Case Study
Strategic Selection of FTZ for setting up a new
manufacturing facility for a global security systems
company
Dragon Sourcing - 龙 源
Your Tailored Sourcing Approach to China
© 2015 Dragon Sourcing. All rights reserved. 2
Agenda
1. Context
2. Phase I Analysis
3. Phase II Analysis
4. Phase III Analysis
5. Results and conclusions
3
Context
• Client: A global digital security systems manufacturer
• Business Requirement: Our client wanted to select a Free Trade Zone in Asia to set-up a new
manufacturing facility in addition to a facility already operating in China
• Dragon Sourcing Approach: Dragon Sourcing conducted a structured 3- phase analysis of 11 FTZs
in Asia, pre-selected for the study by both the client and Dragon Sourcing, eliminating FTZs on pre-
set parameters in each phase
• 3- Phase Study: Study was conducted in 3 phases and each of the phase is explained in the
following slides
© 2015 Dragon Sourcing. All rights reserved.
4
Agenda
1. Context
2. Phase I Analysis
3. Phase II Analysis
4. Phase III Analysis
5. Results and conclusions
© 2015 Dragon Sourcing. All rights reserved.
Phase I - Evaluation of Manufacturing Hubs
Objective
•Analysis and ranking of pre-selected Free Trade Zones in Singapore, Manila (Philippines), Ho Chi
Minh City (Vietnam), Chengdu (China), Phnom Penn (Cambodia), Johor (Malaysia), Batam and
Jakarta (Indonesia), Dubai, Delhi and Chennai (India)
Methodology
•DS used publicly available information sources through secondary research, government sources
and primary information from local logistics & customs clearance companies to analyze and rank
FTZs based on the following parameters:
– Freight capacity of the closest airport to FTZ
• Number of freight flights per day to major destinations in US, Canada, Europe and Africa
• Number of pallets handled per day
– Lead time for export and import clearance
5© 2015 Dragon Sourcing. All rights reserved.
The scope covered 11 cities (FTZ/hubs) in Asia. Airports in these FTZs were
analyzed for air cargo frequency and capacity to destination cities in Europe,
US, Canada, UAE.
6© 2015 Dragon Sourcing. All rights reserved.
Hub/ FTZ
Singapore
Manila
HCMC
Chengdu
Phnom Penh
South Malaysia (Johor)
Batam
Jakarta
Dubai
Delhi
Mumbai
Chennai (added)
Destinations
Los Angeles
Philadelphia
Toronto
Montreal
Paris
Amsterdam
Frankfurt
Dubai
Hubs connectivity direct flights all-cargo and passengers lines
7© 2015 Dragon Sourcing. All rights reserved.
Analysis and Scoring of Airports near Free Trade Zones
8© 2015 Dragon Sourcing. All rights reserved.
Based on Airport capacity and air cargo frequency, 9 FTZs were chosen for
Phase II analysis
9© 2015 Dragon Sourcing. All rights reserved.
Phase I – Summary
• 7 Free Trade Zones/ Hubs were shortlisted based on the ranking of airports close to the FTZ,
which include
– Jebel Ali Free Zone/Dubai International Airport
– Iskandar (Johor)/ Changi Airport (SG) or KLIA
– Batam/ Changi Airport (SG)
– Cavite Economic Zone to Manila/ Manila Niny Aquino International Airport (PH)
– Tan Thuan EPZ (HCMC)/ TSN International Airport (HCMC)
– Chengdu Hi-tech Zone/ Shuangliu International Airport (China)
– Sri City/ Chennai International Airport (IN) + Chennai Free Trade Zone, and
– Bangkok Free Trade Zone (TH)
• Malaysia, Indonesia, Philippines, Vietnam and Thailand Free Trade Zones/Hubs are considered
for Phase II analysis by Dragon Sourcing and the remaining Dubai, China and Indian Free Trade
Zones/Hubs will be analyzed by the client
10© 2015 Dragon Sourcing. All rights reserved.
11
Agenda
1. Context
2. Phase I Analysis
3. Phase II Analysis
4. Phase III Analysis
5. Results and conclusions
© 2015 Dragon Sourcing. All rights reserved.
Phase II - Detailed Evaluation of Manufacturing Hubs
Objective
•A detailed evaluation and in-depth analysis of the FTZs shortlisted in Phase I was performed and the FTZs were
scored based on a scorecard developed jointly by the client and DS
Methodology
•Dragon Sourcing conducted phase II analysis of the following parameters on FTZs shortlisted from phase I
– Tangible Cost parameters like
• Rent of available factory space in FTZs, cost of electricity, water, other utilities and cost labor workforce
– Intangible Cost parameters like
• working hours, overtime, public holidays, termination contract and costs, religious and local specific lean
periods, availability of electricity, availability of space for factory, income tax and hub incentives, other
environmental parameters like logistics, infrastructure, corruption, neighbor industries
