BenWhite PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK
(Including PossibleContingency
Plans If ProblemsAnticipated)
Mon W/B
02/03/15
(Detailed Weekly
Summary)
ThisweekIhave begunresearch.Itis
goingwell sofar butI will needanother
weektofinish.
NextweekIplanto finishmostof
my researchandbeginsome test
drawingsof environments
Mon W/B
09/03/15
(Detailed Weekly
Summary)
ThisweekIhave done some more of my
research,butfocusedmore onmy test
drawings.Ihave createdtwopiecesin
charcoal followingandrecreating
sectionsof a largerpiece createdbythe
artist‘AdamAdamowicz’
NextweekIplanto continue
researchand finishthese drawings.
I alsoneedto beginworkon
planningthe pitch.
Mon W/B
16/03/15
(Detailed Weekly
Summary)
Thisweek,Ispenta lotof time creating
and finishingthe pitchforuse next
Monday.I have also finishedmythird
charcoal drawing.
NextweekIneedtoperformmy
pitchand mightstart workon an
environmental drawinginAdobe
Illustrator.
Mon W/B
23/03/15
(Detailed Weekly
Summary)
ThisweekIhave performedmypitch.I
believeitwentbetterthanIthoughtit
wouldandI managedto speakquite a
bit.Also,Ihave decidedthatitwouldbe
bestto continue studiesincharcoal ad
not onillustrator,sohave begunwork
on a character incharcoal wo I wasable
to finishonFriday.Thiswasto practise
the humanshape in charcoal whilstalso
designingvariousapparel
NextweekIplanto create another
studybasedon Fallout3.
Mon W/B
30/03/15
(Detailed Weekly
Summary)
ThisweekIhave beenworkingona
piece fromconceptart on Fallout3.It
containsa character, a dg and a
destroyed environmentwhichwouldbe
quite useful todraw andwouldbe
similartomy final piece
NextweekIplanto finishthispiece.
It isnearlycomplete,soIplanto
beginanotherstudynextweektoo.
Mon W/B
06/04/15
(Detailed Weekly
Summary)
ThisweekI have finishedmyFallout3
piece andhave begunworkon a piece of
conceptart from The Last of Us. It
containsa farm house thathas been
abandonedandlefttorot overtime and
I coulduse ideasformedinhispiece to
add extradetail tobuildingsinmy final
piece.
Nextweek,Iplantocontinue work
on the Last of Us piece whilstalso
beginwritingupevaluationsof my
workso far and addingitall to my
sketchbook.I do notexpectthis
piece tobe complete nextweekas
there isa lot to add andthinkabout
Mon W/B
13/04/15
(Detailed Weekly
Summary)
ThisweekIhave beenable tosort out
my sketchbookslayout,aswell asadd
evaluationsforeachpiece sofar.I have
alsoaddedtissue papertocertainpages
to stopany charcoal notaffectedbyhair
spray to notsmudge mybook.
NextweekIplanto finishthe Last
of Us piece.
BTEC ExtendedDiplomainCreativeMediaProduction
IG4 Final MajorProject
ProductionDiary
Mon W/B
20/04/15
(Detailed Weekly
Summary)
ThisweekIhave beenable tofinishthe
lastof us piece.Itlooksquite god,
however,Ibelieve Ineedtoimprove on
detail and lightingeffects.
NextweekIplanoncreatingthings
frommy ownmindsuch as test
characters,areas or details.
Mon W/B
27/04/15
(Detailed Weekly
Summary)
Thisweek,Ihave drawna few basic
character designsfrommyownmind.
There are 3 so far and I have alsomade a
small scenerypiece containingabroken
buildingwithacharacterlookinglike he
isabout to attack a monsteror enemy. I
have alsodesignedadestroyedcarand
buildingtotestouthow well these
wouldlookandI quite like them.
NextweekIplanonbeginningmy
firstfinal piece andIplanto set this
ina forestenvironmentor
countryside.
Mon W/B
04/05/15
(Detailed Weekly
Summary)
Thisweek,Ihave beenable tostart and
complete the firstpiece inthe time
provided.Itissetinthe countryside and
containsa viewof a brokenroad and
destroyednature.
NextweekIplanoncreatedthe
secondpiece whichIam planning
to setin a cityenvironment.
Mon W/B
11/05/15
(Detailed Weekly
Summary)
Thisweek,Ihave beenable tocomplete
the secondfinal piece.Thisone isset
fromthe viewof a tall building,
overlookingthe statue of libertyand
othersky-scrapersinthe distance.
NextweekIplanonmakingthe
thirdpiece whichwill alsobe setin
a city.
Mon W/B
18/05/15
(Detailed Weekly
Summary)
Thisweek,Ihave beenable tocomplete
the thirdpiece,andstart the fourthand
final.The thirdpiece issetfromthe view
of a crow whoisoverlookingthe
destructionof a city.The fourthpiece so
far isset fromthe view of the
countryside andIam planningtoplace a
brokencityinthe centre.
Nextweek,Iwill finishthispiece
and beginimprovements.
Mon W/B
25/05/15
(Detailed Weekly
Summary)
The fourthpiece isnow complete and
containsan overview of abrokencity
that has been bombed,aswell ashe
surroundingfarmland.
Nextweek,Iwill startandcomplete
the evaluationandfinalize the blog.
Mon W/B
01/06/15
(Detailed Weekly
Summary)
On the final week,Ihave now just
completedhe evaluationandhave
previouslyfinishedwork ensuringall of
the correct workis on displayinmy
sketchbookaswell asmyblog.
PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK
(IncludingPossible Contingency
Plans)

More Related Content

Viewers also liked

¿Cuál es el mejor programa para hacer software para empresas?
¿Cuál es el mejor programa para hacer software para empresas?¿Cuál es el mejor programa para hacer software para empresas?
¿Cuál es el mejor programa para hacer software para empresas?Fred Lores
 
Tugas mtk 1
Tugas mtk 1Tugas mtk 1
Tugas mtk 1Ria_29
 
การเขียนโปรแกรมภาษา
การเขียนโปรแกรมภาษา การเขียนโปรแกรมภาษา
การเขียนโปรแกรมภาษา Chanikan Kongkaew
 
TEC Indonesia for AEC 2016
TEC Indonesia for AEC 2016TEC Indonesia for AEC 2016
TEC Indonesia for AEC 2016Ferry Pranata
 
Componentes de Business Intelligence
Componentes de Business IntelligenceComponentes de Business Intelligence
Componentes de Business IntelligenceCarlos Escobar
 
Contents page analysis
Contents page analysisContents page analysis
Contents page analysisJamallywal1998
 
Díptico biblio familias
Díptico biblio familiasDíptico biblio familias
Díptico biblio familiascrasadaba
 
Narrative structures
Narrative structuresNarrative structures
Narrative structuresRoss Hardman
 

Viewers also liked (11)

Feature overview
Feature overviewFeature overview
Feature overview
 
¿Cuál es el mejor programa para hacer software para empresas?
¿Cuál es el mejor programa para hacer software para empresas?¿Cuál es el mejor programa para hacer software para empresas?
¿Cuál es el mejor programa para hacer software para empresas?
 
Tugas mtk 1
Tugas mtk 1Tugas mtk 1
Tugas mtk 1
 
การเขียนโปรแกรมภาษา
การเขียนโปรแกรมภาษา การเขียนโปรแกรมภาษา
การเขียนโปรแกรมภาษา
 
TEC Indonesia for AEC 2016
TEC Indonesia for AEC 2016TEC Indonesia for AEC 2016
TEC Indonesia for AEC 2016
 
Componentes de Business Intelligence
Componentes de Business IntelligenceComponentes de Business Intelligence
Componentes de Business Intelligence
 
Leadership styles and engagement
Leadership styles and engagementLeadership styles and engagement
Leadership styles and engagement
 
Love2Love Design Slideshow
Love2Love Design SlideshowLove2Love Design Slideshow
Love2Love Design Slideshow
 
Contents page analysis
Contents page analysisContents page analysis
Contents page analysis
 
Díptico biblio familias
Díptico biblio familiasDíptico biblio familias
Díptico biblio familias
 
Narrative structures
Narrative structuresNarrative structures
Narrative structures
 

