Apec workshop 2 presentation 6 1 compression and transport apec
Final PPT
1. Group 9
Aleksey DOLGANOV (6512445), Yue GONG (6510891)
Xinyue CAI (6510854), Huijin LI (6510916), Xuning XIN
(6509779)
2.
3. TASK
OVERVIEW
Produce 1.6 million tons/year of
ULSD
Required specifications:
Sulphur content: ≤10 PPM
Meet local legislation.
Production: 247 tons/hour
Average of 1.8 million tons/year
Achieved specifications:
• Sulphur content: 5.3 PPM
4. Work spaces: 112
Location: Jingmen industrial zone
Access to:
Waste water treatment plant
Steam generation plant
Water supply plant
Hydrogen generation plant
15. HDS, HDN in the 1st reactor, HDA in the 2nd reactor
Aromatics not only produced particulate emissions, but also
decreases the cetane number of diesel.
Nitrogen content also decreases
16. Hydrogen
-Purified by absorpting NH3 and H2S
-Made-up Hydrogen
MDEA
-Purified by distillation tower
-Recycled back to amine treater
20. Safe Distance
60m for most hazardous equipment
15m for least hazardous equipment
Plant Location
Within the industry zone
500m away from residential area
Other Consideration
Back Gate
Water Poor
21.
22. Policy& Legal & Regulatory Framework
Environmental Indicator
Energy usage
Environmental Baseline Data
Potential Environmental Impact
Social Indicator
Work Place
Health &Safety at Work
Public Consideration
Economic Indicator
25. Equipment list
Reactor101 Compressor(C101A-23)
Reactor102 Compressor(C101B-23)
Seperator(SH101) Feed mixing tank T103-1
Seperator(SH102) Stright run diesel storage tank T101-2
Seperator(SC101) Light cycle oil storage tank T102-2
Seperator(S101) ULSD storage tank T104-22
Heat exchanger(H102) Air coller(AC101-8)
Heat exchanger(H103) Air coller(AC102-19)
Heat exchanger(H104) Pump(P101A-2)
Absorber(A101-10) Pump(P101B-2)
Absorber(A102-11) Pump(P102A-2)
Stripper D101-18 Pump(P102B-2)
Distillation D102-12 Pump(P103A-6)
Condenser(C102-13) Pump(P103B-6)
Compressor(C102A-10) Pump(P104A-21)
Compressor(C102B-10) Pump(P104B-21)
Reboiler(RB101-14)
Equipment cost: 924017905.8 RMB
26. Civil cost : 1005353063 RMB
Civil work list
Main Building Motor Room 2
Contol Room Motor Room3
Warehouse Road
Security House Railway
Motor Room 1
27. ISBL:
Contains:all major equipment, bulk items, Civil works and so
on.
OSBL: 40% of ISBL
Contingency Charge: 5% of (OSBL+ISBL)
28. Working Capital item
Straight run diesel Catalyst
Light cycle oil Electricity
Low pressure steam Employment
H2 Land Rent
Process water Tax
Cooling water Maintenance
Total working capital : 11768685701.5 RMB
29. Revenue RMB/year
ULSD 12878366000
Naptha 242877204
Fuel 642904500
Total earn 13764117704
Total cost in the 1st year
14028341119.68 RMB
Total cost after 1st year
12851424828.73 RMB
Editor's Notes
Temperature difference
Gas to fuel, high low calorific value