•Dragon Sourcing obtained information through desk research from primary data sources (HR resources,
government authorities and representative staff) and a multitude of legitimate secondary sources such as
websites of FTZ authority, government websites, etc.
•Dragon Sourcing created a scorecard and scored the FTZs on the above parameters
12© 2015 Dragon Sourcing. All rights reserved.
Sample Scoring of Tangible Parameters
13© 2015 Dragon Sourcing. All rights reserved.
Rental ChargesRental Charges
Electricity TariffElectricity Tariff
SalarySalary
Cost Driver Framework
StructuralStructural
• Cost is driven by
– Rental Charges
– Electricity Tariff
– Salary
• Cost is driven by
– Rental Charges
– Electricity Tariff
– Salary
(Engineer
Salary as an
example)
Cost Driver Framework
Sample: Comparison of Hubs based on Tangibles and Intangibles
14© 2015 Dragon Sourcing. All rights reserved.
Sample: Labor wage rate scoring
15© 2015 Dragon Sourcing. All rights reserved.
Workforce Measure
Maximum
Score per
Criteria
Hub 1 Hub 2 Hub 3 Hub 4 Hub 5 Hub 6 Hub 7 Hub 8 Hub 9 Hub 10
Total Cost of
an Operator
(monthly)
1=More than $400
2=$400 to $350
3=$350 to $300
4=$300 to $250
5=Less than $250
5 1 1 5 3 5 4 4 5 5 2
Total Cost of
a Technician
1=More than $600
2=$600 to $550
3=$550 to $500
4=$500 to $450
5=Less than $450
5 1 1 3 5 5 5 1 5 5 1
Total Cost of
a Supervisor
1=More than $1000
2=$1000 to $800
3=$800 to $600
4=$600 to $400
5=Less than $400
5 1 2 4 4 5 1 2 4 4 1
Total Cost of
an
Electrical/Mec
hanical
Engineer
1=More than $800
2=$800 to $700
3=$700 to $600
4=$600 to $500
5=Less than $500
5 1 1 3 2 1 3 1 5 3 1
Total Cost of
a Plant
Manager
1=More than $2,100
2=$2,100 to $1,600
3=$1,600 to $1,100
4=$1,100 to $600
5=Less than $600
5 1 1 1 1 1 1 1 1 1 1
Legend: 1 less than current facility 2 less than current facility 3+ less than
current facility
1 more than current facility 2 more than current facility 3+ more than
current facility
Phase II – Summary
• 4 FTZs were shortlisted for phase III part of the study based on the ranking in the scorecard,
which include
– Batam, Indonesia
– Ho Chi Minh, Vietnam
– Chennai, India
– Bangkok, Thailand
16© 2015 Dragon Sourcing. All rights reserved.
17
Agenda
1. Context
2. Phase I Analysis
3. Phase II Analysis
4. Phase III Analysis
5. Results and conclusions
© 2015 Dragon Sourcing. All rights reserved.
Phase III – Physical Audit of the selected hubs
Objective
•To conduct a due diligence of the Free Trade Zones in the shortlisted countries by conducting a physical audit. The information
collected through desk research in phase II was also cross-verified and validated
Methodology
•Based on phase II study, 4 cities/ countries were selected for phase III analysis- physical audit of the short listed FTZs on the
parameters used in phase II analysis to make sure information collected through desk research is correct
•FTZs in these 4 cities/ countries were identified and Industrial Estates within these FTZs were identified based on the immediate
availability of factory space for move-in
•In addition to the parameters of phase II, the following information was also collected during physical visit
– Availability of factory space
– Amenities provided by the Industrial Estate and/ or FTZ
– Ease of getting labor force onboard through HR consultancies
– Local problems that could potentially impact labor and productivity
– Interview workers from neighboring companies to understand if there are any unions/ how active they are, etc.
– Verify access to Ports/ Airports
– Whether the area is prone to flooding/ natural disasters
– Availability of potable water
– Interview logistics and freight forwarders
– Time for customs clearance
– Whether the local customs agency is efficient or if any delay can be expected
•Dragon Sourcing visited the free trade zones & industrial estates and estimated the operating cost by discussing with the trade zone
authorities and other peer companies thus understanding the real operating conditions. Total monthly cost in each free trade zone is
compared to come up with the best suitable free trade zone for the client.
18© 2015 Dragon Sourcing. All rights reserved.
Sample: Phase III Analysis of FTZs
19© 2015 Dragon Sourcing. All rights reserved.
Parameters FTZ1 FTZ2 FTZ3 FTZ4
Section Sub-Section
Industrial
Estate 1
Industrial
Estate 2
Industrial
Estate 3
Industrial
Estate 4
Industrial
Estate 5
Industrial
Estate 6
Industrial
Estate 7
FTZ
• Is there a ready-to occupy factory
available?
 

 
No
Only land
available at
present

• Is the factory available for rent?     
No
Only land
available at
present
No
• Factory floor space (sq.m) • 9,217 • 12,155 • 11,700
• 8,070 (Total
area of 4
small
factories)
• 5,640
Expandable
twice in size
• 10,000
• (land only)
• 1,950
Location
Specific
• Approximate Distance from Airport (km) 72.5 73.5 84 40 147 18 36.5
• Time required to start operations
including obtaining permits
4-6 months 4-6 months 4-6 months 4-6 months 4-6 months 9-12 months 9-12 months
Rental
• Factory rent/sq.m (USD) 3.8 3.8 4.8 6.7 7 6 X
• Maintenance cost/sq.m (USD) 0.91 0.23 0.02 0.02 0.02 0.48 0.04
• Estimated Renovation Capex(USD) Per
Sq. M*
X X X X X X X
Utilities
• Electricity cost/kWh (USD) 0.16 0.12 0.09 0.09 0.09 0.16 0.1
• Water tariff/cu.m (USD) 1.29 1.4 0.5 0.6 0.7 0.46 0.87
• Sewerage tariff/cu.m (USD) 0.2 Nil 0.18 0.18 3.04 0.24 Nil
Sample Analysis of FTZs
20© 2015 Dragon Sourcing. All rights reserved.
Parameters FTZ1 FTZ2 FTZ3 FTZ4
Section Sub-Section
Industrial
Estate 1
Industrial
Estate 2
Industrial
Estate 3
Industrial
Estate 4
Industrial
Estate 5
Industrial
Estate 6
Industrial
Estate 7
Bureaucracy
• Administration Efficiency Good Good Good Good Good Poor Poor
• Customs clearance Quick (<24 hours) Quick (<24 hours) Quick (<24 hours) Quick (<24 hours) Quick (<24 hours)
Very quick (5-6
hours)
Very Slow (3-4
days)
Eco System
• Availability of Packaging
Suppliers (Estimation)
10-15 10-15 25+ 25+ 25+ 10-15 25+
• Availability of Tooling
Suppliers (Estimation)
5-10 5-10 25+ 25+ 25+ <5 25+
• Scheduled Power Cuts
(Yearly)
1-2 times per year
for 1 hour
1-2 times per year
for 1 hour
1-2 times per year
for 1 hour
1-2 times per year
for 1 hour
1-2 times per year
for 1 hour
1-2 times per year
for 1 hour
1 hour every day
• Unscheduled Power Cuts
in 2014
2 times 2 times Nil Nil Nil 3-4 times 10+ times
Tax • Corporate Tax (%) 25% 25% 20% 20% 20% 25% 30%
Sample Analysis of FTZs
21© 2015 Dragon Sourcing. All rights reserved.
Parameters FTZ1 FTZ2 FTZ3 FTZ4
Sub-Section
Industrial
Estate 1
Industrial
Estate 2
Industrial Estate 3 Industrial Estate 4 Industrial Estate 5 Industrial Estate 6 Industrial Estate 7
Minimum Monthly Wage (for
ref)
USD 215 (In 2014) USD 219 (In 2015) USD 145 (In 2015) USD 97 (In 2014)
Worker Termination
Compensation
High
•2 month per worked year 2 + 15% of
monthly allowance
Med
•30 days’ for employment period below 120 days,
•90 days’ for employment period from 1 to 3 years,
•180 days’ for employment period from 3 to 6 years,
•240 days’ for employment period from 6 to 10 years
•300 days wages for 10 years and more
Low
•15 days’ per worked year
Low
•15 days’ per worked year
Paid Sick leave
• 12 months paid sick leave (with
doctor certificate)
• An employee must be granted a minimum of 30 days paid sick leave with
pay (by employer) each year. An employee using sick leave for three
• consecutive working days can be required to provide a physician's certificate
proving the illness
• 30 days max with
proven document from
doctor. Paid by the
government.
Paid leave allowance
14 (Women get 1 day off every
month additional)
13 10 13
Min Wage Revision Period Every Year No systematic. Next revision in 3 years Every Year Every Year
Social/Health Insurance Cost 18% 5% 30% 42%
Approximate time to recruit an
employee
60 days 90 days 90 days 60 days
HR Benefits Package
• Accommodation, food, access
to prayer hall
Food, high bonuses (6 months by auto industry)
• Free two-wheeler
service annually,
food
• Food, transportation
allowance
Contract type (permanent /
temporary)
• Temporary: 2 + 1 year then
permanent
Permanent
• Temporary: 3 + 3
years then
permanent
• Permanent
Availability of English Speaking
Labor
High High Medium High
Projected Labor wage increase
(YOY %) 2014-15
14% 0% 12% 12%
Lean Month (Holiday Season in
2015)
Ramzan
(Jun-Jul)
Songkran (Apr) Chinese New Year (Feb)
Diwali
(Oct-Nov)
No of official holidays in 2015
(days)
12 15 10 15
Phase III – Summary
• Information was collected on available factory spaces in the Industrial Estates in FTZs of the 4
cities/ countries
• Tangible costs were calculated in the FTZs and compared against client’s current tangible costs
in their Chinese facility
• Two Industrial Estates were selected by the client based on both tangible costs associated with
those FTZs and intangible parameters like the country’s HR policy, availability of labour force, etc
22© 2015 Dragon Sourcing. All rights reserved.

More Related Content

What's hot

Case pp t n
Case pp t nCase pp t n
Case pp t nranbaxy
 
Sheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudySheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudyJohn William
 
Slewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingSlewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingJohn William
 
Tapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon SourcingTapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon SourcingJohn William
 
Gear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingGear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingJohn William
 
Wind Turbine Components Case Study - Dragon Sourcing
Wind Turbine Components Case Study - Dragon SourcingWind Turbine Components Case Study - Dragon Sourcing
Wind Turbine Components Case Study - Dragon SourcingDragon Sourcing
 
Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​John William
 
Substation Project Case Study by Dragon Sourcing
Substation Project Case Study by Dragon SourcingSubstation Project Case Study by Dragon Sourcing
Substation Project Case Study by Dragon SourcingJohn William
 
Wind Turbine Case Study - June, 2014
Wind Turbine Case Study - June, 2014Wind Turbine Case Study - June, 2014
Wind Turbine Case Study - June, 2014Dragon Sourcing
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyJohn William
 
Case Study-Indirect China Strategic Sourcing
Case Study-Indirect China Strategic SourcingCase Study-Indirect China Strategic Sourcing
Case Study-Indirect China Strategic SourcingJohn William
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing John William
 
IDA-11969-01 -Satkartar Global fashion- Audit Report
IDA-11969-01 -Satkartar Global fashion- Audit ReportIDA-11969-01 -Satkartar Global fashion- Audit Report
IDA-11969-01 -Satkartar Global fashion- Audit ReportSam Arora
 
summer internship on import procedure
summer internship on import proceduresummer internship on import procedure
summer internship on import procedureGDP1931993
 
Case study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coatingCase study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coatingJohn William
 
Bureau Veritas Marine Offshore presentation 2014 - english
Bureau Veritas Marine Offshore presentation   2014 - englishBureau Veritas Marine Offshore presentation   2014 - english
Bureau Veritas Marine Offshore presentation 2014 - englishKiet Nguyen
 
Strategic Sourcing Case Study-White Goods sourcing in China, Turkey, Vietnam
Strategic Sourcing Case Study-White Goods sourcing in China, Turkey, VietnamStrategic Sourcing Case Study-White Goods sourcing in China, Turkey, Vietnam
Strategic Sourcing Case Study-White Goods sourcing in China, Turkey, VietnamJohn William
 
Bureau Veritas_company_profile ENG
Bureau Veritas_company_profile ENGBureau Veritas_company_profile ENG
Bureau Veritas_company_profile ENGTran Ngoc Minh
 

