Lean Cell Design Project
Arya Dash, Manufacturing Engineer, SIEMENS PLC
Restricted © Siemens plc 2013 All rights reserved.
I DT MC MF-CON
Presentation Template v.3.0
TP585-001Page2
What do we do at Siemens Congleton?
Siemens in Congleton employs 450 employees and is a
 Global supplier of industry-specific drives that control AC Motor speed by
varying the current and frequency.
 The market extends across 190 countries with annual revenue of £74m last
year.
Applications: SKiiP
Heat-sink
Electronics
Restricted © Siemens plc 2013 All rights reserved.
I DT MC MF-CON
Presentation Template v.3.0
TP585-001Page3
Where it all started- Business Need!!
• Old product
• Demand has dropped from ‘21’ to ‘12’units a shift.
• Number of operators in the cell have been reduced from 3 to 1.
• Inefficient layout for ‘One person Build Process’
• Current output is only 7 units a day.
My Job:
 Shrink the size of the cell to make space for a new product
 Upgrade capacity to improve the output with one person working in the cell
Restricted © Siemens plc 2013 All rights reserved.
I DT MC MF-CON
Presentation Template v.3.0
TP585-001Page4
What’s wrong with the current cell: Understanding
the challenges
•Takes up a lot of space!!
Total Area: 110 sq. m
•Excess Motion!!
134 Steps per unit
•Excess Inventory:
•Poor Delivery Performance!!
Restricted © Siemens plc 2013 All rights reserved.
I DT MC MF-CON
Presentation Template v.3.0
TP585-001Page5
How did I address the challenges?
•Initial investigation and experience
•Process Simulation and Calculation
Why?
•Designed smarter storage solutions
(Karakuri Systems)- Reduced floor
space
•Reduced the number of tools- Cost
Avoidance
•Amalgamated work stations- Improved
build times and motion
•Designed slick workstations with quick
change over capabilities- Reduced
Waiting and Downtime
Current State PFA
Data Gathering,
Standard Times etc.
Restricted © Siemens plc 2013 All rights reserved.
I DT MC MF-CON
Presentation Template v.3.0
TP585-001Page6
Cardboard Mock up:
Construct mock up of workstation using cardboard
• Go through the build process and decide the
best place for material / parts
• Bearing in mind storage quantities
• Correct container size
• Placement of tools
• Simulate first production without screwing or
soldering
Duration: approx. 3 days
Cardboard Mock Up- Getting the ‘Buy-in’ Zero Defects &
Continuous Improvement
Restricted © Siemens plc 2013 All rights reserved.
I DT MC MF-CON
Presentation Template v.3.0
TP585-001Page7
New LCD Workstation:
• Order and delivery of the new LCD
Workstation/ESD work tops
• Revise production layout and plan as required
• Reevaluate standard time
• Capture savings
Final Install Zero Defects &
Continuous Improvement
Restricted © Siemens plc 2013 All rights reserved.
I DT MC MF-CON
Presentation Template v.3.0
TP585-001Page8
Achievements
Before Target set
by
Simulation
Achieved
by the
Team
Reduction
in %
Annual Cost
Savings (£)
Floor Space 110 sq. m 55 sq m 47.5 sq.
m
57% 26,040.00
Standard
Time/output
40.2 29.3 26.5 34% £3,500(based
on forecast)
Motion 134 steps
per unit
68 steps
per unit
56 steps
per unit
52% 780.00
Tooling 22 14 14 36% 8,000.00
WIP £2,670 £1,470 £1,470 45% 12,00.00
Total
Savings
£39,520
Total Investment:£5,000
Restricted © Siemens plc 2013 All rights reserved.
I DT MC MF-CON
Presentation Template v.3.0
TP585-001Page9
Learning Outcomes
• Reflective Learning- How else could have I approached it?
• Good Engineer?
• Strategic Problem Solving
• Use of New Simulation Software
• Teamwork
• Decision Making
• Effective Communication
Restricted © Siemens plc 2013 All rights reserved.
I DT MC MF-CON
Presentation Template v.3.0
TP585-001Page9
Learning Outcomes
• Reflective Learning- How else could have I approached it?
• Good Engineer?
• Strategic Problem Solving
• Use of New Simulation Software
• Teamwork
• Decision Making
• Effective Communication

More Related Content

Similar to CttB Presentation_Arya Dash

Nidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applicationsNidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applicationsNidec Corporation
 
KBC decision making tool optimal planning scheduling utility
KBC decision making tool optimal planning scheduling utilityKBC decision making tool optimal planning scheduling utility
KBC decision making tool optimal planning scheduling utilityKBC (A Yokogawa Company)
 
