The US Army Corps of Engineers awarded a construction contract to Al Barih General Contracting. The contract is part of a multiple award construction contract for projects in Iraq. Al Barih was selected as one of six contractors that will have the opportunity to compete for future construction projects under this contract. Two initial seed projects, the Bucca Waste Water Treatment Plant and Ramadi TIFRIC, were awarded, while three others were not due to funding or scope changes. The letter congratulates Al Barih on the contract award and notifies them that they will receive requests to bid on revised projects in the future.
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
US Army Corps of Engineers Awards Top Construction Contract
1.
2.
3.
4.
5.
6.
7. US DEPARTMENT OFTHE ARMY
JOINT CONTRACTING COMMAND-IRAQIAFGHANISTAN
APO AE 09316
Reply to: Joint ContractingCommand -Iraq/Afghanistan
Thcater-Wide Requirements-Construction Sector
17September07
MEMORANDIJM FOR: Al Barih for General Contracting, Mr. Nasser A. Abeltll Amcer
Email: coriirn'cranrb-iy:.kz
Subject: NOTIFICATION OF CONTRACT AWARD -W91GDW-07-D-2012
Rcfcrences: W91GDW-07-R-2004 -Iraq -Multiple Award ConstructionContract(I-MACC)
1. I am plcased to announccyour selection for award ofthe subjectcontract. Your company is one of
six compnies selected for this multiple award, IndefiniteDelivery indefinite Quantitycontract. As an
"awardee" of this contract,you will have the opportunityto compete amongst thc other five I-MACC
contractors for futureconstruction projects awarded undm this contract.
2. As part ofthe I-MACC solicitationprocess, five seed project.. were availablefor all firmsto submit
proposals on as part of the award evaluationprocess. At thistime, two seed projectswill be awarded
immediately: Bucca Waste Water Treatment Plant and Ramadi TIFRIC. Thcse two projectswere.
selccted for award to the finn(s) offcringthe best value based on an evaluation of all non-priceand price
factors in accordancewith the evaluationcriteriastated in Section M ofthe solicitationpackage. The
Union 1112,200 Man-Camp project will not be awarded, since funding is not availableforthis project at
thc present time. 'I'he Taji 1'11:RIC project will not be awarded at this time since the project scope has
changed due to land issuesat the installation. However, a revised statementof work (SOW) has been
created to incorporate the new scope of work and within 24 hours, you will receive a request fora new
proposal on this project underthe Fair Opportunitiesprocess. The Bucca Water Treatment project will
not be awarded at this timc since minor informalities were recognized in the original SOW. Again,
within 24 hours, you will receive a request fora new proposal on this project underthe Fair Opportunities
pmccss.
3. Congratulationson your selection. We look forward lo futuresuccessby your wmpany asyou carry
out the requirementsof the I-MACC. Shouldyou have any contractualconcerns, please do not hesitate to
contact me or Eric Johnson by calling(703) 544-6876 or, you may contact him by Email at
gr~c.~ohnni~61 nco-i~.aci.na.
RE. Maior. USAF
Attachment:
I. Contract Award
. "
Contracting Officer
13. __
DEPARTMENT OF THE ARMY
UNITED STATES ARMY CORPS OF ENGINEERS
GULF REGION SOUTH DISTRICT
BASRAH AREA OFFICE, BASRAH AIR STATION
APO AE 09375
REPLY TO
ATTENTiON OF
CEGRS-BuRO
C-0011 08 April 2009
SUB~IECT: USE AIID POSSESSION FOR COMPLETE CONSTRUCTION
CONTRACT: W91GDW-07-D-2012
The purpose of this serial letter is to formally notify AI Barih that as of 07 April 2009, you
have completed all the remaining construction deficiencies associated with the project
completion.
Please consider this notification that all major construction activities are now complete,
and USACE - GRS would like to extend our appreciation for a job well done.
~e~_Respectfully, .. "" ,L' "
"J~-i!w d~ ,5
LTJG Dan'lel G~tierrez _.~ / ' c:.~".--/
Camp Bucca Resident Engineer