Midsouth Titans
West TN, Memphis Main and Frayser
Midsouth Titans
West TN, Memphis Main and Frayser
Generational Differences
30% Traditionalist
30% Generation X
40% Generation Y
KMI ESM Results
State of the Crew: Eason-Horton
  Mar Apr May
final final final YTD
ESM
Efficiency
Actual 108.44 108.04 112.28 110.60
Target 99.00 99.00 99.00 99.00
Productivity
Actual 98.86 99.08 110.39 102.87
Target 90.00 90.00 90.00 90.00
Disp Efficiency
Actual 85.20 84.47 86.96 85.28
Target 80.00 77.00 77.00 77.00
Revisits
Actual 96.31 91.82 95.59 93.90
Target 93.00 93.00 93.00 93.00
Revisits - I30
Actual 100.00 100.00 98.31 99.03
Target 98.00 98.00 98.00 98.00
Revisits - R30
Actual 93.59 87.95 93.79 90.48
Target 92.00 92.00 92.00 92.00
SIMple Goal 1
Improve ESM R30 from 90.48% to ≥ 93% by October 8, 2015 reducing
truck rolls.
30 Days ≥ 91% by August 8, 2015
60 Days ≥ 92% by September 8, 2015
90 Days ≥ 93% by October 8, 2015
Plan of Action
Techs will:
Contact the customer prior to DPO 
Pull PM Data 
Check circuit history 
Manager will:
Ensure techs understand the reason for DPO 
Partner tech with tech SME 
SIMple Goal 2
Consistently achieve ESM All Revisits to exceed 93% by October 8,
2015 to deliver a good quality product.
30 Days ≥ 94% by August 8, 2015
60 Days ≥ 95% by September 8, 2015
90 Days ≥ 96% by October 8, 2015
Plan of Action
Techs will:
Contact manager prior to returning ticket
Contact tester to confirm circuit is up  
       
