SlideShare a Scribd company logo
1 of 2
Bablu Kumar Badal
Address: H NO 1423/23,phase-11,mohali (Punjab) Ph: 9780547080 / 8146507080
Pin Code: 160062 Email:bablubadal3737@gmail.com
ENGINEER
MICROWAVE TRANSMISSION OPERATION & MAINTAINENCE
Result oriented, proactive and hard working and 2 years of achievement driven experience in Telecom Industry.
Hands on experience on Synchronous Digital Hierarchy SDH including various architectures, Testing techniques,
protection techniques & synchronization methods used in SDH and implementing in Field. Exposure to
implementation, commissioning, NE Testing, Link Testing and traffic routing of E1 and STM's. Hands on experience
on Huawei,Fibcom, ECI & NEC. Complete knowledge of Transmission, SDH, PDH, End to End link Testing.
Exposure to Project tracking, Management Reports. Outstanding communication Skills, verbal as well as written
coupled with good presentation skills.
Professional Strengths Includes
Huawei Optix manger T200 for Huawei NEC MW NMS – PNMS for SDH/PDH Hops
Transmission Equipments OSN2500/3500 ECI EMS_BGF
Converter configeration. FIBCOM NMS- Tellabs 6300 Network Manager
NE Testing/ Link Testing. Alarm Troubleshooting/Inventory Mgmt
HP Rauter configer ation MW Link Visibilities on NMS via IP.
ECI & FIBCOM MUX Management via DCC Huawei rauter configeration
EDUCATION
Bachelor of science
Pujab technical university
PROFESSIONAL EXPERIENCE
Synergy Consultant Pvt. Ltd. Aug, 2013 to Aug 2014
Worked for VIDEOCON TELECOMMUNICTIONS LTD. India’s Leading GSM Company functional in
7 circles ,
Presently working in wipro infotech pvt.Ltd. Aug 2014 to till date
Engineer-Transmission Backend Support.
• Looking after transmission backend operation for MW(SDH+PDH),SDH Equipment including ECI
BG-20, FIBCOM-6325, Huawei OSN Metro-100,OSN2500,OSN3500.
• Installation & commissioning of FIBCOM MUX 6325,6335 &6314.
• Hands on experience on FIBCOM EMS-Tellabs 6300 Extended Craft Terminal.
• Hands on experience on FIBCOM NMS – FIBCOM 6300 Network Manger.
• Responsible for Managing more than2200 Hops in Punjab LSA & 1300 Hops in Haryana circle
Of NEC MW Family via PNMS (Passolink Network Management system Version- 1.19.000.007).
• Arrange Planned Events for Link Rectification Activities.
• Alarm Log analysis for MW & SDH equipments.
• DMR report circulation for Daily Count of Critical Alarms on MW & SDH Fiber Network.
• Validation of Daily Outages from Transmission end which further includes there complete RCA &
Rectification Plan.
• Monitoring, identifying, analyzing and rectifying any technical problem in the Network using NEC,FIBCOM
through the centralized NMS’s and restoration of the system equipment to normal functional order with minimum
traffic disruption
INDUSTRIAL TRAINING
AlcaTel lucent network Management ,Chandigarh(IT Park)
Have done 6 months industrial training in in GSM Dept. in BSS & MW
Transmission domain.
Ensure installation & commissioning of SDH & PDH hops.
Alarms monitoring of Huawei BSC, NEC MW NMS, Fibcom, Tejas, NMS & ECI EMS BGF for BG20.
PERSONAL DETAILS
Date Of Birth 15.10.1992
Languages known English, Hindi and Punjabi
Date: (Bablu Kumar Badal)
Place:

More Related Content

What's hot

02 rn31572 en20gla1_kpi_overview
02 rn31572 en20gla1_kpi_overview02 rn31572 en20gla1_kpi_overview
02 rn31572 en20gla1_kpi_overview
Zhi Huang
 
kamran cv updated
kamran cv updatedkamran cv updated
kamran cv updated
kamran alvi
 
jay prakash_Resume
jay prakash_Resumejay prakash_Resume
jay prakash_Resume
jay prakash
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
Jean de la Sagesse
 
