Seven hundred million cubic
meters of natural gas that
arise as a byproduct of oil-
drilling operations are flared
in Nigeria every day. The Ikot
Abasi aluminium plant forms
part of the government's plan
to make economically effi-
cient use of that gas.
Julius Berger Nigeria PLC,
Bilfinger Berger AG's Nigerian
affiliate, was lead manager of
the joint venture for the civil
construction works of the
aluminium plant. In addition
to the electrolytic plant, a
gas-turbine power plant, a
jetty and a number of buil-
dings ready for occupation,
were also constructed. The
customer was Ferrostaal AG,
Essen, as general contractor.
Extensive dredging had to be
done before work could start
on the plant on the Imo river
which lies in the swampy
area of the Niger delta. Se-
veral million cubic meters of
sand had to be dredged up
for filling up the site. A 720 m
long electrolytic plant, consi-
sting of four bays 21 m wide,
each of which is equipped
with 108 smelting furnaces,
was built on the 800,000 m²
site. Although those buildings
rest on footing or strip foun-
dations, piles had to be
driven to support the heavier
items of equipment. Rein-
forced, prefabricated con-
crete piles were driven to
depths of up to 45 m for that
purpose.
The electric power for
processing the aluminium ore
is generated by a gas turbine
power plant consisting of six
blocks and designed for a
total output of 540 MW. The
natural gas for operating the
power plant is supplied by a
100-km pipeline from Bonny
oil fields.
Since Ikot Abasi is difficult to
reach from the inland side,
raw materials and the finished
products are shipped in and
out by water. The joint ven-
ture therefore built a 300 m
long finger pier on the bank
of the Imo river. A four-
kilometer road links the pier
to the plant.
Ikot Abasi, which has a capa-
city of 193,000 metric tons
annually, is one of Africa's
largest aluminium plants.
n Contract Value:
USD (m) 392.7
n Construction Period:
04/1990 - 12/1999
n Client:
Ferrostaal AG, Essen
n Services:
Civil works for an
aluminium smelter plant
incl. infrastructure
Reg.31-JB-500-19.5.821-00-A
Aluminium PlantAluminium PlantAluminium PlantAluminium Plant
Ikot AbasiIkot AbasiIkot AbasiIkot Abasi,,,,
NigeriaNigeriaNigeriaNigeria

More Related Content

Similar to Alu Plant

Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...haxxo24
 
Ywct Short Presentation Exe
Ywct   Short Presentation ExeYwct   Short Presentation Exe
Ywct Short Presentation Exematanp
 
Final Report BSp
Final Report BSpFinal Report BSp
Final Report BSpArpit Dubey
 
TNB Manjung Power Plant
TNB Manjung Power PlantTNB Manjung Power Plant
TNB Manjung Power PlantAzman Hamzah
 
TNB Manjung Power Plant
TNB Manjung Power PlantTNB Manjung Power Plant
TNB Manjung Power PlantAzman Hamzah
 
PIS Obajana - Cement Factory
PIS Obajana - Cement FactoryPIS Obajana - Cement Factory
PIS Obajana - Cement FactorySven Maedler
 
Innovative engineering design in circulating fluid bed technology
Innovative engineering design in circulating fluid bed technologyInnovative engineering design in circulating fluid bed technology
Innovative engineering design in circulating fluid bed technologyIgor Sidorenko
 
medupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorialmedupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorialRiaan Barwise
 
MedupiFactSheetSept2013
MedupiFactSheetSept2013MedupiFactSheetSept2013
MedupiFactSheetSept2013Matthew Wright
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
Strategic Audit - ezzsteel
Strategic Audit - ezzsteelStrategic Audit - ezzsteel
Strategic Audit - ezzsteelMohamed Kenawy
 
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy
 
IRJET- Fabrication of Foundry Cum Forging Furnace
IRJET- Fabrication of Foundry Cum Forging FurnaceIRJET- Fabrication of Foundry Cum Forging Furnace
IRJET- Fabrication of Foundry Cum Forging FurnaceIRJET Journal
 
Naice 2006 full paper building local capability (case study of agbami project)
Naice 2006 full paper building local capability (case study of agbami project)Naice 2006 full paper building local capability (case study of agbami project)
Naice 2006 full paper building local capability (case study of agbami project)Luis Luis
 
EuroChem reveals phosphate expansion plans at Kovdor and beyond | Industrial ...
EuroChem reveals phosphate expansion plans at Kovdor and beyond | Industrial ...EuroChem reveals phosphate expansion plans at Kovdor and beyond | Industrial ...
EuroChem reveals phosphate expansion plans at Kovdor and beyond | Industrial ...James Sean Dickson FGS
 
Hywind sheringham-shoal
Hywind sheringham-shoalHywind sheringham-shoal
Hywind sheringham-shoalStatoil
 

Similar to Alu Plant (20)

Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...Bharat aluminium company ltd. (balco) mechanical vocational training report h...
Bharat aluminium company ltd. (balco) mechanical vocational training report h...
 