Similar to Production diary

Production diary done
Production diary doneProduction diary done
Production diary doneElliotBlack
 
Jamie shepherd final major project projection diary
Jamie shepherd final major project projection diaryJamie shepherd final major project projection diary
Jamie shepherd final major project projection diaryJamieShepherd
 
Terence Byrne Art FMP Production Diary
Terence Byrne Art FMP Production DiaryTerence Byrne Art FMP Production Diary
Terence Byrne Art FMP Production Diaryterry96
 
Lastproduction jordan2
Lastproduction jordan2Lastproduction jordan2
Lastproduction jordan2Shaz Riches
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis bradyLewisB2013
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis bradyLewisB2013
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis bradyLewisB2013
 
Ben white final major project production diary template 2014_2015 2
Ben white final major project production diary template 2014_2015 2Ben white final major project production diary template 2014_2015 2
Ben white final major project production diary template 2014_2015 2BenWhite101
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis bradyLewisB2013
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis bradyLewisB2013
 
FMP Production Diary Lewis Brady
FMP Production Diary Lewis BradyFMP Production Diary Lewis Brady
FMP Production Diary Lewis BradyLewisB2013
 
ART Production Diary
ART Production DiaryART Production Diary
ART Production Diarybowes96123
 
Final major project production diary template 2014 2015
Final major project production diary template 2014 2015Final major project production diary template 2014 2015
Final major project production diary template 2014 2015LewisDunn
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis bradyLewisB2013
 
Final major project production diary - Terence Byrne
Final major project production diary  -  Terence ByrneFinal major project production diary  -  Terence Byrne
Final major project production diary - Terence Byrneterry96
 
FMP Art Production Log
FMP Art Production LogFMP Art Production Log
FMP Art Production LogSamDuxburyGDS
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis bradyLewisB2013
 
Final major project production diary template
Final major project production diary templateFinal major project production diary template
Final major project production diary templatekelseykiki
 

Similar to Production diary (20)

Production diary done
Production diary doneProduction diary done
Production diary done
 
Jamie shepherd final major project projection diary
Jamie shepherd final major project projection diaryJamie shepherd final major project projection diary
Jamie shepherd final major project projection diary
 
Terence Byrne Art FMP Production Diary
Terence Byrne Art FMP Production DiaryTerence Byrne Art FMP Production Diary
Terence Byrne Art FMP Production Diary
 
Lastproduction jordan2
Lastproduction jordan2Lastproduction jordan2
Lastproduction jordan2
 
FMP Weekly Dairy
FMP Weekly DairyFMP Weekly Dairy
FMP Weekly Dairy
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis brady
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis brady
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis brady
 
Index
IndexIndex
Index
 
Ben white final major project production diary template 2014_2015 2
Ben white final major project production diary template 2014_2015 2Ben white final major project production diary template 2014_2015 2
Ben white final major project production diary template 2014_2015 2
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis brady
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis brady
 
FMP Production Diary Lewis Brady
FMP Production Diary Lewis BradyFMP Production Diary Lewis Brady
FMP Production Diary Lewis Brady
 
ART Production Diary
ART Production DiaryART Production Diary
ART Production Diary
 
Final major project production diary template 2014 2015
Final major project production diary template 2014 2015Final major project production diary template 2014 2015
Final major project production diary template 2014 2015
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis brady
 
Final major project production diary - Terence Byrne
Final major project production diary  -  Terence ByrneFinal major project production diary  -  Terence Byrne
Final major project production diary - Terence Byrne
 
FMP Art Production Log
FMP Art Production LogFMP Art Production Log
FMP Art Production Log
 
Final major project production diary lewis brady
Final major project production diary lewis bradyFinal major project production diary lewis brady
Final major project production diary lewis brady
 
Final major project production diary template
Final major project production diary templateFinal major project production diary template
Final major project production diary template
 

More from BenWhite101

Ben white final major project production diary template 2014_2015 2
Ben white final major project production diary template 2014_2015 2Ben white final major project production diary template 2014_2015 2
Ben white final major project production diary template 2014_2015 2BenWhite101
 
