and distribution system of electrical energy
1.7 transmission and distribution system of electrical energyW3Edify
 
Basics of Hydro power plant
Basics of  Hydro power plant Basics of  Hydro power plant
Basics of Hydro power plant Prasad Vejendla
 
Automatic transfer switch (ats)
Automatic transfer switch (ats)Automatic transfer switch (ats)
Automatic transfer switch (ats)Mark Anthony Enoy
 
Power systems voltage and power control
Power systems voltage and power controlPower systems voltage and power control
Power systems voltage and power controlCaner Göksel Sonuzun
 
Directional relay & Differential relay.pptx
Directional relay & Differential relay.pptxDirectional relay & Differential relay.pptx
Directional relay & Differential relay.pptxUtthejNani1
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training ReportSWAPNILKUMARGUPTA
 
Elements of HYDRO ELECTRIC POWER PLANTS
Elements of HYDRO ELECTRIC POWER PLANTSElements of HYDRO ELECTRIC POWER PLANTS
Elements of HYDRO ELECTRIC POWER PLANTSRaju D
 

What's hot (20)

Power loss due to Corona on High Voltage Transmission Lines
Power loss due to Corona on High Voltage Transmission LinesPower loss due to Corona on High Voltage Transmission Lines
Power loss due to Corona on High Voltage Transmission Lines
 
Hydro Electric Power plant
Hydro Electric Power plantHydro Electric Power plant
Hydro Electric Power plant
 
Unit 3 FACTS Technology
Unit 3 FACTS TechnologyUnit 3 FACTS Technology
Unit 3 FACTS Technology
 
TYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTSTYPES OF HYDRO POWER PLANTS
TYPES OF HYDRO POWER PLANTS
 
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)SUB-STATION DESIGN AND PROTECTION  (AN OVERVIEW)
SUB-STATION DESIGN AND PROTECTION (AN OVERVIEW)
 
Petersen coil grounding
Petersen coil groundingPetersen coil grounding
Petersen coil grounding
 
Hydro turbines
Hydro turbinesHydro turbines
Hydro turbines
 
Piezometer by milan kumar rai
Piezometer by milan kumar raiPiezometer by milan kumar rai
Piezometer by milan kumar rai
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Desin of penstock pipe ppt
Desin of penstock pipe pptDesin of penstock pipe ppt
Desin of penstock pipe ppt
 
Kulekhani-1 hydropower project, Nepal
Kulekhani-1 hydropower project, NepalKulekhani-1 hydropower project, Nepal
Kulekhani-1 hydropower project, Nepal
 
1.7 transmission and distribution system of electrical energy
1.7 transmission and distribution system of electrical energy1.7 transmission and distribution system of electrical energy
1.7 transmission and distribution system of electrical energy
 
Basics of Hydro power plant
Basics of  Hydro power plant Basics of  Hydro power plant
Basics of Hydro power plant
 
Automatic transfer switch (ats)
Automatic transfer switch (ats)Automatic transfer switch (ats)
Automatic transfer switch (ats)
 
Power systems voltage and power control
Power systems voltage and power controlPower systems voltage and power control
Power systems voltage and power control
 
Directional relay & Differential relay.pptx
Directional relay & Differential relay.pptxDirectional relay & Differential relay.pptx
Directional relay & Differential relay.pptx
 
Substation Neutral Earthing
Substation Neutral EarthingSubstation Neutral Earthing
Substation Neutral Earthing
 
Intze PPT
Intze PPTIntze PPT
Intze PPT
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
 
Elements of HYDRO ELECTRIC POWER PLANTS
Elements of HYDRO ELECTRIC POWER PLANTSElements of HYDRO ELECTRIC POWER PLANTS
Elements of HYDRO ELECTRIC POWER PLANTS
 

Similar to Kulekhani 2nd hydropower station

fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxAkshaiSai2
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYRohitashav Goyal
 
training at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvtraining at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvamitietlko
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLsurendra rawat
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPURsahid raja khan
 
power house training seminar
power house training seminarpower house training seminar
power house training seminarParas kumar
 