Cv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cvCv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cv
Farhan Awan
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
abdul jabbar
 
Optimisation guide line ver1.1
Optimisation guide line ver1.1Optimisation guide line ver1.1
Optimisation guide line ver1.1
Chandra Deria
 
24 Years Proven Performance in Telecom
24 Years Proven Performance in Telecom24 Years Proven Performance in Telecom
24 Years Proven Performance in Telecom
Joe Jarrell
 
CV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANYCV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANY
Amit Kumar
 

What's hot (20)

RAN_CV_Gyanendra Patel
RAN_CV_Gyanendra PatelRAN_CV_Gyanendra Patel
RAN_CV_Gyanendra Patel
 
How to resolve irat kpi issue in huawei
How to resolve irat kpi issue in huaweiHow to resolve irat kpi issue in huawei
How to resolve irat kpi issue in huawei
 
introduction to parameter planning
introduction to parameter planningintroduction to parameter planning
introduction to parameter planning
 
Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015
 
02 rn31572 en20gla1_kpi_overview
02 rn31572 en20gla1_kpi_overview02 rn31572 en20gla1_kpi_overview
02 rn31572 en20gla1_kpi_overview
 
kamran cv updated
kamran cv updatedkamran cv updated
kamran cv updated
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
jay prakash_Resume
jay prakash_Resumejay prakash_Resume
jay prakash_Resume
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
 
Cv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cvCv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cv
 
Radio Frequency Front End (RFFE) MIPI core from Arasan Chip Systems
Radio Frequency Front End (RFFE) MIPI core from Arasan Chip SystemsRadio Frequency Front End (RFFE) MIPI core from Arasan Chip Systems
Radio Frequency Front End (RFFE) MIPI core from Arasan Chip Systems
 
2g 3g Drive test by deep kumar
2g 3g Drive test by deep kumar2g 3g Drive test by deep kumar
2g 3g Drive test by deep kumar
 
Introduction to Nokia RNC
Introduction to Nokia RNCIntroduction to Nokia RNC
Introduction to Nokia RNC
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
 
NSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationNSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimization
 
Optimisation guide line ver1.1
Optimisation guide line ver1.1Optimisation guide line ver1.1
Optimisation guide line ver1.1
 
24 Years Proven Performance in Telecom
24 Years Proven Performance in Telecom24 Years Proven Performance in Telecom
24 Years Proven Performance in Telecom
 
CV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANYCV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANY
 
Chap 4. call processing and handover.eng
Chap 4. call processing and handover.engChap 4. call processing and handover.eng
Chap 4. call processing and handover.eng
 
Bts installation & commisioning
Bts installation & commisioningBts installation & commisioning
Bts installation & commisioning
 

Similar to Resume (20)

AMIT _RESUME
AMIT _RESUMEAMIT _RESUME
AMIT _RESUME
 
MohdRiyazKhan_Resume
MohdRiyazKhan_ResumeMohdRiyazKhan_Resume
MohdRiyazKhan_Resume
 
Alpesh Joshi Optical Expert
Alpesh Joshi Optical ExpertAlpesh Joshi Optical Expert
Alpesh Joshi Optical Expert
 
Rahul resume.
Rahul resume.Rahul resume.
Rahul resume.
 
Junaid Eisa CV-May2016
Junaid Eisa CV-May2016Junaid Eisa CV-May2016
Junaid Eisa CV-May2016
 
Waqas_Abbasi
Waqas_AbbasiWaqas_Abbasi
Waqas_Abbasi
 
alexander Eze
alexander Ezealexander Eze
alexander Eze
 
Engr M Ali
Engr M AliEngr M Ali
Engr M Ali
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
Arshad Masih -Resume
Arshad Masih -ResumeArshad Masih -Resume
Arshad Masih -Resume
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
 
Ibrahim AlGhamdi CV
Ibrahim AlGhamdi CVIbrahim AlGhamdi CV
Ibrahim AlGhamdi CV
 
Resume
ResumeResume
Resume
 
Resume MMMagan
Resume MMMaganResume MMMagan
Resume MMMagan
 
Sangamesh reddy CV.
Sangamesh reddy CV.Sangamesh reddy CV.
Sangamesh reddy CV.
 