Estes Power Point Presentation
Estes Power Point PresentationEstes Power Point Presentation
Estes Power Point PresentationLarry_McNew
 
Nc verification and re processing for collaborative machining
Nc verification and re processing for collaborative machiningNc verification and re processing for collaborative machining
Nc verification and re processing for collaborative machiningLiu PeiLing
 
New Mainframe Developments and How Syncsort Helps You Exploit Them
New Mainframe Developments and How Syncsort Helps You Exploit ThemNew Mainframe Developments and How Syncsort Helps You Exploit Them
New Mainframe Developments and How Syncsort Helps You Exploit ThemPrecisely
 
Cimteq CableBuilder Go
Cimteq CableBuilder GoCimteq CableBuilder Go
Cimteq CableBuilder GoCimteq
 
Stirred milling machine development and application expansion
Stirred milling machine development and application expansionStirred milling machine development and application expansion
Stirred milling machine development and application expansionMining On Top
 
RESUME FINAL
RESUME FINALRESUME FINAL
RESUME FINALGOBI S
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study ChallengeNikhil Kejriwal
 
Ciel mech june2014_webinarpresentation
Ciel mech june2014_webinarpresentationCiel mech june2014_webinarpresentation
Ciel mech june2014_webinarpresentationKamal Karimanal
 
Moscow conference keynote in 2012
Moscow conference keynote in 2012Moscow conference keynote in 2012
Moscow conference keynote in 2012Dileep Bhandarkar
 
Industrial Training PRESENTATION
Industrial Training PRESENTATIONIndustrial Training PRESENTATION
Industrial Training PRESENTATIONMuaz Sadini
 
Free video lecture for mba
Free video lecture for mbaFree video lecture for mba
Free video lecture for mbaCss Founder
 
Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019BlackbirdApS
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Pramod Patil
 

Similar to CttB Presentation_Arya Dash (20)

Nidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applicationsNidec asi capability overview for oil&gas applications
Nidec asi capability overview for oil&gas applications
 
KBC decision making tool optimal planning scheduling utility
KBC decision making tool optimal planning scheduling utilityKBC decision making tool optimal planning scheduling utility
KBC decision making tool optimal planning scheduling utility
 
Estes Power Point Presentation
Estes Power Point PresentationEstes Power Point Presentation
Estes Power Point Presentation
 
Cv2
Cv2Cv2
Cv2
 
Nc verification and re processing for collaborative machining
Nc verification and re processing for collaborative machiningNc verification and re processing for collaborative machining
Nc verification and re processing for collaborative machining
 
New Mainframe Developments and How Syncsort Helps You Exploit Them
New Mainframe Developments and How Syncsort Helps You Exploit ThemNew Mainframe Developments and How Syncsort Helps You Exploit Them
New Mainframe Developments and How Syncsort Helps You Exploit Them
 
Cimteq CableBuilder Go
Cimteq CableBuilder GoCimteq CableBuilder Go
Cimteq CableBuilder Go
 
Stirred milling machine development and application expansion
Stirred milling machine development and application expansionStirred milling machine development and application expansion
Stirred milling machine development and application expansion
 
RESUME FINAL
RESUME FINALRESUME FINAL
RESUME FINAL
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study Challenge
 
Ciel mech june2014_webinarpresentation
Ciel mech june2014_webinarpresentationCiel mech june2014_webinarpresentation
Ciel mech june2014_webinarpresentation
 
Autodesk CFD for better building design by ZHU ge
Autodesk CFD for better building design by ZHU geAutodesk CFD for better building design by ZHU ge
Autodesk CFD for better building design by ZHU ge
 
Moscow conference keynote in 2012
Moscow conference keynote in 2012Moscow conference keynote in 2012
Moscow conference keynote in 2012
 
Industrial Training PRESENTATION
Industrial Training PRESENTATIONIndustrial Training PRESENTATION
Industrial Training PRESENTATION
 
Free video lecture for mba
Free video lecture for mbaFree video lecture for mba
Free video lecture for mba
 
Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019
 
7.3_Schneider Electric_Barton_EPRI/SNL Microgrid Symposium
7.3_Schneider Electric_Barton_EPRI/SNL Microgrid Symposium7.3_Schneider Electric_Barton_EPRI/SNL Microgrid Symposium
7.3_Schneider Electric_Barton_EPRI/SNL Microgrid Symposium
 