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...Rishabhlko
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfDevesh54
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptAshutosh Srivastava
 
Srijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) pptSrijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) pptsrijan tripathi
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptxssuser1b3e431
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportArijit Basu
 
PPT ON 400KV GSS HEERAPURA JAIPUR
PPT ON 400KV GSS HEERAPURA JAIPUR PPT ON 400KV GSS HEERAPURA JAIPUR
PPT ON 400KV GSS HEERAPURA JAIPUR Amit kumar
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxShubhoDas5
 
the substation components study
the substation components study the substation components study
the substation components study Krishnaveni Reddy
 
Trishuli hydro power plant 3 day educational visit
Trishuli hydro power plant 3 day educational visitTrishuli hydro power plant 3 day educational visit
Trishuli hydro power plant 3 day educational visitRamesh Adhikari
 

Similar to Kulekhani 2nd hydropower station (20)

fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITY
 
training at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvtraining at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kv
 
J DJ
J DJJ DJ
J DJ
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
power house training seminar
power house training seminarpower house training seminar
power house training seminar
 
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
PRESENTATION ON UPPTCL 220 KV TRANSMISSION SUMMER TRAINING BANDA, BANDA FROM ...
 
Ashwani
AshwaniAshwani
Ashwani
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
Srijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) pptSrijan tripathi(220kv gss) ppt
Srijan tripathi(220kv gss) ppt
 
ntpc ppt
ntpc pptntpc ppt
ntpc ppt
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training Report
 
PPT ON 400KV GSS HEERAPURA JAIPUR
PPT ON 400KV GSS HEERAPURA JAIPUR PPT ON 400KV GSS HEERAPURA JAIPUR
PPT ON 400KV GSS HEERAPURA JAIPUR
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
the substation components study
the substation components study the substation components study
the substation components study
 
Trishuli hydro power plant 3 day educational visit
Trishuli hydro power plant 3 day educational visitTrishuli hydro power plant 3 day educational visit
Trishuli hydro power plant 3 day educational visit
 

Recently uploaded

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 

Recently uploaded (20)