CV - Saif ul amIn-Mgmt
CV - Saif ul amIn-MgmtCV - Saif ul amIn-Mgmt
CV - Saif ul amIn-Mgmt
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
jack george cv
jack george cv jack george cv
jack george cv
 
deepak ResumePDF
deepak ResumePDFdeepak ResumePDF
deepak ResumePDF
 

Resume

  • 1. Bablu Kumar Badal Address: H NO 1423/23,phase-11,mohali (Punjab) Ph: 9780547080 / 8146507080 Pin Code: 160062 Email:bablubadal3737@gmail.com ENGINEER MICROWAVE TRANSMISSION OPERATION & MAINTAINENCE Result oriented, proactive and hard working and 2 years of achievement driven experience in Telecom Industry. Hands on experience on Synchronous Digital Hierarchy SDH including various architectures, Testing techniques, protection techniques & synchronization methods used in SDH and implementing in Field. Exposure to implementation, commissioning, NE Testing, Link Testing and traffic routing of E1 and STM's. Hands on experience on Huawei,Fibcom, ECI & NEC. Complete knowledge of Transmission, SDH, PDH, End to End link Testing. Exposure to Project tracking, Management Reports. Outstanding communication Skills, verbal as well as written coupled with good presentation skills. Professional Strengths Includes Huawei Optix manger T200 for Huawei NEC MW NMS – PNMS for SDH/PDH Hops Transmission Equipments OSN2500/3500 ECI EMS_BGF Converter configeration. FIBCOM NMS- Tellabs 6300 Network Manager NE Testing/ Link Testing. Alarm Troubleshooting/Inventory Mgmt HP Rauter configer ation MW Link Visibilities on NMS via IP. ECI & FIBCOM MUX Management via DCC Huawei rauter configeration EDUCATION Bachelor of science Pujab technical university PROFESSIONAL EXPERIENCE Synergy Consultant Pvt. Ltd. Aug, 2013 to Aug 2014 Worked for VIDEOCON TELECOMMUNICTIONS LTD. India’s Leading GSM Company functional in 7 circles , Presently working in wipro infotech pvt.Ltd. Aug 2014 to till date
  • 2. Engineer-Transmission Backend Support. • Looking after transmission backend operation for MW(SDH+PDH),SDH Equipment including ECI BG-20, FIBCOM-6325, Huawei OSN Metro-100,OSN2500,OSN3500. • Installation & commissioning of FIBCOM MUX 6325,6335 &6314. • Hands on experience on FIBCOM EMS-Tellabs 6300 Extended Craft Terminal. • Hands on experience on FIBCOM NMS – FIBCOM 6300 Network Manger. • Responsible for Managing more than2200 Hops in Punjab LSA & 1300 Hops in Haryana circle Of NEC MW Family via PNMS (Passolink Network Management system Version- 1.19.000.007). • Arrange Planned Events for Link Rectification Activities. • Alarm Log analysis for MW & SDH equipments. • DMR report circulation for Daily Count of Critical Alarms on MW & SDH Fiber Network. • Validation of Daily Outages from Transmission end which further includes there complete RCA & Rectification Plan. • Monitoring, identifying, analyzing and rectifying any technical problem in the Network using NEC,FIBCOM through the centralized NMS’s and restoration of the system equipment to normal functional order with minimum traffic disruption INDUSTRIAL TRAINING AlcaTel lucent network Management ,Chandigarh(IT Park) Have done 6 months industrial training in in GSM Dept. in BSS & MW Transmission domain. Ensure installation & commissioning of SDH & PDH hops. Alarms monitoring of Huawei BSC, NEC MW NMS, Fibcom, Tejas, NMS & ECI EMS BGF for BG20. PERSONAL DETAILS Date Of Birth 15.10.1992 Languages known English, Hindi and Punjabi Date: (Bablu Kumar Badal) Place: