Fresh & Easy, LLC
Campus Kitchen
Internship Project 2014
Presented By:
Project Leader: Ashford Ball
Project Sponsor: Omar Martinez
Project Leader Mentor: Omar Martinez
VIDEO
TRAINING LOG
To develop the initial platform for
the Video Training Log on the
Campus HUB that will deliver
training to our associates more
effectively and efficiently.
 Create the foundation for video training
 Low Risk Department- DCN Kettles
 Build platform for Campus HUB
 Increase associate performance and
retention of duties.
 Reset the standard of proper procedure
 Reinforcement
 Tracking and Accessibility
 Campus Hub Functionalities
 Documentation of daily tasks
 Easily attainable
 Deliverable KPI’s
 Functional Platform
 Completed Video of Kettle Operator position
 Linked Training Documentation
No. of SOPs+PPs x Time to train per SOP+PP = Total Train mins.
226 SOPs+PPs x 15mins = 3,390 train mins. per person
Total Train mins. x Kitchen headcount = Total Kitchen Train mins.
3,390 train mins x 400 workers = 1,356,000 total kitchen train
mins.
Total Kitchen train mins./60 = Total Kitchen Train hours
1,356,000 mins/60 = 22,600 total kitchen train hours
Total Kitchen Train hours x .25 x $17/hr = $Estimated Savings
22,600 hrs x .25 x $17/hr = $96,050 Estimated Savings
Current Stats
 Current training time
Kettles: 5.75 hours
 Current Spending:
$97.75
 Current Kitchen
training time: 22,600
hrs
 Current Spending:
$384,200
Possibilities
 New training time:
30mins
 New Spending $8.50
 New Kitchen Training
Time: 200 hrs
 New Kitchen
Spending: $3,400
 TO THE HUB!
Sauce Viscosity
Measurement Procedure
Low Risk Mixing Sheet
Protective Clothing &
Handwash Procedure
HAACP Procedure
Good Manufacturing Practices Paperwork and Labelling
Procedure
 Specific Safety & Health Procedures
 Emergency situations
 Handling waste and chemical materials
 More PPs (Process Procedures) covered
 Technical Procedures
 General Manufacturing Practices
 Standard Sanitation Operating
Procedures
 Many More!
 Next Steps:
 Completed Validation test
 Retention and Opportunity
 5 mock trainings completed
 Evaluation and Conclusion
How timely associates can
cook.
How quickly they can adapt
to the standard.
Following proper
procedures.
Mr. Omar Martinez (CI Manager)
Miss Sarah Coble (CI Facilitator)
Mr. Victor Sandoval (Kitchen Low Risk DM)
Mr. Paul Sung (Information Tech Campus Kitchen and DC)
Miss Donna Hahn (Kitchen Low Risk Team Lead)
Mr. Michael Smith (Kitchen Low Risk Team Lead)
Mr. Enrique Lupercio (A2 Machine Operator)
Mr. Mark Lodge (Operations Director- Vice President)
All associates in Low Risk Department
Fellow Interns
F&E Project Powerpoint

More Related Content

Viewers also liked

Basic operating procedure – haveli kitchen
Basic operating procedure – haveli kitchenBasic operating procedure – haveli kitchen
Basic operating procedure – haveli kitchenDr. Sunil Kumar
 
Sindrome de condensación 2016 -Agostini
Sindrome de condensación 2016 -AgostiniSindrome de condensación 2016 -Agostini
Sindrome de condensación 2016 -AgostiniMarcela Agostini
 
How to Convert Social Communities into Customers
How to Convert Social Communities into Customers How to Convert Social Communities into Customers
How to Convert Social Communities into Customers Real-Time OutSource
 
food and beverages curriculum guide senior high school
 food and beverages  curriculum guide senior high school food and beverages  curriculum guide senior high school
food and beverages curriculum guide senior high schoolRai Blanquera
 
Culinary art...kitchen operation
Culinary art...kitchen operationCulinary art...kitchen operation
Culinary art...kitchen operationkainlovely30
 
Standard operating procedure
Standard operating procedureStandard operating procedure
Standard operating procedureUMP
 
FOOD & BEVERAGE MANAGEMENT
FOOD & BEVERAGE MANAGEMENTFOOD & BEVERAGE MANAGEMENT
FOOD & BEVERAGE MANAGEMENTLawiex21
 
Flipped education andre
Flipped  education andreFlipped  education andre
Flipped education andre95C
 

Viewers also liked (8)

Basic operating procedure – haveli kitchen
Basic operating procedure – haveli kitchenBasic operating procedure – haveli kitchen
Basic operating procedure – haveli kitchen
 
Sindrome de condensación 2016 -Agostini
Sindrome de condensación 2016 -AgostiniSindrome de condensación 2016 -Agostini
Sindrome de condensación 2016 -Agostini
 
How to Convert Social Communities into Customers
How to Convert Social Communities into Customers How to Convert Social Communities into Customers
How to Convert Social Communities into Customers
 
food and beverages curriculum guide senior high school
 food and beverages  curriculum guide senior high school food and beverages  curriculum guide senior high school
food and beverages curriculum guide senior high school
 
Culinary art...kitchen operation
Culinary art...kitchen operationCulinary art...kitchen operation
Culinary art...kitchen operation
 
Standard operating procedure
Standard operating procedureStandard operating procedure
Standard operating procedure
 
FOOD & BEVERAGE MANAGEMENT
FOOD & BEVERAGE MANAGEMENTFOOD & BEVERAGE MANAGEMENT
FOOD & BEVERAGE MANAGEMENT
 
Flipped education andre
Flipped  education andreFlipped  education andre
Flipped education andre
 

Similar to F&E Project Powerpoint

Solving Standard Costing Problems with Lean Accounting
Solving Standard Costing Problems with Lean AccountingSolving Standard Costing Problems with Lean Accounting
Solving Standard Costing Problems with Lean AccountingSafetyChain Software
 
Lean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACLean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACJulian Kalac P.Eng
 
MODIFIED TRAINING ACTION PLAN FOR OPERATORS.docx
MODIFIED TRAINING ACTION PLAN FOR OPERATORS.docxMODIFIED TRAINING ACTION PLAN FOR OPERATORS.docx
MODIFIED TRAINING ACTION PLAN FOR OPERATORS.docxVikram Mishra
 
City of Salina-Salina Gets Serious About Performance Efficiencies Presentation
City of Salina-Salina Gets Serious About Performance Efficiencies PresentationCity of Salina-Salina Gets Serious About Performance Efficiencies Presentation
City of Salina-Salina Gets Serious About Performance Efficiencies PresentationCity of Salina
 
General Presentation
General PresentationGeneral Presentation
General Presentationgeast
 
Becoming a Learning Masterchef - Cooking Up the Right Blend - Webinar July 2013
Becoming a Learning Masterchef - Cooking Up the Right Blend - Webinar July 2013 Becoming a Learning Masterchef - Cooking Up the Right Blend - Webinar July 2013
Becoming a Learning Masterchef - Cooking Up the Right Blend - Webinar July 2013 KineoPacific
 
Australian society of baking conference aib
Australian society of baking conference aibAustralian society of baking conference aib
Australian society of baking conference aibPeter Meredith
 
Lean Introduction.pptx
Lean Introduction.pptxLean Introduction.pptx
Lean Introduction.pptxSathriyanSathi
 
Course Layout Presentation FINAL
Course Layout Presentation FINALCourse Layout Presentation FINAL
Course Layout Presentation FINALRandall Sansom
 
3-4CBLM FOR COMMERCIAL COOKING NC III.docx
3-4CBLM FOR COMMERCIAL COOKING NC III.docx3-4CBLM FOR COMMERCIAL COOKING NC III.docx
3-4CBLM FOR COMMERCIAL COOKING NC III.docxBobieTinaya2
 
Analysis of food and drinks manufacturing companies
Analysis of food and drinks manufacturing companiesAnalysis of food and drinks manufacturing companies
Analysis of food and drinks manufacturing companiesDavid Fearnley-Brown
 
Anaerobic Digester Workforce Training Curriculum Development
Anaerobic Digester Workforce Training Curriculum DevelopmentAnaerobic Digester Workforce Training Curriculum Development
Anaerobic Digester Workforce Training Curriculum DevelopmentLPE Learning Center
 
Team L - Six Sigma Project (The Sloopy's) - Revised.2
Team L - Six Sigma Project (The Sloopy's) - Revised.2Team L - Six Sigma Project (The Sloopy's) - Revised.2
Team L - Six Sigma Project (The Sloopy's) - Revised.2Baozheng (Michael) Ge
 
Managing Change: Creating a Successful Work Plan
Managing Change: Creating a Successful Work PlanManaging Change: Creating a Successful Work Plan
Managing Change: Creating a Successful Work PlanMeg Thompson
 
Biobased Products and Technology - Edukite
Biobased Products and Technology - EdukiteBiobased Products and Technology - Edukite
Biobased Products and Technology - EdukiteEduKite
 

Similar to F&E Project Powerpoint (20)

Solving Standard Costing Problems with Lean Accounting
Solving Standard Costing Problems with Lean AccountingSolving Standard Costing Problems with Lean Accounting
Solving Standard Costing Problems with Lean Accounting
 
Lean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALACLean Supply Chain Management--by JULIAN KALAC
Lean Supply Chain Management--by JULIAN KALAC
 
MODIFIED TRAINING ACTION PLAN FOR OPERATORS.docx
MODIFIED TRAINING ACTION PLAN FOR OPERATORS.docxMODIFIED TRAINING ACTION PLAN FOR OPERATORS.docx
MODIFIED TRAINING ACTION PLAN FOR OPERATORS.docx
 
City of Salina-Salina Gets Serious About Performance Efficiencies Presentation
City of Salina-Salina Gets Serious About Performance Efficiencies PresentationCity of Salina-Salina Gets Serious About Performance Efficiencies Presentation
City of Salina-Salina Gets Serious About Performance Efficiencies Presentation
 
General Presentation
General PresentationGeneral Presentation
General Presentation
 
Becoming a Learning Masterchef - Cooking Up the Right Blend - Webinar July 2013
Becoming a Learning Masterchef - Cooking Up the Right Blend - Webinar July 2013 Becoming a Learning Masterchef - Cooking Up the Right Blend - Webinar July 2013
Becoming a Learning Masterchef - Cooking Up the Right Blend - Webinar July 2013
 
Australian society of baking conference aib
Australian society of baking conference aibAustralian society of baking conference aib
Australian society of baking conference aib
 
Lean Introduction.pptx
Lean Introduction.pptxLean Introduction.pptx
Lean Introduction.pptx
 
AmolPawar08
AmolPawar08AmolPawar08
AmolPawar08
 
Course Layout Presentation FINAL
Course Layout Presentation FINALCourse Layout Presentation FINAL
Course Layout Presentation FINAL
 
3-4CBLM FOR COMMERCIAL COOKING NC III.docx
3-4CBLM FOR COMMERCIAL COOKING NC III.docx3-4CBLM FOR COMMERCIAL COOKING NC III.docx
3-4CBLM FOR COMMERCIAL COOKING NC III.docx
 
Analysis of food and drinks manufacturing companies
Analysis of food and drinks manufacturing companiesAnalysis of food and drinks manufacturing companies
Analysis of food and drinks manufacturing companies
 
business review
business reviewbusiness review
business review
 
Anaerobic Digester Workforce Training Curriculum Development
Anaerobic Digester Workforce Training Curriculum DevelopmentAnaerobic Digester Workforce Training Curriculum Development
Anaerobic Digester Workforce Training Curriculum Development
 
Harish Cv Latest 2016
Harish Cv Latest 2016Harish Cv Latest 2016
Harish Cv Latest 2016
 
Team L - Six Sigma Project (The Sloopy's) - Revised.2
Team L - Six Sigma Project (The Sloopy's) - Revised.2Team L - Six Sigma Project (The Sloopy's) - Revised.2
Team L - Six Sigma Project (The Sloopy's) - Revised.2
 
Managing Change: Creating a Successful Work Plan
Managing Change: Creating a Successful Work PlanManaging Change: Creating a Successful Work Plan
Managing Change: Creating a Successful Work Plan
 
fries
friesfries
fries
 
Biobased Products and Technology - Edukite
Biobased Products and Technology - EdukiteBiobased Products and Technology - Edukite
Biobased Products and Technology - Edukite
 
FLS (2).pptx
FLS (2).pptxFLS (2).pptx
FLS (2).pptx
 

F&E Project Powerpoint

  • 1. Fresh & Easy, LLC Campus Kitchen Internship Project 2014 Presented By: Project Leader: Ashford Ball Project Sponsor: Omar Martinez Project Leader Mentor: Omar Martinez VIDEO TRAINING LOG
  • 2. To develop the initial platform for the Video Training Log on the Campus HUB that will deliver training to our associates more effectively and efficiently.
  • 3.
  • 4.  Create the foundation for video training  Low Risk Department- DCN Kettles  Build platform for Campus HUB  Increase associate performance and retention of duties.  Reset the standard of proper procedure  Reinforcement
  • 5.  Tracking and Accessibility  Campus Hub Functionalities  Documentation of daily tasks  Easily attainable  Deliverable KPI’s  Functional Platform  Completed Video of Kettle Operator position  Linked Training Documentation
  • 6. No. of SOPs+PPs x Time to train per SOP+PP = Total Train mins. 226 SOPs+PPs x 15mins = 3,390 train mins. per person Total Train mins. x Kitchen headcount = Total Kitchen Train mins. 3,390 train mins x 400 workers = 1,356,000 total kitchen train mins. Total Kitchen train mins./60 = Total Kitchen Train hours 1,356,000 mins/60 = 22,600 total kitchen train hours Total Kitchen Train hours x .25 x $17/hr = $Estimated Savings 22,600 hrs x .25 x $17/hr = $96,050 Estimated Savings
  • 7. Current Stats  Current training time Kettles: 5.75 hours  Current Spending: $97.75  Current Kitchen training time: 22,600 hrs  Current Spending: $384,200 Possibilities  New training time: 30mins  New Spending $8.50  New Kitchen Training Time: 200 hrs  New Kitchen Spending: $3,400
  • 8.  TO THE HUB!
  • 9. Sauce Viscosity Measurement Procedure Low Risk Mixing Sheet Protective Clothing & Handwash Procedure HAACP Procedure Good Manufacturing Practices Paperwork and Labelling Procedure
  • 10.  Specific Safety & Health Procedures  Emergency situations  Handling waste and chemical materials  More PPs (Process Procedures) covered  Technical Procedures  General Manufacturing Practices  Standard Sanitation Operating Procedures  Many More!
  • 11.  Next Steps:  Completed Validation test  Retention and Opportunity  5 mock trainings completed  Evaluation and Conclusion
  • 12. How timely associates can cook. How quickly they can adapt to the standard. Following proper procedures.
  • 13. Mr. Omar Martinez (CI Manager) Miss Sarah Coble (CI Facilitator) Mr. Victor Sandoval (Kitchen Low Risk DM) Mr. Paul Sung (Information Tech Campus Kitchen and DC) Miss Donna Hahn (Kitchen Low Risk Team Lead) Mr. Michael Smith (Kitchen Low Risk Team Lead) Mr. Enrique Lupercio (A2 Machine Operator) Mr. Mark Lodge (Operations Director- Vice President) All associates in Low Risk Department Fellow Interns