Fmp presentatatat
Fmp presentatatatFmp presentatatat
Fmp presentatatatBenWhite101
 
Story boards and level recognisance
Story boards and level recognisanceStory boards and level recognisance
Story boards and level recognisanceBenWhite101
 
Story boards and level recognisance
Story boards and level recognisanceStory boards and level recognisance
Story boards and level recognisanceBenWhite101
 
Story boards and level recognisance
Story boards and level recognisanceStory boards and level recognisance
Story boards and level recognisanceBenWhite101
 
Enviromental art research
Enviromental art researchEnviromental art research
Enviromental art researchBenWhite101
 
Enviromental art research
Enviromental art researchEnviromental art research
Enviromental art researchBenWhite101
 
Enviromental art research
Enviromental art researchEnviromental art research
Enviromental art researchBenWhite101
 
Fmp pitch script2
Fmp pitch script2Fmp pitch script2
Fmp pitch script2BenWhite101
 
Final major project proposal form contrast
Final major project proposal form contrastFinal major project proposal form contrast
Final major project proposal form contrastBenWhite101
 

More from BenWhite101 (20)

Evaluation fmp
Evaluation   fmpEvaluation   fmp
Evaluation fmp
 
Ben white final major project production diary template 2014_2015 2
Ben white final major project production diary template 2014_2015 2Ben white final major project production diary template 2014_2015 2
Ben white final major project production diary template 2014_2015 2
 
Fmp presentatatat
Fmp presentatatatFmp presentatatat
Fmp presentatatat
 
Q cards
Q cardsQ cards
Q cards
 
Story boards and level recognisance
Story boards and level recognisanceStory boards and level recognisance
Story boards and level recognisance
 
Story boards and level recognisance
Story boards and level recognisanceStory boards and level recognisance
Story boards and level recognisance
 
Story boards and level recognisance
Story boards and level recognisanceStory boards and level recognisance
Story boards and level recognisance
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Enviromental art research
Enviromental art researchEnviromental art research
Enviromental art research
 
Evaluation art
Evaluation artEvaluation art
Evaluation art
 
Enviromental art research
Enviromental art researchEnviromental art research
Enviromental art research
 
Fmp pitch
Fmp pitchFmp pitch
Fmp pitch
 
Enviromental art research
Enviromental art researchEnviromental art research
Enviromental art research
 
Fmp pitch script2
Fmp pitch script2Fmp pitch script2
Fmp pitch script2
 
Work flow 4
Work flow 4Work flow 4
Work flow 4
 
Work flow 4
Work flow 4Work flow 4
Work flow 4
 
Engine flow
Engine flowEngine flow
Engine flow
 
Uv flow
Uv flowUv flow
Uv flow
 
Final major project proposal form contrast
Final major project proposal form contrastFinal major project proposal form contrast
Final major project proposal form contrast
 
Research
ResearchResearch
Research
 

Production diary

  • 1. BTEC ExtendedDiplomainCreativeMediaProduction IG4 Final MajorProject ProductionDiary BenWhite PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (Including PossibleContingency Plans If ProblemsAnticipated) Mon W/B 02/03/15 (Detailed Weekly Summary) ThisweekIhave begunresearch.Itis goingwell sofar butI will needanother weektofinish. NextweekIplanto finishmostof my researchandbeginsome test drawingsof environments Mon W/B 09/03/15 (Detailed Weekly Summary) ThisweekIhave done some more of my research,butfocusedmore onmy test drawings.Ihave createdtwopiecesin charcoal followingandrecreating sectionsof a largerpiece createdbythe artist‘AdamAdamowicz’ NextweekIplanto continue researchand finishthese drawings. I alsoneedto beginworkon planningthe pitch. Mon W/B 16/03/15 (Detailed Weekly Summary) Thisweek,Ispenta lotof time creating and finishingthe pitchforuse next Monday.I have also finishedmythird charcoal drawing. NextweekIneedtoperformmy pitchand mightstart workon an environmental drawinginAdobe Illustrator. Mon W/B 23/03/15 (Detailed Weekly Summary) ThisweekIhave performedmypitch.I believeitwentbetterthanIthoughtit wouldandI managedto speakquite a bit.Also,Ihave decidedthatitwouldbe bestto continue studiesincharcoal ad not onillustrator,sohave begunwork on a character incharcoal wo I wasable to finishonFriday.Thiswasto practise the humanshape in charcoal whilstalso designingvariousapparel NextweekIplanto create another studybasedon Fallout3. Mon W/B 30/03/15 (Detailed Weekly Summary) ThisweekIhave beenworkingona piece fromconceptart on Fallout3.It containsa character, a dg and a destroyed environmentwhichwouldbe quite useful todraw andwouldbe similartomy final piece NextweekIplanto finishthispiece. It isnearlycomplete,soIplanto beginanotherstudynextweektoo. Mon W/B 06/04/15 (Detailed Weekly Summary) ThisweekI have finishedmyFallout3 piece andhave begunworkon a piece of conceptart from The Last of Us. It containsa farm house thathas been abandonedandlefttorot overtime and I coulduse ideasformedinhispiece to add extradetail tobuildingsinmy final piece. Nextweek,Iplantocontinue work on the Last of Us piece whilstalso beginwritingupevaluationsof my workso far and addingitall to my sketchbook.I do notexpectthis piece tobe complete nextweekas there isa lot to add andthinkabout Mon W/B 13/04/15 (Detailed Weekly Summary) ThisweekIhave beenable tosort out my sketchbookslayout,aswell asadd evaluationsforeachpiece sofar.I have alsoaddedtissue papertocertainpages to stopany charcoal notaffectedbyhair spray to notsmudge mybook. NextweekIplanto finishthe Last of Us piece.
  • 2. BTEC ExtendedDiplomainCreativeMediaProduction IG4 Final MajorProject ProductionDiary Mon W/B 20/04/15 (Detailed Weekly Summary) ThisweekIhave beenable tofinishthe lastof us piece.Itlooksquite god, however,Ibelieve Ineedtoimprove on detail and lightingeffects. NextweekIplanoncreatingthings frommy ownmindsuch as test characters,areas or details. Mon W/B 27/04/15 (Detailed Weekly Summary) Thisweek,Ihave drawna few basic character designsfrommyownmind. There are 3 so far and I have alsomade a small scenerypiece containingabroken buildingwithacharacterlookinglike he isabout to attack a monsteror enemy. I have alsodesignedadestroyedcarand buildingtotestouthow well these wouldlookandI quite like them. NextweekIplanonbeginningmy firstfinal piece andIplanto set this ina forestenvironmentor countryside. Mon W/B 04/05/15 (Detailed Weekly Summary) Thisweek,Ihave beenable tostart and complete the firstpiece inthe time provided.Itissetinthe countryside and containsa viewof a brokenroad and destroyednature. NextweekIplanoncreatedthe secondpiece whichIam planning to setin a cityenvironment. Mon W/B 11/05/15 (Detailed Weekly Summary) Thisweek,Ihave beenable tocomplete the secondfinal piece.Thisone isset fromthe viewof a tall building, overlookingthe statue of libertyand othersky-scrapersinthe distance. NextweekIplanonmakingthe thirdpiece whichwill alsobe setin a city. Mon W/B 18/05/15 (Detailed Weekly Summary) Thisweek,Ihave beenable tocomplete the thirdpiece,andstart the fourthand final.The thirdpiece issetfromthe view of a crow whoisoverlookingthe destructionof a city.The fourthpiece so far isset fromthe view of the countryside andIam planningtoplace a brokencityinthe centre. Nextweek,Iwill finishthispiece and beginimprovements. Mon W/B 25/05/15 (Detailed Weekly Summary) The fourthpiece isnow complete and containsan overview of abrokencity that has been bombed,aswell ashe surroundingfarmland. Nextweek,Iwill startandcomplete the evaluationandfinalize the blog. Mon W/B 01/06/15 (Detailed Weekly Summary) On the final week,Ihave now just completedhe evaluationandhave previouslyfinishedwork ensuringall of the correct workis on displayinmy sketchbookaswell asmyblog. PROGRESS UPDATE PLAN FOR NEXT MONTH / WEEK (IncludingPossible Contingency Plans)