Manager will:
Review previous day results
Partner tech with tech SME 
SIMple Goal 3
Improve negative trend on R30 Loyalty Commitment from 79.65% to
84% by October 8, 2015 to deliver excellent customer service.
30 Days ≥ 82.75% by August 8, 2015
60 Days ≥ 83% by September 8, 2015
90 Days ≥ 84% by October 8, 2015
Plan of Action
Techs will:
Verify trouble was cleared with the customer
Perform call backs the following business day
Manager will:
Ensure techs understand reason for DPO 
Partner tech with tech SME 
Top Three Performers - YTD
Common behaviors positively impacted performance:
Appropriately performed tests to isolate trouble
Check Circuit history
Add NA/DM when needed
Identify appropriate closure and analysis codes 
Demonstrate flexibility at all times
Initiate helping others
Accepts accountability
Tech Scorecard   Goal Tech A Tech B Tech C
ESM Efficiency 99% 107.40% 121.88% 112.17%
Revisits - Installation 98% 98.49% 98.18% 100.00%
Revisits - Repair 91% 92.16% 94.51% 94.05%
Bottom Three Performers - YTD
Common Behaviors that negatively impact Revisits:
Remote testing without DPO
Closing tickets when No Access was provided
Didn’t contact tested to verify circuit restored
Didn’t check circuit history
Action Plan
Techs will:
Contact the customer prior to DPO to verify access hours
Perform appropriate testing and pull PM Data
Follow-up with customer the following morning
Tech Scorecard Goal Tech A Tech B Tech C
ESM Efficiency 99% 98.12% 106.80% 104.00%
Revisits - Installation 98% 100.00% 100.00% 97.00%
Revisits - Repair 91% 95.45% 89.67% 87.78%
SMART Action Plan 1
Improve negative Repair Revisits for Tech A from 87.78% to 92% by
October 8, 2015 to provide excellent customer service.
30 Days ≥ 88.5% by August 8, 2015
60 Days ≥ 90% by September 8, 2015
90 Days ≥ 92% by October 8, 2015
Action Plan
Tech will:
 Check circuit history
 Pull PM data
 Contact manager prior to returning ticket
 Follow-up with customer next business day
Manager will:
 Follow-up with tech
 Partner tech with SME
SMART Action Plan 2
Improve negative ESM Efficiency trend for Tech A from 98.12% to
99% by October 8, 2015 to reduce truck rolls.
30 Days ≥ 99% by August 8, 2015
60 Days ≥ 99% by September 8, 2015
90 Days ≥ 99% by October 8, 2015
Action Plan
Tech will:
 Check circuit history
 Contact manager prior to returning ticket
 Refer trouble to cable after 2 hours
Manager will:
 Ensure tech understands why DPO
 Partner tech with tech SME
SMART Action Plan 3
Improve negative R30 trend for Tech C from 89.67% to 91% by
October 8, 2015 to deliver excellent customer service.
30 Days ≥ 90% by August 8, 2015
60 Days ≥ 91% by September 8, 2015
90 Days ≥ 92% by October 8, 2015
Action Plan
Tech will:
 Check circuit history
 Contact customer prior to DPO
 Contact manager prior to returning ticket
 Contact tester to verify circuit is restored
Manager will:
 Follow-up with tech
 Partner Tech with tech SME
Performance Management
Tech - R30 YTD 95.45% ESM 98.12
Manager and Tech:
Agreed on plan of action
Tech successfully worked plan
Adjusted plan with new focus - ESM Efficiency
Tech:
Contact tester prior to closing ticket
Refer trouble to cable
Review circuit history
Contact manager when faced with roadblocks
Manager:
Balance work between Install and Maintenance
Ensure tech understand reason for DPO
Follow-up on previous weeks performance
Encouragement
“Always do right -- this will
gratify some and astonish
the rest.”
Mark Twain
Team Successes
- Consistently Exceeded UTG – Prov/Maint target
- Safety 0 incidents
- PIP Success
- Face to Face Team Meeting
- Completed Elite Training
- Secured FEDEX ID’s for two Techs
- 5 Star Award 3 months
- Met 11/11 Metrics 6 mos.
- Goldstar Metrics
Orders – 40% to 96.88%
Tickets – 32% to 90%
How Did We Get There
Told my team they were valued members
Identified their strength and allowed them
to utilize their strength
Listened to their ideas
Praised their accomplishments
Trusted them
What questions do you
have?

More Related Content

Similar to State of the Crew July 2015

Customer Service Manager Introduction Chubb Sheffield
Customer Service Manager   Introduction Chubb SheffieldCustomer Service Manager   Introduction Chubb Sheffield
Customer Service Manager Introduction Chubb Sheffield
Steve Birtles
 
Black Belt Project on Increasing CSAT%
Black Belt Project on Increasing CSAT%Black Belt Project on Increasing CSAT%
Black Belt Project on Increasing CSAT%
Sk. Noor Mohammad
 
Maint Dept rebuild plan
Maint Dept rebuild planMaint Dept rebuild plan
Maint Dept rebuild plan
Roger Tomko
 
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
John Barney
 
MVR BEFORE RAMP
MVR BEFORE RAMPMVR BEFORE RAMP
MVR BEFORE RAMP
RAMANA M V
 

Similar to State of the Crew July 2015 (20)

Six sigma project_-_Call Centre Quality improvement
Six sigma project_-_Call Centre Quality improvement Six sigma project_-_Call Centre Quality improvement
Six sigma project_-_Call Centre Quality improvement
 
The New Face of Quality in Office and Service Environments
The New Face of Quality in Office and Service EnvironmentsThe New Face of Quality in Office and Service Environments
The New Face of Quality in Office and Service Environments
 
3 colors balance score card record (tham khao)
3 colors balance score card record (tham khao)3 colors balance score card record (tham khao)
3 colors balance score card record (tham khao)
 
