SlideShare a Scribd company logo
1 of 3
Amitkumar H. Makwana
Phone: (M) +91 9033893422 E-mail: amitmakwana89@gmail.com
A/10, Natvar-park society, Sharda-mandir school road, Nadiad- 387002
To work in a stimulating and challenging milieu that would facilitate the maximum utilization and
application of my broad skills and expertise in making a positive difference to the organization
Dedicated, result oriented mechanical engineer with experience of 6 years in Application & Marketing, Design
Engineering and Project Management. Extended expertise on willingness to work on any platform (Platform Has
No Bar) and adoptability:
 Possessing first rate communication and collaboration skills to lead and work in concert with diverse
groups effectively
 Adroit at learning new concepts quickly, working well under pressure and communicating ideas clearly
and effectively
 Dedicated and highly ambitious to achieve personal goals as well as the organizational goals
 Friendly with an upbeat attitude
 Excellent decision making skills with a positive approach
 Analytical and inter personal and problem solving skills
PAST ORGANIZATION
Jasubhai Engineering Pvt. Ltd. (2014, Sep – 2016, June)
Phase-I, GIDC Vatva,
Ahmedabad – 382 445
Gujarat, India
(Worked as Asst. Manager Projects & Engineering) (2015, August – 2016, June)
(Worked as Asst. Manager Application & Marketing) (2014, Sep – 2015, July)
ROLE IN THE ORGANIZATION
 Responsible for project management, engineering, coordination, planning, site supervision
administration, erection & commissioning co-ordination, installation & project execution
 Design of Hot gas generators (HGG), SNCR equipment, burner, NOx reduction techniques for burner &
furnaces, etc.
 Preparation and evaluation of the system P&ID, PFD (Process Flow Design)
 Detail engineering including, making of GA drawings, manufacturing drawings, piping layout
 Product development
 Material expediting, estimating and costing
 Documentation - preparation of the Bill of Materials, technical specification of the Bought-out items like
control valves, actuated valves, transmitters, flow meters, switches, rotary or linear actuators etc.
 Techno-commercial evaluation of vendor’s quotations
 Customer relationship management, promptly addressing customer queries and providing solutions
 Coordination with internal departments and external agencies like contractors, vendors
 Evaluation, comparisons and selection of contractors & vendors
 Continuously monitor progress of all engineering activities
 Preparation of the master project schedule on controlling & monitoring of schedule to ensure timely
completion, resource planning
 Commercial documentation viz. invoicing, billing break up, payment follow up
 Project material reconciliation
 Preparation of operation and maintenance manual
 Post commissioning support, design validation
ROLE AS AN APPLICATION AND MARKETING MANAGER
 Responsible for entire application engineering, detail GA drawing preparation
 Preparation of customized proposals as per customer requirements
 Designing piping and instrumentation diagram
 Preparation of instrument specification
 Process calculations for Burner, Hot gas generators, etc.
 Generating back up quotes and preparing costing sheets
 Resolving technical queries
 Vendor registration, Inquiry generation
 Coordination and support to sales team for technical queries
 Quickly understanding customer needs, developing solutions to those needs, and integrating those
solution into the system
 Strategic planning for business development
 Technical presentation to customer
FIVES Combustion Systems Pvt. Ltd. (2010, July – 2014, July)
(An Indian subsidiary of Fivespillard, Fivesgroup)
Plot No. 230, Padra-Jambusar Highway
Dabhasa-391440, District-Vadodara
Gujarat, India
(Worked as a Project Engineer)
PROJECTS EXECUTED
1. Design and supply of Novaflam kiln burner for cement industries viz. M/s Holicim – Ambuja cement,
FLSmidth, Jaypee cement, Shree Cement, Digvijay cement, Ramco cements
2. Retrofit of NG fired forced draft Low NOx burner in place natural draft burner for Fired Heater, for Indian
Government gas company M/s GAIL, Gas Processing Unit, for their plant in Gandhar and Usar
3. Tunnel kiln system for re-baking of the graphite electrodes for M/s HEG Bhopal and M/s Graphite India
Limited
4. LCO and NG control station skids for M/s MRPL (Mangalore Refinery Petrochemical Ltd.)
5. Combustion chamber package (HGG) for M/s Toyo Thailand Corporation Ltd. in A/c Vinachem
6. Reburnflam duct burner for the HRSG system in a/c Macchi (division of sofinter s.p.a)
for Comperj project
7. Startup burner system for AFBC or CFBC boilers for M/s IJT, Thermax, Enmas GB
Power
8. Retrofit of Gas fired burner for Thermic fluid heater system for M/s Styrolution
9. Vertical fired burner and Hot gas generator for M/s GEA Process A/c DCW,
calcium chloride plant at Sahupuram
10. Multifuel fired multiburner for M/s Thermax Limited in A/c Dangote industries Ltd.
11. Retrofit of Low NOx gas burner for M/s Air Liquide Thailand
To name a few ….
PROJECT DELIVERABLES
 Site visit for design data collection, measurement, freeze location of equipments
 Design and supply burners, Hot gas generator, pumping & filtering unit, piping oil & gas skids, heat
exchangers, heaters, incinerator, chimneys, process ducts
 Detail engineering, preparation of manufacturing drawings of equipment in scope of supply
 Duct routing, overall layout
 Procurement of mechanical, electrical and instrument items in scope
 Evaluation of parameters like tube wall temperature of heater, chimney exhaust temperature, flow, etc to
determine efficiency of retrofitted system
 Installation, testing and commissioning assistance
EDUCATION & TRAINING
 BE in Mechanical Engineering from Sardar Patel University in July 2010 with 61.9% (G. H. Patel College
of Engineering & Technology, Vallabh-Vidyanagar)
 12th
(Science) from CBSE Board in March 2006 with 71.6% (Jawahar Navodaya Vidyalaya, Kathlal)
 10th
from CBSE Board in 2004 with 83% (Jawahar Navodaya Vidyalaya, Kathlal)
 A training programme attended on ASME Section VIII, Division – 1: Design and fabrication of pressure
vessels
 A training programme attended on Control Valve sizing and selection conducted by M/s MIL
TECHNICAL SKILLS
 Operating System: Windows 10 / Mac OS
 Office automation tool: MS office, MS-project, Open office, ERP
 Drafting tool: AutoCAD / Solid works
 Email Software: Outlook, Thunderbird
ACHIEVEMENTS
 Nominated as a Product Manager for Fives Pillard’s premium product, NOVAFLAM Burner
 National in football at school level
 Selected as sports captain of school
 NCC Certificate holder
PERSONAL DETAILS
Date of Birth: 08th April, 1989
Nationality: Indian
Languages: English, Hindi and Gujarati
References: Available on request
(Amitkumar H. Makwana)

More Related Content

What's hot

Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarSandip Karmakar
 
Aizaz Cv -Agricultural Engr.
Aizaz Cv -Agricultural Engr.Aizaz Cv -Agricultural Engr.
Aizaz Cv -Agricultural Engr.Aizaz ul Haq
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)hitesh desai
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpSURENDRA BABU
 
Mechanical (piping) engineer
Mechanical (piping)  engineer Mechanical (piping)  engineer
Mechanical (piping) engineer imran15691
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopySharvan kumar
 
Manish_Sagar 4 Year
Manish_Sagar 4 YearManish_Sagar 4 Year
Manish_Sagar 4 YearManish Sagar
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant
 

What's hot (20)

Rsume CB
Rsume CBRsume CB
Rsume CB
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
Aizaz Cv -Agricultural Engr.
Aizaz Cv -Agricultural Engr.Aizaz Cv -Agricultural Engr.
Aizaz Cv -Agricultural Engr.
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
Raghavendra Purohit - Ver.01
Raghavendra Purohit - Ver.01Raghavendra Purohit - Ver.01
Raghavendra Purohit - Ver.01
 
Jestin - Resume
Jestin - ResumeJestin - Resume
Jestin - Resume
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
Mechanical (piping) engineer
Mechanical (piping)  engineer Mechanical (piping)  engineer
Mechanical (piping) engineer
 
Madhu_LPD.doc
Madhu_LPD.docMadhu_LPD.doc
Madhu_LPD.doc
 
Sudeshna Resume
Sudeshna ResumeSudeshna Resume
Sudeshna Resume
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - Copy
 
RESUME_RAJENDRA PRAJAPAT
RESUME_RAJENDRA PRAJAPATRESUME_RAJENDRA PRAJAPAT
RESUME_RAJENDRA PRAJAPAT
 
CV
CVCV
CV
 
Manish_Sagar 4 Year
Manish_Sagar 4 YearManish_Sagar 4 Year
Manish_Sagar 4 Year
 
RESUME
RESUMERESUME
RESUME
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 

Viewers also liked

HATEM MOHAMED ABD EL AZIZ
HATEM MOHAMED ABD EL AZIZHATEM MOHAMED ABD EL AZIZ
HATEM MOHAMED ABD EL AZIZHatem Mohamed
 
10 questions bunsen burners
10 questions bunsen burners10 questions bunsen burners
10 questions bunsen burners06426345
 
Clinker Liquid Phase
Clinker Liquid PhaseClinker Liquid Phase
Clinker Liquid PhaseRicardoMosci
 
Fireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a BoilerFireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a BoilerZalak Shah
 
Burning and cooling
Burning and coolingBurning and cooling
Burning and coolingirrraju1976
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systemsIngrid McKenzie
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing processHavalarif
 
Cement rotary kiln questions & answers
Cement rotary kiln questions & answersCement rotary kiln questions & answers
Cement rotary kiln questions & answersNael Shabana
 
Cement mill notebook
Cement mill notebookCement mill notebook
Cement mill notebookNael Shabana
 
Burner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsBurner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsGerard B. Hawkins
 
Cement Process Chemistry
Cement Process ChemistryCement Process Chemistry
Cement Process ChemistryShambhudayal
 
Bag filter operation pradeep kumar
Bag filter operation pradeep kumarBag filter operation pradeep kumar
Bag filter operation pradeep kumarpradeepdeepi
 
Influence of process on quality
Influence of process on qualityInfluence of process on quality
Influence of process on qualitypradeepdeepi
 
Burning zone ref failue f
Burning zone ref failue fBurning zone ref failue f
Burning zone ref failue fpradeepdeepi
 
Snow ball formation pradeep kumar
Snow ball formation  pradeep kumarSnow ball formation  pradeep kumar
Snow ball formation pradeep kumarpradeepdeepi
 
Red river in clinker cooler
Red river in clinker  coolerRed river in clinker  cooler
Red river in clinker coolerpradeepdeepi
 
Snowman formation pradeep kumar
Snowman formation pradeep kumarSnowman formation pradeep kumar
Snowman formation pradeep kumarpradeepdeepi
 

Viewers also liked (20)

HATEM MOHAMED ABD EL AZIZ
HATEM MOHAMED ABD EL AZIZHATEM MOHAMED ABD EL AZIZ
HATEM MOHAMED ABD EL AZIZ
 
10 questions bunsen burners
10 questions bunsen burners10 questions bunsen burners
10 questions bunsen burners
 
Clinker Liquid Phase
Clinker Liquid PhaseClinker Liquid Phase
Clinker Liquid Phase
 
Fireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a BoilerFireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a Boiler
 
Cement
CementCement
Cement
 
Pet coke in cement clinker
Pet coke in cement clinkerPet coke in cement clinker
Pet coke in cement clinker
 
Momentum dan impuls
Momentum dan impuls Momentum dan impuls
Momentum dan impuls
 
Burning and cooling
Burning and coolingBurning and cooling
Burning and cooling
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systems
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing process
 
Cement rotary kiln questions & answers
Cement rotary kiln questions & answersCement rotary kiln questions & answers
Cement rotary kiln questions & answers
 
Cement mill notebook
Cement mill notebookCement mill notebook
Cement mill notebook
 
Burner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsBurner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia Plants
 
Cement Process Chemistry
Cement Process ChemistryCement Process Chemistry
Cement Process Chemistry
 
Bag filter operation pradeep kumar
Bag filter operation pradeep kumarBag filter operation pradeep kumar
Bag filter operation pradeep kumar
 
Influence of process on quality
Influence of process on qualityInfluence of process on quality
Influence of process on quality
 
Burning zone ref failue f
Burning zone ref failue fBurning zone ref failue f
Burning zone ref failue f
 
Snow ball formation pradeep kumar
Snow ball formation  pradeep kumarSnow ball formation  pradeep kumar
Snow ball formation pradeep kumar
 
Red river in clinker cooler
Red river in clinker  coolerRed river in clinker  cooler
Red river in clinker cooler
 
Snowman formation pradeep kumar
Snowman formation pradeep kumarSnowman formation pradeep kumar
Snowman formation pradeep kumar
 

Similar to Amit_CV

Similar to Amit_CV (20)

kushal kumar srivastava
kushal kumar srivastavakushal kumar srivastava
kushal kumar srivastava
 
Rotating Equipment Engineer
Rotating Equipment  EngineerRotating Equipment  Engineer
Rotating Equipment Engineer
 
CV Pragati Mane-00
CV Pragati Mane-00CV Pragati Mane-00
CV Pragati Mane-00
 
sujitResume (76)
sujitResume (76)sujitResume (76)
sujitResume (76)
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
JAY RESUME
JAY RESUMEJAY RESUME
JAY RESUME
 
cv
cvcv
cv
 
Cv melwin samuel w lt 2
Cv melwin samuel w lt 2Cv melwin samuel w lt 2
Cv melwin samuel w lt 2
 
Cv melwin samuel w lt
Cv melwin samuel w ltCv melwin samuel w lt
Cv melwin samuel w lt
 
P.MAHADEVAN - RESUME------
P.MAHADEVAN - RESUME------P.MAHADEVAN - RESUME------
P.MAHADEVAN - RESUME------
 
Madhankumar 1984..
Madhankumar 1984..Madhankumar 1984..
Madhankumar 1984..
 
Piping Purushothaman.k Resume
Piping Purushothaman.k ResumePiping Purushothaman.k Resume
Piping Purushothaman.k Resume
 
Cv melwin samuel w lt
Cv melwin samuel w ltCv melwin samuel w lt
Cv melwin samuel w lt
 
Experienced in Quality Control & Production
Experienced in Quality Control & ProductionExperienced in Quality Control & Production
Experienced in Quality Control & Production
 
Resume g santhosh kumar
Resume g santhosh kumarResume g santhosh kumar
Resume g santhosh kumar
 
Project Planning Engineer
Project Planning EngineerProject Planning Engineer
Project Planning Engineer
 
GS
GSGS
GS
 
Manoj Yadav_Project Coordinator cum inspection Engineer (B.E. Mechanical + ND...
Manoj Yadav_Project Coordinator cum inspection Engineer (B.E. Mechanical + ND...Manoj Yadav_Project Coordinator cum inspection Engineer (B.E. Mechanical + ND...
Manoj Yadav_Project Coordinator cum inspection Engineer (B.E. Mechanical + ND...
 
Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)
Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)
Project Coordinator cum Inspection Engineer (B.E. Mechanical + NDT Level-II)
 
Resume_Santhosh Kumar
Resume_Santhosh KumarResume_Santhosh Kumar
Resume_Santhosh Kumar
 

Amit_CV

  • 1. Amitkumar H. Makwana Phone: (M) +91 9033893422 E-mail: amitmakwana89@gmail.com A/10, Natvar-park society, Sharda-mandir school road, Nadiad- 387002 To work in a stimulating and challenging milieu that would facilitate the maximum utilization and application of my broad skills and expertise in making a positive difference to the organization Dedicated, result oriented mechanical engineer with experience of 6 years in Application & Marketing, Design Engineering and Project Management. Extended expertise on willingness to work on any platform (Platform Has No Bar) and adoptability:  Possessing first rate communication and collaboration skills to lead and work in concert with diverse groups effectively  Adroit at learning new concepts quickly, working well under pressure and communicating ideas clearly and effectively  Dedicated and highly ambitious to achieve personal goals as well as the organizational goals  Friendly with an upbeat attitude  Excellent decision making skills with a positive approach  Analytical and inter personal and problem solving skills PAST ORGANIZATION Jasubhai Engineering Pvt. Ltd. (2014, Sep – 2016, June) Phase-I, GIDC Vatva, Ahmedabad – 382 445 Gujarat, India (Worked as Asst. Manager Projects & Engineering) (2015, August – 2016, June) (Worked as Asst. Manager Application & Marketing) (2014, Sep – 2015, July) ROLE IN THE ORGANIZATION  Responsible for project management, engineering, coordination, planning, site supervision administration, erection & commissioning co-ordination, installation & project execution  Design of Hot gas generators (HGG), SNCR equipment, burner, NOx reduction techniques for burner & furnaces, etc.  Preparation and evaluation of the system P&ID, PFD (Process Flow Design)  Detail engineering including, making of GA drawings, manufacturing drawings, piping layout  Product development  Material expediting, estimating and costing  Documentation - preparation of the Bill of Materials, technical specification of the Bought-out items like control valves, actuated valves, transmitters, flow meters, switches, rotary or linear actuators etc.  Techno-commercial evaluation of vendor’s quotations  Customer relationship management, promptly addressing customer queries and providing solutions  Coordination with internal departments and external agencies like contractors, vendors  Evaluation, comparisons and selection of contractors & vendors  Continuously monitor progress of all engineering activities  Preparation of the master project schedule on controlling & monitoring of schedule to ensure timely completion, resource planning  Commercial documentation viz. invoicing, billing break up, payment follow up  Project material reconciliation  Preparation of operation and maintenance manual  Post commissioning support, design validation ROLE AS AN APPLICATION AND MARKETING MANAGER
  • 2.  Responsible for entire application engineering, detail GA drawing preparation  Preparation of customized proposals as per customer requirements  Designing piping and instrumentation diagram  Preparation of instrument specification  Process calculations for Burner, Hot gas generators, etc.  Generating back up quotes and preparing costing sheets  Resolving technical queries  Vendor registration, Inquiry generation  Coordination and support to sales team for technical queries  Quickly understanding customer needs, developing solutions to those needs, and integrating those solution into the system  Strategic planning for business development  Technical presentation to customer FIVES Combustion Systems Pvt. Ltd. (2010, July – 2014, July) (An Indian subsidiary of Fivespillard, Fivesgroup) Plot No. 230, Padra-Jambusar Highway Dabhasa-391440, District-Vadodara Gujarat, India (Worked as a Project Engineer) PROJECTS EXECUTED 1. Design and supply of Novaflam kiln burner for cement industries viz. M/s Holicim – Ambuja cement, FLSmidth, Jaypee cement, Shree Cement, Digvijay cement, Ramco cements 2. Retrofit of NG fired forced draft Low NOx burner in place natural draft burner for Fired Heater, for Indian Government gas company M/s GAIL, Gas Processing Unit, for their plant in Gandhar and Usar 3. Tunnel kiln system for re-baking of the graphite electrodes for M/s HEG Bhopal and M/s Graphite India Limited 4. LCO and NG control station skids for M/s MRPL (Mangalore Refinery Petrochemical Ltd.) 5. Combustion chamber package (HGG) for M/s Toyo Thailand Corporation Ltd. in A/c Vinachem 6. Reburnflam duct burner for the HRSG system in a/c Macchi (division of sofinter s.p.a) for Comperj project 7. Startup burner system for AFBC or CFBC boilers for M/s IJT, Thermax, Enmas GB Power 8. Retrofit of Gas fired burner for Thermic fluid heater system for M/s Styrolution 9. Vertical fired burner and Hot gas generator for M/s GEA Process A/c DCW, calcium chloride plant at Sahupuram 10. Multifuel fired multiburner for M/s Thermax Limited in A/c Dangote industries Ltd. 11. Retrofit of Low NOx gas burner for M/s Air Liquide Thailand To name a few ….
  • 3. PROJECT DELIVERABLES  Site visit for design data collection, measurement, freeze location of equipments  Design and supply burners, Hot gas generator, pumping & filtering unit, piping oil & gas skids, heat exchangers, heaters, incinerator, chimneys, process ducts  Detail engineering, preparation of manufacturing drawings of equipment in scope of supply  Duct routing, overall layout  Procurement of mechanical, electrical and instrument items in scope  Evaluation of parameters like tube wall temperature of heater, chimney exhaust temperature, flow, etc to determine efficiency of retrofitted system  Installation, testing and commissioning assistance EDUCATION & TRAINING  BE in Mechanical Engineering from Sardar Patel University in July 2010 with 61.9% (G. H. Patel College of Engineering & Technology, Vallabh-Vidyanagar)  12th (Science) from CBSE Board in March 2006 with 71.6% (Jawahar Navodaya Vidyalaya, Kathlal)  10th from CBSE Board in 2004 with 83% (Jawahar Navodaya Vidyalaya, Kathlal)  A training programme attended on ASME Section VIII, Division – 1: Design and fabrication of pressure vessels  A training programme attended on Control Valve sizing and selection conducted by M/s MIL TECHNICAL SKILLS  Operating System: Windows 10 / Mac OS  Office automation tool: MS office, MS-project, Open office, ERP  Drafting tool: AutoCAD / Solid works  Email Software: Outlook, Thunderbird ACHIEVEMENTS  Nominated as a Product Manager for Fives Pillard’s premium product, NOVAFLAM Burner  National in football at school level  Selected as sports captain of school  NCC Certificate holder PERSONAL DETAILS Date of Birth: 08th April, 1989 Nationality: Indian Languages: English, Hindi and Gujarati References: Available on request (Amitkumar H. Makwana)