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 

Kulekhani 2nd hydropower station

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8. CIVIL COMPONENT 1.DAM The dam of kulekhani II (KL2) is rock fill type located in makwanpur district of narayani zone,nepal. The dam is located at the Gross head of 860m from KL2 Substation and headrace of KL2 is located at gross head 0f 310m. The distance of head Race canal from KL2 sub Station is 12km.
  • 9. 2.CATCHMENT AREA The catchment area is 126 km^2. 3.RESERVOIR The live storage volume of the reservoir is 2400 m^3.
  • 10. 4.SURGE TANK The surge tank of kulekhani II is restricted orifice type. 5.PENSTOCK  The penstock is made up of steel. The overall length of penstock is 841.279m. The maximum design head for penstock 409.375m.the weight of penstock is 7,01,393.17kg.Its installation is completed in august 1986.
  • 11. INLET AND BY PASS VALVE INLET VALVE Allows water flow from penstock to turbine Spherical BY PASS VALVE Balance pressure on either side of valve
  • 12. Turbine Vertical shaft francis type turbine Speed 750 rpm Runway speed is 1280 rpm Rated output 16500 kw Net head 303.6/284.1 m Rated flow 6.45 m3 /s
  • 13. Francis turbine with spiral casing and runner water is enter radially and Exit axially
  • 14.
  • 15.
  • 16. GOVERNOR • Used for controlling the guide vanes by detecting turbine speed and its guide vane opening in order to keep turbine speed stable or to regulate its output. • The performance of the governor dominates the controllability of the power plant and quality of electrical power produced.
  • 17. GOVERNOR (speed or frequency control) • The hydraulic turbine governor is equipment for controlling the guide vanes by detecting turbine speed and its guide vane opening in order to keep the turbine speed stable or to regulate it's output. • Governors are provided with the following features:  Quick responses and stable control.  Guide vanes opening detection with high accuracy.  Speed detection with high accuracy.  High reliability and easy maintenances.
  • 18. SERVOMOTOR USED FOR GUIDE VANES • The opening of guide vanes is controlled. • The small opening of guide vanes reduces the RPM and hence the frequency. • The maximum opening of guide vanes increases RPM of turbine and Hence frequency is increased.
  • 19. • Reacts to sudden change of generator load by giving corresponding excitation voltage, under the new load condition. • Two units of AVR are in use. • Here it helps in stabilizing the output voltage from the generator remain constant to 6.6 KV. GOVERNOR (AUTOMATIC VOLTAGE REGULATOR )
  • 20. EXCITATION SYSTEM • Brushless (ac) excitation system • With rotating rectifiers ,the need for slips rings and brushes is eliminated.
  • 21. EXCITER STATOR WINDING • Here, the exciter has stationary field winding • The rectifier output of pilot exciter stator energises the stationary field of the ac exciter
  • 22. EXCITER ROTOR WINDING • Here, the exciter has rotating armature winding • The voltage regulator controls the ac exciter field
  • 23. CONTROL PANNEL FOR BATTERY BACKUP • The voltage of battery backup is 110V • The cooling system and several lighting system is supplied with battery backup at emergency conditions.
  • 24. Figure: Generator and excitor • GENERATOR  Two, salient pole rotor type synchronous generator  Output : 3 phase, 6.6K V ; 18.8 MVA  Power factor: 0.85  No. of poles and speed: 8 pole, 750 rpm  Excitation voltage: 130 V  Excitation system: brushless •
  • 25. LA Generato r bus Power transformer 6.6/132 KV SF6 Circuit breaker SF6 Circuit breaker Circuit breaker CT CT CT isolator isolator isolator isolator isolator isolator Three units of Capacitive voltage transformer H E T A U D A S U I T A C H A R Mainbusbar 132 kv Feeder busbar 132 KV SINGLE LINE DIAGRAM OF SWITCHYARD
  • 27. RESERVOIR SURGE TANK FRANCIS-1 FRANCIS -2 GENERATOR -1 6.6KV,18.8 MVA SWICHTAR,LDC HEUTADA GENERATOR -2 6.6KV,18.8 MVA POWER TRANSFORMER 6.6KV/132KV, 37.8 MVA BURSHLES S EXCITOR BRUSHLES S EXCITOR Rapti river Mandu river Out flow of KL-1 MAIN BUSBAR 132 KV ENERGY FLOW DIAGRAM
  • 28. PROTECTION SCHEME CURRENT TRANSFORMER Three CT’s of rating 500-250/5A are used for over current protection of 132KV line.  for the protection of transformer ,CT’s of rating 200/5A. For the protection of generator ,CT’s of 2000/5A are used.
  • 29. POTENTIAL TRANSFORMER Three PT’s of rating 132KV/110V are used for 132KV bus bar protection(1 per phase).  PT’s of rating 6.6KV/110V are used for over voltage and under voltage protection of both unit of generators.
  • 30. CIRCUIT BREAKERS For the protection of 132KV line in switchyard, SF6 circuit breaker is used. For the protection of 6.6KV line, vacuum circuit breaker is used. Air circuit breaker are used in low tension system.
  • 32. RELAY TYPE USES DIFFERENTIAL RELAY For the protection of generators, transformers and bus bar of kulekhani-2. OVER CURRENT RELAY In case of external faults of KL-2.like phase to ground fault, phase to phase fault, double phase to ground fault. OVER VOLTAGE AND UNDER VOLTAGE RELAY Protects the system from abnormal high and low voltage.
  • 36.  To solve black out in whole Nepal power system network, firstly Khulekhani I is operated which supplies power to the grid and to Khulekhani II as well. Thereafter Khulekhani II is operated and adds its power to the grid.  Then the remaining hydropower plants is operated by taking excitation from the grid. KHULEKHANI I and II: INITIALIZER TO SOLVE BLACK OUT
  • 37.  On Jestha 2075, damper winding of rotor of unit 2 generator was damaged. Then, repairing process was done. Now the unit is operating smoothly.  Recently, automatic remote controller for cranes to lift the turbines, generators, exciter etc. is being set up. Maintenance and Upgrade Activities