Customer Service Manager Introduction Chubb Sheffield
Customer Service Manager   Introduction Chubb SheffieldCustomer Service Manager   Introduction Chubb Sheffield
Customer Service Manager Introduction Chubb Sheffield
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Value Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive InValue Stream Mapping: What to Do Before You Dive In
Value Stream Mapping: What to Do Before You Dive In
 
Black Belt Project on Increasing CSAT%
Black Belt Project on Increasing CSAT%Black Belt Project on Increasing CSAT%
Black Belt Project on Increasing CSAT%
 
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018Total Productive Maintenance (Tpm) EVERTS 21Aug2018
Total Productive Maintenance (Tpm) EVERTS 21Aug2018
 
Smarter Supplier Management – Improving Supplier Performance Through Better C...
Smarter Supplier Management – Improving Supplier Performance Through Better C...Smarter Supplier Management – Improving Supplier Performance Through Better C...
Smarter Supplier Management – Improving Supplier Performance Through Better C...
 
Maint Dept rebuild plan
Maint Dept rebuild planMaint Dept rebuild plan
Maint Dept rebuild plan
 
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
STRATEGICALLY CHANGING TO SUPPORT-Team Version 11-2013
 
Island Of Excellence Presentation
Island Of Excellence PresentationIsland Of Excellence Presentation
Island Of Excellence Presentation
 
PECB Webinar: Achieve business excellence through the power of Six Sigma
PECB Webinar: Achieve business excellence through the power of Six SigmaPECB Webinar: Achieve business excellence through the power of Six Sigma
PECB Webinar: Achieve business excellence through the power of Six Sigma
 
TQM - Total Quality Management
TQM - Total Quality ManagementTQM - Total Quality Management
TQM - Total Quality Management
 
MVR BEFORE RAMP
MVR BEFORE RAMPMVR BEFORE RAMP
MVR BEFORE RAMP
 
Quality manegment
Quality manegmentQuality manegment
Quality manegment
 
Asq int lss
Asq int lssAsq int lss
Asq int lss
 
Six Sigma- Define & Measure_Sudhanshu.pdf
Six Sigma- Define & Measure_Sudhanshu.pdfSix Sigma- Define & Measure_Sudhanshu.pdf
Six Sigma- Define & Measure_Sudhanshu.pdf
 
QSIR knowledge exchange - Matt Tite presentation
QSIR knowledge exchange   -  Matt Tite presentationQSIR knowledge exchange   -  Matt Tite presentation
QSIR knowledge exchange - Matt Tite presentation
 
Nitheesh Kumar tp
Nitheesh Kumar tpNitheesh Kumar tp
Nitheesh Kumar tp
 

State of the Crew July 2015

  • 1. STATE OF THE CREW Anna Eason-Horton MidsouthTitans July 8, 2015
  • 2. Agenda  Introduction  KMI ESM Metrics/Results  SIMple Goals  Top Three Performers  Bottom Three Performers  SMART Action Plans  Performance Management  Team Successes  Q&A!
  • 3. Midsouth Titans West TN, Memphis Main and Frayser
  • 4. Midsouth Titans West TN, Memphis Main and Frayser
  • 5. Generational Differences 30% Traditionalist 30% Generation X 40% Generation Y
  • 6. KMI ESM Results State of the Crew: Eason-Horton   Mar Apr May final final final YTD ESM Efficiency Actual 108.44 108.04 112.28 110.60 Target 99.00 99.00 99.00 99.00 Productivity Actual 98.86 99.08 110.39 102.87 Target 90.00 90.00 90.00 90.00 Disp Efficiency Actual 85.20 84.47 86.96 85.28 Target 80.00 77.00 77.00 77.00 Revisits Actual 96.31 91.82 95.59 93.90 Target 93.00 93.00 93.00 93.00 Revisits - I30 Actual 100.00 100.00 98.31 99.03 Target 98.00 98.00 98.00 98.00 Revisits - R30 Actual 93.59 87.95 93.79 90.48 Target 92.00 92.00 92.00 92.00
  • 7. SIMple Goal 1 Improve ESM R30 from 90.48% to ≥ 93% by October 8, 2015 reducing truck rolls. 30 Days ≥ 91% by August 8, 2015 60 Days ≥ 92% by September 8, 2015 90 Days ≥ 93% by October 8, 2015 Plan of Action Techs will: Contact the customer prior to DPO  Pull PM Data  Check circuit history  Manager will: Ensure techs understand the reason for DPO  Partner tech with tech SME 
  • 8. SIMple Goal 2 Consistently achieve ESM All Revisits to exceed 93% by October 8, 2015 to deliver a good quality product. 30 Days ≥ 94% by August 8, 2015 60 Days ≥ 95% by September 8, 2015 90 Days ≥ 96% by October 8, 2015 Plan of Action Techs will: Contact manager prior to returning ticket Contact tester to confirm circuit is up           Manager will: Review previous day results Partner tech with tech SME 
  • 9. SIMple Goal 3 Improve negative trend on R30 Loyalty Commitment from 79.65% to 84% by October 8, 2015 to deliver excellent customer service. 30 Days ≥ 82.75% by August 8, 2015 60 Days ≥ 83% by September 8, 2015 90 Days ≥ 84% by October 8, 2015 Plan of Action Techs will: Verify trouble was cleared with the customer Perform call backs the following business day Manager will: Ensure techs understand reason for DPO  Partner tech with tech SME 
  • 10. Top Three Performers - YTD Common behaviors positively impacted performance: Appropriately performed tests to isolate trouble Check Circuit history Add NA/DM when needed Identify appropriate closure and analysis codes  Demonstrate flexibility at all times Initiate helping others Accepts accountability Tech Scorecard   Goal Tech A Tech B Tech C ESM Efficiency 99% 107.40% 121.88% 112.17% Revisits - Installation 98% 98.49% 98.18% 100.00% Revisits - Repair 91% 92.16% 94.51% 94.05%
  • 11. Bottom Three Performers - YTD Common Behaviors that negatively impact Revisits: Remote testing without DPO Closing tickets when No Access was provided Didn’t contact tested to verify circuit restored Didn’t check circuit history Action Plan Techs will: Contact the customer prior to DPO to verify access hours Perform appropriate testing and pull PM Data Follow-up with customer the following morning Tech Scorecard Goal Tech A Tech B Tech C ESM Efficiency 99% 98.12% 106.80% 104.00% Revisits - Installation 98% 100.00% 100.00% 97.00% Revisits - Repair 91% 95.45% 89.67% 87.78%
  • 12. SMART Action Plan 1 Improve negative Repair Revisits for Tech A from 87.78% to 92% by October 8, 2015 to provide excellent customer service. 30 Days ≥ 88.5% by August 8, 2015 60 Days ≥ 90% by September 8, 2015 90 Days ≥ 92% by October 8, 2015 Action Plan Tech will:  Check circuit history  Pull PM data  Contact manager prior to returning ticket  Follow-up with customer next business day Manager will:  Follow-up with tech  Partner tech with SME
  • 13. SMART Action Plan 2 Improve negative ESM Efficiency trend for Tech A from 98.12% to 99% by October 8, 2015 to reduce truck rolls. 30 Days ≥ 99% by August 8, 2015 60 Days ≥ 99% by September 8, 2015 90 Days ≥ 99% by October 8, 2015 Action Plan Tech will:  Check circuit history  Contact manager prior to returning ticket  Refer trouble to cable after 2 hours Manager will:  Ensure tech understands why DPO  Partner tech with tech SME
  • 14. SMART Action Plan 3 Improve negative R30 trend for Tech C from 89.67% to 91% by October 8, 2015 to deliver excellent customer service. 30 Days ≥ 90% by August 8, 2015 60 Days ≥ 91% by September 8, 2015 90 Days ≥ 92% by October 8, 2015 Action Plan Tech will:  Check circuit history  Contact customer prior to DPO  Contact manager prior to returning ticket  Contact tester to verify circuit is restored Manager will:  Follow-up with tech  Partner Tech with tech SME
  • 15. Performance Management Tech - R30 YTD 95.45% ESM 98.12 Manager and Tech: Agreed on plan of action Tech successfully worked plan Adjusted plan with new focus - ESM Efficiency Tech: Contact tester prior to closing ticket Refer trouble to cable Review circuit history Contact manager when faced with roadblocks Manager: Balance work between Install and Maintenance Ensure tech understand reason for DPO Follow-up on previous weeks performance
  • 16. Encouragement “Always do right -- this will gratify some and astonish the rest.” Mark Twain
  • 17. Team Successes - Consistently Exceeded UTG – Prov/Maint target - Safety 0 incidents - PIP Success - Face to Face Team Meeting - Completed Elite Training - Secured FEDEX ID’s for two Techs - 5 Star Award 3 months - Met 11/11 Metrics 6 mos. - Goldstar Metrics Orders – 40% to 96.88% Tickets – 32% to 90%
  • 18. How Did We Get There Told my team they were valued members Identified their strength and allowed them to utilize their strength Listened to their ideas Praised their accomplishments Trusted them
  • 19. What questions do you have?