What's hot (18)

Case pp t n
Case pp t nCase pp t n
Case pp t n
 
Sheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudySheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case Study
 
Slewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingSlewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon Sourcing
 
Tapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon SourcingTapioca Starch Sourcing Case Study by Dragon Sourcing
Tapioca Starch Sourcing Case Study by Dragon Sourcing
 
Gear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingGear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon Sourcing
 
Wind Turbine Components Case Study - Dragon Sourcing
Wind Turbine Components Case Study - Dragon SourcingWind Turbine Components Case Study - Dragon Sourcing
Wind Turbine Components Case Study - Dragon Sourcing
 
Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​
 
Substation Project Case Study by Dragon Sourcing
Substation Project Case Study by Dragon SourcingSubstation Project Case Study by Dragon Sourcing
Substation Project Case Study by Dragon Sourcing
 
Wind Turbine Case Study - June, 2014
Wind Turbine Case Study - June, 2014Wind Turbine Case Study - June, 2014
Wind Turbine Case Study - June, 2014
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case Study
 
Case Study-Indirect China Strategic Sourcing
Case Study-Indirect China Strategic SourcingCase Study-Indirect China Strategic Sourcing
Case Study-Indirect China Strategic Sourcing
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
 
IDA-11969-01 -Satkartar Global fashion- Audit Report
IDA-11969-01 -Satkartar Global fashion- Audit ReportIDA-11969-01 -Satkartar Global fashion- Audit Report
IDA-11969-01 -Satkartar Global fashion- Audit Report
 
summer internship on import procedure
summer internship on import proceduresummer internship on import procedure
summer internship on import procedure
 
Case study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coatingCase study-strategic sourcing of powder coating
Case study-strategic sourcing of powder coating
 
Bureau Veritas Marine Offshore presentation 2014 - english
Bureau Veritas Marine Offshore presentation   2014 - englishBureau Veritas Marine Offshore presentation   2014 - english
Bureau Veritas Marine Offshore presentation 2014 - english
 
Strategic Sourcing Case Study-White Goods sourcing in China, Turkey, Vietnam
Strategic Sourcing Case Study-White Goods sourcing in China, Turkey, VietnamStrategic Sourcing Case Study-White Goods sourcing in China, Turkey, Vietnam
Strategic Sourcing Case Study-White Goods sourcing in China, Turkey, Vietnam
 
Bureau Veritas_company_profile ENG
Bureau Veritas_company_profile ENGBureau Veritas_company_profile ENG
Bureau Veritas_company_profile ENG
 

Similar to Strategic Location Analysis for setting up of Manufacturing Facility

Case Study-China Factory Location Analysis and Sourcing
Case Study-China Factory Location Analysis and SourcingCase Study-China Factory Location Analysis and Sourcing
Case Study-China Factory Location Analysis and SourcingJohn William
 
SUMMER INTERNSHIP PPT
SUMMER INTERNSHIP PPTSUMMER INTERNSHIP PPT
SUMMER INTERNSHIP PPTWalter Sims
 
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chainHari Sivaprakasam
 
Global Sourcing Case Study (Chinese Appliances Market)
Global Sourcing Case Study (Chinese Appliances Market)Global Sourcing Case Study (Chinese Appliances Market)
Global Sourcing Case Study (Chinese Appliances Market)John William
 
How does sourcing services help to start a new company in China?
How does sourcing services help to start a new company in China?How does sourcing services help to start a new company in China?
How does sourcing services help to start a new company in China?John William
 
Global Sourcing Case study in Appliances Market
Global Sourcing Case study in Appliances MarketGlobal Sourcing Case study in Appliances Market
Global Sourcing Case study in Appliances MarketDragon Sourcing
 
How to prepare organisation projrct copy (2)
How to prepare organisation projrct   copy (2)How to prepare organisation projrct   copy (2)
How to prepare organisation projrct copy (2)sourabh bhandare
 
Mine excellence drilling platform v15 nov 2020
Mine excellence drilling platform v15 nov 2020Mine excellence drilling platform v15 nov 2020
Mine excellence drilling platform v15 nov 2020Mason Taylor
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)Giselle Duran
 
Developments in Intellectual Property by John Cabeca, Director of USPTO Silic...
Developments in Intellectual Property by John Cabeca, Director of USPTO Silic...Developments in Intellectual Property by John Cabeca, Director of USPTO Silic...
Developments in Intellectual Property by John Cabeca, Director of USPTO Silic...Knobbe Martens - Intellectual Property Law
 
Pricing , lisencing and portfolios in tech transfer
Pricing , lisencing and portfolios in tech transferPricing , lisencing and portfolios in tech transfer
Pricing , lisencing and portfolios in tech transferRakshaSharma26
 
Financial Analysis
Financial AnalysisFinancial Analysis
Financial AnalysisUjjwal Goyal
 
Financial Estimations and Projections
Financial Estimations and ProjectionsFinancial Estimations and Projections
Financial Estimations and ProjectionsUjjwal Goyal
 
Presentation trade remedial measures
Presentation trade remedial measuresPresentation trade remedial measures
Presentation trade remedial measuresCA Mohit Gupta
 
Estimation and measuring of software size within the atos gobal delivery plat...
Estimation and measuring of software size within the atos gobal delivery plat...Estimation and measuring of software size within the atos gobal delivery plat...
Estimation and measuring of software size within the atos gobal delivery plat...IWSM Mensura
 
plant location
plant locationplant location
plant locationSanjay War
 
A Contract Bidding Process in Construction Industry
A Contract Bidding Process in Construction IndustryA Contract Bidding Process in Construction Industry
A Contract Bidding Process in Construction IndustryIRJET Journal
 
RFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docxRFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docxhealdkathaleen
 

Similar to Strategic Location Analysis for setting up of Manufacturing Facility (20)