Ywct Short Presentation Exe
Ywct   Short Presentation ExeYwct   Short Presentation Exe
Ywct Short Presentation Exe
 
Final Report BSp
Final Report BSpFinal Report BSp
Final Report BSp
 
TNB Manjung Power Plant
TNB Manjung Power PlantTNB Manjung Power Plant
TNB Manjung Power Plant
 
TNB Manjung Power Plant
TNB Manjung Power PlantTNB Manjung Power Plant
TNB Manjung Power Plant
 
PIS Obajana - Cement Factory
PIS Obajana - Cement FactoryPIS Obajana - Cement Factory
PIS Obajana - Cement Factory
 
Innovative engineering design in circulating fluid bed technology
Innovative engineering design in circulating fluid bed technologyInnovative engineering design in circulating fluid bed technology
Innovative engineering design in circulating fluid bed technology
 
Aluminium World Journal 2022
Aluminium World Journal 2022Aluminium World Journal 2022
Aluminium World Journal 2022
 
medupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorialmedupi-kusile-south-africa-editorial
medupi-kusile-south-africa-editorial
 
gilgel gibe dam
gilgel gibe damgilgel gibe dam
gilgel gibe dam
 
Bsp ppt
Bsp pptBsp ppt
Bsp ppt
 
MedupiFactSheetSept2013
MedupiFactSheetSept2013MedupiFactSheetSept2013
MedupiFactSheetSept2013
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
Strategic audit ezz steel
Strategic audit  ezz steelStrategic audit  ezz steel
Strategic audit ezz steel
 
Strategic Audit - ezzsteel
Strategic Audit - ezzsteelStrategic Audit - ezzsteel
Strategic Audit - ezzsteel
 
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017
 
IRJET- Fabrication of Foundry Cum Forging Furnace
IRJET- Fabrication of Foundry Cum Forging FurnaceIRJET- Fabrication of Foundry Cum Forging Furnace
IRJET- Fabrication of Foundry Cum Forging Furnace
 
Naice 2006 full paper building local capability (case study of agbami project)
Naice 2006 full paper building local capability (case study of agbami project)Naice 2006 full paper building local capability (case study of agbami project)
Naice 2006 full paper building local capability (case study of agbami project)
 
EuroChem reveals phosphate expansion plans at Kovdor and beyond | Industrial ...
EuroChem reveals phosphate expansion plans at Kovdor and beyond | Industrial ...EuroChem reveals phosphate expansion plans at Kovdor and beyond | Industrial ...
EuroChem reveals phosphate expansion plans at Kovdor and beyond | Industrial ...
 
Hywind sheringham-shoal
Hywind sheringham-shoalHywind sheringham-shoal
Hywind sheringham-shoal
 

Alu Plant

  • 1. Seven hundred million cubic meters of natural gas that arise as a byproduct of oil- drilling operations are flared in Nigeria every day. The Ikot Abasi aluminium plant forms part of the government's plan to make economically effi- cient use of that gas. Julius Berger Nigeria PLC, Bilfinger Berger AG's Nigerian affiliate, was lead manager of the joint venture for the civil construction works of the aluminium plant. In addition to the electrolytic plant, a gas-turbine power plant, a jetty and a number of buil- dings ready for occupation, were also constructed. The customer was Ferrostaal AG, Essen, as general contractor. Extensive dredging had to be done before work could start on the plant on the Imo river which lies in the swampy area of the Niger delta. Se- veral million cubic meters of sand had to be dredged up for filling up the site. A 720 m long electrolytic plant, consi- sting of four bays 21 m wide, each of which is equipped with 108 smelting furnaces, was built on the 800,000 m² site. Although those buildings rest on footing or strip foun- dations, piles had to be driven to support the heavier items of equipment. Rein- forced, prefabricated con- crete piles were driven to depths of up to 45 m for that purpose. The electric power for processing the aluminium ore is generated by a gas turbine power plant consisting of six blocks and designed for a total output of 540 MW. The natural gas for operating the power plant is supplied by a 100-km pipeline from Bonny oil fields. Since Ikot Abasi is difficult to reach from the inland side, raw materials and the finished products are shipped in and out by water. The joint ven- ture therefore built a 300 m long finger pier on the bank of the Imo river. A four- kilometer road links the pier to the plant. Ikot Abasi, which has a capa- city of 193,000 metric tons annually, is one of Africa's largest aluminium plants. n Contract Value: USD (m) 392.7 n Construction Period: 04/1990 - 12/1999 n Client: Ferrostaal AG, Essen n Services: Civil works for an aluminium smelter plant incl. infrastructure Reg.31-JB-500-19.5.821-00-A Aluminium PlantAluminium PlantAluminium PlantAluminium Plant Ikot AbasiIkot AbasiIkot AbasiIkot Abasi,,,, NigeriaNigeriaNigeriaNigeria