Editor's Notes

  1. This template can be used as a starter file for presenting training materials in a group setting. Sections Right-click on a slide to add sections. Sections can help to organize your slides or facilitate collaboration between multiple authors. Notes Use the Notes section for delivery notes or to provide additional details for the audience. View these notes in Presentation View during your presentation. Keep in mind the font size (important for accessibility, visibility, videotaping, and online production) Coordinated colors Pay particular attention to the graphs, charts, and text boxes. Consider that attendees will print in black and white or grayscale. Run a test print to make sure your colors work when printed in pure black and white and grayscale. Graphics, tables, and graphs Keep it simple: If possible, use consistent, non-distracting styles and colors. Label all graphs and tables.
  2. This is another option for an Overview slide.
  3. Give a brief overview of the presentation. Describe the major focus of the presentation and why it is important. Introduce each of the major topics. To provide a road map for the audience, you can repeat this Overview slide throughout the presentation, highlighting the particular topic you will discuss next.
  4. Give a brief overview of the presentation. Describe the major focus of the presentation and why it is important. Introduce each of the major topics. To provide a road map for the audience, you can repeat this Overview slide throughout the presentation, highlighting the particular topic you will discuss next.
  5. Add slides to each topic section as necessary, including slides with tables, graphs, and images. See next section for sample table, graph, image, and video layouts.
  6. Add slides to each topic section as necessary, including slides with tables, graphs, and images. See next section for sample table, graph, image, and video layouts.
  7. What will the audience be able to do after this training is complete? Briefly describe each objective how the audience will benefit from this presentation.
  8. What will the audience be able to do after this training is complete? Briefly describe each objective how the audience will benefit from this presentation.
  9. What will the audience be able to do after this training is complete? Briefly describe each objective how the audience will benefit from this presentation.
  10. This is another option for an Overview slide.
  11. This is another option for an Overview slide.
  12. This is another option for an Overview slide.
  13. Add slides to each topic section as necessary, including slides with tables, graphs, and images. See next section for sample table, graph, image, and video layouts.
  14. Add slides to each topic section as necessary, including slides with tables, graphs, and images. See next section for sample table, graph, image, and video layouts.
  15. Add slides to each topic section as necessary, including slides with tables, graphs, and images. See next section for sample table, graph, image, and video layouts.
  16. This is another option for an Overview slide.
  17. This is another option for an Overview slide.
  18. This is another option for an Overview slide.