Case Study-China Factory Location Analysis and Sourcing
Case Study-China Factory Location Analysis and SourcingCase Study-China Factory Location Analysis and Sourcing
Case Study-China Factory Location Analysis and Sourcing
 
SUMMER INTERNSHIP PPT
SUMMER INTERNSHIP PPTSUMMER INTERNSHIP PPT
SUMMER INTERNSHIP PPT
 
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain
2014_12_10_increase_effectiveness_of_auto_inbound_supply_chain
 
Global Sourcing Case Study (Chinese Appliances Market)
Global Sourcing Case Study (Chinese Appliances Market)Global Sourcing Case Study (Chinese Appliances Market)
Global Sourcing Case Study (Chinese Appliances Market)
 
How does sourcing services help to start a new company in China?
How does sourcing services help to start a new company in China?How does sourcing services help to start a new company in China?
How does sourcing services help to start a new company in China?
 
Global Sourcing Case study in Appliances Market
Global Sourcing Case study in Appliances MarketGlobal Sourcing Case study in Appliances Market
Global Sourcing Case study in Appliances Market
 
How to prepare organisation projrct copy (2)
How to prepare organisation projrct   copy (2)How to prepare organisation projrct   copy (2)
How to prepare organisation projrct copy (2)
 
Mine excellence drilling platform v15 nov 2020
Mine excellence drilling platform v15 nov 2020Mine excellence drilling platform v15 nov 2020
Mine excellence drilling platform v15 nov 2020
 
om assign.docx
om assign.docxom assign.docx
om assign.docx
 
Capital budgeting techniques in project management
Capital budgeting techniques in project management Capital budgeting techniques in project management
Capital budgeting techniques in project management
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
 
Developments in Intellectual Property by John Cabeca, Director of USPTO Silic...
Developments in Intellectual Property by John Cabeca, Director of USPTO Silic...Developments in Intellectual Property by John Cabeca, Director of USPTO Silic...
Developments in Intellectual Property by John Cabeca, Director of USPTO Silic...
 
Pricing , lisencing and portfolios in tech transfer
Pricing , lisencing and portfolios in tech transferPricing , lisencing and portfolios in tech transfer
Pricing , lisencing and portfolios in tech transfer
 
Financial Analysis
Financial AnalysisFinancial Analysis
Financial Analysis
 
Financial Estimations and Projections
Financial Estimations and ProjectionsFinancial Estimations and Projections
Financial Estimations and Projections
 
Presentation trade remedial measures
Presentation trade remedial measuresPresentation trade remedial measures
Presentation trade remedial measures
 
Estimation and measuring of software size within the atos gobal delivery plat...
Estimation and measuring of software size within the atos gobal delivery plat...Estimation and measuring of software size within the atos gobal delivery plat...
Estimation and measuring of software size within the atos gobal delivery plat...
 
plant location
plant locationplant location
plant location
 
A Contract Bidding Process in Construction Industry
A Contract Bidding Process in Construction IndustryA Contract Bidding Process in Construction Industry
A Contract Bidding Process in Construction Industry
 
RFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docxRFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docx
 

More from Dragon Sourcing

Strategic Sourcing Case Study – Wind Turbine Industry
Strategic Sourcing Case Study – Wind Turbine IndustryStrategic Sourcing Case Study – Wind Turbine Industry
Strategic Sourcing Case Study – Wind Turbine IndustryDragon Sourcing
 
High precision welded component Case Study
High precision welded component Case Study High precision welded component Case Study
High precision welded component Case Study Dragon Sourcing
 
Construction categories case study
Construction categories case studyConstruction categories case study
Construction categories case studyDragon Sourcing
 
Building material case Study
Building material case Study Building material case Study
Building material case Study Dragon Sourcing
 
Case Study China RFI/RFQ Report for “Tomato Sauce”
Case Study  China RFI/RFQ Report for “Tomato Sauce” Case Study  China RFI/RFQ Report for “Tomato Sauce”
Case Study China RFI/RFQ Report for “Tomato Sauce” Dragon Sourcing
 
Non Merchandise Case study for Apparel
Non Merchandise Case study for ApparelNon Merchandise Case study for Apparel
Non Merchandise Case study for ApparelDragon Sourcing
 
Packaging and chemicals case study
Packaging and chemicals case studyPackaging and chemicals case study
Packaging and chemicals case studyDragon Sourcing
 
Ductile Pipes Case Study
Ductile Pipes Case StudyDuctile Pipes Case Study
Ductile Pipes Case StudyDragon Sourcing
 
Coffee Machine Case Study
Coffee Machine Case StudyCoffee Machine Case Study
Coffee Machine Case StudyDragon Sourcing
 
Textile Products Sourcing Project - Turkey
Textile Products Sourcing Project - TurkeyTextile Products Sourcing Project - Turkey
Textile Products Sourcing Project - TurkeyDragon Sourcing
 
Construction Company Case Study by Dragonsourcing
Construction Company Case Study by DragonsourcingConstruction Company Case Study by Dragonsourcing
Construction Company Case Study by DragonsourcingDragon Sourcing
 
China “Beer Processing Equipment”
China “Beer Processing Equipment”China “Beer Processing Equipment”
China “Beer Processing Equipment”Dragon Sourcing
 
Pharmaceutical R&D China Sourcing Pilot Final Report
Pharmaceutical R&D  China Sourcing Pilot  Final Report Pharmaceutical R&D  China Sourcing Pilot  Final Report
Pharmaceutical R&D China Sourcing Pilot Final Report Dragon Sourcing
 
Mothercare:Go west policy Case study
Mothercare:Go west policy Case studyMothercare:Go west policy Case study
Mothercare:Go west policy Case studyDragon Sourcing
 

More from Dragon Sourcing (20)

Strategic Sourcing Case Study – Wind Turbine Industry
Strategic Sourcing Case Study – Wind Turbine IndustryStrategic Sourcing Case Study – Wind Turbine Industry
Strategic Sourcing Case Study – Wind Turbine Industry
 
Raw Material case study
Raw Material case studyRaw Material case study
Raw Material case study
 
High precision welded component Case Study
High precision welded component Case Study High precision welded component Case Study
High precision welded component Case Study
 
Construction categories case study
Construction categories case studyConstruction categories case study
Construction categories case study
 
Building material case Study
Building material case Study Building material case Study
Building material case Study
 
Case Study China RFI/RFQ Report for “Tomato Sauce”
Case Study  China RFI/RFQ Report for “Tomato Sauce” Case Study  China RFI/RFQ Report for “Tomato Sauce”
Case Study China RFI/RFQ Report for “Tomato Sauce”
 
Non Merchandise Case study for Apparel
Non Merchandise Case study for ApparelNon Merchandise Case study for Apparel
Non Merchandise Case study for Apparel
 
Packaging and chemicals case study
Packaging and chemicals case studyPackaging and chemicals case study
Packaging and chemicals case study
 
Breeze Chair Case Study
Breeze Chair Case StudyBreeze Chair Case Study
Breeze Chair Case Study
 
Hospitality Case study
Hospitality Case studyHospitality Case study
Hospitality Case study
 
Toothbrush case study
Toothbrush case studyToothbrush case study
Toothbrush case study
 
Ductile Pipes Case Study
Ductile Pipes Case StudyDuctile Pipes Case Study
Ductile Pipes Case Study
 
Coffee Machine Case Study
Coffee Machine Case StudyCoffee Machine Case Study
Coffee Machine Case Study
 
Textile Products Sourcing Project - Turkey
Textile Products Sourcing Project - TurkeyTextile Products Sourcing Project - Turkey
Textile Products Sourcing Project - Turkey
 
Construction Company Case Study by Dragonsourcing
Construction Company Case Study by DragonsourcingConstruction Company Case Study by Dragonsourcing
Construction Company Case Study by Dragonsourcing
 
China “Beer Processing Equipment”
China “Beer Processing Equipment”China “Beer Processing Equipment”
China “Beer Processing Equipment”
 
Pharmaceutical R&D China Sourcing Pilot Final Report
Pharmaceutical R&D  China Sourcing Pilot  Final Report Pharmaceutical R&D  China Sourcing Pilot  Final Report
Pharmaceutical R&D China Sourcing Pilot Final Report
 
Mothercare:Go west policy Case study
Mothercare:Go west policy Case studyMothercare:Go west policy Case study
Mothercare:Go west policy Case study
 
CAPEX Case Study
CAPEX Case StudyCAPEX Case Study
CAPEX Case Study
 
Social Audit Case Study
Social Audit Case StudySocial Audit Case Study
Social Audit Case Study
 

Recently uploaded

Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756dollysharma2066
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 

Recently uploaded (20)

Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 

Strategic Location Analysis for setting up of Manufacturing Facility

  • 1. Case Study Strategic Selection of FTZ for setting up a new manufacturing facility for a global security systems company Dragon Sourcing - 龙 源 Your Tailored Sourcing Approach to China
  • 2. © 2015 Dragon Sourcing. All rights reserved. 2 Agenda 1. Context 2. Phase I Analysis 3. Phase II Analysis 4. Phase III Analysis 5. Results and conclusions
  • 3. 3 Context • Client: A global digital security systems manufacturer • Business Requirement: Our client wanted to select a Free Trade Zone in Asia to set-up a new manufacturing facility in addition to a facility already operating in China • Dragon Sourcing Approach: Dragon Sourcing conducted a structured 3- phase analysis of 11 FTZs in Asia, pre-selected for the study by both the client and Dragon Sourcing, eliminating FTZs on pre- set parameters in each phase • 3- Phase Study: Study was conducted in 3 phases and each of the phase is explained in the following slides © 2015 Dragon Sourcing. All rights reserved.
  • 4. 4 Agenda 1. Context 2. Phase I Analysis 3. Phase II Analysis 4. Phase III Analysis 5. Results and conclusions © 2015 Dragon Sourcing. All rights reserved.
  • 5. Phase I - Evaluation of Manufacturing Hubs Objective •Analysis and ranking of pre-selected Free Trade Zones in Singapore, Manila (Philippines), Ho Chi Minh City (Vietnam), Chengdu (China), Phnom Penn (Cambodia), Johor (Malaysia), Batam and Jakarta (Indonesia), Dubai, Delhi and Chennai (India) Methodology •DS used publicly available information sources through secondary research, government sources and primary information from local logistics & customs clearance companies to analyze and rank FTZs based on the following parameters: – Freight capacity of the closest airport to FTZ • Number of freight flights per day to major destinations in US, Canada, Europe and Africa • Number of pallets handled per day – Lead time for export and import clearance 5© 2015 Dragon Sourcing. All rights reserved.
  • 6. The scope covered 11 cities (FTZ/hubs) in Asia. Airports in these FTZs were analyzed for air cargo frequency and capacity to destination cities in Europe, US, Canada, UAE. 6© 2015 Dragon Sourcing. All rights reserved. Hub/ FTZ Singapore Manila HCMC Chengdu Phnom Penh South Malaysia (Johor) Batam Jakarta Dubai Delhi Mumbai Chennai (added) Destinations Los Angeles Philadelphia Toronto Montreal Paris Amsterdam Frankfurt Dubai
  • 7. Hubs connectivity direct flights all-cargo and passengers lines 7© 2015 Dragon Sourcing. All rights reserved.
  • 8. Analysis and Scoring of Airports near Free Trade Zones 8© 2015 Dragon Sourcing. All rights reserved.
  • 9. Based on Airport capacity and air cargo frequency, 9 FTZs were chosen for Phase II analysis 9© 2015 Dragon Sourcing. All rights reserved.
  • 10. Phase I – Summary • 7 Free Trade Zones/ Hubs were shortlisted based on the ranking of airports close to the FTZ, which include – Jebel Ali Free Zone/Dubai International Airport – Iskandar (Johor)/ Changi Airport (SG) or KLIA – Batam/ Changi Airport (SG) – Cavite Economic Zone to Manila/ Manila Niny Aquino International Airport (PH) – Tan Thuan EPZ (HCMC)/ TSN International Airport (HCMC) – Chengdu Hi-tech Zone/ Shuangliu International Airport (China) – Sri City/ Chennai International Airport (IN) + Chennai Free Trade Zone, and – Bangkok Free Trade Zone (TH) • Malaysia, Indonesia, Philippines, Vietnam and Thailand Free Trade Zones/Hubs are considered for Phase II analysis by Dragon Sourcing and the remaining Dubai, China and Indian Free Trade Zones/Hubs will be analyzed by the client 10© 2015 Dragon Sourcing. All rights reserved.
  • 11. 11 Agenda 1. Context 2. Phase I Analysis 3. Phase II Analysis 4. Phase III Analysis 5. Results and conclusions © 2015 Dragon Sourcing. All rights reserved.
  • 12. Phase II - Detailed Evaluation of Manufacturing Hubs Objective •A detailed evaluation and in-depth analysis of the FTZs shortlisted in Phase I was performed and the FTZs were scored based on a scorecard developed jointly by the client and DS Methodology •Dragon Sourcing conducted phase II analysis of the following parameters on FTZs shortlisted from phase I – Tangible Cost parameters like • Rent of available factory space in FTZs, cost of electricity, water, other utilities and cost labor workforce – Intangible Cost parameters like • working hours, overtime, public holidays, termination contract and costs, religious and local specific lean periods, availability of electricity, availability of space for factory, income tax and hub incentives, other environmental parameters like logistics, infrastructure, corruption, neighbor industries •Dragon Sourcing obtained information through desk research from primary data sources (HR resources, government authorities and representative staff) and a multitude of legitimate secondary sources such as websites of FTZ authority, government websites, etc. •Dragon Sourcing created a scorecard and scored the FTZs on the above parameters 12© 2015 Dragon Sourcing. All rights reserved.
  • 13. Sample Scoring of Tangible Parameters 13© 2015 Dragon Sourcing. All rights reserved. Rental ChargesRental Charges Electricity TariffElectricity Tariff SalarySalary Cost Driver Framework StructuralStructural • Cost is driven by – Rental Charges – Electricity Tariff – Salary • Cost is driven by – Rental Charges – Electricity Tariff – Salary (Engineer Salary as an example) Cost Driver Framework
  • 14. Sample: Comparison of Hubs based on Tangibles and Intangibles 14© 2015 Dragon Sourcing. All rights reserved.
  • 15. Sample: Labor wage rate scoring 15© 2015 Dragon Sourcing. All rights reserved. Workforce Measure Maximum Score per Criteria Hub 1 Hub 2 Hub 3 Hub 4 Hub 5 Hub 6 Hub 7 Hub 8 Hub 9 Hub 10 Total Cost of an Operator (monthly) 1=More than $400 2=$400 to $350 3=$350 to $300 4=$300 to $250 5=Less than $250 5 1 1 5 3 5 4 4 5 5 2 Total Cost of a Technician 1=More than $600 2=$600 to $550 3=$550 to $500 4=$500 to $450 5=Less than $450 5 1 1 3 5 5 5 1 5 5 1 Total Cost of a Supervisor 1=More than $1000 2=$1000 to $800 3=$800 to $600 4=$600 to $400 5=Less than $400 5 1 2 4 4 5 1 2 4 4 1 Total Cost of an Electrical/Mec hanical Engineer 1=More than $800 2=$800 to $700 3=$700 to $600 4=$600 to $500 5=Less than $500 5 1 1 3 2 1 3 1 5 3 1 Total Cost of a Plant Manager 1=More than $2,100 2=$2,100 to $1,600 3=$1,600 to $1,100 4=$1,100 to $600 5=Less than $600 5 1 1 1 1 1 1 1 1 1 1 Legend: 1 less than current facility 2 less than current facility 3+ less than current facility 1 more than current facility 2 more than current facility 3+ more than current facility
  • 16. Phase II – Summary • 4 FTZs were shortlisted for phase III part of the study based on the ranking in the scorecard, which include – Batam, Indonesia – Ho Chi Minh, Vietnam – Chennai, India – Bangkok, Thailand 16© 2015 Dragon Sourcing. All rights reserved.