Jornada convocatoria experimentos H2020 FORTISSIMO2
Jornada convocatoria experimentos H2020 FORTISSIMO2Jornada convocatoria experimentos H2020 FORTISSIMO2
Jornada convocatoria experimentos H2020 FORTISSIMO2
 
C. Bright Singh
C. Bright SinghC. Bright Singh
C. Bright Singh
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.
 

CttB Presentation_Arya Dash

  • 1. 09/06/16 Restricted © Siemens plc 2013 All rights reserved. I DT MC MF-CON Presentation Template v.3.0 TP585-001 Lean Cell Design Project Arya Dash, Manufacturing Engineer, SIEMENS PLC
  • 2. Restricted © Siemens plc 2013 All rights reserved. I DT MC MF-CON Presentation Template v.3.0 TP585-001Page2 What do we do at Siemens Congleton? Siemens in Congleton employs 450 employees and is a  Global supplier of industry-specific drives that control AC Motor speed by varying the current and frequency.  The market extends across 190 countries with annual revenue of £74m last year. Applications: SKiiP Heat-sink Electronics
  • 3. Restricted © Siemens plc 2013 All rights reserved. I DT MC MF-CON Presentation Template v.3.0 TP585-001Page3 Where it all started- Business Need!! • Old product • Demand has dropped from ‘21’ to ‘12’units a shift. • Number of operators in the cell have been reduced from 3 to 1. • Inefficient layout for ‘One person Build Process’ • Current output is only 7 units a day. My Job:  Shrink the size of the cell to make space for a new product  Upgrade capacity to improve the output with one person working in the cell
  • 4. Restricted © Siemens plc 2013 All rights reserved. I DT MC MF-CON Presentation Template v.3.0 TP585-001Page4 What’s wrong with the current cell: Understanding the challenges •Takes up a lot of space!! Total Area: 110 sq. m •Excess Motion!! 134 Steps per unit •Excess Inventory: •Poor Delivery Performance!!
  • 5. Restricted © Siemens plc 2013 All rights reserved. I DT MC MF-CON Presentation Template v.3.0 TP585-001Page5 How did I address the challenges? •Initial investigation and experience •Process Simulation and Calculation Why? •Designed smarter storage solutions (Karakuri Systems)- Reduced floor space •Reduced the number of tools- Cost Avoidance •Amalgamated work stations- Improved build times and motion •Designed slick workstations with quick change over capabilities- Reduced Waiting and Downtime Current State PFA Data Gathering, Standard Times etc.
  • 6. Restricted © Siemens plc 2013 All rights reserved. I DT MC MF-CON Presentation Template v.3.0 TP585-001Page6 Cardboard Mock up: Construct mock up of workstation using cardboard • Go through the build process and decide the best place for material / parts • Bearing in mind storage quantities • Correct container size • Placement of tools • Simulate first production without screwing or soldering Duration: approx. 3 days Cardboard Mock Up- Getting the ‘Buy-in’ Zero Defects & Continuous Improvement
  • 7. Restricted © Siemens plc 2013 All rights reserved. I DT MC MF-CON Presentation Template v.3.0 TP585-001Page7 New LCD Workstation: • Order and delivery of the new LCD Workstation/ESD work tops • Revise production layout and plan as required • Reevaluate standard time • Capture savings Final Install Zero Defects & Continuous Improvement
  • 8. Restricted © Siemens plc 2013 All rights reserved. I DT MC MF-CON Presentation Template v.3.0 TP585-001Page8 Achievements Before Target set by Simulation Achieved by the Team Reduction in % Annual Cost Savings (£) Floor Space 110 sq. m 55 sq m 47.5 sq. m 57% 26,040.00 Standard Time/output 40.2 29.3 26.5 34% £3,500(based on forecast) Motion 134 steps per unit 68 steps per unit 56 steps per unit 52% 780.00 Tooling 22 14 14 36% 8,000.00 WIP £2,670 £1,470 £1,470 45% 12,00.00 Total Savings £39,520 Total Investment:£5,000
  • 9. Restricted © Siemens plc 2013 All rights reserved. I DT MC MF-CON Presentation Template v.3.0 TP585-001Page9 Learning Outcomes • Reflective Learning- How else could have I approached it? • Good Engineer? • Strategic Problem Solving • Use of New Simulation Software • Teamwork • Decision Making • Effective Communication
  • 10. Restricted © Siemens plc 2013 All rights reserved. I DT MC MF-CON Presentation Template v.3.0 TP585-001Page9 Learning Outcomes • Reflective Learning- How else could have I approached it? • Good Engineer? • Strategic Problem Solving • Use of New Simulation Software • Teamwork • Decision Making • Effective Communication