  • 17. 17 Agenda 1. Context 2. Phase I Analysis 3. Phase II Analysis 4. Phase III Analysis 5. Results and conclusions © 2015 Dragon Sourcing. All rights reserved.
  • 18. Phase III – Physical Audit of the selected hubs Objective •To conduct a due diligence of the Free Trade Zones in the shortlisted countries by conducting a physical audit. The information collected through desk research in phase II was also cross-verified and validated Methodology •Based on phase II study, 4 cities/ countries were selected for phase III analysis- physical audit of the short listed FTZs on the parameters used in phase II analysis to make sure information collected through desk research is correct •FTZs in these 4 cities/ countries were identified and Industrial Estates within these FTZs were identified based on the immediate availability of factory space for move-in •In addition to the parameters of phase II, the following information was also collected during physical visit – Availability of factory space – Amenities provided by the Industrial Estate and/ or FTZ – Ease of getting labor force onboard through HR consultancies – Local problems that could potentially impact labor and productivity – Interview workers from neighboring companies to understand if there are any unions/ how active they are, etc. – Verify access to Ports/ Airports – Whether the area is prone to flooding/ natural disasters – Availability of potable water – Interview logistics and freight forwarders – Time for customs clearance – Whether the local customs agency is efficient or if any delay can be expected •Dragon Sourcing visited the free trade zones & industrial estates and estimated the operating cost by discussing with the trade zone authorities and other peer companies thus understanding the real operating conditions. Total monthly cost in each free trade zone is compared to come up with the best suitable free trade zone for the client. 18© 2015 Dragon Sourcing. All rights reserved.
  • 19. Sample: Phase III Analysis of FTZs 19© 2015 Dragon Sourcing. All rights reserved. Parameters FTZ1 FTZ2 FTZ3 FTZ4 Section Sub-Section Industrial Estate 1 Industrial Estate 2 Industrial Estate 3 Industrial Estate 4 Industrial Estate 5 Industrial Estate 6 Industrial Estate 7 FTZ • Is there a ready-to occupy factory available?      No Only land available at present  • Is the factory available for rent?      No Only land available at present No • Factory floor space (sq.m) • 9,217 • 12,155 • 11,700 • 8,070 (Total area of 4 small factories) • 5,640 Expandable twice in size • 10,000 • (land only) • 1,950 Location Specific • Approximate Distance from Airport (km) 72.5 73.5 84 40 147 18 36.5 • Time required to start operations including obtaining permits 4-6 months 4-6 months 4-6 months 4-6 months 4-6 months 9-12 months 9-12 months Rental • Factory rent/sq.m (USD) 3.8 3.8 4.8 6.7 7 6 X • Maintenance cost/sq.m (USD) 0.91 0.23 0.02 0.02 0.02 0.48 0.04 • Estimated Renovation Capex(USD) Per Sq. M* X X X X X X X Utilities • Electricity cost/kWh (USD) 0.16 0.12 0.09 0.09 0.09 0.16 0.1 • Water tariff/cu.m (USD) 1.29 1.4 0.5 0.6 0.7 0.46 0.87 • Sewerage tariff/cu.m (USD) 0.2 Nil 0.18 0.18 3.04 0.24 Nil
  • 20. Sample Analysis of FTZs 20© 2015 Dragon Sourcing. All rights reserved. Parameters FTZ1 FTZ2 FTZ3 FTZ4 Section Sub-Section Industrial Estate 1 Industrial Estate 2 Industrial Estate 3 Industrial Estate 4 Industrial Estate 5 Industrial Estate 6 Industrial Estate 7 Bureaucracy • Administration Efficiency Good Good Good Good Good Poor Poor • Customs clearance Quick (<24 hours) Quick (<24 hours) Quick (<24 hours) Quick (<24 hours) Quick (<24 hours) Very quick (5-6 hours) Very Slow (3-4 days) Eco System • Availability of Packaging Suppliers (Estimation) 10-15 10-15 25+ 25+ 25+ 10-15 25+ • Availability of Tooling Suppliers (Estimation) 5-10 5-10 25+ 25+ 25+ <5 25+ • Scheduled Power Cuts (Yearly) 1-2 times per year for 1 hour 1-2 times per year for 1 hour 1-2 times per year for 1 hour 1-2 times per year for 1 hour 1-2 times per year for 1 hour 1-2 times per year for 1 hour 1 hour every day • Unscheduled Power Cuts in 2014 2 times 2 times Nil Nil Nil 3-4 times 10+ times Tax • Corporate Tax (%) 25% 25% 20% 20% 20% 25% 30%
  • 21. Sample Analysis of FTZs 21© 2015 Dragon Sourcing. All rights reserved. Parameters FTZ1 FTZ2 FTZ3 FTZ4 Sub-Section Industrial Estate 1 Industrial Estate 2 Industrial Estate 3 Industrial Estate 4 Industrial Estate 5 Industrial Estate 6 Industrial Estate 7 Minimum Monthly Wage (for ref) USD 215 (In 2014) USD 219 (In 2015) USD 145 (In 2015) USD 97 (In 2014) Worker Termination Compensation High •2 month per worked year 2 + 15% of monthly allowance Med •30 days’ for employment period below 120 days, •90 days’ for employment period from 1 to 3 years, •180 days’ for employment period from 3 to 6 years, •240 days’ for employment period from 6 to 10 years •300 days wages for 10 years and more Low •15 days’ per worked year Low •15 days’ per worked year Paid Sick leave • 12 months paid sick leave (with doctor certificate) • An employee must be granted a minimum of 30 days paid sick leave with pay (by employer) each year. An employee using sick leave for three • consecutive working days can be required to provide a physician's certificate proving the illness • 30 days max with proven document from doctor. Paid by the government. Paid leave allowance 14 (Women get 1 day off every month additional) 13 10 13 Min Wage Revision Period Every Year No systematic. Next revision in 3 years Every Year Every Year Social/Health Insurance Cost 18% 5% 30% 42% Approximate time to recruit an employee 60 days 90 days 90 days 60 days HR Benefits Package • Accommodation, food, access to prayer hall Food, high bonuses (6 months by auto industry) • Free two-wheeler service annually, food • Food, transportation allowance Contract type (permanent / temporary) • Temporary: 2 + 1 year then permanent Permanent • Temporary: 3 + 3 years then permanent • Permanent Availability of English Speaking Labor High High Medium High Projected Labor wage increase (YOY %) 2014-15 14% 0% 12% 12% Lean Month (Holiday Season in 2015) Ramzan (Jun-Jul) Songkran (Apr) Chinese New Year (Feb) Diwali (Oct-Nov) No of official holidays in 2015 (days) 12 15 10 15
  • 22. Phase III – Summary • Information was collected on available factory spaces in the Industrial Estates in FTZs of the 4 cities/ countries • Tangible costs were calculated in the FTZs and compared against client’s current tangible costs in their Chinese facility • Two Industrial Estates were selected by the client based on both tangible costs associated with those FTZs and intangible parameters like the country’s HR policy, availability of labour force, etc 22© 2015 Dragon Sourcing. All rights reserved.